Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Himachal Pradesh
|
FP/HP/ROAD/154466/2022
|
FC/HPC/79/2023
|
Diversion of 19.5896 Ha. Forest land for Rehabilitation and Upgradation to Two lane with paved shoulder configuration & Strengthening of Padhar to Bijni (Package-VA) from Km 180.00 to Km 202.815 (Design Length 19.050 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR
|
19.5896
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jul 2022
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2025
|
|
|
|
04 Feb 2025
|
2
|
Rajasthan
|
FP/RJ/TRANS/120030/2021
|
8B/Raj/12/28/2021/FC
|
132 KV S/C Raisinghnagar - Jetsar (M/s NTPC) Transmission Line, District-Sri Ganganagar, Rajasthan (Total Length 17893 meters).
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD HANUMANGARH
|
0.0972
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Feb 2021
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2024
|
|
|
|
03 Feb 2025
|
3
|
Uttarakhand
|
FP/UK/ROAD/27732/2017
|
8B/UCP/06/64/2019/FC
|
Construction of Tharali Kurar Motor Road, km-15 to Gummar Lagga Gerur Link Motor Road under PMGSY in phase-XVI
|
Road
|
RES PMGSY KARANPERAYAG
|
1.825
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
Stage-I Approval on
|
:
|
17 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
31 Jan 2025
|
4
|
Karnataka
|
FP/KA/MIN/48654/2020
|
F.No.4-KRB1348/2022-BAN/
|
To access existing approach road to M.L No 2545 Jaisinghpur Iron Ore Mines, Ramghad Block Forest, Jaisinghpur Village, Sandur Taluk, Bellary District. In favour of M/s Lakshmi Minerals, Hospet
|
Mining
|
LAKSHMI MINERALS
|
0.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Aug 2020
|
Stage-I Approval on
|
:
|
06 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2023
|
|
|
|
31 Jan 2025
|
5
|
Uttarakhand
|
FP/UK/ROAD/38048/2019
|
8B/UCP/06/42/2020/FC
|
C/o Naugaon to Kanarichhina Motor road distt almora
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
1.377
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2019
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
30 Jan 2025
|
6
|
Sikkim
|
FP/SK/ROAD/122332/2021
|
SK/ROAD-72/2021/FC
|
Diversion of 1.0428 ha of forest land for construction of RCR from Narkhola to Upper Narkhola & Lower Narkhola in West Sikkim
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
1.0428
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
31 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
29 Jan 2025
|
7
|
Sikkim
|
FP/SK/ROAD/138431/2021
|
IRO/KOL/SK/ROAD/138431/2021
|
Construction of Rural Connectivity Road from NSH via Tadong to Upper Phodong
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.376
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Apr 2021
|
Stage-I Approval on
|
:
|
01 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
29 Jan 2025
|
8
|
Haryana
|
FP/HR/ROAD/40712/2019
|
9-HRB090-2019-CHA
|
Diversion of 0.90 ha of forest land for Wdg. & Stg. of Meerut Sonipat Gohana Assand Kaithal Patiala road (Assand Kaithal Cheeka Patiala road ) S. H. No. 11 Km. Km. 231.44 to 234.21 & RD 234.41 to 234.
|
Road
|
EXECUTIVE ENGINEER
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2019
|
Stage-I Approval on
|
:
|
22 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2020
|
|
|
|
29 Jan 2025
|
9
|
Sikkim
|
FP/SK/Others/41900/2019
|
SK-UDHD-70/2021/FC
|
Diversion of 2 ha of forest land for garbage Management plant,Ringding, North sikkim by UDHD, GoS
|
Others
|
UDD GOVT OF SIKKIM
|
2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Sep 2019
|
Stage-I Approval on
|
:
|
29 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2025
|
|
|
|
29 Jan 2025
|
10
|
Uttarakhand
|
FP/UK/ROAD/34286/2018
|
8B/UCP/06/31/2020/FC
|
Gangani To Bhangeli Motor Road.
