Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Tamil Nadu
|
FP/TN/Pipeline/111896/2020
|
TN 018 2021
|
Laying pipe line from Bhavani river to Forest College
|
Pipeline
|
FOREST COLLEGE AND RESEARCH INSTITUTE, METTUPALAYAM
|
0.0117
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2020
|
Stage-I Approval on
|
:
|
06 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Apr 2022
|
|
|
|
06 Jul 2022
|
2
|
Tamil Nadu
|
FP/TN/WATER/40316/2019
|
TN 02 2020
|
Outlived CWSS - 2017 - 18 - Shifting of 600mm AC pipe with 600mm DI pipe Gravity main from Vanjuvancheri to Oragadam BPT(LS 8100m to LS 12600m) in CWSS to Tambaram - Pallavaram in Kancheepuram Distric
|
Drinking Water
|
TWAD BOARD
|
0.0295
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2019
|
Stage-I Approval on
|
:
|
28 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2020
|
|
|
|
15 Jul 2021
|
3
|
Tamil Nadu
|
FP/TN/TRANS/7223/2014
|
4-TNB006/2015-CHN
|
765kV S/C New Salem - Madhugiri Transmission line
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
3.3472
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2014
|
Stage-I Approval on
|
:
|
08 Feb 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2016
|
|
|
|
16 Jun 2016
|
4
|
Tamil Nadu
|
FP/TN/ROAD/43112/2019
|
TN 052 2020
|
Karaikudi - Ramanathapuram
|
Road
|
PIU Karaikudi NHAI
|
0.03
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2019
|
Stage-I Approval on
|
:
|
16 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2022
|
|
|
|
06 Apr 2022
|
5
|
Tamil Nadu
|
FP/TN/Approach/36237/2018
|
4-TNB032/2019-CHN
|
Construction and improvement works of steps leading to Mahalingeswarar Temple in Mettupatti RF, Nilakottai TK, Dindigul District
|
Approach Access
|
BLOCK DEVELOPMENT OFFICE
|
0.1896
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2018
|
Stage-I Approval on
|
:
|
12 Apr 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jun 2019
|
|
|
|
06 Aug 2019
|
6
|
Tamil Nadu
|
FP/TN/ROAD/149622/2021
|
4-TNB092/2022-CHN
|
Initial Rectification including Widening Strengthening and improvements and Performance Based Maintenance Contract for a Period of 60 Months in State Highways and Major District Roads for a length o
|
Road
|
ASSISANT DIVISIONAL ENGINEER HIGHWAYS CONSTRUCTION AND MAINTANANCE THIRUVAIYARU
|
0.82
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
23 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
|
7
|
Tamil Nadu
|
FP/TN/WATER/153702/2022
|
4-TNB103/2023-CHN
|
CWSS to 8 TPs, 2452 Rural habitations in 11 unions with bulk provision to 3 Municipalities in Sivagangai District with river Cauvery as source
|
Drinking Water
|
EE TWAD PROJECT DN KULITHALAI
|
0.874
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2022
|
Stage-I Approval on
|
:
|
13 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2023
|
|
|
|
16 Aug 2023
|
8
|
Tamil Nadu
|
FP/TN/WATER/151721/2022
|
TN 030 2022
|
Laying of underground water pipe line (914 mm MS) across Thirukalambur R.F. in Pudukottai District under CWSS for Sivagangai District by TWAD Board Project Sub Division, Devakottai.
