Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Rajasthan
|
FP/RJ/ROAD/6996/2014
|
8B/RAJ/06/7/2015
|
Road from Bhanwargarh to Ranwasi
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.5
|
IN-PRINCIPLE
|
27-Dec-2018
|
|
|
|
|
|
No
|
2
|
Rajasthan
|
FP/RJ/WATER/36565/2018
|
8B/Raj/08/30/2020
|
Balance work of cluster scheme of 315 villages of Mandalgarh, Bijoliya and Jahajpur Tehsils along with Augmentation of UWSS of mandalgarh and Bijoliya Towns from Aroli Headworks under Chambal-Bhilwara
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
2.0467
|
IN-PRINCIPLE
|
04-Feb-2021
|
|
|
|
|
|
No
|
3
|
Rajasthan
|
FP/RJ/WATER/13768/2015
|
8B/Raj/08/13/2016/FC
|
ITJSK PACKAGE2 DRINKING WATER PROJECT
|
Drinking Water
|
PHED ITJSK PROJECT PACKAGE II
|
0.5662
|
IN-PRINCIPLE
|
17-Feb-2017
|
|
|
|
|
|
No
|
4
|
Rajasthan
|
FP/RJ/OFC/45025/2020
|
8B/RAJ003/2024-JPR
|
Underground OFC along PWD road within existing ROW from Udaipurwati - Kot from Lat/long point 27.70724°/ 75.47414° to 27.66962°/ 75.43614° for total length of 6.349 KM and forest area – 0.2857 ha, within ROW Limits in Jhunjhunu District, Rajasthan.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.06
|
IN-PRINCIPLE
|
05-Nov-2024
|
|
|
|
|
|
No
|
5
|
Rajasthan
|
FP/RJ/ROAD/42702/2019
|
8B/RAJ052/2022-JPR
|
Widening of Road and Construction of Divider from Sr. School Lohagal to police Chowki Shastri Nagar Ajmer, District-Ajmer, Rajasthan".
|
Road
|
AJMER DEVELOPMENT AUTHORITY
|
1.789
|
IN-PRINCIPLE
|
24-Nov-2022
|
|
|
|
|
|
No
|
6
|
Rajasthan
|
FP/RJ/ROAD/43718/2020
|
8B/RAJ049/2022-JPR
|
Construction of Approach Road (0/00 to 0/531.60 Km) from Bhageshwar to Khasra No. 2/3, Revenue Village – Bhageshwar, Tehsil - Neem Ka Thana, District – Sikar (Rajasthan)
|
Road
|
M/S HEERARAM & SONS
|
0.2586
|
IN-PRINCIPLE
|
07-Mar-2024
|
|
|
|
|
|
No
|
7
|
Rajasthan
|
FP/RJ/ROAD/32363/2018
|
8B/Raj/06/24/2019/FC
|
Development of Emergency Landing Facility for Fighter on National Highway No. 68 (Old No. 15) from km 109.740 to km 113.445 of Jaisalmer-Barmer stretch, in the state of Rajasthan
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BARMER
|
6.5976
|
IN-PRINCIPLE
|
20-Feb-2020
|
|
|
|
|
|
No
|
8
|
Rajasthan
|
FP/RJ/TRANS/120030/2021
|
8B/Raj/12/28/2021/FC
|
132 KV S/C Raisinghnagar - Jetsar (M/s NTPC) Transmission Line, District-Sri Ganganagar, Rajasthan (Total Length 17893 meters).