|
Road
|
PMGSY ID UTTARKASHI
|
1.316
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2018
|
Stage-I Approval on
|
:
|
09 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2024
|
|
|
|
28 Jan 2025
|
11
|
Madhya Pradesh
|
FP/MP/ROAD/153796/2022
|
6-MPR039/2023-BHO
|
Additional Land Required for 4 Laning of Harda to Betul Section of National Highway (NH-47)from Temagav Km 30+000 to Chicholi Km 81+000(Length- 51 km) under BHARATMALA Pariyojna Economic Corridor (Phase-I) in three districts of Harda, Hoshangabad and Betul in the state of Madhya Pradesh on EPC Mode
|
Road
|
PRASHANT PATHAK
|
11.399
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2022
|
Stage-I Approval on
|
:
|
05 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jun 2024
|
|
|
|
28 Jan 2025
|
12
|
Chhattisgarh
|
FP/CG/Pipeline/151253/2022
|
FC-I/IROCH-18/2022
|
B S Sponge Pvt Ltd Laying of Pipeline
|
Pipeline
|
B.S.SPONGE PVT. LTD.
|
0.144
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2022
|
Stage-I Approval on
|
:
|
22 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2024
|
|
|
|
27 Jan 2025
|
13
|
Bihar
|
FP/BR/Others/48533/2020
|
FP/BR/OTHERS/48533/2020
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-60 Road in Purnea district of Bihar.
|
Others
|
PRADIP KUMAR SAH
|
0.01275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Aug 2020
|
Stage-I Approval on
|
:
|
20 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
26 Jan 2025
|
14
|
Maharashtra
|
FP/MH/Others/17764/2016
|
FC-I/MH-69/2017-NGP
|
Diversion of forest land for construction of disaster management works of sky walk, buy pass road, drainage line & sewage treatment plant at Saptashrungi Gad, Tal- Kalwan, Dist- Nashik.
|
Others
|
EXECUTIVE ENGINEER TRIBAL PUBLIC WORKS DIVISION KALWAN
|
0.8567
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2016
|
Stage-I Approval on
|
:
|
17 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2025
|
|
|
|
24 Jan 2025
|
15
|
Madhya Pradesh
|
FP/MP/WATER/145554/2021
|
6-MPB062/2023-BHO
|
Rajghat Multi Village Scheme
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
3.885
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2021
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
24 Jan 2025
|
16
|
Madhya Pradesh
|
FP/MP/WATER/145554/2021
|
6-MPB062/2023-BHO
|
Rajghat Multi Village Scheme
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
3.885
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2021
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
24 Jan 2025
|
17
|
Arunachal Pradesh
|
FP/AR/ROAD/116857/2020
|
3-AN-A-179/2023/GHY
|
Diversion of Forest Land for Construction of Nelya-Dhaula Road from Km 0.910 to Km 34.124 and link road to Bhawani post of Km 2.39 (Net length= Km 35.604) by Border Roads Organisation under Tawang District of Arunachal Pradesh
|
Road
|
BORDER ROADS ORGANISATION 763 TF
|
89.298
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2020
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
23 Jan 2025
|
18
|
Maharashtra
|
FP/MH/Others/123612/2021
|
FC-I/MH-386/2024-NGP
|
CONSTRUCTION OF APPROACH WATER BOUND MECADAM ROAD IS TO BE PASSING THROUGH THE RESERVED FOREST G.No.2731,AT-VILLAGE-KADUS (RANMALA) TAL-KHED DIST-PUNE.
