FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/ROAD/143853/2021   (ii). Name of Project for which Forest Land is required : Widening & Stentheing of Dhariyawad Pratapgarh Mandsour Road 58/0 K.M to 59/0 K.M & 76/0 K.M to 98/0 K.M (SH-81)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Dhariyawad Pratapgarh Mandsour Road(SH-81)   (iv). State : Rajasthan   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2995.27   (viii). Area of forest land proposed for diversion(in ha.): 3.468   (ix). Non-forest land required for this project(in ha.): 24.132   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EE1PWD PRATAPGARH   (ii). Address1 : Executive Engineer 1   (iii). Address2 : Pratapgarh   (iv). State : Rajasthan   (v). District : Pratapgarh   (vi). Pin : 312605   (vii). Landmark : NIL   (viii). Email address : pwdeepratap1@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 8112254714   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Ram   (ii). Middle Name: Charan   (iii). Last Name: Meena   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Executive Engineer -1   (vii). Address 2: Dn-i Pratapgarh   (viii). State: Rajasthan   (ix). District: Pratapgarh   (x). Tehsil: NIL   (xi). Pin: 312605   (xii). Landmark: NIL   (xiii). Email Address: pwdeepratap1@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 8112254714   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ApprovedFP/RJ/ROAD/1982/20067-RJB023/2006-LUC1.81.809 Jan 200730 Sep 2008
2ApprovedFP/RJ/ROAD/1981/20067-RJOB24/2006-LUC2.50292.502921 Jan 200726 Mar 2008
Total 4.3029 4.3029
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pratapgarh Territorial3.46824.132
Total3.46824.132
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pratapgarh3.46824.132
Total3.46824.132
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1ranpur1.1342.15
2devgarh1.442.28
3shaji ka pathar04.5
4choti bamb0ri07.2
5pratapgarh02.4
6Bordi02.416
7chiklad0.8943.186
Total 3.468 24.132
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Widening and Improvement of existing Road3.46824.132
Total 3.468 24.132
C. Maps of forest land proposed to be diverted
Division 1. : Pratapgarh Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 3.468   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.99    View File
2.1.038    View File
3.1.44    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Widening and Improvement of existing Road
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 20
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Pratapgarh
  (a). Village: Aamli kheda   (b). Area(in ha.): 3.468   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 59   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1AREA CALCULATIONS SHEET
2check list number 11
3check list number 12
4CHECK LIST SERIAL NUMBER 13
5COMPENSATORY AFFORESTATION.
6conservative of flora during construction
7UNDERTAKING FOR USE OF FOREST LAND
8UNDERTAKING FOR NO CHANGE _S IN STATUTORY POSITION OF DIVERTED
9UNDERTAKING FOR PAYMENT OF ANY OTHER COST & CONDITION
10UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION
11UNDERTAKING FOR WASTE MANAGEMENT
12undertaking of FRA
13Undertaking for Deemed Forest Area
14Villages wise Area Calculation sheet
15Technical Report
16NO OTHER FEASIBLE ALTERNATIVR & DIVERSION OF MINIMUM Land
17JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
18Administrative & Financial Sanction Report
19BAR chart
20Khashra wise Details
21UNDERTAKING FOR CA LAND
22Segment wise Area Calculation sheet
23COMPENSATORYAFFORESTATION
24AS_FS Report
25Project Report
26Cross Section
27EDS-22Dec2021
28Digital Map
29Topo Sheet Map
30EDS 06-05-2022
31Jamabandhi & Revenue Map of NFL Land
32Jamabandhi_NFL
33RevenueMap_NFL
34Jamabandi
35MarkedRevenueMap
36EDS 7-7-2022
37EDS_22_11_2022