|
Drinking Water
|
TWAD BOARD PROJECT SUB DIVISION DEVAKOTTAI SIVAGANGAI DISTRICT
|
0.196
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2022
|
Stage-I Approval on
|
:
|
05 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2023
|
|
|
|
07 Nov 2023
|
9
|
Tamil Nadu
|
FP/TN/ROAD/37330/2018
|
4-TNB071/2021-CHN
|
Natham - Thuvarankurichi (NH-785 Extension)
|
Road
|
National Highways Authority of India
|
3.708
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2018
|
Stage-I Approval on
|
:
|
20 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2022
|
|
|
|
21 Sep 2022
|
10
|
Tamil Nadu
|
FP/TN/Others/33885/2018
|
4-TNB089/2022-CHN
|
Laying OFC from Madurai-Natham Main Road to Saranthangi village through forest area
|
Others
|
Jio Digital Fibre Private Limited
|
0.033
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
24 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
06 Dec 2023
|
11
|
Tamil Nadu
|
FP/TN/TRANS/32103/2018
|
4-TNB051/2020-CHN
|
Providing electricity service for Agricultural purpose in survey field No.103 of Thoppampatti village, Sirumalai North West Slope RF in Sirumalai Range
|
Transmission Line
|
SUPERINTENDING ENGINEER
|
0.05632
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2018
|
Stage-I Approval on
|
:
|
25 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2021
|
|
|
|
16 Jun 2021
|
12
|
Tamil Nadu
|
FP/TN/Others/17714/2016
|
4-TNB018/2018-CHN
|
Laying optical fiber cable through Mudumalai Tiger Reserve, Udhagamandalam.
|
Others
|
RELAINCE JIO INFORCOMM LIMITED
|
0.71595
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2016
|
Stage-I Approval on
|
:
|
06 Mar 2019
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2019
|
|
|
|
04 Oct 2019
|
13
|
Tamil Nadu
|
FP/TN/WATER/27069/2017
|
TN090/2018
|
WATER SUPPLY SCHEME TO USILAMPATTY MUNICIPALITY IN MADURAI DISTRICT
|
Drinking Water
|
TWAD BOARD
|
0.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2017
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2022
|
|
|
|
06 Jan 2023
|
14
|
Tamil Nadu
|
FP/TN/ROAD/8238/2014
|
4-TNC043/2019-CHN
|
Bangalore-Chennai Expressway
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU KRISHNAGIRI
|
5.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2014
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2022
|
|
|
|
31 Oct 2022
|
15
|
Tamil Nadu
|
FP/TN/ROAD/152701/2022
|
TN 021 2022
|
WIDENING AND IMPROVEMENTS OF POLUR JAMUNAMARATHUR ALANGAYAM VANIYAMBADI ROAD AT Km.58/6 - 61/2 WITH PAVED SHOULDER SH 215
|
Road
|
KARUPPUCHTTY LOGANATHAN
|
0.845
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2022
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2022
|
|
|
|
14 Nov 2022
|
16
|
Tamil Nadu
|
FP/TN/WATER/41577/2019
|
TN 099 2019
|
CWSS to Reddiarpatti and other 63 rural habitatons in Palayamkottai Union in Tirunelveli District
|
Drinking Water
|
TWAD BOARD
|
0.1196
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2019
|
Stage-I Approval on
|
:
|
21 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
04 Sep 2020
|
|
|
|
21 Nov 2020
|
17
|
Tamil Nadu
|
FP/TN/ROAD/29470/2017
|
4-TNB077/2022-CHN
|
MADURAI - NATHAM
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
2.3824
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2017
|
Stage-I Approval on
|
:
|
15 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2023
|
|
|
|
28 Apr 2023
|
18
|
Tamil Nadu
|
FP/TN/WATER/142613/2021
|
TN 038 2021
|
Creation of an Additional Source with Pump House to Combined Water Supply Scheme to 893 Habitations in Nagapattinam District - For Ayyanallur CW
|
Drinking Water
|
EE MAINTENANCE NAGAPATTINAM
|
0.1925
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2021
|
Stage-I Approval on
|
:
|
24 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2022
|
|
|
|
24 Aug 2022
|
19
|
Tamil Nadu
|
FP/TN/WATER/49039/2020
|
TN 053 2020
|
Providing 0.70 mld Water Supply To TNSCB Housing for All (HFA) Project Area for 1920 Tenements at Narimadu of Pudukkottai District
|
Drinking Water
|
TAMILNADU WATER SUPPLY AND DRAINAGE BOARD
|
0.12
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Aug 2020
|
Stage-I Approval on
|
:
|
05 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
