Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
02/04/2018
|
.
|
|
2
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
23/04/2018
|
The correction have been made as per the instruction received
|
|
3
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
18/05/2018
|
Kindly resolve the following shortcomings.
1. Copy of map indicating location of alternative examined is not uploaded at para D-a of part I.
2. Copy of cost benefit analysis is not uploaded at para G-a of part I.
3. Details of emloyment likely to be generated filled in at para E of part I are incorrect.
4. Documents uploaded at para L-f, L-g and para L-h are not signed by competent authority of Revennue department.
5. G.I.S. Geo referenced map of C.A. area is not uploaded at para L-v of part I and at para 13-ii of part II. Instead of this, Topo sheet map of the area being proposed for diversion has been uploaded.
|
|
4
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
22/05/2018
|
.
|
|
5
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
07/06/2018
|
The correction have been made as per the instruction received
|
|
6
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
22/06/2018
|
.
|
|
7
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
23/06/2018
|
Kindly upload A.N.R. estimate of oak trees and estimate of translocation of oak tress having measurement of 0-10 c.m. coming in alignment of proposed road.
|
|
8
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
10/07/2018
|
.
|
|
9
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
17/07/2018
|
Sir,
Please Complete The ANR before Site Inspection of CF Bhagirathi.
|
|
10
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
20/07/2018
|
Sir, Please Complete The ANR before Site Inspection of CF Bhagirathi.
|
|
11
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
14/08/2018
|
The correction have been made as per the instruction received
|
|
12
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
30/08/2018
|
Sir, objection clear as per attachment to PDF file.
|
|
13
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
19/09/2018
|
Please attend the shortcoming as per attached file.
|
|
14
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
28/09/2018
|
Please attend the shortcoming as per attached file.
|
|
15
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
26/11/2018
|
The correction have been made as per the instruction received
|
|
16
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
24/12/2018
|
Please attend the shortcoming as per attached file.
|
|
17
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
16/01/2019
|
The correction have been made as per the instruction received
|
|
18
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
19/01/2019
|
Sir, objection clear as per attachment to PDF file.
|
|
19
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
25/01/2019
|
Please submit the corrected original copy of FRA-2006, digital map/GIS map of proposed forest land and CA land , justification to this office.
|
|
20
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
25/01/2019
|
Please submit the corrected original copy of FRA-2006, digital map/GIS map of proposed forest land and CA land , justification to this office.
|
|
21
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
13/02/2019
|
The correction have been made as per the instruction received
|
|
22
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
28/02/2019
|
Please submit the corrected original copy of FRA-2006, digital map/GIS map of proposed forest land and CA land , justification to this office.
|
|
23
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
22/03/2019
|
The correction have been made as per the instruction received
|
|
24
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
26/03/2019
|
Sir, objection clear as per attachment to PDF file.
|
|
25
|
Nodal Officer
|
EDS
|
CF (Bhagirathi)
|
29/03/2019
|
find the letter attached
|
|
26
|
Nodal Officer
|
EDS
|
CF (Yamuna)
|
29/03/2019
|
find the letter attached
|
|
27
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
29/03/2019
|
Find the letter attached.
|
|
28
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
22/04/2019
|
.
|
|
29
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
04/05/2019
|
The correction have been made as per the instruction received
|
|
30
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
01/08/2019
|
.
|
|
31
|
CF (Yamuna)
|
REPLY
|
Nodal Officer
|
02/08/2019
|
Reply provided by DFO is attached.
|
|
32
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
03/08/2019
|
find the letter attached.
|
|
33
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
21/08/2019
|
Find the letter attached.
|
|
34
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
27/08/2019
|
The correction have been made as per the instruction received
|
|
35
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
05/09/2019
|
In the place of CA toposheet, road alignment toposheet has been uploaded. plz rectify. & see EDS serial no-3 , provide the whole FRA certificate in hard copy in this office.
|
|
36
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
20/09/2019
|
The correction have been made as per the instruction received
|
|
37
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
23/09/2019
|
sir objection clear as per attachment to pdf file.
|
|
38
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
04/10/2019
|
Please attend the shortcomings as per mentioned in attached file.
|
|
39
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
16/10/2019
|
Please attend the shortcomings as per mentioned in attached file.
|
|
40
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
01/11/2019
|
The correction have been made as per the instruction received
|
|
41
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
14/11/2019
|
CF Bhagirathi Eds point no.6 has not rectified yet, plz rectify.
