Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Tamil Nadu
|
FP/TN/Others/19938/2016
|
Tn 022 2018
|
Police Wireless VHF Repeater Stations
|
Others
|
TN POLICE DHARMAPURI
|
0.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jun 2016
|
Stage-I Approval on
|
:
|
21 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2024
|
|
|
|
17 Mar 2025
|
2
|
Tamil Nadu
|
FP/TN/ROAD/151930/2022
|
4-TNB118/2024-CHN
|
Construction of Road Over Bridge in lieu of LC No.32 inbetween Tambaram and Vandalur Railway stations near Perungalathur
|
Road
|
CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.
|
0.95472
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Feb 2022
|
Stage-I Approval on
|
:
|
27 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jan 2025
|
|
|
|
13 Mar 2025
|
3
|
Tamil Nadu
|
FP/TN/IND/34099/2018
|
4-TNB033/2019-CHN
|
TWAD 20 MGD CLOSED CONDUIT SCHEME
|
Industry
|
TWAD BOARD
|
0.08
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jun 2018
|
Stage-I Approval on
|
:
|
18 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2024
|
|
|
|
26 Feb 2025
|
4
|
Tamil Nadu
|
FP/TN/ROAD/155502/2022
|
4-TNB117/2024-CHN
|
Construction of Grade Seperator connecting Medavakkam – Sholinganallur road junction, Medavakkam - Mambakkam road junction, Mount – Medavakkam Road junction in Marmalong Bridge – Irumbuliyur Road at M
|
Road
|
CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.
|
0.536
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 May 2022
|
Stage-I Approval on
|
:
|
04 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2024
|
|
|
|
21 Feb 2025
|
5
|
Tamil Nadu
|
FP/TN/WATER/49039/2020
|
TN 053 2020
|
Providing 0.70 mld Water Supply To TNSCB Housing for All (HFA) Project Area for 1920 Tenements at Narimadu of Pudukkottai District
|
Drinking Water
|
TAMILNADU WATER SUPPLY AND DRAINAGE BOARD
|
0.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Aug 2020
|
Stage-I Approval on
|
:
|
05 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
14 Mar 2022
|
|
|
|
17 Feb 2025
|
6
|
Tamil Nadu
|
FP/TN/TRANS/150320/2021
|
4-TNB100/2023-CHN
|
Erection of 230KV DC line on MC towers by making LILO of existing Ottiyambakkam to Omega feeder - II at the proposed Mambakkam 230/110KV Substation
|
Transmission Line
|
TAMIL NADU TRANSMISSION CORPORATION LIMITED
|
4.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2024
|
|
|
|
10 Jan 2025
|
7
|
Tamil Nadu
|
FP/TN/WATER/145727/2021
|
TN 063 2021
|
Laying of water pipe lines under CWSS to 8 Town Panchayats, 2452 Rural Habitations and 3 Municipalities in Sivagangai District across Eriyur North RF
|
Drinking Water
|
TWAD BOARD PROJECT SUBDIVISION KARAIKUDI
|
0.1696
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Aug 2021
|
Stage-I Approval on
|
:
|
12 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Sep 2023
|
|
|
|
09 Oct 2024
|
8
|
Tamil Nadu
|
FP/TN/ROAD/29107/2017
|
TN 071 2019
|
Proposal for Formation of Road
|
Road
|
ASSISTANT ENGINEER RURAL DEVELOPMENT PANCHAYAT UNION KOLLIDAM
|
0.48
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2018
|
Stage-I Approval on
|
:
|
29 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2024
|
|
|
|
24 Sep 2024
|
9
|
Tamil Nadu
|
FP/TN/Others/30208/2017
|
4-TNB074/2021-CHN
|
Laying OFC in Anchetty to Denkanikottai route
|
Others
|
Jio Digital Fibre Private Limited
|
0.312
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2017
|
Stage-I Approval on
|
:
|
23 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Sep 2023
|
|
|
|
14 Aug 2024
|
10
|
Tamil Nadu
|
FP/TN/Others/36378/2018
|
4-TNB107/2023-CHN
|
Laying of OFC along road side of Thiruvannamalai to Thiyagadurgam road section from Pagandai Koot road to Thiagadurgam across Swamimalai R.F.
