| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Himachal Pradesh
|
FP/HP/TRANS/151522/2022
|
FC/HPB/114/2023
|
Construction of 66kV S/C transmission line from Proposed 220/66kV S/Stn. Nadukhar to Shakrori, Shimla (H.P
|
Transmission Line
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
1.6681
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2022
|
|
Stage-I Approval on
|
:
|
25 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jan 2026
|
|
|
|
13 Mar 2026
|
|
2
|
Himachal Pradesh
|
FP/HP/ROAD/151932/2022
|
FC/HPB/48/2023
|
Construction of New 2 Lane with Paved Shoulder of Hamirpur Bypass of NH-88 (New NH-103 & 3 ) (Design Chainage-Km.121+175 to Km.138+295, Design Length-17.120 Km) in the State of Himachal Pradesh
|
Road
|
National Highways Authority of India
|
12.8537
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Feb 2022
|
|
Stage-I Approval on
|
:
|
03 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2026
|
|
|
|
19 Feb 2026
|
|
3
|
Himachal Pradesh
|
FP/HP/ROAD/37858/2018
|
8B/HP/06/90/2020/FC
|
SLAPPER TATAPANI ROAD KM.8/500 TO 61/600
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
33.3292
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2019
|
|
Stage-I Approval on
|
:
|
24 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2026
|
|
|
|
27 Jan 2026
|
|
4
|
Himachal Pradesh
|
FP/HP/Others/14799/2015
|
8B/HP/09/90/2017
|
Development of Paragliding Site at Bir Billing in Tehsil Baijnath, District Kangra, Himachal Pradesh
|
Others
|
TOURISM AND CIVIL AVIATION DEPARTMENT
|
0.9925
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2015
|
|
Stage-I Approval on
|
:
|
22 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2025
|
|
|
|
09 Jan 2026
|
|
5
|
Himachal Pradesh
|
FP/HP/HYD/37189/2018
|
8B/HP/01/71/2020/FC
|
Kasol Hydro Power Project
|
Hydel
|
MS BEENA BUTAIL PALMPUR
|
1.496448
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2018
|
|
Stage-I Approval on
|
:
|
12 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
05 Dec 2025
|
|
6
|
Himachal Pradesh
|
FP/HP/ROAD/37428/2018
|
8b/hp/06/07/2021
|
C/O TANDI SIRIM BATAHAN ROAD KM 0/0 TO 4/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.6231
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Dec 2018
|
|
Stage-I Approval on
|
:
|
21 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Oct 2025
|
|
|
|
21 Nov 2025
|
|
7
|
Himachal Pradesh
|
FP/HP/ROAD/150882/2022
|
FC/HPB/06/06/144/2022
|
Construction of Ghat Paucha Pai Road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.462
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jan 2022
|
|
Stage-I Approval on
|
:
|
01 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
20 Nov 2025
|
|
8
|
Himachal Pradesh
|
FP/HP/HYD/150023/2021
|
FC/HPB/04/2023
|
Sajla SHEP (2.00 MW)
|
Hydel
|
SERAJ HYDRO POWER DEVELOPERS
|
0.7995
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2022
|
|
Stage-I Approval on
|
:
|
12 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2025
|
|
|
|
18 Nov 2025
|
|
9
|
Himachal Pradesh
|
FP/HP/ROAD/146729/2021
|
FC/HPC/06/112/2022
|
WIDENING & STRENGTHENING TO DOUBLE LANE OF POANTA-RAJBAN-SHILAI-MINUS-HATKOTI ROAD, PORTION SNAIL TO HATKOTI FROM RD 149/00 TO 161/715 NH-707 (OLD NH-72B), DISTRICT SHIMLA, H.P.
