Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Maharashtra
|
FP/MH/ROAD/27126/2017
|
FC-I/MH-104/2019-NGP
|
Proposed Construction of Goregaon-Mulund Link Road, at Village - Aarey, Gundgaon, Vihar & Nahur, District - Mumbai Suburban by MCGM
|
Road
|
MUNICIPAL CORPORATION OF GREATER MUMBAI
|
19.43
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jul 2017
|
Stage-I Approval on
|
:
|
02 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2025
|
|
|
|
01 Jul 2025
|
2
|
Bihar
|
FP/BR/TRANS/122227/2021
|
FP/BR/TRANS/122227/2021
|
LILO OF KISHANGANJ DARBHANGA 400KV D/C (QUAD) LINE OF POWERGRID AT SAHARSA (NEW) SUBSTATION
|
Transmission Line
|
POWERGRID MITHILANCHAL TRANSMISSION LIMITED SAHARSA
|
2.191
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2021
|
Stage-I Approval on
|
:
|
24 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2022
|
|
|
|
30 Jun 2025
|
3
|
Maharashtra
|
FP/MH/ROAD/20894/2016
|
FC-II/MH-147/2021-NGP
|
Nashik-Peth Road, Section of NH-848
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION NASHIK
|
7.332
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Aug 2016
|
Stage-I Approval on
|
:
|
16 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 May 2023
|
|
|
|
30 Jun 2025
|
4
|
Maharashtra
|
FP/MH/Canal/150569/2021
|
FC-I/MH-350/2023-NGP
|
Diversion of 3.27 ha. Forest land for construction of Upper Pravara Right Bank Canal Nilwande Dam Project
|
Canal
|
PRAMOD MANE
|
3.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jan 2022
|
Stage-I Approval on
|
:
|
13 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2025
|
|
|
|
30 Jun 2025
|
5
|
Chhattisgarh
|
FP/CG/Approach/156074/2022
|
FC-8/22/2023/IRO-Raipur
|
ALTERNATIVE ROAD FOR TRANSPORTATION OF IRON ORE AT CHHOTEDONGAR IRON ORE MINE
|
Approach Access
|
JAYASWAL NECO INDUSTRIES LIMITED
|
2.025
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2022
|
Stage-I Approval on
|
:
|
29 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
27 Jun 2025
|
6
|
Himachal Pradesh
|
FP/HP/TRANS/148907/2021
|
FC/HPB/91/2023
|
66KV D/C Transmission line from Pragati Nagar to 66/22KV Sub-Station Hulli (Kotkhai) Shimla. (H.P)
|
Transmission Line
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
3.613
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
Stage-I Approval on
|
:
|
10 Jan 2025
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2025
|
|
|
|
26 Jun 2025
|
7
|
Uttar Pradesh
|
FP/UP/Approach/52653/2020
|
8B/UP/06/291/2021/FC
|
Proposed IOCL Retail Outlet on Bilrayan-Panwari Road(SH-21) In Km.24(Ch 23.410 to 23.445) at Gata No. No.407,Village:Barotha,Tehsil:Nighasan,District:Lakhimpur Kheri
|
Approach Access
|
INDIAN OIL COPERATION LIMITED
|
0.086211
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2020
|
Stage-I Approval on
|
:
|
14 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jun 2025
|
|
|
|
26 Jun 2025
|
8
|
Uttar Pradesh
|
FP/UP/TRANS/144301/2021
|
8B/UP/04/63/2022/FC
|
CONSTRUCTION OF 33 KV ELECTRIC LINE FROM 220 KV SUB-STATION, BABINA-JHANSI TO 33/11 KV SUB-STATION M.E.S., BABINA, TOTAL KM- 6.110, UNDER ELECTRICITY SECONDARY WORKS DIVISION, JHANSI(DVVNL)-U.P.
|
Transmission Line
|
ELECTRICITY SECONDARY WORKS DIVISION DVVNL JHANSI
|
2.5035
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jul 2021
|
Stage-I Approval on
|
:
|
14 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2025
|
|
|
|
26 Jun 2025
|
9
|
Maharashtra
|
FP/MH/ROAD/146680/2021
|
FC-I/MH-390/2024-NGP
|
Construction of proposed Bridge at Dharivali village at Marve road by Municipal Corporation of Greater Mumbai.
|
Road
|
MUNICIPAL CORPORATION OF GREATER MUMBAI BRIDGES DEPARTMENT
|
0.1702
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Sep 2021
|
Stage-I Approval on
|
:
|
01 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2025
|
|
|
|
23 Jun 2025
|
10
|
Bihar
|
FP/BR/Others/46309/2020
|
FP/BR/Others/46309/2020
|
Diversion of 0.010725 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of SH-49 in Vaishali district of Bihar.
