PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-094/2020
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Ganderbal  (iii) Forest Division : Sindh Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 49.5904  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Sindh Forest Division49.5904Reserved Forest
Total 49.5904
Division 1. : Sindh Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Ganderbal49.5904
Total49.5904
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
149.59040.3Eco 6
Total. 49.5904


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Pinus Griffithi Michell Kail68158184211917
2Abies Alba Fir194539032
3Others Cuperous900000
4Others Willow012000
5Acer Cambelli Maple241000
Total 273 216196 2122 19
Sub Total (No of Trees.) 747


5. Working plan prescription for the forest land proposed for diversion : Comptt. 63(a)/Sindh falls under Protection Working Circle of the Working Plan and is as such managed as per the prescriptions of the said working circle
6. Brief note on vulnerability of the forest area to erosion : The area being moderately to very high steep with less crop density is susceptible to soil erosion. Being in Protection WC, it is being managed as per the prescriptions
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.01
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Himalayan Brown bear, Himalayan Black bear, Jackal, Ibex, Common Leopard, Musk Deer etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : The Thajwas Wild Life Sanctuary Sonamarg is around less than one Km from the project site at various points. Though ESZ of the protected area is not notified, but the project site falls within the 10 Kms of the protected area. There may not be any profound impact on the un-notified ESZ, however the better observations in this regard can be had from the Wild Life Department
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The Thajwas Wild Life Sanctuary Sonamarg is around less than one Km from the project site at various points. There may not be any profound impact on the protected area, however the better observations in this regard can be had from the Wild Life Department
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 733.03
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1133RFSindh63(a)/Sindh    View file
2267RFSindh65(b)/Sindh    View file
330.5RFSindh63(a)/Sindh    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Justification for locating project in forest area
2 Land Suitability Certificate by DFO as per format
3 Certificate for Minimum Use of Forest Land as per format
4 Certificate for minimum use of forest land
5 Details of forest area proposed for Non-forestry use
6 Undertaking for payment of NPV and other Components
7 Letter of Acceptance
8 Calculation Sheet of NPV
9 Approval of the Project
10 DPR of the project
11 Enumeration List of Approach Road to ZojillaTunnel
12 checklist part II DFO level for Approach road to zogilla case

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Ganderbal19790037901324.52738133612/10/202013360
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 Srinagar CircleCFYesOne15/10/2020
Sindh Forest DivisionSrinagar CircleDFOYesTwo18/09/2020,21/09/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Sindh Forest DivisionSrinagar CircleDFO Recommended The area proposed for diversion is 49.5904 Hacs. The project is linear and part of a bigger National project which include Z Morh and Zogilla tunnels meant for all season connectivity to Sonamarg and Ladakh. Earlier also around 170 Hacs of forest land in Sindh division has been diverted for these two tunnels. Since the project is of National Importance awarding all weather connectivity to Sonamarg and Ladakh. Also, this road may also be beneficial for the department in terms of better management of High Altitude forestry of Sonamarg and beyond. Detailed Recommendation report is uploaded.
Srinagar CircleCF RecommendedThe use of forest land is inevitable. The benefits from the project to the people of Ladakh are immense as year round connectivity is main objective of the project. It is important from Defense point of view also.Yes
Nodal Officer RecommendedTo provide road connectivity in all weather conditions.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended10/02/2021 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuRegional Office9-JKC002-2021-CHA22/02/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/ROAD/48999/2020ROAD48999202096570,018,800.0070,018,800.0017/03/2021CNRB307558927561Corporation BankNEFT/RTGS (Challan)04/03/202104/03/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 100.5   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 3
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)33
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : 63(a)/ Sindh   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
SindhRF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)67
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : 65(b)/ Sindh   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
SindhRF
  No. of patches : 3
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
3Block(Polygon)0.5
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : 63(a)/ Sindh   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
SindhRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/ROAD/48999/202026 Mar 2021No DataCA as per approval
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/ROAD/48999/202026 Mar 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/JK/ROAD/48999/2020Compliance report 08 Apr 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/ROAD/48999/202008 May 2021APPROVED