|
Others
|
V.S.KARPE
|
0.068
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2021
|
Stage-I Approval on
|
:
|
17 May 2024
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
23 Jan 2025
|
19
|
Uttarakhand
|
FP/UK/ROAD/18757/2016
|
8B/UCP/06/59/2017/FC
|
Fatgali-Damoli-Malujhal-Ukhalso motor road in District Bageshwar (CM Ghosna-804/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
4.103
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2016
|
Stage-I Approval on
|
:
|
27 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
22 Jan 2025
|
20
|
Madhya Pradesh
|
FP/MP/ROAD/149613/2021
|
6-MPB055/2023-BHO
|
Diversion of 2.06 ha of forest land for construction of Begamganj sultanganj road under FCA 1980
|
Road
|
MPRDC BHOPAL DIVISION
|
2.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2022
|
Stage-I Approval on
|
:
|
18 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
22 Jan 2025
|
21
|
Uttarakhand
|
FP/UK/ROAD/41387/2019
|
8B/UCP/06/187/2019/FC
|
RAMA TO SYALUKA
|
Road
|
PMGSYID PUROLA
|
4.536
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2019
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
21 Jan 2025
|
22
|
Maharashtra
|
FP/MH/RAIL/154664/2022
|
FC-I/MH-314/2023-NGP
|
Diversion of Forest Land for doubling of existing Broad-Gauge line from Nira- Lonand Section of Pune- Miraj BG Railway Line
|
Railway
|
DY. CHIEF ENGINEER (CON.), CR, PUNE
|
0.02
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2022
|
Stage-I Approval on
|
:
|
29 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Dec 2024
|
|
|
|
17 Jan 2025
|
23
|
Maharashtra
|
FP/MH/TRANS/125061/2021
|
FC-II/MH-226/2023-NGP
|
220kv Padghe Wada for Abitghar S/S Transmission Line.
|
Transmission Line
|
MAHATRANSCO
|
12.7435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Mar 2021
|
Stage-I Approval on
|
:
|
11 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2024
|
|
|
|
17 Jan 2025
|
24
|
Maharashtra
|
FP/MH/TRANS/125061/2021
|
FC-II/MH-226/2023-NGP
|
220kv Padghe Wada for Abitghar S/S Transmission Line.
|
Transmission Line
|
MAHATRANSCO
|
12.7435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Mar 2021
|
Stage-I Approval on
|
:
|
11 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2024
|
|
|
|
17 Jan 2025
|
25
|
Himachal Pradesh
|
FP/HP/Others/40164/2019
|
8B/HP/09/36/2020/FC
|
C/O AE office at Kelodhar in Tehsil Chachiot District Mandi.
|
Others
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
0.0576
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2019
|
Stage-I Approval on
|
:
|
14 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2024
|
|
|
|
17 Jan 2025
|
26
|
Maharashtra
|
FP/MH/Pipeline/155620/2022
|
FC-I/MH-391/2024-NGP
|
Rediversion of forest land for Uran Usar Pipeline Project
|
Pipeline
|
GAIL INDIA LTD
|
1.783
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 May 2022
|
Stage-I Approval on
|
:
|
05 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jan 2025
|
|
|
|
16 Jan 2025
|
27
|
Gujarat
|
FP/GJ/Others/34353/2018
|
6-GJB045/2019-BHO
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Banaskantha District
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
0.4117
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2018
|
Stage-I Approval on
|
:
|
06 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2023
|
|
|
|
16 Jan 2025
|
28
|
Maharashtra
|
FP/MH/VELEC/157219/2022
|
FC-I/MH-388/2024-NGP
|
Diversion of forest land from G. no 191 at Solashi Tal. Koregaon G no 1010 at village Vele Tal Wai for laying of overhead 440 volt L.T Aerial Bunche cable ABC twisted electric line
|
Village Electricity
|
DY.EXECUTIVE ENGINEER M.S.E.D.C. LTD WATHER STATION DIT.SATARA..
|
0.64
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2022
|
Stage-I Approval on
|
:
|
11 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2024
|
|
|
|
16 Jan 2025
|
29
|
Andhra Pradesh
|
FP/AP/OFC/36007/2018
|
4-APB221/2023-VIJ
|
Laying of Under ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
1.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2018
|
Stage-I Approval on
|
:
|
17 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2023
|
|
|
|
16 Jan 2025
|
30
|
Jharkhand
|
FP/JH/SCH/27020/2017
|
FP/JH/SCH/27020/2017
|
Jwahar Navodaya Vidyalaya, Palamau-I
|
School
|
NAVODAYA VIDYALAYA SAMITI
|
9.71
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2017
|
Stage-I Approval on
|
:
|
24 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Nov 2024
|
|
|
|
15 Jan 2025
|
31
|
Uttarakhand
|
FP/UK/ROAD/45667/2020
|
8B/UCP/06/101/2020/FC
|
Kalimati Chittor Ghaishen to Upper talai
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.5225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jun 2020
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2024
|
|
|
|
15 Jan 2025
|
32
|
Uttarakhand
|
FP/UK/ROAD/39349/2019
|
8B/UCP/06/76/2020/FC
|
Diversion of forest land for widening and strengthening of existing road from Km 399.000 to Km 460.000 of NH-07 (Old NH-58) under Badrinath Forest Division in Chamoli District of Uttarakhand.