|
Others
|
SAURABH KUMAR
|
0.01073
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2020
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2021
|
|
|
|
20 Jun 2025
|
11
|
Assam
|
FP/AS/TRANS/145939/2021
|
3-AS-B-107/2022/GHY
|
Construction of 132kV D/C Roing-Chapakhowa Transmission Line under NERSS-X
|
Transmission Line
|
POWERGRID
|
0.675
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Aug 2021
|
Stage-I Approval on
|
:
|
02 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Apr 2023
|
|
|
|
19 Jun 2025
|
12
|
Uttarakhand
|
FP/UK/ROAD/32834/2018
|
8B/UCP/06/148/2019/FC
|
Construction of Chamba Mussoorie Motor Road in Place Kanatal to Andhiyargadhi Sangaon Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2018
|
Stage-I Approval on
|
:
|
17 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2024
|
|
|
|
17 Jun 2025
|
13
|
Jharkhand
|
FP/JH/TRANS/151158/2022
|
FP/JH/TRANS/151158/2022
|
2.2 MVA Power Supply to Garrison Engineers (MES)at Ramgarh Cantonment at 33 KV from 132/33KV DVC's Ramgarh Substation through independent feeder
|
Transmission Line
|
DAMODAR VALLEY CORPORATION
|
0.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2022
|
Stage-I Approval on
|
:
|
17 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Mar 2025
|
|
|
|
17 Jun 2025
|
14
|
Jharkhand
|
FP/JH/ROAD/46818/2020
|
FP/JH/Road/46818/2020
|
Approach Road for Basantpur-Tapin Coking Coal Washery
|
Road
|
Central Coalfields Limited
|
2.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
Stage-I Approval on
|
:
|
07 Mar 2025
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2025
|
|
|
|
17 Jun 2025
|
15
|
Punjab
|
FP/PB/Others/142313/2021
|
9-PBB329-2022-CHA
|
M/S Hill Side Concrete Plant
|
Others
|
MOHAN LAL
|
0.4156
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2021
|
Stage-I Approval on
|
:
|
07 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2025
|
|
|
|
16 Jun 2025
|
16
|
Bihar
|
FP/BR/Approach/152066/2022
|
FP/BR/Approach/152066/2022
|
The proposal for establishment of retail out-let dealership of M/s NX100 PACIFIC BIOFUEL PVT Ltd.
|
Approach Access
|
AJIT KUMAR
|
0.015
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2022
|
Stage-I Approval on
|
:
|
14 Feb 2025
|
Compliance Report Submitted by User Agency on
|
:
|
15 May 2025
|
|
|
|
16 Jun 2025
|
17
|
Himachal Pradesh
|
FP/HP/ROAD/151416/2022
|
FC/HPB/06/124/2022
|
C/O road from Shamshar to Chalohan
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.668
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2022
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2025
|
|
|
|
13 Jun 2025
|
18
|
Himachal Pradesh
|
FP/HP/Others/51314/2020
|
FC/HPB/06/42/2021
|
Construction of Sewerage Treatment Plant at Naddi, in Tehsil Dharamshala, District Kangra
|
Others
|
IRRIGATION AND PUBLIC HEALTH GOVT OF HP
|
0.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
Stage-I Approval on
|
:
|
06 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jun 2025
|
|
|
|
11 Jun 2025
|
19
|
Sikkim
|
FP/SK/ROAD/45664/2020
|
FP/SK/ROAD-31/2021/FC
|
Diversion of 1.0440 ha of forest land for const of RCR from SPWD road to Rateypani (Passi) South Sikkim by RMDD, GoS
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
1.044
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2020
|
Stage-I Approval on
|
:
|
07 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2025
|
|
|
|
11 Jun 2025
|
20
|
Uttarakhand
|
FP/UK/ROAD/11139/2015
|
8B/UCP/06/15/2019/FC
|
Mastkhal to Sila Danda Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
2.275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2015
|
Stage-I Approval on
|
:
|
09 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
10 Jun 2025
|
21
|
Maharashtra
|
FP/MH/ROAD/124762/2021
|
FC-II/MH-203/2022-NGP
|
Diversion of 6.295 ha of Forest land for Pahur to Bodwad Road (NH- 753 L) (Old Proposal No- FP/MH/ROAD/42070/2019
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS MUMBAI MAHARASHTRA
|
6.295
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Mar 2021
|