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD HANUMANGARH
|
0.0972
|
IN-PRINCIPLE
|
22-Dec-2021
|
|
|
|
|
|
No
|
9
|
Rajasthan
|
FP/RJ/ROAD/7000/2014
|
8B/RJ/06/19/2015
|
Road from Gordhanpura to Kali mati
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.98
|
IN-PRINCIPLE
|
04-Aug-2016
|
|
|
|
|
|
No
|
10
|
Rajasthan
|
FP/RJ/ROAD/7127/2014
|
8B/Raj/06/24/2015
|
bt ROAD FROM MAMLI LAKSHMIPURA TO PATPADI
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.14
|
IN-PRINCIPLE
|
19-Jan-2021
|
|
|
|
|
|
No
|
11
|
Rajasthan
|
FP/RJ/ROAD/6982/2014
|
8B/Rj/06/20/2015
|
Road from Gordhanpura to Ghatta
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.22
|
IN-PRINCIPLE
|
05-Feb-2016
|
|
|
|
|
|
No
|
12
|
Rajasthan
|
FP/RJ/WATER/18811/2016
|
8B/Raj/08/41/2015
|
Chambal-Bhilwara Water Supply Project (Phase-I)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
15.0015
|
IN-PRINCIPLE
|
23-May-2016
|
|
|
|
|
|
No
|
13
|
Rajasthan
|
FP/RJ/WATER/18811/2016
|
8B/Raj/08/41/2015
|
Chambal-Bhilwara Water Supply Project (Phase-I)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
15.0015
|
IN-PRINCIPLE
|
23-May-2016
|
|
|
|
|
|
No
|
14
|
Rajasthan
|
FP/RJ/WATER/18811/2016
|
8B/Raj/08/41/2015
|
Chambal-Bhilwara Water Supply Project (Phase-I)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
15.0015
|
IN-PRINCIPLE
|
23-May-2016
|
|
|
|
|
|
No
|
15
|
Rajasthan
|
FP/RJ/WATER/18811/2016
|
8B/Raj/08/41/2015
|
Chambal-Bhilwara Water Supply Project (Phase-I)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
15.0015
|
IN-PRINCIPLE
|
23-May-2016
|
|
|
|
|
|
No
|
16
|
Rajasthan
|
FP/RJ/IRRIG/47910/2020
|
8B/RAJ001/2022-JPR
|
Construction of Mansa Mata Anicut, village Kho, G.P. Manaksas, Tehsil Udaipurwati, District Jhunjhunu
|
Irrigation
|
WATER RESOURCES DEPARTMENT,DIVISION,SIKAR
|
1.8498
|
IN-PRINCIPLE
|
29-Sep-2022
|
|
|
|
|
|
No
|
17
|
Rajasthan
|
FP/RJ/WATER/154215/2022
|
8B/RAJ/028/2023-JPR
|
Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi (Rajasthan)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARMENT RAJASTHAN
|
4.9975
|
IN-PRINCIPLE
|
10-Aug-2023
|
|
|
|
|
|
No
|
18
|
Rajasthan
|
FP/RJ/WATER/154215/2022
|
8B/RAJ/028/2023-JPR
|
Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi (Rajasthan)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARMENT RAJASTHAN
|
4.9975
|
IN-PRINCIPLE
|
10-Aug-2023
|
|
|
|
|
|
No
|
19
|
Rajasthan
|
FP/RJ/WATER/154215/2022
|
8B/RAJ/028/2023-JPR
|
Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi (Rajasthan)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARMENT RAJASTHAN
|
4.9975
|
IN-PRINCIPLE
|
10-Aug-2023
|
|
|
|
|
|
No
|
20
|
Rajasthan
|
FP/RJ/WATER/15016/2015
|
8B-Raj024/2022JPR
|
RURAL WATER SUPPLY SCHEME VILLAGE SONKHARI
|
Drinking Water
|
PHED
|
0.05
|
IN-PRINCIPLE
|
09-May-2022
|
|
|
|
|
|
No
|
21
|
Rajasthan
|
FP/RJ/TRANS/44930/2020
|
8B/RAJ/04/10/2021
|
400 KV D/C BHADLA (PG) Bhadla 2 (TWIN HTLS) Transmission Line, District-Jodhpur, Rajasthan (Total Length 48.345 km)
