FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/IRRIG/23175/2016   (ii). Name of Project for which Forest Land is required : Ahamdi Minor Irrigation Project   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : proposal for diverting of forest land for right main canal & minor of ahamdi minor irrigation project forest land 5.232 hact. non forest land 10.983 hact. in canal and total command area - 726.72 hac.   (iv). State : Rajasthan   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2892.65   (viii). Area of forest land proposed for diversion(in ha.): 5.232   (ix). Non-forest land required for this project(in ha.): 10.983   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : WATER RESOURCES DEPARTMENT   (ii). Address1 : Near Railway Over Bridge Kota Road Baran   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Baran   (vi). Pin : 325205   (vii). Landmark : NIL   (viii). Email address : eewrdiv3baran@gmail.com   (ix). Landline Telephone No. : 7453-237209   (x). Fax No. : 7453-   (xi). Mobile No. : 9460745028   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Manoj   (ii). Middle Name: Kumar   (iii). Last Name: Goyal   (iv). Gender: Male   (v). Designation: EXECUTIVE ENGINEER   (vi). Address 1: WATER RESOURCES DIVISION III, BARAN   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Baran   (x). Tehsil: Baran   (xi). Pin: 325205   (xii). Landmark: NIL   (xiii). Email Address: eewrdiv3baran@gmail.com   (xiv). Landline Telephone No.: 7453-237209   (xv). Fax No.: NIL   (xvi). Mobile No.: 9460745028   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Baran Territorial5.23210.983
Total5.23210.983
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Baran5.23210.983
Total5.23210.983
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Ahamda1.1463.93
2ahamdi2.8262.562
3pitampura00.831
4jalwara00.876
5Bajranggarh1.262.784
Total 5.232 10.983
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1RIGHT MAIN CANAL4.6628.628
2MINOR0.572.355
Total 5.232 10.983
C. Maps of forest land proposed to be diverted
Division 1. : Baran Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 5.232   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.5.232    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 40000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Banswara
  (a). Village: Pipliya chocki   (b). Area(in ha.): 5.232   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 56,61,62,120,121   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0   (ii). Total command area of the Project(in ha.): 726.72
Additional information Details
Documents
S.No Documents
Remarks
1SANCTION
2BAR CHART
3KHASARA DETAIL
4REVENUE MAP
5Justification of canal
6certificate of minimum land use
7certificate of NPV
8certificate of payement of any other cost
9certificate of payment of CAcost
10certificate of conservation
11certificate of use of forest land
12certificate of muk disposal
13PREVIOUS DIVERT LAND OF FOREST FOR SUBMERGANCE
14KHASARA DETAIL OF FOREST
15REPLY OF EDS
16LMC TECHNICAL REPORT
17RMC DPR AND TECHNICAL REPORT
18EDS 3 7 18
19Detail project report
20tyipical x section
21reply of eds 2506018
22REPLY 18 6 19
23moka report
24reply 20 9 19
25justification of alternate land
26alternate route plan
27reply 30 10 19
28muk certificate
29reply of eds 12 8 20
30Typical x section
31reply eds 9 9 20
32reply 29 12 20
33reply eds 1 3 21
34reply 4 7 21
35reply of eds 1 9 21
36reply of eds 27 1 22
37Allotment Letter for CA Encumbrance certificate By District Collector Baran
38JAMABANDI FOR CA (NFL)
39EDS Reply to DCF Baran-26-02-2022
40SDM-TEHSILDAR AND PATWARI REPORT FOR CA LAND
41Geo-Referenced Khasra Map for CA land Scale 1 : 4000
42Map Showing for Geo-Referenced Survey of India Toposheet With Proposed Canal Route Alignment Toposheet no 54C/12 And 5d/94 Scale 1: 50000
43Geo-Referenced DGPS Map Showing for Required Land Coordinate With Proposed Canal Route Alignment
44EDS Reply-12-07-2022
45Geo-Referenced Survey of India Toposheet for CA land Scale 1 : 50000
46Geo-Referenced DGPS Map for Required CA land Coordinate