Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/HYD/35371/2018
|
8-32/2019-FC
|
Pumped Storage Component of Pinnapuram IREP
|
Hydel
|
GREENKO ENERGIES PRIVATE LIMITED
|
365.66
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Aug 2018
|
Stage-I Approval on
|
:
|
23 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
14 Apr 2021
|
|
|
|
24 May 2021
|
2
|
Assam
|
FP/AS/REHAB/120428/2021
|
8-01/2021-FC
|
RELOCATION OF FOREST VILLAGE LAIKA
|
Rehabilitation
|
TINSUKIA WILDLIFE DIVISION
|
238
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2021
|
Stage-I Approval on
|
:
|
29 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2023
|
|
|
|
07 Aug 2023
|
3
|
Assam
|
FP/AS/HYD/8294/2014
|
8-53/2018-FC
|
Lower Kopili Hydro Electric Project (120 MW)
|
Hydel
|
APGCL
|
523.046
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2014
|
Stage-I Approval on
|
:
|
05 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
28 Aug 2020
|
|
|
|
04 Dec 2020
|
4
|
Assam
|
FP/AS/MIN/17426/2016
|
8-11/2019-FC
|
New Umrangshu Limestone Mine
|
Mining
|
CALCOM CEMENT INDIA LTD
|
425.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2016
|
Stage-I Approval on
|
:
|
23 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jun 2020
|
|
|
|
25 Nov 2020
|
5
|
Chhattisgarh
|
FP/CG/MIN/149564/2021
|
8-09/2023-FC
|
Bhaskarpara Coal Mine
|
Mining
|
Prakash Industries Limited
|
515.581
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2021
|
Stage-I Approval on
|
:
|
21 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Feb 2024
|
|
|
|
11 Jul 2024
|
6
|
Chhattisgarh
|
FP/CG/MIN/16237/2015
|
8-15/2021-FC
|
CHHAL OPENCAST SEAM III 6 MTY
|
Mining
|
SOUTH EASTERN COALFIELDS LIMITED
|
185.017
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Dec 2015
|
Stage-I Approval on
|
:
|
06 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2022
|
|
|
|
29 Jan 2024
|
7
|
Chhattisgarh
|
FP/CG/MIN/39334/2019
|
8-15/2021-FC Vol.
|
CHHAL OPENCAST SEAM III 6 MTY
|
Mining
|
SOUTH EASTERN COALFIELDS LIMITED
|
55.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Mar 2019
|
Stage-I Approval on
|
:
|
06 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2023
|
|
|
|
29 Jan 2024
|
8
|
Chhattisgarh
|
FP/CG/REHAB/42779/2019
|
8-93/2013-FC Pt.
|
Relocation of villages from Core Area of ATR to Mungeli Forest Division.
|
Rehabilitation
|
DEPUTY DIRECTOR ACHANAKMAR TIGER RESERVE
|
255.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Nov 2019
|
Stage-I Approval on
|
:
|
13 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2023
|
|
|
|
07 Aug 2023
|
9
|
Chhattisgarh
|
FP/CG/MIN/20495/2016
|
8-06/2022-FC
|
Gare Palma Sector II Coal Mine
|
Mining
|
MAHARASHTRA STATE POWER GENERATION CORPORATION LTD
|
214.869
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2016
|
Stage-I Approval on
|
:
|
02 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Dec 2022
|
|
|
|
27 Jan 2023
|
10
|
Chhattisgarh
|
FP/CG/MIN/20495/2016
|
8-06/2022-FC
|
Gare Palma Sector II Coal Mine
|
Mining
|
MAHARASHTRA STATE POWER GENERATION CORPORATION LTD
|
214.869
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2016
|
Stage-I Approval on
|
:
|
02 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Dec 2022
|
|
|
|
27 Jan 2023
|
11
|
Chhattisgarh
|
FP/CG/MIN/13199/2015
|
8-41/2017-FC
|
GEVRA OPENCAST
|
Mining
|