14 Mar 2022
|
|
|
|
|
20
|
Tamil Nadu
|
FP/TN/WATER/142564/2021
|
TN 039 2021
|
Creation of an Additional Source with Pump House to Combined Water Supply Scheme to 893 Habitations in Nagapattinam District - For Kadabamkudi CW
|
Drinking Water
|
EE MAINTENANCE NAGAPATTINAM
|
0.0405
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2021
|
Stage-I Approval on
|
:
|
29 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2021
|
|
|
|
24 Mar 2022
|
21
|
Tamil Nadu
|
FP/TN/ROAD/148726/2021
|
TN 013 2022
|
Relaying and Periodical Maintenance of Mailai - Rayamangalam road Km. 0/910-1/610
|
Road
|
DE H RR CHENGALPET
|
0.49
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Oct 2021
|
Stage-I Approval on
|
:
|
20 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2023
|
|
|
|
26 Feb 2024
|
22
|
Tamil Nadu
|
FP/TN/Pipeline/34620/2018
|
4-TNB037/2019-CHN
|
Conveyor and Pipeline crossing Korampallam Canal
|
Pipeline
|
SEPC Power Private Limited
|
0.17688
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2018
|
Stage-I Approval on
|
:
|
28 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2019
|
|
|
|
23 Aug 2019
|
23
|
Tamil Nadu
|
FP/TN/ROAD/9818/2015
|
4-TNB011/2017-CHN
|
Four laning of NH-47B Nagercoil to Kavalkinaru
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA TIRUNELVELI
|
0.88
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2015
|
Stage-I Approval on
|
:
|
09 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
28 Sep 2018
|
|
|
|
30 Jul 2021
|
24
|
Tamil Nadu
|
FP/TN/ROAD/151511/2022
|
4-TNB094/2022-CHN
|
Widening and Improvement of existing carriage way to 4-laning of Poondiyankuppam-Sathanathapuram section of NH-45A in the state of TN under NHDP Phase IV (Pkg-3)
|
Road
|
NATIONAL HIGHWAY AUTHORITY
|
2.5553
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jan 2022
|
Stage-I Approval on
|
:
|
22 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2023
|
|
|
|
03 Mar 2023
|
25
|
Tamil Nadu
|
FP/TN/VELEC/36455/2018
|
TN 09 2020
|
Laying 11KV Transmission Line along right of way in Veppanapalli Reserved Forest for the Benefit of Patta Holders (Enclosure in RF) of Krishnagiri Division
|
Village Electricity
|
EXECUTIVE ENGINEER TANGEDCO KRISHNAGIRI
|
0.81
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2018
|
Stage-I Approval on
|
:
|
21 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2022
|
|
|
|
26 Aug 2022
|
26
|
Tamil Nadu
|
FP/TN/WATER/143706/2021
|
TN 049 2021
|
CWSS to Tittakudi, Pennadam, Mangalampettai, Gangaikondan, Vadalur and Kurinjipadi TP and 625 Rural Habitation in Virudhachalam , NAllur, Mangalore union n Cuddalore District with NLC mine water as so
|
Drinking Water
|
TWAD BOARD PROJECT CUDDALORE
|
0.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2021
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2022
|
|
|
|
17 Mar 2023
|
27
|
Tamil Nadu
|
FP/TN/ROAD/44088/2020
|
TN 057 2020
|
Construction of retaining wall at various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km. 37/2-50/8
|
Road
|
DE H TIRUVANNAMALAI
|
0.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2020
|
Stage-I Approval on
|
:
|
17 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2022
|
|
|
|
25 Apr 2022
|
28
|
Tamil Nadu
|
FP/TN/ROAD/44090/2020
|
TN 047 2020
|
GNT road to New Erumaivettipalayam Km. 2/350 - 4/150
|
Road
|
DE H TIRUVALLUR
|
0.93
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2020
|
Stage-I Approval on
|
:
|
09 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2022
|
|
|
|
22 Aug 2022
|
29
|
Tamil Nadu
|
FP/TN/ROAD/44087/2020
|
TN 056 2020
|
Construction of Retaining wall in various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km. 33/2-36/10
|
Road
|
DE H TIRUVANNAMALAI
|
0.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2020
|
Stage-I Approval on
|
:
|
20 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Dec 2021
|
|
|
|
25 Apr 2022
|
30
|
Tamil Nadu
|
FP/TN/Others/38131/2019
|
4-TNB073/2021-CHN
|
Laying of OFC along road side of Andipatti - Usilampatti road section (Andipatti Ghat) in Madurai - Kochin NH49 via Sasthakovil, Thimmarasanaickanur village in across Andipati South R.F. in Andipatti
|
Others
|
Jio Digital Fibre Private Limited
