Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Jammu and Kashmir
|
FP/JK/OFC/144255/2021
|
9-JKA-030/2022-Jammu
|
Underground & Aerial Cabling from Bhandarkot - Hynen , Marwah Forest Div, Kishtwar District by Jio Digital Fibre Pvt Ltd.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.8177
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2021
|
Stage-I Approval on
|
:
|
28 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Nov 2022
|
|
|
|
27 Feb 2023
|
2
|
Jammu and Kashmir
|
FP/JK/OFC/46953/2020
|
FST/Land/Parivesh/22/2020
|
Laying of Optical fiber from Patnitop to Sanasar
|
Optical Fibre Cable
|
VINDHYA TELELINKS LTD
|
0.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2020
|
Stage-I Approval on
|
:
|
04 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2022
|
|
|
|
05 Jul 2022
|
3
|
Jammu and Kashmir
|
FP/JK/ROAD/154608/2022
|
9-JKA-041/2022-Jammu
|
Construction of Road Hari Katha to Moh Sheikhan
|
Road
|
RURAL DEVELOPMENT DEPARTMENT POONCH
|
0.1375
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2022
|
Stage-I Approval on
|
:
|
16 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2023
|
|
|
|
|
4
|
Jammu and Kashmir
|
FP/JK/ROAD/142566/2021
|
9-JKB090-2021-JAMMU
|
Development of Package-15 (KM 468+100 to KM 503+250) of Phase-II of Delhi-Katra Expressway
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
1.9891
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 May 2021
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2022
|
|
|
|
30 Aug 2022
|
5
|
Jammu and Kashmir
|
FP/JK/ROAD/144002/2021
|
9-JKC-066/2021-Jammu
|
Construction of Main Approach Road from TunnelT14P1 to TunnelT14 Adit (USBRL Project)
|
Road
|
NORTHERN RAILWAY
|
8.81
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2021
|
Stage-I Approval on
|
:
|
13 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jun 2022
|
|
|
|
28 Oct 2022
|
6
|
Jammu and Kashmir
|
FP/JK/ROAD/44818/2020
|
9-JKC-085/2021-Jammu
|
Construction of road Cl-9 SBA specification (Defence Road)from Km 0.00 to Km 13.41 Pharkian Gali- Puthkhan Gali by BRO.
|
Road
|
HQ 109 ROAD CONSTRUCTION COY (P) BEACON
|
22.445
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2020
|
Stage-I Approval on
|
:
|
20 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2023
|
|
|
|
03 Dec 2024
|
7
|
Jammu and Kashmir
|
FP/JK/ROAD/141843/2021
|
9-JKC-096/2021-Jammu
|
Widening of road from Phiter to Billawar road alongwith Balance work of Billawar to Sukralla road
|
Road
|
XEN PWD BASOHLI
|
0.15
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2021
|
Stage-I Approval on
|
:
|
07 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2024
|
|
|
|
|
8
|
Jammu and Kashmir
|
FP/JK/ROAD/150559/2021
|
FST-land0FC/76/2022-02
|
CONSTRUCTION OF ROAD FROM KHADWAL TO BHATTI TALAB, LENGTH = 1.50 KM
|
Road
|
ASSTT. EXECUTIVE ENGINEER PWD(R&B) SUB DIVISION MAJALTA
|
0.58
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Dec 2021
|
Stage-I Approval on
|
:
|
30 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Sep 2024
|
|
|
|
16 Feb 2025
|
9
|
Jammu and Kashmir
|
FP/JK/QRY/50085/2020
|
9-JKA-067/2021-Jammu
|
AGE Patel JV, USBRL Project T-15 & T-14
|
Quarrying
|
M/S AGE PATEL JV
|
0.993
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Sep 2020
|
Stage-I Approval on
|
:
|
16 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
14 Mar 2022
|
|
|
|
26 May 2022
|
10
|
Jammu and Kashmir
|
FP/JK/ROAD/146404/2021
|
9-JKC-002/2022-JAMMU
|
Upgradation of road from Thial to Chountra Mata KM 6th RD 500 to KM 19th RD 500.