|
Others
|
Jio Digital Fibre Private Limited
|
0.1137
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Oct 2018
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
15 Jul 2024
|
11
|
Tamil Nadu
|
FP/TN/Others/36379/2018
|
4-TNB106/2023-CHN
|
Laying of OFC along road side of Sankarapuram to Arakandanallur road section from Kulathur to Nariyandhal across Kaduvanur R.F. and Swamimalai R.F.
|
Others
|
Jio Digital Fibre Private Limited
|
0.1266
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Oct 2018
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
27 Jun 2024
|
12
|
Tamil Nadu
|
FP/TN/Others/38127/2019
|
4-TNB104/2023-CHN
|
Laying of OFC along road side of Rishivandiyam to Poondi (Eraiyur) and Adhiyur to Eraiyur road sections road section in Rishivandiyam - Nemili Road across Seedevi R.F. in Sankarapuram Taluk of Villupu
|
Others
|
Jio Digital Fibre Private Limited
|
0.045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2019
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
27 Jun 2024
|
13
|
Tamil Nadu
|
FP/TN/Others/38126/2019
|
4-TNB105/2023-CHN
|
Laying of OFC along road side of Maiyanur to Thondananthal road section across Melpalangur R.F. in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.054
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2019
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
13 Jun 2024
|
14
|
Tamil Nadu
|
FP/TN/Others/30207/2017
|
4-TNB076/2021-CHN
|
Laying OFC for Dharmapuri-Anchetty route Anchetty stretch
|
Others
|
Jio Digital Fibre Private Limited
|
0.258
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2017
|
Stage-I Approval on
|
:
|
23 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2023
|
|
|
|
06 May 2024
|
15
|
Tamil Nadu
|
FP/TN/ROAD/116544/2020
|
TN 055 2021
|
Four Laning of Thorapalli Agraharam - Jittandahalli section of New NH – 844 From Km 23+350 to Km 60+100 (Design Chainage) under Bharatmala Pariyojana , Phase I (National Corridor) on Hybrid Annuity
|
Road
|
PIU KRISHNAGIRI
|
0.389
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2021
|
Stage-I Approval on
|
:
|
12 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jan 2023
|
|
|
|
08 Apr 2024
|
16
|
Tamil Nadu
|
FP/TN/ROAD/148552/2021
|
11932/FR 10/2022-1
|
Upgradation of Mahaniyam to Padappai road Km. 0/188-1/200 of Mahaniyam Reserve Forest
|
Road
|
DE H RR CHENGALPET
|
0.678
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Oct 2021
|
Stage-I Approval on
|
:
|
10 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2023
|
|
|
|
27 Feb 2024
|
17
|
Tamil Nadu
|
FP/TN/ROAD/148726/2021
|
TN 013 2022
|
Relaying and Periodical Maintenance of Mailai - Rayamangalam road Km. 0/910-1/610
|
Road
|
DE H RR CHENGALPET
|
0.49
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Oct 2021
|
Stage-I Approval on
|
:
|
20 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2023
|
|
|
|
26 Feb 2024
|
18
|
Tamil Nadu
|
FP/TN/OFC/118876/2021
|
4-TNB101/2023-CHN
|
Laying underground OFC along road of Vaiyampatti Konnaiyur MDR 729 ammapatti to Ammankuruchi through forest area
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.0069
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jan 2021
|
Stage-I Approval on
|
:
|
11 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2023
|
|
|
|
16 Jan 2024
|
19
|
Tamil Nadu
|
FP/TN/ROAD/53276/2020
|
4-TNC099/2022-CHN
|
Construction of 6 lane Highway, Greenfield corridor from Chittoor – Thatchur road (NH 716B)
|
Road
|
National Highways Authority of India
|
14.029
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Nov 2020
|
Stage-I Approval on
|
:
|
21 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2023
|
|
|
|
01 Jan 2024
|
20
|
Tamil Nadu
|
FP/TN/Others/33885/2018
|
4-TNB089/2022-CHN
|
Laying OFC from Madurai-Natham Main Road to Saranthangi village through forest area
|
Others
|
Jio Digital Fibre Private Limited
|
0.033
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
24 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
06 Dec 2023
|
21
|
Tamil Nadu
|
FP/TN/ROAD/119100/2021
|
TN 016 2021
|
Road improvement works which passing from Eriyur Ganeshapuram to Kalungapatti village across Eriyur North R.F. in Sivagangai Forest Division
|
Road
|
NABARD AND RURAL ROADS, THIRUPPATHUR
|
0.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jan 2021
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jul 2023
|
|
|
|
07 Nov 2023
|
22
|
Tamil Nadu
|
FP/TN/WATER/151721/2022
|
TN 030 2022
|
Laying of underground water pipe line (914 mm MS) across Thirukalambur R.F. in Pudukottai District under CWSS for Sivagangai District by TWAD Board Project Sub Division, Devakottai.
