FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/44930/2020   (ii). Name of Project for which Forest Land is required : 400 KV D/C BHADLA (PG) Bhadla 2 (TWIN HTLS) Transmission Line, District-Jodhpur, Rajasthan (Total Length 48.345 km)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : 400 KV D/C BHADLA (PG) Bhadla 2 (TWIN HTLS) Transmission Line, District-Jodhpur, Rajasthan (Total Length 48.345 km)   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 15200   (viii). Area of forest land proposed for diversion(in ha.): 4.95   (ix). Non-forest land required for this project(in ha.): 217.437   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : POWERGRID CORPORATION OF INDIA LIMITED   (ii). Address1 : 115 Nandpuri Colony, Nagaur Road   (iii). Address2 : Phalodi   (iv). State : Rajasthan   (v). District : Jodhpur   (vi). Pin : 342301   (vii). Landmark : NIL   (viii). Email address : ajay.mishra@powergridindia.com   (ix). Landline Telephone No. : 151-2233135   (x). Fax No. : 151-   (xi). Mobile No. : 9001890971   (xii). Website (if any) : www.poergridindia.com   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Kumar   (ii). Middle Name: NIL   (iii). Last Name: Gautam   (iv). Gender: Male   (v). Designation: Deputy General Manager   (vi). Address 1: 115 Nanadpuri Colony, Nagaur Road   (vii). Address 2: Phalodi   (viii). State: Rajasthan   (ix). District: Jodhpur   (x). Tehsil: Phalodi   (xi). Pin: 342301   (xii). Landmark: NIL   (xiii). Email Address: kumar.gautam@powergridindia.com   (xiv). Landline Telephone No.: 151-2233135   (xv). Fax No.: NIL   (xvi). Mobile No.: 8650502474   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ApprovedFP/RJ/TRANS/35279/20188B/RAJ/04/14/2019/FC10.29910.29904 Jul 201911 Sep 2019
Total 10.299 10.299
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur Territorial4.95217.437
Total4.95217.437
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur4.95155.7177
1.Bikaner061.7193
Total4.95217.437
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Dedasari021.5744
2Nure ki Bhurj1.764910.5864
3Kanasar0.635134.4067
4Mandli2.037422.7526
5Netawaton ki dhani0.2336.4136
6Baori Barsinga015.801
7Bari Seer0.279630.8752
8Kansing ki Seer013.3078
9Seora061.7193
Total 4.95 217.437
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Stringing Area1.614169.7295
2Tower Foundation Area03.6
3Remaining ROW3.3359144.1075
Total 4.95 217.437
C. Maps of forest land proposed to be diverted
Division 1. : Jodhpur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 4.95   (ii). Nature of the Project: Linear   (b). No. of Segments : Eight
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.5824    View File
2.0.7073    View File
3.0.4752    View File
4.0.6351    View File
5.0.4822    View File
6.1.5552    View File
7.0.233    View File
8.0.2796    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 12   (iii). Temporary Employment(Number of person-days): 450
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Project Report.
2CERTIFICATE FOR MINIMUM USE OF FOREST LAND.
3COMPLETE ALIGNMENT TOWER COORDINATES.
4Component Wise Area Calculation Sheet.
5Details of Permanent Employment to be generated.
6TWO TIME DEGRADED FOREST LAND UNDERTAKING.
7UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING TRANSMISSION LINE.
8UNDERTAKING FOR FRA CERTIFICATE.
9Undertaking for Muck Disposal Plan.
10UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND.
11UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE.
12UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION.
13UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION.
14Undertaking for Payment of Cost of Medicinal Pland under Transmission line.
15UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF Forest Land.
16UNDERTAKING FOR SUBMISSION OF MISSING OR REQUIRED ADDITIONAL DOCUMENTS.
17Undertaking for Use of Any Material From Forest Land.
18UNDERTAKING FOR USE OF FOREST LAND.
19Undertaking to Pay the Cost of Plantation.
20Village Wise Area Calculation Sheet.
21Segment Wise Area Calculation Sheet.
22Bar chart Status.
23Geo Referenced Zoom view Digital map Segment 1.
24Geo Referenced Zoom view Digital map Segment 2 and 3.
25Geo Referenced Zoom view Digital map Segment 4.
26Geo Referenced Zoom view Digital map Segment 5.
27Geo Referenced Zoom view Digital map Segment 6 and 7.
28Geo Referenced Zoom view Digital map Segment 8.
29COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE.
30Alternative Route map 50000 scale.
31Administrative and Financial Approval.
32Reply Letter of 18th May. 2020 EDS.
33Khasra Map and Jamabandi.