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
4.95
|
IN-PRINCIPLE
|
18-Jun-2021
|
|
|
|
|
|
No
|
22
|
Rajasthan
|
FP/RJ/TRANS/150764/2022
|
8B/RAJ030/2022-JPR
|
Avaada Energy Pvt Ltd. Solar Power Plant in Kolayat Tehsil , Bikaner - Bhadla -II PS 220 KV S/C Transmission Line
|
Transmission Line
|
AVAADA ENERGY PRIVATE LIMITED
|
0.9625
|
IN-PRINCIPLE
|
13-Jun-2022
|
|
|
|
|
|
No
|
23
|
Rajasthan
|
FP/RJ/ROAD/41036/2019
|
8B/Raj/06/29/2020
|
Upgradation to 2 lane with paved shoulder/ 4 lane of Khajuwala - Poogal Section (Design chainage 0+000 to 30+812) and Poogal - Dantour - Jaggasar - Gokul - Goddu- Ranjitpura - Charanwala - Naukh - Ba
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA BIKANER
|
11.8259
|
IN-PRINCIPLE
|
16-Oct-2020
|
|
|
|
|
|
No
|
24
|
Rajasthan
|
FP/RJ/ROAD/6994/2014
|
8B/RAJ/06/6/2015
|
Road from Khandela to Halawani
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.05
|
IN-PRINCIPLE
|
04-Aug-2016
|
|
|
|
|
|
No
|
25
|
Rajasthan
|
FP/RJ/TRANS/28622/2017
|
8B/Raj/04/11/2018/FC
|
Babai (RRPVNL) - Bhiwani (PG) 400kV D/C Transmission Line
|
Transmission Line
|
NRSS XXXVI TRANSMISSION LIMITED
|
13.015
|
IN-PRINCIPLE
|
06-Jul-2018
|
|
|
|
|
|
No
|
26
|
Rajasthan
|
FP/RJ/ROAD/14903/2015
|
8B/RAJ/06/43/2015/FC
|
missing link dooni anwa road to chandli maata jee
|
Road
|
EXECUTIVE ENGINEER RAJASTHAN STATE AGRICULTURAL MARKTING BOARD DIVISION TONK
|
2.1
|
IN-PRINCIPLE
|
15-Dec-2017
|
|
|
|
|
|
No
|
27
|
Rajasthan
|
FP/RJ/ROAD/6988/2014
|
8B/RAJ/06/172015
|
Road from Ramgarh-Kalapatta Road to Karwala Lakshmipura
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2
|
IN-PRINCIPLE
|
01-Oct-2018
|
|
|
|
|
|
No
|
28
|
Rajasthan
|
FP/RJ/ROAD/8746/2014
|
8B/RAJ/06/11/2015
|
Rajpur Benta Road To Isatori (Actually from Rampur upreti to Isatori)
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.97
|
IN-PRINCIPLE
|
04-Aug-2016
|
|
|
|
|
|
No
|
29
|
Rajasthan
|
FP/RJ/OFC/43321/2019
|
8B/Raj/09/17/2020/FC
|
BHARATNET PROJECT
|
Optical Fibre Cable
|
BHARAT SANCHAR NIGAM LIMITED RAJASTHAN
|
0.5625
|
IN-PRINCIPLE
|
21-Jul-2020
|
|
|
|
|
|
No
|
30
|
Rajasthan
|
FP/RJ/ROAD/6997/2014
|
8B/RJ/06/26/2015
|
Upgradation of road from Kasbathana to Bamangawan
|
Road
|
PUBLIC WORKS DEPARTMENT
|
5.2
|
IN-PRINCIPLE
|
23-Aug-2016
|
|
|
|
|
|
No
|
31
|
Rajasthan
|
FP/RJ/WATER/17698/2016
|
8B/Raj/08/28/2018/FC
|
Bhasirodgarh Borav Water Supply Project
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
3.8122
|
IN-PRINCIPLE
|
22-Dec-2021
|
|
|
|
|
|
No
|
32
|
Rajasthan
|
FP/RJ/WATER/17698/2016
|
8B/Raj/08/28/2018/FC
|
Bhasirodgarh Borav Water Supply Project
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
3.8122
|
IN-PRINCIPLE
|
22-Dec-2021
|
|
|
|
|
|
No
|
33
|
Rajasthan
|
FP/RJ/WATER/39353/2019
|
8B/Raj/08/18/2020
|
Water Supply Project for 399 Villages and 395 Dhanies of Blocks Kushalgarh and Sajjangarh, District – Banswara, Rajasthan.