|
|
42
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
30/11/2019
|
The correction have been made as per the instruction received
|
|
43
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
07/12/2019
|
CF Bhagirathi Eds point no.6 has not been rectified yet, plz rectify.
|
|
44
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
30/01/2020
|
The correction have been made as per the instruction received
|
|
45
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
17/02/2020
|
sir npv certificate has not uploaded in part-I
|
|
46
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
04/03/2020
|
The correction have been made as per the instruction received
|
|
47
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
05/05/2020
|
sir objection clear as per attachment to pdf file.
|
|
48
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
15/05/2020
|
The hard copy of EDS reply along with annexure have not submitted to this office.
|
|
49
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
28/05/2020
|
The hard copy of EDS reply along with annexure have not submitted to this office
|
|
50
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
15/06/2020
|
The correction have been made as per the instruction received
|
|
51
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
23/06/2020
|
The hard copy of EDS reply along with annexure have not submitted to this office.
|
|
52
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
03/07/2020
|
The correction have been made as per the instruction received
|
|
53
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
09/07/2020
|
sir objection clear as per attachment to pdf file
|
|
54
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
16/07/2020
|
Please provide the hard copy along with annexure to this office for further action.
|
|
55
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
20/07/2020
|
sir objection clear as per attachment to pdf file
|
|
56
|
CF (Bhagirathi)
|
REPLY
|
Nodal Officer
|
30/07/2020
|
EDS Reply done find the letter attached.
|
|
57
|
Nodal Officer
|
EDS
|
CF (Bhagirathi)
|
11/08/2020
|
find the letter attached
|
|
58
|
Nodal Officer
|
EDS
|
CF (Yamuna)
|
11/08/2020
|
find the letter attached
|
|
59
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
13/08/2020
|
find the letter attached
|
|
60
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
14/08/2020
|
.
|
|
61
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
09/09/2020
|
The correction have been made as per the instruction received
|
|
62
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
07/10/2020
|
plise submited the hard copy of eds querv
|
|
63
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
23/10/2020
|
The correction have been made as per the instruction received
|
|
64
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
16/12/2020
|
..
|
|
65
|
CF (Yamuna)
|
REPLY
|
Nodal Officer
|
16/12/2020
|
Reply of DFO is attached.
|
|
66
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
17/12/2020
|
find the letter attached
|
|
67
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
24/12/2020
|
find the letter attached
|
|
68
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
12/01/2021
|
The correction have been made as per the instruction received
|
|
69
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
22/01/2021
|
Sir, plz submit the eds neutralization letter to this office.
|
|
70
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
19/02/2021
|
The correction have been made as per the instruction received
|
|
71
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
24/02/2021
|
Sir, objection clear as per attachment to pdf file.
|
|
72
|
CF (Bhagirathi)
|
REPLY
|
Nodal Officer
|
26/02/2021
|
Please find the letter attached.
|
|
73
|
Regional Office
|
EDS
|
State secretary
|
31/03/2021
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
74
|
State secretary
|
EDS
|
Nodal Officer
|
31/03/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
75
|
Nodal Officer
|
EDS
|
CF (Bhagirathi)
|
31/03/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
76
|
Nodal Officer
|
EDS
|
CF (Yamuna)
|
31/03/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
77
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
01/04/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
78
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
05/04/2021
|
.
|
|
79
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
25/06/2021
|
The correction have been made as per the instruction received
|
|
80
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
30/06/2021
|
Please submit the hard copy of guary.. solution
|
|
81
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
30/06/2021
|
The correction have been made as per the instruction received
|
|
82
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
02/07/2021
|
Please submit the hard copy of guary.. solution
|
|
83
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
05/07/2021
|
The correction have been made as per the instruction received
|
|
84
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
15/07/2021
|
.
|
|
85
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
17/07/2021
|
find the letter attached.
|
|
86
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
27/07/2021
|
find the letter attached.
|
|
87
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
03/08/2021
|
The correction have been made as per the instruction received
|
|
88
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
07/08/2021
|
Sir, objection clear as per attachment to pdf file.
|
|
89
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
09/08/2021
|
Please send original documents.
|
|
90
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
16/08/2021
|
hard copy has been sent vide this office letter dated 07-08-2021
|
|
91
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
17/08/2021
|
Please send original documents
|
|
92
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
23/08/2021
|
original Document has been sent vide this office letter dated 07-08-2021.