SOUTH EASTERN COALFIELDS LTD
|
112.385
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jun 2015
|
Stage-I Approval on
|
:
|
27 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
10 Nov 2021
|
|
|
|
21 Jun 2022
|
12
|
Chhattisgarh
|
FP/CG/MIN/20742/2016
|
8-36/2018-FC
|
PARSA OPEN CAST COAL MINE (5MTPA)
|
Mining
|
Rajasthan Rajya Vidyut Utpadan NIgam Limited
|
841.538
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2016
|
Stage-I Approval on
|
:
|
13 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
26 Feb 2021
|
|
|
|
21 Oct 2021
|
13
|
Chhattisgarh
|
FP/CG/MIN/14531/2015
|
8-25/2017-FC
|
Pathrai Bauxite Mines
|
Mining
|
CHHATTISGARH MINERAL DEVELOPMENT CORPORATION LIMITED
|
99.35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2016
|
Stage-I Approval on
|
:
|
28 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2018
|
|
|
|
19 Jul 2018
|
14
|
Gujarat
|
FP/GJ/IRRIG/27326/2017
|
8-50/2017-FC
|
Bhadbhut Barrage across Narmada River
|
Irrigation
|
KALPASAR DEPRTMENT GOVERNMENT OF GUJARAT
|
187
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2017
|
Stage-I Approval on
|
:
|
21 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2018
|
|
|
|
11 Jan 2021
|
15
|
Gujarat
|
FP/GJ/Others/25138/2017
|
8-48/2017-FC
|
Greenfield Airport at Rajkot
|
Others
|
CIVIL AVIATION DEPARTMENT
|
632.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2017
|
Stage-I Approval on
|
:
|
19 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2019
|
|
|
|
10 Feb 2020
|
16
|
Haryana
|
FP/HR/Others/34808/2018
|
8-52/2018-FC
|
NCR Biotech Science Cluster
|
Others
|
NATIONAL CAPITAL REGION BIOTECH SCIENCE CLUSTER
|
41.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2018
|
Stage-I Approval on
|
:
|
30 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2019
|
|
|
|
17 Apr 2020
|
17
|
Himachal Pradesh
|
FP/HP/HYD/40611/2019
|
8-78/2010-FC pt.
|
Shongtong Karcham HEP 450 MW
|
Hydel
|
SHONGTONG KARCHHAM HYDRO ELECTRIC PROJECT, HPPCL
|
7.3722
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Nov 2019
|
Stage-I Approval on
|
:
|
19 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jun 2024
|
|
|
|
29 Jul 2024
|
18
|
Himachal Pradesh
|
FP/HP/TRANS/130156/2021
|
8-47/2011-FC Pt.
|
Construction of LILO from 400KV D/C Transmission line Lahal to Rajera at Tower no 8 to Pot Head yard for Evacuation of Power of JSW ENERGY (KUTEHR)LTD KUTEHR HEP 3X80 MW Vill. Machhettar Post Chanhota
|
Transmission Line
|
JSW ENERGY LIMITED
|
3.7904
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2021
|
Stage-I Approval on
|
:
|
05 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2024
|
|
|
|
15 Mar 2024
|
19
|
Himachal Pradesh
|
FP/HP/MIN/34137/2018
|
8-03/2020-FC
|
sand, stone and bajri mining project by Randeep Singh
|
Mining
|
SAND STONE AND BAJRI MINING PROJECT BY RANDEEP SINGH
|
54.668
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jun 2018
|
Stage-I Approval on
|
:
|
02 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jun 2022
|
|
|
|
29 Nov 2022
|
20
|
Himachal Pradesh
|
FP/HP/HYD/31019/2017
|
8-07/2021-FC
|
Sunni Dam Project
|
Hydel
|
SJVN LIMITED
|
397.8863
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Dec 2017
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jul 2022
|
|
|
|
23 Aug 2022
|
21
|
Himachal Pradesh
|
FP/HP/HYD/39709/2019
|
8-48/2018-FC Vol.