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT, DIVISION - I BANSWARA
|
16.4546
|
IN-PRINCIPLE
|
07-Dec-2020
|
|
|
|
|
|
No
|
34
|
Rajasthan
|
FP/RJ/ROAD/149560/2021
|
8B/RAJ017/2023-JPR
|
“Construction of Widening ,Strengthening on SH-32A From Jhameshwarji to Jagat Road KM Stone No-67/0 to 80/0, Tehsil–Girwa, District -Udaipur (Rajasthan)”
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN
|
6.75
|
IN-PRINCIPLE
|
30-Aug-2023
|
|
|
|
|
|
No
|
35
|
Rajasthan
|
FP/RJ/TRANS/153699/2022
|
8B/RAJ012/2023-JPR
|
Construction of 220kV S/C Transmission line on D/C towers laying between proposed ABCSIPL 300MW Solar Power Plant to PGCIL 765/400/220kV GSS at Near Village - Badi Sird, Tehsil-BAP, District – Jodhpur in the State of Rajasthan ((Total Length 11.540 km)
|
Transmission Line
|
ABC SOLAR (INDIA) PRIVATE LIMITED
|
0.175
|
IN-PRINCIPLE
|
14-Oct-2024
|
|
|
|
|
|
No
|
36
|
Rajasthan
|
FP/RJ/ROAD/143853/2021
|
8B/RAJ015/2023-JPR
|
Widening & Stentheing of Dhariyawad Pratapgarh Mandsour Road 58/0 K.M to 59/0 K.M & 76/0 K.M to 98/0 K.M (SH-81)
|
Road
|
EE1PWD PRATAPGARH
|
3.468
|
IN-PRINCIPLE
|
11-May-2023
|
|
|
|
|
|
No
|
37
|
Rajasthan
|
FP/RJ/OFC/51041/2020
|
8B/RAJ/12/30/2021/FC
|
Laying of Underground Optical Fiber Cable along the (Ratlam - Bamnia road within the existing ROW from KMS - 0/0 to KMS 11/00 Km) District - Banswara (Raj.)
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.0667
|
IN-PRINCIPLE
|
06-Apr-2023
|
|
|
|
|
|
No
|
38
|
Rajasthan
|
FP/RJ/TRANS/116897/2020
|
8B/Raj/04/19/2021/FC
|
Construction of 220 KV S/C Transmission line for Power Evacuation from 200 MW Solar Power Project of M/s Mahindra Susten Private Limited, Village – Khari Charnan, Tehsil – Kolayat, District – Bikaner, Rajasthan to RVPN 220 KV Gajner Substation (Total Length 8.547 km)
|
Transmission Line
|
MAHINDRA SUSTEN PVT. LTD.
|
0.0812
|
IN-PRINCIPLE
|
10-Sep-2021
|
|
|
|
|
|
No
|
39
|
Rajasthan
|
FP/RJ/ROAD/154137/2022
|
8B/RAJ010/2023-JPR
|
“Construction of Bypass Road from NH-8 to Kothariya & Nathuwas link road, Tehsil-Nathdwara, District -Rajsamand (Rajasthan)”
|
Road
|
NAGAR PALIKA NATHDWARA,RAJASTHAN
|
1.2978
|
IN-PRINCIPLE
|
21-Jun-2023
|
|
|
|
|
|
No
|
40
|
Rajasthan
|
FP/RJ/TRANS/44981/2020
|
8B/Raj/04/9/2021/FC
|
Construction of 765 KV DC Fatehgarh II to Bhadla II Transmission Line, District - Jodhpur, Raj
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
2.8874
|
IN-PRINCIPLE
|
25-Mar-2021
|
|
|
|
|
|
No
|
41
|
Rajasthan
|
FP/RJ/TRANS/8925/2014
|
|
WELSPUN RENEWABLES ENERGY PVT.LTD