|
Road
|
MORTH (NHIDCL)
|
40.8916
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Mar 2019
|
Stage-I Approval on
|
:
|
29 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2024
|
|
|
|
15 Jan 2025
|
33
|
Orissa
|
FP/OR/ROAD/52400/2020
|
5-ORB479/2021-BHU
|
Diversion of 2.62 Hectre forest land for Construction of 4 lane carriage way with service road of Belpahar bypass from Km 0/0 to Km 2/971 for the year 2019-20 Under MCL fund
|
Road
|
EXECUTIVE ENGINEER ROAD AND BUILDING DIVSION JHARSUGDA
|
2.622
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2020
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
14 Jan 2025
|
34
|
Orissa
|
FP/OR/ROAD/150863/2022
|
5-ORC543/2022-BHU
|
Improvement of Road from Kharabhuin PWD road chhak to Khandahata P.S.road via-Sankulei, Ghantabania, Panasaputuli road for the year 2018-19
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DIVISION BOUDH
|
6.098
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
Stage-I Approval on
|
:
|
18 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Dec 2024
|
|
|
|
14 Jan 2025
|
35
|
Orissa
|
FP/OR/TRANS/119219/2021
|
5-ORC473/2021-BHU
|
33 K.V power line corridor on N.B.L.S tower from 220/33kV grid sub-station at Khairiput, Govindpalli of OPTCL to 33kV sub-station site near Saptadhara H.E.P of Avantika Power Projects
|
Transmission Line
|
SRI AVANTIKA POWER PROJECTS LIMITED
|
10.803
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2021
|
Stage-I Approval on
|
:
|
03 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2024
|
|
|
|
14 Jan 2025
|
36
|
Sikkim
|
FP/SK/ROAD/36928/2018
|
SK/ROAD-82/2021/FC
|
Diversion of 141.124 ha. forest land for non forest use in Toong Partem Pt. 4865 Tamze Border Road Forest Proposal
|
Road
|
ITBP GANGTOK
|
141.124
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2018
|
Stage-I Approval on
|
:
|
06 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2024
|
|
|
|
14 Jan 2025
|
37
|
Chhattisgarh
|
FP/CG/SCH/153246/2022
|
FC-II/IROCH-13/2022
|
TRIBAL DEVELOPMENT KANKER, Establishment of Eklavya Modern Residential School, At Village Anjani, Tehsil-Kanker, District- North Bastar, Kanker (C.G.)
|
School
|
TRIBAL DEVELOPMENT KANKER
|
6.66
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Mar 2022
|
Stage-I Approval on
|
:
|
03 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
13 Jan 2025
|
38
|
Sikkim
|
FP/SK/ROAD/49640/2020
|
Sk-NHIDCL-10/2021/FC
|
Diversion of 119.92 ha of forest land for const of road from Roleph to Menla under East Sikkim by NHIDCL
|
Road
|
NHIDCL RHENOK
|
119.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Sep 2020
|
Stage-I Approval on
|
:
|
20 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2022
|
|
|
|
13 Jan 2025
|
39
|
Uttarakhand
|
FP/UK/ROAD/29432/2017
|
8B/UCP/06/105/2017
|
Bayana to Syaba motor road
|
Road
|
PMGSY ID UTTARKASHI
|
3.318
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Sep 2017
|
Stage-I Approval on
|
:
|
26 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2024
|
|
|
|
13 Jan 2025
|
40
|
Orissa
|
FP/OR/RAIL/45694/2020
|
5-ORA528/2022-BHU
|
Khurda Road - Bolangir New BG Rail Link Project i.e. from Km112-180
|
Railway
|
EAST COAST RAILWAY
|
594.618
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jun 2020
|
Stage-I Approval on
|
:
|
13 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2024
|
|
|
|
13 Jan 2025
|
41
|
Rajasthan
|
FP/RJ/ROAD/46675/2020
|
8B/RAJ/06/36/2020
|
Construction of Approach Road for Proposed Bio-Diesel Plant, on NH-62(Old-NH-15) Chainage No 209+621 to 209 +671(RHS)AT Chak 7 BLW,SQ No-55,Killa No 21-25 At Village- Kenchiya,Tehsil-Pilibanga , Dist
|
Road
|
M/S JUGGLER HAWK INDUSTRIES PVT. LTD.