|
Road
|
AEE PWD (R&B) SUB DIVISION MAJALTA
|
5.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Aug 2021
|
Stage-I Approval on
|
:
|
12 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Sep 2024
|
|
|
|
13 Nov 2024
|
11
|
Jammu and Kashmir
|
FP/JK/ROAD/46676/2020
|
FST-Land0FC/1/2021-02
|
Construction of Road Neota to manwah Dispensary in Km 9th and 10th
|
Road
|
R&B DEPARTMENT JAMMU
|
0.225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2020
|
Stage-I Approval on
|
:
|
09 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2024
|
|
|
|
16 Feb 2025
|
12
|
Jammu and Kashmir
|
FP/JK/HYD/51783/2020
|
9-JKC002/2020-Jammu
|
Shahpurkandi Dam Project
|
Hydel
|
SHAHPURKANDI DAM PROJECT
|
13.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2024
|
|
|
|
14 Aug 2024
|
13
|
Jammu and Kashmir
|
FP/JK/ROAD/143808/2021
|
9-JKB-004/2022-Jammu
|
Construction and Upgradation to 2-lane with paved shoulder from Km. 80.675 (Start of Kishtwar bypass) to Km 95+550 (end of Helmet top bypass) of length 14.875 Km & link road from 0+000 to 1.871 of length=1.871 km total length = 16.746 km (including link road) on khellani- kishtwar-chattroo-khanabal section of NH-244 in jammu and kashmir
|
Road
|
PMU KISHTWAR, NHIDCL
|
2.65072
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2021
|
Stage-I Approval on
|
:
|
18 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jun 2022
|
|
|
|
23 Aug 2022
|
14
|
Jammu and Kashmir
|
FP/JK/ROAD/47867/2020
|
9-JKA-059/2021-JAMMU
|
Construction of road from Lali Dhabar via Sergali Pauni (Dhengidhar) to village Tote Phase 2nd under NABARD Loan Assistance (L= 2.0 km)
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
0.644
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jul 2020
|
Stage-I Approval on
|
:
|
18 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2022
|
|
|
|
05 Apr 2023
|
15
|
Jammu and Kashmir
|
FP/JK/ROAD/152729/2022
|
9-JKB-037/2022-Jammu
|
4 Laning of Nasri-Ramban Section of NH 44 (old NH1A) at CRITICAL LOCATIONS between km 130 and km 151 in the UT of Jammu & Kashmir
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
3.4482
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2022
|
Stage-I Approval on
|
:
|
25 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2023
|
|
|
|
18 Jul 2023
|
16
|
Jammu and Kashmir
|
FP/JK/ROAD/48999/2020
|
9-JKC002-2021-CHA
|
Approach road with Avalanches Protection Works from Z-morh Tunnel East Portal to Zojila Tunnel West Portal in Ganderbal district of J&K
|
Road
|
NHIDCL PMU- SONAMARG
|
49.5904
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2020
|
Stage-I Approval on
|
:
|
22 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2021
|
|
|
|
08 May 2021
|
17
|
Jammu and Kashmir
|
FP/JK/ROAD/157232/2022
|
FST-Land0FC/90/2022-02
|
Construction Of Link Road from Agnari to Tragan Trigam Phase IST
|
Road
|
PWD R&B JAMMU
|
0.7
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2022
|
Stage-I Approval on
|
:
|
03 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Mar 2023
|
|
|
|
10 Oct 2023
|
18
|
Jammu and Kashmir
|
FP/JK/ROAD/145108/2021
|
9-JKC-093/2021-Jammu
|
4 Laning of Ramban Banihal Section of NH 44 (old NH1A) at CRITICAL LOCATIONS between km 151 and km 187 in the UT of Jammu & Kashmir
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
78.3877
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jul 2021