|
Road
|
HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT
|
5.368
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2021
|
|
Stage-I Approval on
|
:
|
14 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Oct 2025
|
|
|
|
15 Nov 2025
|
|
10
|
Himachal Pradesh
|
FP/HP/ROAD/45203/2020
|
FC/HPB/06/03/2022
|
C/O motorable link road from Dhakyara to Bharni Km 0/0 to 6/750
|
Road
|
HPPWD
|
3.65
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2020
|
|
Stage-I Approval on
|
:
|
25 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Oct 2025
|
|
|
|
11 Nov 2025
|
|
11
|
Himachal Pradesh
|
FP/HP/HYD/36856/2018
|
8B/HP/01/57/2020/FC
|
Grahan Kasol Hydro Power
|
Hydel
|
M/S DINESH BUTAIL
|
1.6201
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Nov 2018
|
|
Stage-I Approval on
|
:
|
22 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
08 Nov 2025
|
|
12
|
Himachal Pradesh
|
FP/HP/Others/42429/2019
|
8B/HP/09/28/2020/FC
|
Construction of Judicial Court Complex in Mandi (H.P.)
|
Others
|
HIGH COURT OF HP
|
9.6
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Oct 2019
|
|
Stage-I Approval on
|
:
|
11 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Sep 2025
|
|
|
|
19 Oct 2025
|
|
13
|
Himachal Pradesh
|
FP/HP/SCH/19350/2016
|
FC/HPB/09/49/2021
|
Kendriya Vidyalaya, Ghumarwin
|
School
|
DEPUTY DIRECTOR
|
2.26
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2016
|
|
Stage-I Approval on
|
:
|
31 Jul 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Sep 2025
|
|
|
|
13 Oct 2025
|
|
14
|
Himachal Pradesh
|
FP/HP/HYD/49387/2020
|
FC/HPB/01/177/2022
|
Integrated Kashang Stage II & III
|
Hydel
|
HIMACHAL PRADESH POWER CORPORATION LTD
|
0.4148
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Sep 2020
|
|
Stage-I Approval on
|
:
|
01 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
18 Sep 2025
|
|
15
|
Himachal Pradesh
|
FP/HP/ROAD/150852/2022
|
FC/HPB/06/111/2022
|
C/O of link road from PHC Badahari Gurshali to Village Dawath Km 0/00 to 1/500.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.4614
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jan 2022
|
|
Stage-I Approval on
|
:
|
18 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
16 Sep 2025
|
|
16
|
Himachal Pradesh
|
FP/HP/ROAD/74345/2020
|
FC/HPB/06/152/2022
|
C/O Ambulance road from Fire Brigade road for the building in Daizy Bank Estate Lower Jakhu Shimla Ward No-16 KM 0/0 To 0/45.
|
Road
|
Commissioner MCS
|
0.0112
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Dec 2020
|
|
Stage-I Approval on
|
:
|
17 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2025
|
|
|
|
11 Sep 2025
|
|
17
|
Himachal Pradesh
|
FP/HP/SubStation/148224/2021
|
FC/HPB/12/178/2022
|
Construction of 33/11 KV Electrical Sub Center Shri Naina Devi Ji which falls in the Jurisdiction of Modar Village, Tehsil Shri Naina Devi Ji at Swarghat, Bilaspur District, H.P
|
Sub Station
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD
|
0.2
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2021
|
|
Stage-I Approval on
|
:
|
22 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2025
|
|
|
|
11 Sep 2025
|
|
18
|
Himachal Pradesh
|
FP/HP/Others/145662/2021
|
FC/HPB/09/99/2022
|
Fire Post at Ani
|
Others
|
COMMANDANT HOME GUARDS 7TH BN KULLU
|
0.0768
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2021
|
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2025
|
|
|
|
20 Aug 2025
|
|
19
|
Himachal Pradesh
|
FP/HP/ROAD/42526/2019
|
8B/HP/06/37/2021/FC
|
construction of Tanda Kohla Tikkari Kawal Kothi Sidhkothi Via Baba Balak Nath Mandir Thapla Dari ka Nal Sidhyani Road Km.0/0 To 11/340.
