FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/JK/ROAD/48822/2020   (ii). Name of Project for which Forest Land is required : Construction of Project Goha - Khellani two lane with paved shoulder Km 12+850 to 20+300 (Design Length 7.45 km) in the union territory of Jammu and Kashmir Package-IA   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of Project Goha - Khellani two lane with paved shoulder Km 12+850 to 20+300 (Design Length 7.45 km) in the union territory of Jammu and Kashmir Package-IA   (iv). State : Jammu and Kashmir   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 22839   (viii). Area of forest land proposed for diversion(in ha.): 5.325   (ix). Non-forest land required for this project(in ha.): 13.638   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PMU KISHTWAR, NHIDCL   (ii). Address1 : Ho. No. 89, Ward No.-09, Sheetla Road, Near Kulled Chowk, Kishwtar, 182204   (iii). Address2 : NIL   (iv). State : Jammu and Kashmir   (v). District : Kishtwar   (vi). Pin : 182204   (vii). Landmark : Near Kulled Chowk   (viii). Email address : pmunhidclkishtwar@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9370520884   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Naginder   (ii). Middle Name: NIL   (iii). Last Name: Singh   (iv). Gender: Male   (v). Designation: General Manager   (vi). Address 1: Ho.No. 89, Ward No. -09, Sheetla Road, Near Kulled Chowk, Kishtwar, 182204   (vii). Address 2: NIL   (viii). State: Jammu and Kashmir   (ix). District: Kishtwar   (x). Tehsil: NIL   (xi). Pin: 182204   (xii). Landmark: Near Kulled Chowk   (xiii). Email Address: pmunhidclkishtwar@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9663539977   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ApprovedFP/JK/Road/143629/2021FP/JK/Road/143629/20213.51833.51824 Jan 202222 Jul 2022
Total 3.5183 3.518
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Batote Forest Division5.32513.638
Total5.32513.638
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Doda5.32513.638
Total5.32513.638
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Humble5.32513.638
Total 5.325 13.638
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road5.32513.638
Total 5.325 13.638
C. Maps of forest land proposed to be diverted
Division 1. : Batote Forest Division
  (i). Area of forest land proposed to be diverted(in ha.) : 5.325   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.5.325    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 300   (iii). Temporary Employment(Number of person-days): 80000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Administrative Approval and Financial sanction letter
2Certificate of minimum of forest land
3Undertaking for Payment of CA
4Toposheet A1
5Google Earth file of Project Area
6No. of Trees 960 in the alignmnet
7Reply of EDS of SG by NHIDCL with all attachments
8Layout Plan of Goha Khellani Package
9DPR Vol -II of Goha Khellani
10DPR Vol -III of Goha Khellani
11Cost Benefit Analysis of Goha -Khellani
12Muck Disposal Plan along with designated site.
13Justification for diversion of forest land
14Undertaking for NPV and Additional NPV
15Alignment of NH-244 design Chainage 0.00 to 29.030
16Slope protection and TCS of project
17Geo referenced for forest land
18Reply to RO, MoEF EDS dated 25.03.2021
19Technical & Executive summary
20Alignment location Goha hellani
21NHIDCL project Alignment
22DPR Vol -I of Goha Khellani
23Joint site visit report
243D under NH-Act of Goha Khellani
25Area Calculation