|
Stage-I Approval on
|
:
|
15 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2022
|
|
|
|
26 Oct 2022
|
19
|
Jammu and Kashmir
|
FP/JK/ROAD/145753/2021
|
FST-Land/0FC/108/2021-02
|
Construction of road from Kathar to Bal Saroh (Kund Kanyari), km 1st RD0 to km 3rd RD 1000. (UNDER NABARD)
|
Road
|
EXECUTIVE ENGINEER PWD R&B CONSTRUCTION DIVISION 3, JAMMU
|
0.75
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Aug 2021
|
Stage-I Approval on
|
:
|
24 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2023
|
|
|
|
09 Nov 2023
|
20
|
Jammu and Kashmir
|
FP/JK/ROAD/143629/2021
|
9-JKB-082/2021-Jammu
|
Construction & Upgradation to 2 lane with paved shoulder from Design Km. 67.805 (at the end of Km 83rd tunnel near Dhrabshala) to Km 80.675 (Dulhasti) 12.87 Km length on Khellani-Kishtwar-Chattroo sec
|
Road
|
PMU KISHTWAR, NHIDCL
|
3.5183
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2021
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Apr 2022
|
|
|
|
22 Jul 2022
|
21
|
Jammu and Kashmir
|
FP/JK/ROAD/152548/2022
|
9-JKA-033/2022-Jammu
|
Up-gradation to existing 2-lane highway to 4-lane with Paved Shoulder configuration (NH 144A) from kin. 26.350 (Khati Chowk) to kin. 30.097 (Hanuman Chowk) of Jammu-Akhnoor section in the UT of Jammu and Kashmir
|
Road
|
NHIDCL_JAMMU
|
0.349
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2022
|
Stage-I Approval on
|
:
|
31 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2022
|
|
|
|
16 Feb 2023
|
22
|
Jammu and Kashmir
|
FP/JK/OFC/44684/2020
|
FST/Land/Parivesh/18/2020
|
Vindhya Telelinks Ltd.( IP1 to provide 4g network)
|
Optical Fibre Cable
|
VINDHYA TELELINKS LTD
|
0.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2020
|
Stage-I Approval on
|
:
|
04 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2021
|
|
|
|
13 Dec 2021
|
23
|
Jammu and Kashmir
|
FP/JK/ROAD/141548/2021
|
9-JKB-052/2021-JAMMU
|
Construction of Road upto TRT outlet, Kwar HEP Kishtwar
|
Road
|
CVPP (P) L
|
2.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2021
|
Stage-I Approval on
|
:
|
15 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2021
|
|
|
|
27 Jan 2022
|
24
|
Jammu and Kashmir
|
FP/JK/ROAD/146187/2021
|
9-JKB-092/2021-Jammu
|
Construction and Upgradation to 2 lane with paved Shoulder of road from design Chainage 31.449 (Khellani, Pariyot) to Km 51.700 (Prem Nagar) (Design length 20.251 Km.) in the Union territory of Jammu and Kashmir Package-1 of NH-24
|
Road
|
NHIDCL PMU DODA
|
3.2549356
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
Stage-I Approval on
|
:
|
10 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2022
|
|
|
|
|
25
|
Jammu and Kashmir
|
FP/JK/ROAD/48822/2020
|
9-JKB-013/2021-Jammu
|
Construction of Project Goha - Khellani two lane with paved shoulder Km 12+850 to 20+300 (Design Length 7.45 km) in the union territory of Jammu and Kashmir Package-IA
|
Road
|
PMU KISHTWAR, NHIDCL
|
5.325
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2020
|
Stage-I Approval on
|
:
|
25 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2021
|
|
|
|
09 Mar 2022
|
26
|
Jammu and Kashmir
|
FP/JK/ROAD/154405/2022
|
FST-Land0FC/5/2023-02
|
Construction of road from Sanghiote road Km 3rd to Mohalla Hattian Ward No.06 via Katnarian, Qureshian Ward No. 04 to Purana School Kallar, Tehsil Balakote District Poonch, Length = 4.00 Kms.