|
Drinking Water
|
TWAD BOARD PROJECT SUB DIVISION DEVAKOTTAI SIVAGANGAI DISTRICT
|
0.196
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2022
|
Stage-I Approval on
|
:
|
05 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2023
|
|
|
|
07 Nov 2023
|
23
|
Tamil Nadu
|
FP/TN/WATER/145728/2021
|
TN 065 2021
|
Laying of water pipe lines under CWSS to 8 Town Panchayats, 2452 Rural Habitations and 3 Municipalities in Sivagangai District across Nattucheri RF
|
Drinking Water
|
TWAD BOARD PROJECT SUBDIVISION KARAIKUDI
|
0.0696
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Aug 2021
|
Stage-I Approval on
|
:
|
19 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2023
|
|
|
|
30 Oct 2023
|
24
|
Tamil Nadu
|
FP/TN/ROAD/32148/2018
|
4-TNB091/CHN-2022
|
Madurai Ring Road
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
1.28
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Feb 2018
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 May 2023
|
|
|
|
16 Aug 2023
|
25
|
Tamil Nadu
|
FP/TN/WATER/153702/2022
|
4-TNB103/2023-CHN
|
CWSS to 8 TPs, 2452 Rural habitations in 11 unions with bulk provision to 3 Municipalities in Sivagangai District with river Cauvery as source
|
Drinking Water
|
EE TWAD PROJECT DN KULITHALAI
|
0.874
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2022
|
Stage-I Approval on
|
:
|
13 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2023
|
|
|
|
16 Aug 2023
|
26
|
Tamil Nadu
|
FP/TN/ROAD/44426/2020
|
TN 051 2021
|
K.S ROAD TO MANALI
|
Road
|
BLOCK DEVELOPMENT OFFICER GUMMIDIPOONDI
|
0.858
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2020
|
Stage-I Approval on
|
:
|
26 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Apr 2023
|
|
|
|
02 Aug 2023
|
27
|
Tamil Nadu
|
FP/TN/Others/149812/2021
|
4-TNB090/2022-CHN
|
Expansion works of Government Arts and Science College, Jayankondam across Periyavalayam R.F. in Ariyalur District
|
Others
|
GOVT. ARTS & SCIENCE COLLEGE, JAYANKODAM, ARIYALUR DISTRICT
|
0.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Dec 2021
|
Stage-I Approval on
|
:
|
16 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2023
|
|
|
|
07 Jun 2023
|
28
|
Tamil Nadu
|
FP/TN/ROAD/29470/2017
|
4-TNB077/2022-CHN
|
MADURAI - NATHAM
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
2.3824
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2017
|
Stage-I Approval on
|
:
|
15 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2023
|
|
|
|
28 Apr 2023
|
29
|
Tamil Nadu
|
FP/TN/WATER/140975/2021
|
TN 060 2021
|
Water Supply Improvement scheme to Tiruttani municipality in Thiruvallur District
|
Drinking Water
|
EE TWAD BOARD RWS DIVISION RANIPET
|
0.1584
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2021
|
Stage-I Approval on
|
:
|
11 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2023
|
|
|
|
17 Mar 2023
|
30
|
Tamil Nadu
|
FP/TN/WATER/143706/2021
|
TN 049 2021
|
CWSS to Tittakudi, Pennadam, Mangalampettai, Gangaikondan, Vadalur and Kurinjipadi TP and 625 Rural Habitation in Virudhachalam , NAllur, Mangalore union n Cuddalore District with NLC mine water as so
|
Drinking Water
|
TWAD BOARD PROJECT CUDDALORE
|
0.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2021
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2022
|
|
|
|
17 Mar 2023
|
31
|
Tamil Nadu
|
FP/TN/IRRIG/150193/2021
|
TN 016 2022
|
Construction of a check dam across the Thamiraparani river between Alwarthoppu and Alwarthirunagari villages of Srivaikundam Taluk in thoothukudi District.