|
Luhri HEP Stage-I (Additional land for approach road)
|
Hydel
|
SJVN LIMITED
|
0.9486
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2019
|
Stage-I Approval on
|
:
|
21 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Sep 2021
|
|
|
|
13 Oct 2021
|
22
|
Himachal Pradesh
|
FP/HP/HYD/19905/2016
|
8-48/2018-FC
|
Luhri HEP Stage-I
|
Hydel
|
SJVN LIMITED
|
98.1004
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2016
|
Stage-I Approval on
|
:
|
19 Sep 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2018
|
|
|
|
28 Mar 2019
|
23
|
Himachal Pradesh
|
FP/HP/DISP/35397/2018
|
8-70/2018-FC
|
C/o Proposed AIIMS Bilaspur at Kothipura Himachal Pradesh
|
Dispensary/Hospital
|
ADM CUM DY DIR ADMN AIIMS
|
40.5084
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Aug 2018
|
Stage-I Approval on
|
:
|
30 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Feb 2019
|
|
|
|
08 Mar 2019
|
24
|
Jammu and Kashmir
|
FP/JK/HYD/51783/2020
|
9-JKC002/2020-Jammu
|
Shahpurkandi Dam Project
|
Hydel
|
SHAHPURKANDI DAM PROJECT
|
13.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2024
|
|
|
|
14 Aug 2024
|
25
|
Jharkhand
|
FP/JH/FVC/46701/2020
|
8-35/2021-FC
|
Diversion of forest land of Polpol Kalan PF of Kundri Range, Medininagar Forest Division for Relocation of Kujrum, Latu & other Villages from Palamau Tiger Reserve, Daltonganj, Jharkhand
|
Forest Village Conversion
|
DEPUTY DIRECTOR, PALAMAU TIGER PROJECT, SOUTH DIVISION, MEDININAGAR
|
133.64
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2020
|
Stage-I Approval on
|
:
|
14 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2024
|
|
|
|
16 Apr 2024
|
26
|
Jharkhand
|
FP/JH/MIN/39338/2019
|
8-08/2022-FC Vol.
|
Kotre Basantpur Pachmo OCP (372.98 Ha)
|
Mining
|
Central Coalfields Limited
|
372.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2019
|
Stage-I Approval on
|
:
|
27 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2023
|
|
|
|
14 Mar 2024
|
27
|
Jharkhand
|
FP/JH/MIN/38247/2019
|
8-08/2022-FC
|
Kotre Basantpur Pachmo OCP
|
Mining
|
Central Coalfields Limited
|
633.19
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2019
|
Stage-I Approval on
|
:
|
27 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2023
|
|
|
|
14 Mar 2024
|
28
|
Jharkhand
|
FP/JH/FVC/146641/2021
|
8-35/2021-FC pt.
|
Diversion of forest land of Lai KRF & Pailapathal RF of Latehar Range, Latehar Forest Division for Relocation of Kujrum, Latu & other Villages from Palamau Tiger Reserve, Daltonganj, Jharkhand
|
Forest Village Conversion
|
DEPUTY DIRECTOR, PALAMAU TIGER PROJECT, SOUTH DIVISION, MEDININAGAR
|
166
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
29 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jun 2023
|
|
|
|
07 Aug 2023
|
29
|
Jharkhand
|
FP/JH/MIN/29167/2017
|
8-23/2019-FC
|
Tubed Coal Mine
|
Mining
|
DAMODAR VALLEY CORPORATION
|
162.394
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Sep 2017
|
Stage-I Approval on
|
:
|
13 Nov 2019
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2022
|
|
|
|
28 Mar 2022
|
30
|
Karnataka
|
FP/KA/MIN/39394/2019
|
8-286/1988-FC Vol.
|
R.I.O.M. M.L. No. 2141_Closed Pipe Conveyor Project
|
Mining
|
SRI KUMARASWAMY MINERAL EXPORTS PRIVATE LIMITED
|
12.4724
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2019
|
Stage-I Approval on
|
:
|
24 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2024
|
|
|
|
07 Nov 2024
|
31
|
Karnataka
|
FP/KA/HYD/37723/2018
|
8-29/2021-FC
|
Standalone Pumped Storage Component of Saundatti IREP
|
Hydel
|
GREENKO SOLAR ENERGY PVT LTD
|
160.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
Stage-I Approval on
|
:
|
12 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2024
|
|
|
|
21 Aug 2024
|
32
|
Karnataka
|
FP/KA/MIN/36226/2018
|
8-113/2003-FC Vol.