Stage-I Approval on
|
:
|
06 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2025
|
|
|
|
09 Jun 2025
|
22
|
Maharashtra
|
FP/MH/ROAD/152831/2022
|
FC-I/MH-349/2023-NGP
|
Diversion of 3.9 Ha. of Forest land in Jamkhed to Sautada road
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
3.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2022
|
Stage-I Approval on
|
:
|
20 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jun 2025
|
|
|
|
09 Jun 2025
|
23
|
Jammu and Kashmir
|
FP/JK/SCH/154248/2022
|
9-JKB-001/2023-Jammu
|
Construction of New Govt. Degree College Dudu Basantgarh
|
School
|
PRINCIPAL GDC DUDU BASANTGARH HIGHER EDUCATION DEPARTMENT, J&K UT
|
2.2425
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2022
|
Stage-I Approval on
|
:
|
07 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
09 Jun 2025
|
24
|
Jammu and Kashmir
|
FP/JK/ROAD/43956/2020
|
9-JKB-095/2021-Jammu
|
Up-gradation of Reasi-Arnas-Mahore road to NHDL specifications from km 57.00 to km 68.00 in 31 BRTF area under project Sampark in J&K UT
|
Road
|
BRO, 110 RCC
|
3.22
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2020
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
09 Jun 2025
|
25
|
Rajasthan
|
FP/RJ/TRANS/44981/2020
|
8B/Raj/04/9/2021/FC
|
Construction of 765 KV DC Fatehgarh II to Bhadla II Transmission Line, District - Jodhpur, Raj
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
2.8874
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2020
|
Stage-I Approval on
|
:
|
25 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
06 Jun 2025
|
26
|
Gujarat
|
FP/GJ/OFC/148825/2021
|
FC-6/GJB-27/2023-GNR
|
Proposal for laying OFC for Jio Digital Fibre Private Limited 4G Dang South District
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.3073
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2021
|
Stage-I Approval on
|
:
|
08 Jan 2025
|
Compliance Report Submitted by User Agency on
|
:
|
03 Mar 2025
|
|
|
|
06 Jun 2025
|
27
|
Karnataka
|
FP/KA/MIN/153210/2022
|
F.No.4-KRB1442/2023-BAN
|
Diversion of 3.028 ha of forest land in Tumbaraguddi RF, Jiganahalli Village, Sandur [H] & [T], Ballari [D] for approach road [connecting from Main Road to Mining Area ML No.2482] passing through forest area of M/s Marwa Mining company, # 687, 13 th ward, Umer manzil, Kudligi, Vijayanagar District- 583135, Karnataka.
|
Mining
|
MARWA MINING COMPANY
|
3.028
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2022
|
Stage-I Approval on
|
:
|
12 Nov 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Mar 2025
|
|
|
|
06 Jun 2025
|
28
|
Sikkim
|
FP/SK/ROAD/51397/2020
|
SK/ROAD-15/2021/FC
|
Diversion of 0.984 ha of forest land for const of RCR from NSH to Yak Farm Denga under Chungthang Range N Sikkim by RDD Govt of Sikkim
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.984
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Oct 2020
|
Stage-I Approval on
|
:
|
09 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2025
|
|
|
|
05 Jun 2025
|
29
|
Karnataka
|
FP/KA/TRANS/151786/2022
|
F.No.4-KRC1478/2023-BAN
|
Construction of 220 Kilo Volt Single Circuit line from existing 220/66/11 Kilo Volt Sub-Station, Badaladku Village, Kudligi Taluk to M/s. Resources Pellets Concentrate Private Limited, Somalapura Village, Sandur Taluk, Bellary District for length of 27.90 KM in Sy. No 165/B of Somalapura Village and Sy.No 1/B of Ankammanahall
|
Transmission Line
|
RESOURCES PELLETS CONCENTRATES PRIVATE LIMITED
|
5.1734
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2022
|
Stage-I Approval on
|
:
|
16 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 May 2025
|
|
|
|
05 Jun 2025
|
30
|
Maharashtra
|
FP/MH/Approach/152907/2022
|
FC-I/MH-383/2024-NGP
|
Approach Road to Private land
|
Approach Access
|
DINESH PATEL
|
0.0216
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
15 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2024
|
|
|
|
04 Jun 2025
|
31
|
Rajasthan
|
FP/RJ/TRANS/44930/2020
|
8B/RAJ/04/10/2021
|