|
Road
|
PWD R&B DIVISION POONCH
|
0.33
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jun 2022
|
Stage-I Approval on
|
:
|
17 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2023
|
|
|
|
09 Nov 2023
|
27
|
Jammu and Kashmir
|
FP/JK/ROAD/157064/2022
|
9-JKB-058/2022 -Jammu
|
Construction Of Road from Bawa To Mangit
|
Road
|
PWD R&B JAMMU
|
1.05
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jun 2022
|
Stage-I Approval on
|
:
|
09 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Mar 2023
|
|
|
|
|
28
|
Jammu and Kashmir
|
FP/JK/OFC/43961/2020
|
FST/Land/Parivesh/41/2020
|
Vindhya Telelinks Limited (IP1)
|
Optical Fibre Cable
|
VINDHYA TELELINKS LTD
|
0.4402
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2020
|
Stage-I Approval on
|
:
|
04 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2021
|
|
|
|
22 Apr 2022
|
29
|
Jammu and Kashmir
|
FP/JK/ROAD/150343/2021
|
9-JKB-022/2022-Jammu
|
Construction Of Road from Ramakunda To Gool
|
Road
|
PWD R&B JAMMU
|
3.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2021
|
Stage-I Approval on
|
:
|
12 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Mar 2023
|
|
|
|
12 Oct 2023
|
30
|
Jammu and Kashmir
|
FP/JK/ROAD/151949/2022
|
9-JKA-045/2022-Jammu
|
Construction of road from Peerah (NHAI) to Kameti
|
Road
|
PWD R&B JAMMU
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2022
|
Stage-I Approval on
|
:
|
07 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Apr 2023
|
|
|
|
17 Oct 2023
|
31
|
Jammu and Kashmir
|
FP/JK/ROAD/151949/2022
|
9-JKA-045/2022-Jammu
|
Construction of road from Peerah (NHAI) to Kameti
|
Road
|
PWD R&B JAMMU
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2022
|
Stage-I Approval on
|
:
|
07 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Apr 2023
|
|
|
|
17 Oct 2023
|
32
|
Jammu and Kashmir
|
FP/JK/ROAD/43956/2020
|
9-JKB-095/2021-Jammu
|
Up-gradation of Reasi-Arnas-Mahore road to NHDL specifications from km 57.00 to km 68.00 in 31 BRTF area under project Sampark in J&K UT
|
Road
|
BRO, 110 RCC
|
3.22
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2020
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
|
33
|
Jammu and Kashmir
|
FP/JK/ROAD/146042/2021
|
9-JKC-034/2022-Jammu
|
Development of Package-17 (KM 515+000 to KM 566+475) of Phase-II of Delhi-Katra Expressway
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
36.2511
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Aug 2021
|
Stage-I Approval on
|
:
|
26 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2023
|
|
|
|
05 Apr 2023
|
34
|
Jammu and Kashmir
|
FP/JK/ROAD/51130/2020
|
9-JKC-019/2022-Jammu
|
Construction of Motorable Road Ikhala Block Boundary Kishtwar to Lopara Road part -II
|
Road
|
CHIEF ENGINEER PMGSY (JKRRDA) JAMMU
|
5.9312
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2020
|
Stage-I Approval on
|
:
|
21 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2023
|
|
|
|
|
35
|
Jammu and Kashmir
|
FP/JK/ROAD/45422/2020
|
FSt/Land/parivesh/06/2021
|
Construction of road from Dhanu (Dhanwalt) to Barigairian (forol) via Gaihar Ramnagar
|
Road
|
AEE PWD (R&B) SUB DIVISION MAJALTA
|
0.645
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 May 2020
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
36
|
Jammu and Kashmir
|
FP/JK/ROAD/143554/2021
|
9-JKB-094/2021-Jammu
|
Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km )
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
1.982
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
37
|
Jammu and Kashmir
|
FP/JK/ROAD/143554/2021
|
9-JKB-094/2021-Jammu
|
Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km )
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
1.982
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
38
|
Jammu and Kashmir
|
FP/JK/OFC/144842/2021
|
FST-Land/0FC/111/2021-02
|
Laying optical Fiber Cable (Kainthgali - Lali)
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.967
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jul 2021
|
Stage-I Approval on
|
:
|
14 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2022
|
|
|
|
09 Sep 2022
|
39
|
Jammu and Kashmir
|
FP/JK/Others/152416/2022
|
9-JKA-018/2022-Jammu
|
HH-44 Realignment project-Diversion of 0.442 forest land for installation of Crusher plant, Batching plant, magazine, HSD Pump, Labour Hut
|
Others
|
CEIGALL INDIA LIMITED
|
0.442
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2022
|
Stage-I Approval on
|
:
|
05 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 May 2022
|
|
|
|
07 Jul 2022
|
40
|
Jammu and Kashmir
|
FP/JK/Others/153389/2022
|
9-JKA-057/2022 -Jammu
|
Construction of Cafeteria and Public Convenience along with Mughal Road
|
Others
|
DIRECTOR TOURISM JAMMU
|
0.025
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2022
|
Stage-I Approval on
|
:
|
07 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2023
|
|
|
|
|
41
|
Jammu and Kashmir
|
FP/JK/Others/153363/2022
|
9-JKA-040/2022-Jammu
|
Temporary permission of installation of Hot mix plant and crusher plant for Widening and Strengthening of the existing approach road from Digdole to Bajmasta in Connection with construction of new Adit at Urnihal to the tunnel T49A on Katra Banihal Section of USBRL Project.