|
Irrigation
|
THAMBRAPARANI BASIN CIRCLE
|
0.9896
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Dec 2021
|
Stage-I Approval on
|
:
|
03 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Feb 2023
|
|
|
|
16 Mar 2023
|
32
|
Tamil Nadu
|
FP/TN/ROAD/156883/2022
|
13735/FR 10/2022-1
|
Formation of Cement Conrete road from Nduhatty Kallhaty road of Naduhatty Panchayat
|
Road
|
NANJAN JAYABALAN
|
0.6996
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jun 2022
|
Stage-I Approval on
|
:
|
05 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2022
|
|
|
|
16 Mar 2023
|
33
|
Tamil Nadu
|
FP/TN/ROAD/21076/2016
|
4-TNB026/2018-CHN
|
Upgradation of the road from kannamoochi pirivu to Kemmampatti
|
Road
|
BLOCK DEVELOPMENT OFFICER
|
4.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2016
|
Stage-I Approval on
|
:
|
22 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2022
|
|
|
|
03 Mar 2023
|
34
|
Tamil Nadu
|
FP/TN/ROAD/151511/2022
|
4-TNB094/2022-CHN
|
Widening and Improvement of existing carriage way to 4-laning of Poondiyankuppam-Sathanathapuram section of NH-45A in the state of TN under NHDP Phase IV (Pkg-3)
|
Road
|
NATIONAL HIGHWAY AUTHORITY
|
2.5553
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jan 2022
|
Stage-I Approval on
|
:
|
22 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2023
|
|
|
|
03 Mar 2023
|
35
|
Tamil Nadu
|
FP/TN/RAIL/141594/2021
|
4-TNB080/2022-CHN
|
CMRL Phase II C5 - 06 Madhavaram to Sholinganallur- Nanmangalam Forest land required for Elevated metro station
|
Railway
|
CMRL CHENNAI
|
1.569
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2021
|
Stage-I Approval on
|
:
|
13 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2023
|
|
|
|
02 Mar 2023
|
36
|
Tamil Nadu
|
FP/TN/Others/10333/2015
|
4-TNB060/2020-CHN
|
SIVANESH BAGERATHI ENTERPRISES
|
Others
|
SIVANESH BAGERATHI ENTERPRISES
|
0.288
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2015
|
Stage-I Approval on
|
:
|
27 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2022
|
|
|
|
16 Feb 2023
|
37
|
Tamil Nadu
|
FP/TN/WATER/27069/2017
|
TN090/2018
|
WATER SUPPLY SCHEME TO USILAMPATTY MUNICIPALITY IN MADURAI DISTRICT
|
Drinking Water
|
TWAD BOARD
|
0.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2017
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2022
|
|
|
|
06 Jan 2023
|
38
|
Tamil Nadu
|
FP/TN/Others/38130/2019
|
4-TNB088/ 2022-CHN
|
Laying of OFC along road side of Vadakkanandhal - Thumbal road section via Parigam, Kondiyanantham across Parigam RF in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2019
|
Stage-I Approval on
|
:
|
12 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Oct 2022
|
|
|
|
16 Dec 2022
|
39
|
Tamil Nadu
|
FP/TN/ROAD/19576/2016
|
4-TNB029/2019-CHN
|
Bodhamalai - Kappukadu - Pudupatti - Kedamalai Road (Km 0/0 - 11/375)
|
Road
|
DRDA NAMAKKAL
|
2.71
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2017
|
Stage-I Approval on
|
:
|
07 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2022
|
|
|
|
30 Nov 2022
|
40
|
Tamil Nadu
|
FP/TN/Others/29282/2017
|
4-TNB083/2022-CHN
|
Laying OFC for Coimbatore Goundampalayam to Udagamandalam route
|
Others
|
Jio Digital Fibre Private Limited
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Sep 2017
|
Stage-I Approval on
|
:
|
11 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2022
|
|
|
|
29 Nov 2022
|
41
|
Tamil Nadu
|
FP/TN/ROAD/19579/2016
|
4-TNC027/2018-CHN
|