400 KV D/C BHADLA (PG) Bhadla 2 (TWIN HTLS) Transmission Line, District-Jodhpur, Rajasthan (Total Length 48.345 km)
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
4.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2020
|
Stage-I Approval on
|
:
|
18 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
02 Jun 2025
|
32
|
Uttar Pradesh
|
FP/UP/Others/29655/2017
|
8B/UP/06/68/2021/FC
|
Protected Forest Land Proposed to be diverted for Exit/Entry Approach to Sherwood College of Engineering Research and Technology on Lucknow-Faizabad Road in KM.18-19 Khasra No. 59,60,63,65,66,310,299,305,300,301,302,311,2869,2871,2876,294,298,304,287,308/526,309,Village:Dharsaniya in Barabanki District
|
Others
|
SHERWOOD COLLEGE EDUCATIONAL GROUP
|
0.063404
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Oct 2017
|
Stage-I Approval on
|
:
|
17 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
30 May 2025
|
33
|
Madhya Pradesh
|
FP/MP/IRRIG/37077/2018
|
6-MPB029/2022-BHO
|
Ghoghri Irrigation Project (Affected in Pipeline)
|
Irrigation
|
EXECUTIVE ENGINEER WATER RESOURCES DIVISION NO II BETUL
|
1.987
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2022
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jul 2023
|
|
|
|
30 May 2025
|
34
|
Himachal Pradesh
|
FP/HP/ROAD/48987/2020
|
FC/HPB/73/2023
|
C/O CHILLON TO CHOWKIMRIGWAL ROAD KM 0/00 TO 8/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2020
|
Stage-I Approval on
|
:
|
22 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2025
|
|
|
|
30 May 2025
|
35
|
Madhya Pradesh
|
FP/MP/IRRIG/32304/2018
|
6-MPC054/2021-BHO
|
Rosiya Talab Yojana
|
Irrigation
|
ENGINEER,WATER RESOURCES ENGINEER,DISTRICT=KHARGONE
|
39.715
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2018
|
Stage-I Approval on
|
:
|
29 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 Mar 2025
|
|
|
|
30 May 2025
|
36
|
Himachal Pradesh
|
FP/HP/Others/123920/2021
|
8B/HP/09/86/2021/FC
|
Diversion of 0.3253 Ha. Forest Land for Augmentation of Sewerage Scheme to Mandi Town and Providing sewerage facility to adjoing villages of Mandi Town HP
|
Others
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.3253
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2021
|
Stage-I Approval on
|
:
|
29 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
29 May 2025
|
37
|
Uttar Pradesh
|
FP/UP/Approach/157152/2022
|
8B/UP/06/178/2023/FC
|
My Own Eco Energy Pvt. Ltd. Petrol Pump on Kushinagar to Hata Road NH-27 (Old NH-28) in Km.No. 310 (CH. No. 309.915, LHS) at Khasra No. 2Mi, 31, 3Mi and 4Mi, Village:-Chhapra Bhagat, Tehsil:-Hata, District:-Kushinagar.
|
Approach Access
|
MY WON ECO ENERGY PRIVATE LIMITED
|
0.17416
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2022
|
Stage-I Approval on
|
:
|
12 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2025
|
|
|
|
28 May 2025
|
38
|
Uttar Pradesh
|
FP/UP/ROAD/150997/2022
|
8B/UP/06/274/2022/FC
|
Rehabilitation & up-gradation to four lane road from Km. 70.500 to 78.600 Km of NH-92 (new NH-719) under in District Etawah in the State of Uttar Pradesh (UP Portion)
|
Road
|
MORTH (NH-UP)
|
12.275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2022
|
Stage-I Approval on
|
:
|
31 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2025
|
|
|
|
28 May 2025
|
39
|
Uttarakhand
|
FP/UK/ROAD/23336/2016
|
8B/UCP/06/60/2018/FC
|
Construction of Pothing Toli Motor Road (Length 7.00km)
|
Road
|
PWDKAPKOT
|
4.287
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2016
|
Stage-I Approval on
|
:
|
16 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
28 May 2025
|
40
|
Tamil Nadu
|
FP/TN/ROAD/101799/2020
|
4-TNB086/2022-CHN
|
Road to Combined Court Complex at Udhagamandalam
|
Road
|
DISTRICT COURT
|
0.33
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2020
|
Stage-I Approval on
|
:
|
06 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Mar 2025
|
|
|
|
28 May 2025
|
41
|
Orissa
|
FP/OR/Others/23166/2016
|
5-ORC496/2022-BHU
|
: Kalamang (Sagasahi)-Dabuna Slurry& Water Pipelines Project of M/s Essar Steel India Ltd.