|
Others
|
R. K. INFRACORP PRIVATE LIMITED
|
0.2421
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Mar 2022
|
Stage-I Approval on
|
:
|
30 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 May 2023
|
|
|
|
18 Jul 2023
|
42
|
Jammu and Kashmir
|
FP/JK/ROAD/47304/2020
|
9-JKC-18/2021-Jammu
|
Diversion of 5.146 ha. Forest Land for Additional ROW Requirement for Development of Two Bridges located at Km- 2+250 to Km- 3+450 and Km- 10+100 to 10+560 of Chenani - Sudhmahadev Road (NH- 244)
|
Road
|
NHIDCL_JAMMU
|
5.146
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jul 2020
|
Stage-I Approval on
|
:
|
21 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2021
|
|
|
|
31 Jan 2022
|
43
|
Jammu and Kashmir
|
FP/JK/ROAD/149044/2021
|
9-JKA-007/2023-Jammu
|
Construction of road from Kaldi to Khurrian alongwith drainage
|
Road
|
ASSISTANT EXECUTIVE ENGINEER PWD UDHAMPUR
|
0.96
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2022
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2024
|
|
|
|
|
44
|
Jammu and Kashmir
|
FP/JK/SCH/154248/2022
|
9-JKB-001/2023-Jammu
|
Construction of New Govt. Degree College Dudu Basantgarh
|
School
|
PRINCIPAL GDC DUDU BASANTGARH HIGHER EDUCATION DEPARTMENT, J&K UT
|
2.2425
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2022
|
Stage-I Approval on
|
:
|
07 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
|
45
|
Jammu and Kashmir
|
FP/JK/Others/142143/2021
|
9-JKA-080/2021-Jammu
|
Temporary Establishment of Crusher Plant for construction of Khellani Tunnel Project
|
Others
|
APCO INFRATECH PVT LTD
|
0.3533
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 May 2021
|
Stage-I Approval on
|
:
|
17 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
05 Mar 2022
|
|
|
|
28 Jul 2022
|
46
|
Jammu and Kashmir
|
FP/JK/TRANS/152211/2022
|
9-JKC-038/2022-Jammu
|
Construction of LILO of 220 KV Udhampur-Gladni Transmission Line at Nagrota GSS
|
Transmission Line
|
JAMMU AND KASHMIR STATE POWER TRANSMISSION COMPANY LIMITED
|
11.2525
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Feb 2022
|
Stage-I Approval on
|
:
|
06 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2024
|
|
|
|
20 Sep 2024
|
47
|
Jammu and Kashmir
|
FP/JK/Others/141018/2021
|
9-JKB-053/2021-Jammu
|
PAKAL DUL HYDRO ELECTRIC POWER PROJECT
|
Others
|
LARSEN & TOUBRO LIMITED HEAVY CIVIL INFRA IC
|
3.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Apr 2021
|
Stage-I Approval on
|
:
|
05 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Feb 2022
|
|
|
|
23 Mar 2022
|
48
|
Jammu and Kashmir
|
FP/JK/Others/153316/2022
|
9-JKA-039/2022-Jammu
|
Installation of Mobile Tower at Jajot Kandu
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
0.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Mar 2022
|
Stage-I Approval on
|
:
|
25 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Nov 2022
|
|
|
|
20 Dec 2022
|
49
|
Jammu and Kashmir
|
FP/JK/HYD/127255/2021
|
Fst/Land/Parivesh/61/2021
|
diversion of 0.36 ha forest land for realignment of HRT of Sewa-II PS, UT of J&K
|
Hydel
|
NHPC LTD SEWA-II POWER STATION
|
0.36
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Mar 2021
|
Stage-I Approval on
|
:
|
04 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2022
|
|
|
|
16 Aug 2022
|
50
|
Jammu and Kashmir
|
FP/JK/TRANS/140816/2021
|
9-JKC-069/2021-Jammu
|
Re routing of 400kV Single Circuit Dulhasti-Kishenpur Transmission Line at Drabshalla in district Kishtwar
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED BATOTE
|
6.003
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Apr 2021
|
Stage-I Approval on
|
:
|
27 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jun 2023
|
|
|
|
12 Jul 2023
|
|