|
|
93
|
CF (Yamuna)
|
REPLY
|
Nodal Officer
|
28/08/2021
|
Reply attached.
|
|
94
|
CF (Bhagirathi)
|
REPLY
|
Nodal Officer
|
28/08/2021
|
Sir please find the attachment.
|
|
95
|
Nodal Officer
|
EDS
|
CF (Bhagirathi)
|
06/09/2021
|
find the letter attached
|
|
96
|
Nodal Officer
|
EDS
|
CF (Yamuna)
|
06/09/2021
|
find the letter attached
|
|
97
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
07/09/2021
|
find the letter attached
|
|
98
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
07/09/2021
|
find the letter attached
|
|
99
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
14/09/2021
|
The correction have been made as per the instruction received
|
|
100
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
16/09/2021
|
Sir, submit the eds neutralization letter to this office.
|
|
101
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
06/10/2021
|
The correction have been made as per the instruction received
|
|
102
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
08/10/2021
|
find the letter attached
|
|
103
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
25/10/2021
|
The correction have been made as per the instruction received
|
|
104
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
17/12/2021
|
Plz mention date of meeting of DLC in proforma-30
|
|
105
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
17/12/2021
|
The correction have been made as per the instruction received
|
|
106
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
18/12/2021
|
Sir, objection clear as per attachment to pdf file.
|
|
107
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
18/12/2021
|
original Documents not availbe.
|
|
108
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
20/12/2021
|
The correction have been made as per the instruction received
|
|
109
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
24/12/2021
|
find the letter attached
|
|
110
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
03/01/2022
|
.
|
|
111
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
03/01/2022
|
original Documents not availbe.
|
|
112
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
03/01/2022
|
The correction have been made as per the instruction received
|
|
113
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
05/01/2022
|
original document not available.
|
|
114
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
15/01/2022
|
original document has been sent vide this office letter dated 18.12.2021.
|
|
115
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
18/01/2022
|
Reply provided by DFO is not relevant to query raised by Nodal office
|
|
116
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
22/01/2022
|
.
|
|
117
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
30/03/2022
|
The correction have been made as per the instruction received
|
|
118
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
31/03/2022
|
Please submit the hard copy
|
|
119
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
01/04/2022
|
The correction have been made as per the instruction received
|
|
120
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
27/04/2022
|
Please submit the hard copy
|
|
121
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
27/04/2022
|
The correction have been made as per the instruction received
|
|
122
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
31/05/2022
|
Please provide the hard copy of eds solution.
|
|
123
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
03/06/2022
|
The correction have been made as per the instruction received
|
|
124
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
25/08/2022
|
The correction have been made as per the instruction receive.
|
|
125
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
30/08/2022
|
Point no. 9 of Query not fully resolved yet. Date not mentioned in field inspection report of CA area. Specie wise and girth wise list of trees present in CA area not submitted by DFO Upper Yamuna.
|
|
126
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
30/08/2022
|
The correction have been made as per the instruction receive.
|
|
127
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
31/08/2022
|
DFO Submit the hard copy of documents accordingly to CF office.
|
|
128
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
05/09/2022
|
The correction have been made as per the instruction receive.
|
|
129
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
05/09/2022
|
DFO Submit the hard copy of documents accordingly to CF office.
|
|
130
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
09/09/2022
|
The correction have been made as per the instruction receive
|
|
131
|
CF (Yamuna)
|
REPLY
|
Nodal Officer
|
15/09/2022
|
Reply is attached and hard copy is also dispatched separately.
|
|
132
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
06/10/2022
|
You have not mentioned the letter number in the FRA and please provide a copy of the complete FRA.
|
|
133
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
05/11/2022
|
You have not mentioned the letter number in the FRA and please provide a copy of the complete FRA.
|
|
134
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
16/11/2022
|
The correction have been made as per the instruction received
|
|
135
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
22/11/2022
|
pls upload complete FRA ducuments in additional information
|
|
136
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
05/12/2022
|
The correction have been made as per the instruction received
|
|
137
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
01/02/2023
|
The correction have been made as per the instruction received
|
|
138
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
25/03/2023
|
• • The hard copy of EDS is containing original documents is not yet received in this office.
|
|
139
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
11/04/2023
|
compelete FRA REPORT is uploaded in part -1, Sr. No.-72. pls check the documents
|
|
140
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
01/06/2023
|
find the letter attached
|
|
141
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
03/06/2023
|
find the attach lettor.