Keelur - Vadugammelur Km 0/0 - 23/625
|
Road
|
DRDA NAMAKKAL
|
5.96
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2017
|
Stage-I Approval on
|
:
|
03 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2022
|
|
|
|
25 Nov 2022
|
42
|
Tamil Nadu
|
FP/TN/ROAD/152701/2022
|
TN 021 2022
|
WIDENING AND IMPROVEMENTS OF POLUR JAMUNAMARATHUR ALANGAYAM VANIYAMBADI ROAD AT Km.58/6 - 61/2 WITH PAVED SHOULDER SH 215
|
Road
|
KARUPPUCHTTY LOGANATHAN
|
0.845
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2022
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2022
|
|
|
|
14 Nov 2022
|
43
|
Tamil Nadu
|
FP/TN/ROAD/8238/2014
|
4-TNC043/2019-CHN
|
Bangalore-Chennai Expressway
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU KRISHNAGIRI
|
5.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2014
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2022
|
|
|
|
31 Oct 2022
|
44
|
Tamil Nadu
|
FP/TN/TRANS/15163/2015
|
4-TNB052/2020-CHN
|
Erection of 230 KV DC Transmission line from Ottiyambakkam 400 KV SS to Omega 230 KV SS
|
Transmission Line
|
Tamil Nadu Generation and Distribution Corporation
|
3.256295
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Sep 2015
|
Stage-I Approval on
|
:
|
06 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2022
|
|
|
|
31 Oct 2022
|
45
|
Tamil Nadu
|
FP/TN/Pipeline/146983/2021
|
TN 03 2022
|
150 MLD Product Water Main
|
Pipeline
|
CMWSSB
|
0.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2021
|
Stage-I Approval on
|
:
|
11 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 Aug 2022
|
|
|
|
31 Oct 2022
|
46
|
Tamil Nadu
|
FP/TN/ROAD/45847/2020
|
TN 050 2020
|
Proposal for Upgradation of Road and Bridge at Km 3/434 - 4/074 in Thandavankulam to Nadukottayamedu Road
|
Road
|
ASSISTANT ENGINEER RURAL DEVELOPMENT PANCHAYAT UNION KOLLIDAM
|
0.48
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2020
|
Stage-I Approval on
|
:
|
13 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jun 2022
|
|
|
|
30 Sep 2022
|
47
|
Tamil Nadu
|
FP/TN/ROAD/37330/2018
|
4-TNB071/2021-CHN
|
Natham - Thuvarankurichi (NH-785 Extension)
|
Road
|
National Highways Authority of India
|
3.708
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2018
|
Stage-I Approval on
|
:
|
20 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2022
|
|
|
|
21 Sep 2022
|
48
|
Tamil Nadu
|
FP/TN/Others/38125/2019
|
4-TNB078/2022-CHN
|
Laying of OFC along road side of Nainarpalayam to Chinnasalem road section Road across Thottapadi R.F. in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.057
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2019
|
Stage-I Approval on
|
:
|
24 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2022
|
|
|
|
21 Sep 2022
|
49
|
Tamil Nadu
|
FP/TN/Others/45416/2020
|
TN 042 2021
|
Erection of 11 KV Feeder (HT) EB Posts from Ayyur to Pukkuzhi village via Silambur across Kanguli and Tirukkonam RF.
|
Others
|
TANGEDCO SOUTH ANDIMADAM ARIYALUR DISTRICT
|
0.0768
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2020
|
Stage-I Approval on
|
:
|
09 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jun 2022
|
|
|
|
12 Sep 2022
|
50
|
Tamil Nadu
|
FP/TN/WATER/30065/2017
|
TN 088 2018
|
CWSS TO TO 135 HABITATIONS IN TRICHY Dt.
|
Drinking Water
|
RWS TWAD TRICHY
|
0.49884
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Nov 2017
|
Stage-I Approval on
|
:
|
28 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2020
|
|
|
|
31 Aug 2022
|
|