|
0.2239
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jul 2020
|
Stage-I Approval on
|
:
|
05 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
13 Jan 2025
|
42
|
Chhattisgarh
|
FP/CG/ROAD/35248/2018
|
FC-II/IROCH-11/2022
|
Panduka Mudagaon Road
|
Road
|
PROJECT DIRECTOR CSRSP PWD RAIPUR
|
24.569
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2018
|
Stage-I Approval on
|
:
|
12 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
13 Jan 2025
|
43
|
Jharkhand
|
FP/JH/SubStation/36590/2018
|
FP/JH/SubStation/36590/2018
|
Forest proposal for the land provided by state government for construction of 132/33 KV G/S/S at Barhi, Village- Khodahar, under transmission circle, Hazaribag
|
Sub Station
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
4.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2018
|
Stage-I Approval on
|
:
|
14 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2024
|
|
|
|
13 Jan 2025
|
44
|
Madhya Pradesh
|
FP/MP/ROAD/149386/2021
|
6-MPR036/2023-BHO
|
Diversion of 6.93 ha of forest land under FCA 1980 for Construction of Garhi Ahmedpur Road
|
Road
|
MPRDC BHOPAL DIVISION
|
6.93
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2022
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
12 Jan 2025
|
45
|
Tamil Nadu
|
FP/TN/TRANS/150320/2021
|
4-TNB100/2023-CHN
|
Erection of 230KV DC line on MC towers by making LILO of existing Ottiyambakkam to Omega feeder - II at the proposed Mambakkam 230/110KV Substation
|
Transmission Line
|
TAMIL NADU TRANSMISSION CORPORATION LIMITED
|
4.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2024
|
|
|
|
10 Jan 2025
|
46
|
Madhya Pradesh
|
FP/MP/WATER/151775/2022
|
6-MPB048/2023-BHO
|
Gond Deosar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.8959
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2022
|
Stage-I Approval on
|
:
|
23 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
10 Jan 2025
|
47
|
Uttarakhand
|
FP/UK/ROAD/45839/2020
|
8B/UCP/06/97/2020/FC
|
Thano Bhogpur Motor road KM 3 to 240 mitre PSC Motor Bridge
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.986
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2020
|
Stage-I Approval on
|
:
|
28 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2024
|
|
|
|
09 Jan 2025
|
48
|
Haryana
|
FP/HR/Approach/155085/2022
|
9-HRB168-2023-CHA
|
Diversion of forest land for access to the Retail Outlet of Bharat Petroleum Corporation Ltd. at Kawartan on Kaithal to Kawartan Road at RDKM 10.930 (RHS) Tehsil and, Distt. Kaithal, Haryana bearing
|
Approach Access
|
BPCL AMBALA
|
0.0544
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jul 2022
|
Stage-I Approval on
|
:
|
17 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Sep 2024
|
|
|
|
08 Jan 2025
|
49
|
Bihar
|
FP/BR/Others/46397/2020
|
FP/BR/Others/46397/2020
|
Diversion of 0.01245 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of SH-75 in Darbhanga district of Bihar.
|
Others
|
KIRAN SINGH
|
0.01245
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2020
|
Stage-I Approval on
|
:
|
19 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
06 Jan 2025
|
50
|
Uttarakhand
|
FP/UK/ROAD/10142/2015
|
8B/UCP/06/82/2015/FC
|
Construction of Chamdeval to Nidil M/R under PMGSY Champawat.
|
Road
|
PMGSY
|
5.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2015
|
Stage-I Approval on
|
:
|
23 Sep 2019
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2024
|
|
|
|
06 Jan 2025
|
|