|
Proposal for setting up of Downhill conveyor system from Haddinapade Iron Ore Mine,M.L.No 2516 to proposed Railway siding at Dharmapur
|
Mining
|
B RUDRA GOUDA LEGAL REPRESENTATIVE OF LATE B KUMARGOUDA
|
19.206
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Oct 2018
|
Stage-I Approval on
|
:
|
15 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
23 Feb 2024
|
|
|
|
14 Jun 2024
|
33
|
Karnataka
|
FP/KA/ROAD/21837/2016
|
8-112/2000-FC Vol
|
Approach road for Bellary Iron Ore Mine over an extent of 4.74 Ha.
|
Road
|
JSW STEEL LIMITED
|
4.74
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2016
|
Stage-I Approval on
|
:
|
19 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2023
|
|
|
|
25 Sep 2023
|
34
|
Karnataka
|
FP/KA/ROAD/21842/2016
|
8-323/1989-FC (PT.)
|
Approach Road for Malagolla Iron Ore Mine over an extent of 4.25 Ha.
|
Road
|
JSW STEEL LIMITED
|
4.25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2016
|
Stage-I Approval on
|
:
|
11 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2023
|
|
|
|
22 Sep 2023
|
35
|
Karnataka
|
FP/KA/Others/27780/2017
|
8-14/2018-FC Vol.
|
Approach Road, Downhill Pipe Conveyor and Feed & Transfer Point Area for Rama Iron Ore Mine ML No. 2621.
|
Others
|
JSW STEEL LIMITED
|
15.981
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Aug 2017
|
Stage-I Approval on
|
:
|
31 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2022
|
|
|
|
12 Sep 2023
|
36
|
Karnataka
|
FP/KA/Others/14576/2015
|
8-17/2021-FC
|
Diversion of Forest land (75.92Ha.,) for construction of New Screening Plant, Tailing dam(s), Slurry Pipeline corridor, and Water Pipeline corridor at Donimalai Complex of NMDC Limited.
|
Others
|
NMDC LIMITED DONIMALAI
|
75.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Aug 2015
|
Stage-I Approval on
|
:
|
06 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2023
|
|
|
|
10 Jul 2023
|
37
|
Karnataka
|
FP/KA/MIN/32568/2018
|
8-24/2020-FC
|
DEVADARI IRON ORE MINE
|
Mining
|
KIOCL LIMITED
|
484.0733
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Mar 2018
|
Stage-I Approval on
|
:
|
24 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2022
|
|
|
|
16 Dec 2022
|
38
|
Karnataka
|
FP/KA/ROAD/8506/2014
|
8-27/2005-FC VOL.
|
Diversion of 4.4 Hectares forest land for KIOM approach road
|
Road
|
NMDC LIMITED DONIMALAI
|
4.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2014
|
Stage-I Approval on
|
:
|
27 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jun 2022
|
|
|
|
10 Nov 2022
|
39
|
Karnataka
|
FP/KA/Others/26566/2017
|
8-07/2018-FC Vol.
|
Diversion of 5.271 ha. of forestland for Existing/Proposed Approach Road, Downhill Pipe Conveyor, Service Roads, Transmission Line Cable and Water Pipeline in S.M. Block, Sandur South Range, Lakshmipura Village, Sandur Taluk, Ballari District, Karnataka.
|
Others
|
JSW STEEL LIMITED
|
5.271
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2017
|
Stage-I Approval on
|
:
|
28 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2019
|
|
|
|
23 May 2022
|
40
|
Karnataka
|
FP/KA/Others/27706/2017
|
8-12/2018-FC Vol.
