PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-019/2022
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Jammu  (iii) Forest Division : Jammu Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 11.2525  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Jammu Forest Division11.2525Reserved Forest
Total 11.2525
Division 1. : Jammu Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Jammu11.2525
Total11.2525
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
111.25250.7Eco 5
Total. 11.2525


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersFarlai37066521547101
2OthersRetha230000
3OthersDrankadi020000
4Ceiba PentandraKambal78128491310
5OthersLacunea442471139900
6OthersDhaman56272000
7Dalburgia SisooShisham10663231061
8Syzigium CuminiJamun320000
9Bombax CeibaSimbal16117200
10PineChir001000
11OthersKakoa19181000
12Zizyphus JujubaBeri42201000
13Acacia CatechuKhair14213036200
14Albezzia LabbeckSiris011000
15Butea MonospermaPlah13166520
16Mangifera IndicaMango001000
17OthersFukadi010000
18OthersKathaid010000
19Psidium GuajavaGuava100000
20Calistemon LanceolatusBottle Brush602500
21OthersPeach200000
22TeakTeak100000
23OthersKakoa19100000
24OthersKanseer030000
25Moringa oleiferaSwanjana001000
26OthersPansar28341000
27Cassia FistulaKrongal010000
28Melotus PhilippensisKamila341000
Total 1349 1611487 9319 2
Sub Total (No of Trees.) 3561


5. Working plan prescription for the forest land proposed for diversion : The forest land proposed for diversion falls under the compartment no:1/N,2/N,3/N,4/N &5/N. The compartments 1/N,2/N,3/N falls under Rehabilitation & Reboisement working circle (SS-2) as per the existing Working Plan of the division wherein effective protection from biotic/abiotic interference and ANR is prescribed. The compartments 4/N & 5/N falls under Chir improvement cum selection working cirlce as per the existing Working Plan of the division wherein the areas shall be developed with the sole intention of promoting natural regeneration of Chir and by supplementing the natural regeneration with artificial sowing and planting of Chir seedlings whereever necessary.
6. Brief note on vulnerability of the forest area to erosion : The maximum area coming under the alignment is quartzite and rocky which makes the forest area stable and least vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : leopard, jackal,porcupine, Jungle Cat etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : Ramnagar Wildlife sanctuary and the impact of this project is negligible. MoEF & CC issued Clarification vide F.No6-60/2020 WL part 1 dated 16-07-2022 where under it has been clarified that in case there is no requirement for environmental clearance for any project falling in ECO Senstive Zone, the wildlife clearance for the same is not required.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 67.648
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1131Reserved ForestJammu6/N    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Checklist

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Jammu23360049540977.3395971815.44931/05/20221776.4590
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Jammu Forest DivisionEast Circle JammuDFOYesOne18/04/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Jammu Forest DivisionEast Circle JammuDFO RecommendedLoad of Nagrota is expected to increase with development in area like establishment of IIT, IIM and upcoming of IT park at Nagrota. The Nagrota Grid Sub Station along with associated transmission line is essential to meet upcoming load in Nagrota and adjoining area.
East Circle JammuCF RecommendedDiversion of 11.2525 ha of forest land is recommended as this transmission line is essential to meet upcoming load in Nagrota and adjoining area.Yes
Nodal Officer RecommendedRECOMMENDED.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended17/08/2022Recommended for grant of Stage I clearance.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuRegional Office9-JKC-038/2022-Jammu06/12/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/TRANS/152211/2022TRANS152211202289721,312,595.0021,312,600.0010/05/2024JAKAR20240510000085136Union Bank Of IndiaNEFT/RTGS (Challan)NANA
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 31   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)31
  Status of CA Land so identified : Forest Area   Site Name : 6/N   Location Details : 6/N   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
6/NRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/TRANS/152211/202210 Jun 2024No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/TRANS/152211/202212 Jun 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/JK/TRANS/152211/2022Recommended for Stage-II approval 20 Jul 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/TRANS/152211/202220 Sep 2024APPROVED