|
Transmission Line
|
WELSPUN RENEWABLES ENERGY PVT LIMITED
|
2.416
|
IN-PRINCIPLE
|
17-Mar-2015
|
|
|
|
|
|
No
|
42
|
Rajasthan
|
FP/RJ/WATER/18810/2016
|
8B/RAJ/08/11/2016/FC
|
BORABAS MANDANA WATER SUPPLY PROJECT KOTA (RAJASTHAN)
|
Drinking Water
|
EXECUTIVE ENGINEER PHED PROJECT DIVISION I KOTA
|
4
|
IN-PRINCIPLE
|
19-Jul-2017
|
|
|
|
|
|
No
|
43
|
Rajasthan
|
FP/RJ/WATER/18810/2016
|
8B/RAJ/08/11/2016/FC
|
BORABAS MANDANA WATER SUPPLY PROJECT KOTA (RAJASTHAN)
|
Drinking Water
|
EXECUTIVE ENGINEER PHED PROJECT DIVISION I KOTA
|
4
|
IN-PRINCIPLE
|
19-Jul-2017
|
|
|
|
|
|
No
|
44
|
Rajasthan
|
FP/RJ/WATER/26264/2017
|
8B/RAJ/08/26/2017/FC
|
Trambay station Harizan Basti OHSR
|
Drinking Water
|
EXECUTIVE ENGINEER PHED CITY DN I AJMER
|
0.0225
|
IN-PRINCIPLE
|
09-Mar-2018
|
|
|
|
|
|
No
|
45
|
Rajasthan
|
FP/RJ/WATER/35465/2018
|
8B/Raj/08/11/2021/FC
|
Amrut Yojana ( Water Supply Project for Urban Chittorgarh)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT CHITTORGARH
|
0.016
|
IN-PRINCIPLE
|
18-May-2021
|
|
|
|
|
|
No
|
46
|
Rajasthan
|
FP/RJ/Approach/149635/2021
|
8B/RAJ001/2023-JPR
|
Construction of Approach Road for Proposed Indian Oil Corporation Limited Retail Outlet on Birdhawal to Chhatargarh Road between KM Stone No. 43-44 (Chainage: 43/195 - 43/230) LHS in Kila No. 16, 17/2, Plot No. 23/30, Murba No. 19 Village-2 DOA, Tehsil - Suratgarh, District- Sri Ganganagar, Raj.
|
Approach Access
|
Indian Oil Corporation Limited
|
0.0614
|
IN-PRINCIPLE
|
24-Nov-2023
|
|
|
|
|
|
No
|
47
|
Rajasthan
|
FP/RJ/RAIL/20470/2016
|
8B/RAJ/07/15/2017/FC
|
Udaipur-Himmatnagar Railway Line Gauge Conversion Project
|
Railway
|
NORTH WESTERN RAILWAY
|
35.7823
|
IN-PRINCIPLE
|
18-Oct-2017
|
|
|
|
|
|
No
|
48
|
Rajasthan
|
FP/RJ/ROAD/16088/2015
|
8B/RAJ016/2022-JPR
|
Kudi Bhagtasani HB to Pali Link Road
|
Road
|
JODHPUR DEVELOPMENT AUTHORITY JODHPUR
|
0.3291
|
IN-PRINCIPLE
|
27-Apr-2022
|
|
|
|
|
|
No
|
49
|
Rajasthan
|
FP/RJ/OFC/47243/2020
|
8B/RAJ017/2022-JPR
|
“Laying of Underground Optical Fiber Cable Along the NH-21(old NH11) Road Within the Existing Row from Mahuwa to Via Halena -Bharatpur.
|
Optical Fibre Cable
|
GM NTP JAIPUR
|
2.8224
|
IN-PRINCIPLE
|
12-Jun-2023
|
|
|
|
|
|
No
|
50
|
Rajasthan
|
FP/RJ/OFC/47243/2020
|
8B/RAJ017/2022-JPR
|
“Laying of Underground Optical Fiber Cable Along the NH-21(old NH11) Road Within the Existing Row from Mahuwa to Via Halena -Bharatpur.
|
Optical Fibre Cable
|
GM NTP JAIPUR
|
2.8224
|
IN-PRINCIPLE
|
12-Jun-2023
|
|
|
|
|
|
No
|
|