|
0.039
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2019
|
Stage-I Approval on
|
:
|
31 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2022
|
|
|
|
31 May 2022
|
31
|
Tamil Nadu
|
FP/TN/TRANS/150320/2021
|
4-TNB100/2023-CHN
|
Erection of 230KV DC line on MC towers by making LILO of existing Ottiyambakkam to Omega feeder - II at the proposed Mambakkam 230/110KV Substation
|
Transmission Line
|
TAMIL NADU TRANSMISSION CORPORATION LIMITED
|
4.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2024
|
|
|
|
10 Jan 2025
|
32
|
Tamil Nadu
|
FP/TN/ROAD/8584/2014
|
4-TNB012/2017-CHN
|
Reconstruction of bridge at Km 18/4 of Puthur-Puthupattinam-Palayar Road with approach road
|
Road
|
HIGHWAYS
|
0.53
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2014
|
Stage-I Approval on
|
:
|
07 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
15 Aug 2024
|
|
|
|
|
33
|
Tamil Nadu
|
FP/TN/ROAD/29107/2017
|
TN 071 2019
|
Proposal for Formation of Road
|
Road
|
ASSISTANT ENGINEER RURAL DEVELOPMENT PANCHAYAT UNION KOLLIDAM
|
0.48
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2018
|
Stage-I Approval on
|
:
|
29 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2024
|
|
|
|
24 Sep 2024
|
34
|
Tamil Nadu
|
FP/TN/ROAD/37176/2018
|
4-TNB091/2022-CHN
|
Thimmalanmedu to Kotturmalai road
|
Road
|
BLOCK DEVELOPMENT OFFICER BP
|
5
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2018
|
Stage-I Approval on
|
:
|
11 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jan 2025
|
|
|
|
|
35
|
Tamil Nadu
|
FP/TN/TRANS/30358/2017
|
4-TNB063/2020-CHN
|
conversion of existing 11 kv line into 33 kv line for establishement of 33/11 kv new sub station
|
Transmission Line
|
TANGEDCO PUDURNADU
|
4.47
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2017
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 Apr 2022
|
|
|
|
24 Jun 2022
|
36
|
Tamil Nadu
|
FP/TN/ROAD/44086/2020
|
TN 048 2020
|
Construction of retaining wall in various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km.18/4-26/10
|
Road
|
DE H TIRUVANNAMALAI
|
0.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2020
|
Stage-I Approval on
|
:
|
16 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2021
|
|
|
|
28 Feb 2022
|
37
|
Tamil Nadu
|
FP/TN/ROAD/44115/2020
|
TN 049 2020
|
Construction of retaining wall in various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km. 27/4 - 32/10 (SH215)
|
Road
|
DE H TIRUVANNAMALAI
|
0.48
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2020
|
Stage-I Approval on
|
:
|
27 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2021
|
|
|
|
02 Mar 2022
|
38
|
Tamil Nadu
|
FP/TN/OFC/116522/2020
|
F.No. 4-TNB115/2023-CHN
|
Laying of underground OFC along Cumbam-Cumuli NH road from Lower camp to Kumuli through Suranganar RF
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.193
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2020
|
Stage-I Approval on
|
:
|
07 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jan 2025
|
|
|
|
|
39
|
Tamil Nadu
|
FP/TN/ROAD/21076/2016
|
4-TNB026/2018-CHN
|
Upgradation of the road from kannamoochi pirivu to Kemmampatti
|
Road
|
BLOCK DEVELOPMENT OFFICER
|
4.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2016
|
Stage-I Approval on
|
:
|
22 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2022
|
|
|
|
03 Mar 2023
|
40
|
Tamil Nadu
|
FP/TN/ROAD/21074/2016
|
4-TNB019/2018-CHN
|
Upgradation of the road from erumapalayam panangadu to jarugumalai
|
Road
|
Block Developement Officer
|
4.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2016
|
Stage-I Approval on
|
:
|
18 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2018
|
|
|
|
20 Nov 2018
|
41
|
Tamil Nadu
|
FP/TN/Others/20994/2016
|
4-TNB030/2019-CHN
|
TANTEA SALES PROMOTION
|
Others
|
THE TAMILNADU TEA PLANTATION CORPORATION LIMITED
|
0.0048768
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2016
|
Stage-I Approval on
|
:
|
25 Mar 2019
|
Compliance Report Submitted by User Agency on
|
:
|
28 Sep 2020
|
|
|
|
18 Feb 2022
|
42
|
Tamil Nadu
|
FP/TN/TRANS/23761/2017
|
4-TNC044/2019-CHN
|
Erection of 230 KV DC Transmission line from Cuddalore to Veerapuram (S.P.Koil) via Neyveli.