|
Others
|
ArcelorMittal Nippon Steel India Limited
|
16.466
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2016
|
Stage-I Approval on
|
:
|
25 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 May 2025
|
|
|
|
27 May 2025
|
42
|
Karnataka
|
FP/KA/ROAD/34601/2018
|
F.No.KRC1250/2020-BAN
|
Four laning of Goa-Karnataka Border - Kundapur Section of NH-66
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU MANGALORE
|
28.218
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jul 2018
|
Stage-I Approval on
|
:
|
17 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
21 May 2025
|
43
|
Kerala
|
FP/KL/ROAD/24605/2017
|
4-KLB1475/2023-BAN
|
Edavetty Nadayam Depot Road
|
Road
|
GRAMAPANCHAYAT EDAVETTY
|
0.456
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 May 2019
|
Stage-I Approval on
|
:
|
18 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2024
|
|
|
|
21 May 2025
|
44
|
Uttar Pradesh
|
FP/UP/TRANS/39285/2019
|
8B/UP/04/105/2019/FC
|
Forest Land Proposed to be diverted for construction 765 kV S/C Ghatampur-Agra Transmission Line passing through Reserve forest land in Etawah, Firozabad & Agra Districts and Protected Forest land in Crossing NH-86 at Km. 57.147, SH-46 at Km. 24.487, Etawah- Branch of Lower Ganga Canal in Kanpur Nagar, NH-25 at Km. 1559.650 in Kanpur Dehat, SH-21
|
Transmission Line
|
GHATAMPUR TRANSMISSION LIMITED
|
79.4992
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2019
|
Stage-I Approval on
|
:
|
01 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
20 May 2025
|
45
|
Tamil Nadu
|
FP/TN/ROAD/149622/2021
|
4-TNB092/2022-CHN
|
Initial Rectification including Widening Strengthening and improvements and Performance Based Maintenance Contract for a Period of 60 Months in State Highways and Major District Roads for a length o
|
Road
|
ASSISANT DIVISIONAL ENGINEER HIGHWAYS CONSTRUCTION AND MAINTANANCE THIRUVAIYARU
|
0.82
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
23 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
19 May 2025
|
46
|
Madhya Pradesh
|
FP/MP/RAIL/42206/2019
|
6-MPR040/2023-BHO
|
BUDNI - INDORE NEW B.G. RAIL LINE PROJECT
|
Railway
|
RAIL VIKAS NIGAM LTD
|
70.775
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Nov 2019
|
Stage-I Approval on
|
:
|
17 Feb 2025
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2025
|
|
|
|
14 May 2025
|
47
|
Gujarat
|
FP/GJ/ROAD/41444/2019
|
6-GJB005/2021-BHO
|
New RCC/Black tarred Road
|
Road
|
RUCHIL AGRO FOOD PRODUCTS
|
0.459
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2019
|
Stage-I Approval on
|
:
|
29 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
13 May 2025
|
48
|
Uttar Pradesh
|
FP/UP/Others/141612/2021
|
8B/UP/06/213/2022/FC
|
CCONSTRUCTION OF M/S IOCL MORADABAD BY PROPOSED A RETAIL OUTLET PROTECTED LAND IS REQUIRED TO BE DIVERTED (FCA 1980 FOR NON FORESTRY PURPOSE) SITE SITUATED AT VILLAGE JYOTHI KHASRA NO. 24 ALONG NEHTAUR – HALDAUR ROAD (SH-12) KM 150-153 (RHS) TEHSIL DHAMPUR DISTRICT BIJNOR (U.P.)
|
Others
|
INDIAN OIL CORPORATION LIMITED
|
0.1954
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2021
|
Stage-I Approval on
|
:
|
19 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
09 May 2025
|
49
|
Uttarakhand
|
FP/UK/ROAD/37053/2018
|
8B/UCP/06/91/2020/FC
|
Pawadhar naini Jageshwar motor Road
|
Road
|
EE TY DIV PWD BERINAG
|
5.94
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2018
|
Stage-I Approval on
|
:
|
05 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
25 Mar 2025
|
|
|
|
09 May 2025
|
50
|
Tamil Nadu
|
FP/TN/OFC/116522/2020
|
F.No. 4-TNB115/2023-CHN
|
Laying of underground OFC along Cumbam-Cumuli NH road from Lower camp to Kumuli through Suranganar RF
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.193
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2020
|
Stage-I Approval on
|
:
|
07 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jan 2025
|
|
|
|
09 May 2025
|
|