|
Diversion of 0.604 ha. of forest area proposed for Downhill Pipe Conveyor (DHPC) for Bhadra Iron Ore Mine ML No. 2365 and Tunga Iron Ore Mine ML No. 2366
|
Others
|
JSW STEEL LIMITED
|
0.604
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2017
|
Stage-I Approval on
|
:
|
31 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jan 2021
|
|
|
|
22 Oct 2021
|
41
|
Karnataka
|
FP/KA/Others/29186/2017
|
8-75/2018-FC
|
creation of zoological park
|
Others
|
EXECUTIVE DIRECTOR AND DEPUTY CONSERVATOR FORESTS SHRI ATAL BHIHAARI VAJAPYEE ZOOLOGICAL PARK KAMALAPURA
|
140.917
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Sep 2017
|
Stage-I Approval on
|
:
|
05 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2020
|
|
|
|
31 May 2020
|
42
|
Karnataka
|
FP/KA/MIN/24548/2017
|
8-14/2018-FC
|
Diversion of 33.80 ha. of forestland for Mining Lease ML No. 2621 of M/s. Rama Rao Paol, recently allocated to M/s. JSW Steel Ltd., Toranagallu in Ramanamalai Block Reserved Forest, Sandur North Range, Ramgad Village, Sandur Taluk, Ballari District, Karnataka.
|
Mining
|
JSW STEEL LIMITED
|
33.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2017
|
Stage-I Approval on
|
:
|
27 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 Dec 2018
|
|
|
|
19 Nov 2019
|
43
|
Kerala
|
FP/KL/Others/36775/2018
|
8-72/2018-FC
|
THRISSUR ZOOLOGICAL PARK-Wildlife Conservation and Research Centre
|
Others
|
KERALA FOREST DEPARTMENT
|
136.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2018
|
Stage-I Approval on
|
:
|
13 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2022
|
|
|
|
19 Dec 2022
|
44
|
Madhya Pradesh
|
FP/MP/MIN/49537/2020
|
8-34/2021-FC
|
Bikram Coal Mine
|
Mining
|
COAL MINE BIRLA CORPORATION LIMITED
|
151.095
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2020
|
Stage-I Approval on
|
:
|
21 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2025
|
|
|
|
27 Jan 2025
|
45
|
Madhya Pradesh
|
FP/MP/IRRIG/30441/2017
|
8-39/2018-FC
|
Parna Minor Irrigation Project
|
Irrigation
|
WRD DAMOH
|
55.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Dec 2017
|
Stage-I Approval on
|
:
|
29 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
21 May 2022
|
|
|
|
12 Nov 2024
|
46
|
Madhya Pradesh
|
FP/MP/MIN/151378/2022
|
8-10/2023-FC
|
Sahapur West Coal Mine
|
Mining
|
SARDA ENERGY & MINERALS LIMITED
|
80.59
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2022
|
Stage-I Approval on
|
:
|
12 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2024
|
|
|
|
15 Oct 2024
|
47
|
Madhya Pradesh
|
FP/MP/IRRIG/23086/2016
|
8-11/2018-FC
|
Kadan Medium Project
|
Irrigation
|
WATER RESOURCES DIVISION NO ONE SAGAR
|
248.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Aug 2017
|
Stage-I Approval on
|
:
|
18 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
15 Sep 2020
|
|
|
|
24 Sep 2024
|
48
|
Madhya Pradesh
|
FP/MP/FVC/39952/2019
|
8-13/2020-FC
|
Relocation of forest village Karmajhiri.
|
Forest Village Conversion
|
MADHYA PRADESH FOREST DEPARTMENT
|
160
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2019
|
Stage-I Approval on
|
:
|
10 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2023
|
|
|
|
07 Aug 2024
|
49
|
Madhya Pradesh
|
FP/MP/REHAB/152389/2022
|
8-21/2022-FC
|
Rehabilitation of village Bagcha
|
Rehabilitation
|
DIVISIONAL FOREST OFFICER KUNO WILDLIFE DIVISION, SHEOPUR
|
421
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2022
|
Stage-I Approval on
|
:
|
09 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 Nov 2023
|
|
|
|
30 Jul 2024
|
50
|
Madhya Pradesh
|
FP/MP/IRRIG/20556/2016
|
8-10/2020-FC
|
Patpadi Tank Project
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
72
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2018
|
Stage-I Approval on
|
:
|
02 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
31 Aug 2023
|
|
|
|
02 Jul 2024
|
|