|
|
142
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
13/07/2023
|
The correction have been made as per the instruction received
|
|
143
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
20/07/2023
|
the hard copy is not received yet
|
|
144
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
09/08/2023
|
The correction have been made as per the instruction received
|
|
145
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
29/08/2023
|
correction have been made as per instruction
|
|
146
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
16/10/2023
|
find the letter attached
|
|
147
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
21/10/2023
|
find the lettor attched
|
|
148
|
CF (Bhagirathi)
|
REPLY
|
Nodal Officer
|
18/01/2024
|
correction have been made as per instruction received
|
|
149
|
Nodal Officer
|
REPLY
|
State secretary
|
25/01/2024
|
correction have been made as per instruction received
|
|
150
|
State secretary
|
REPLY
|
Regional Office
|
27/01/2024
|
The correction have been made as per the instruction received
|
|
151
|
Regional Office
|
EDS
|
State secretary
|
05/03/2024
|
State Govt is requested to attend the shortcomings as per the letter attached.
|
|
152
|
State secretary
|
EDS
|
Nodal Officer
|
06/03/2024
|
State Govt is requested to attend the shortcomings as per the letter attached.
|
|
153
|
Nodal Officer
|
EDS
|
CF (Bhagirathi)
|
06/03/2024
|
State Govt is requested to attend the shortcomings as per the letter attached.
|
|
154
|
Nodal Officer
|
EDS
|
CF (Yamuna)
|
06/03/2024
|
State Govt is requested to attend the shortcomings as per the letter attached.
|
|
155
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
07/03/2024
|
State Govt is requested to attend the shortcomings as per the letter attached.
|
|
156
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
02/04/2024
|
State Govt is requested to attend the shortcomings as per the letter attached.
|
|
157
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
06/04/2024
|
The correction have been made as per the instruction received
|
|
158
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
04/05/2024
|
Please submit the hard copy of query . solution
|
|
159
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
09/05/2024
|
The correction have been made as per the instruction received
|
|
160
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
09/05/2024
|
Please submit the hard copy of query
|
|
161
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
06/06/2024
|
The correction have been made as per the instruction received
|
|
162
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
02/07/2024
|
Please submit the hard copy of query
|
|
163
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
25/07/2024
|
The correction have been made as per the instruction received
|
|
164
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
26/07/2024
|
.
|
|
165
|
CF (Bhagirathi)
|
EDS
|
DFO (Uttarkashi)
|
01/08/2024
|
original document not available.
|
|
166
|
DFO (Uttarkashi)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
03/08/2024
|
PLS CORRET FACTOR OF SAFETY OF MUCK DUMPING PLAN
|
|
167
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Uttarkashi)
|
06/08/2024
|
The correction have been made as per the instruction received
|
|
168
|
DFO (Uttarkashi)
|
REPLY
|
CF (Bhagirathi)
|
14/08/2024
|
The correction have been made as per the instruction received
|
|
169
|
CF (Bhagirathi)
|
REPLY
|
Nodal Officer
|
22/08/2024
|
The correction have been made as per the instruction received
|
|
170
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
29/08/2024
|
requested to attend the shortcomings as per the letter attached.
|
|
171
|
DFO (Upper Yamuna,Barkot)
|
EDS
|
User Agency (eecdpwd_uki@rediffmail.com)
|
16/09/2024
|
please reply eds quarry.
|
|
172
|
User Agency (eecdpwd_uki@rediffmail.com)
|
REPLY
|
DFO (Upper Yamuna,Barkot)
|
04/10/2024
|
The correction have been made as per the instruction received
|
|
173
|
DFO (Upper Yamuna,Barkot)
|
REPLY
|
CF (Yamuna)
|
25/10/2024
|
The correction have been made as per the instruction received
|
|
174
|
CF (Yamuna)
|
REPLY
|
Nodal Officer
|
07/11/2024
|
Reply is attached and hard copy is also dispatched separately.
|
|
175
|
Nodal Officer
|
EDS
|
CF (Yamuna)
|
02/12/2024
|
Please send pointwise RO EDS reply online with annexures.
|
|
176
|
CF (Yamuna)
|
EDS
|
DFO (Upper Yamuna,Barkot)
|
07/12/2024
|
Please send pointwise RO EDS reply online with annexures.
|
|