PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-02/2022
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Ramban  (iii) Forest Division : Ramban Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 3.27  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Ramban Forest Division3.27Reserved Forest
Total 3.27
Division 1. : Ramban Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Ramban3.27
Total3.27
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.270.1Eco 6
Total. 3.27


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersFir (Abies pindrow)0000016
Total 0 00 00 16
Sub Total (No of Trees.) 16


5. Working plan prescription for the forest land proposed for diversion : The area falls in reboisement working circle as per draft working plan of Mahore Forest Division from 2020-21 to 2029-30.
6. Brief note on vulnerability of the forest area to erosion : The area is highly vulnerable to the soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Rhesus Monkey, House Sparrow, Common Myna, Leopard, Khaleej Pheasant etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 10.46083
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
119.40Seripora FemroteGool47/R    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Specific Recommendation of DFO
2 Revised Joint Inspection Report
3 Comments of Chief Wildlife Warden
4 Biological measures for stabilization of 3 muck dumping sites.
5 Enumeration List
6 Undertaking for CA cost payment
7 Area Calculation Sheet
8 NPV Calculation sheet
9 Undertaking for the payment of NPV
10 Certificate of minimum use of forest land
11 checklist of Ramakunda to Gool Road

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Ramban13290082164.58866.237789022/02/20221704.910
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Ramban Forest DivisionChenab Circle DodaDFOYesOne16/02/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Ramban Forest DivisionChenab Circle DodaDFO Recommendedrecommendations with justification uploaded
Chenab Circle DodaCF RecommendedForest land diversion under executive engineer PWD R&B for construction of road from ramakunda to gool in ramban forest division is hereby recommended for approval under FCA. Total of 3.27 hac of forest area in ramban forest division is recommended. Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended09/05/2022Recommended for grant of Stage I ClearanceState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuRegional Office9-JKB-022/2022-Jammu12/10/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/ROAD/150343/2021ROAD15034320213284,794,574.004,794,574.0016/03/2023904581Union Bank Of IndiaNEFT/RTGS (Challan)15/02/202320/02/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 9.4   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)9.4
  Status of CA Land so identified : Forest Area   Site Name : Seripora Femrote   Location Details : Seripora Femrote Range: Gool Compartment No: 47/R   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Seripora FemroteRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/ROAD/150343/202128 Mar 2023No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/ROAD/150343/202130 Mar 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/JK/ROAD/150343/2021recommended for Stage-II approval 30 Aug 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/ROAD/150343/202112 Oct 2023APPROVED