|
Transmission Line
|
Tamil Nadu Generation and Distribution Corporation
|
6.026
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2017
|
Stage-I Approval on
|
:
|
02 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
06 Mar 2020
|
|
|
|
03 Aug 2020
|
43
|
Tamil Nadu
|
FP/TN/RAIL/141594/2021
|
4-TNB080/2022-CHN
|
CMRL Phase II C5 - 06 Madhavaram to Sholinganallur- Nanmangalam Forest land required for Elevated metro station
|
Railway
|
CMRL CHENNAI
|
1.569
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2021
|
Stage-I Approval on
|
:
|
13 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2023
|
|
|
|
02 Mar 2023
|
44
|
Tamil Nadu
|
FP/TN/ROAD/155502/2022
|
4-TNB117/2024-CHN
|
Construction of Grade Seperator connecting Medavakkam – Sholinganallur road junction, Medavakkam - Mambakkam road junction, Mount – Medavakkam Road junction in Marmalong Bridge – Irumbuliyur Road at M
|
Road
|
CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.
|
0.536
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 May 2022
|
Stage-I Approval on
|
:
|
04 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2024
|
|
|
|
|
45
|
Tamil Nadu
|
FP/TN/TRANS/25759/2017
|
4-TNB022/2018-CHN
|
Construction of 800kV HVDC Transmission line from Raigarh to Pugalur
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
9.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2017
|
Stage-I Approval on
|
:
|
07 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2019
|
|
|
|
30 Jan 2020
|
46
|
Tamil Nadu
|
FP/TN/ROAD/148552/2021
|
11932/FR 10/2022-1
|
Upgradation of Mahaniyam to Padappai road Km. 0/188-1/200 of Mahaniyam Reserve Forest
|
Road
|
DE H RR CHENGALPET
|
0.678
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Oct 2021
|
Stage-I Approval on
|
:
|
10 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2023
|
|
|
|
27 Feb 2024
|
47
|
Tamil Nadu
|
FP/TN/Others/38130/2019
|
4-TNB088/ 2022-CHN
|
Laying of OFC along road side of Vadakkanandhal - Thumbal road section via Parigam, Kondiyanantham across Parigam RF in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2019
|
Stage-I Approval on
|
:
|
12 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Oct 2022
|
|
|
|
16 Dec 2022
|
48
|
Tamil Nadu
|
FP/TN/ROAD/32148/2018
|
4-TNB091/CHN-2022
|
Madurai Ring Road
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
1.28
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Feb 2018
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 May 2023
|
|
|
|
16 Aug 2023
|
49
|
Tamil Nadu
|
FP/TN/Pipeline/114004/2020
|
TN 017 2021
|
CWSS to 138 Rural habitations in Thottiyam Union of Trichy District
|
Pipeline
|
ASSISTANT EXECUTIVE ENGINEER, TWAD BOARD, URBAN DIVISION, TRICHY
|
0.127
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2020
|
Stage-I Approval on
|
:
|
17 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2022
|
|
|
|
11 Mar 2022
|
50
|
Tamil Nadu
|
FP/TN/Others/42494/2019
|
4-TNC050/2019-CHN
|
Establishment of New Government Medical College
|
Others
|
HEALTH AND FAMILY WELFARE DEPARTMENT
|
10.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2019
|
Stage-I Approval on
|
:
|
22 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2020
|
|
|
|
27 May 2020
|
|