|
Road
|
HPPWD
|
2.2876
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2019
|
|
Stage-I Approval on
|
:
|
09 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2025
|
|
|
|
14 Aug 2025
|
|
20
|
Himachal Pradesh
|
FP/HP/Others/37353/2018
|
FC/HPB/09/53/2021
|
C/o Solid waste Management Plant at MC Rohru, Distt. Shimla, H.P.
|
Others
|
EXECUTIVE OFFICER MC ROHRU
|
0.252
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2018
|
|
Stage-I Approval on
|
:
|
24 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2025
|
|
|
|
04 Aug 2025
|
|
21
|
Himachal Pradesh
|
FP/HP/Others/140938/2021
|
FC/HPB/09/60/2021FC/HPB/09/60/2021
|
C/o the Sub Divisional Soil Conservation Officer office building at Bagsiad, Distt. Mandi (H.P).
|
Others
|
AGRICULTURE DEPARTMENT H.P.
|
0.0869
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Apr 2021
|
|
Stage-I Approval on
|
:
|
05 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jun 2025
|
|
|
|
01 Aug 2025
|
|
22
|
Himachal Pradesh
|
FP/HP/TRANS/148907/2021
|
FC/HPB/91/2023
|
66KV D/C Transmission line from Pragati Nagar to 66/22KV Sub-Station Hulli (Kotkhai) Shimla. (H.P)
|
Transmission Line
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
3.613
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
|
Stage-I Approval on
|
:
|
10 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2025
|
|
|
|
26 Jun 2025
|
|
23
|
Himachal Pradesh
|
FP/HP/ROAD/151416/2022
|
FC/HPB/06/124/2022
|
C/O road from Shamshar to Chalohan
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.668
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2022
|
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2025
|
|
|
|
13 Jun 2025
|
|
24
|
Himachal Pradesh
|
FP/HP/Others/51314/2020
|
FC/HPB/06/42/2021
|
Construction of Sewerage Treatment Plant at Naddi, in Tehsil Dharamshala, District Kangra
|
Others
|
IRRIGATION AND PUBLIC HEALTH GOVT OF HP
|
0.3
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
|
Stage-I Approval on
|
:
|
06 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jun 2025
|
|
|
|
11 Jun 2025
|
|
25
|
Himachal Pradesh
|
FP/HP/ROAD/48987/2020
|
FC/HPB/73/2023
|
C/O CHILLON TO CHOWKIMRIGWAL ROAD KM 0/00 TO 8/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.92
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2020
|
|
Stage-I Approval on
|
:
|
22 Jun 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2025
|
|
|
|
30 May 2025
|
|
26
|
Himachal Pradesh
|
FP/HP/Others/123920/2021
|
8B/HP/09/86/2021/FC
|
Diversion of 0.3253 Ha. Forest Land for Augmentation of Sewerage Scheme to Mandi Town and Providing sewerage facility to adjoing villages of Mandi Town HP
|
Others
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.3253
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2021
|
|
Stage-I Approval on
|
:
|
29 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
29 May 2025
|
|
27
|
Himachal Pradesh
|
FP/HP/ROAD/25347/2017
|
FC/HPB/64/2023
|
C/o Link Road from Domehar-Navi Road Km 0/0 to 5/241
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
3.2322
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2020
|
|
Stage-I Approval on
|
:
|
18 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2025
|
|
|
|
21 Apr 2025
|
|
28
|
Himachal Pradesh
|
FP/HP/HYD/14396/2015
|
8B/HP/01/116/2017
|
MANIMAHESH ENTERPRISES
|
Hydel
|
M/S MANIMAHESH ENTERPRISES
|
0.7649
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2015
|
|
Stage-I Approval on
|
:
|
01 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
11 Apr 2025
|
|
29
|
Himachal Pradesh
|
FP/HP/ROAD/32474/2018
|
8B/HP/06/99/2019/FC
|
BANOUN KANCHI SE GHARA ROAD KM 0/0 TO 4/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.27
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2018
|
|
Stage-I Approval on
|
:
|
21 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2025
|
|
|
|
08 Apr 2025
|
|
30
|
Himachal Pradesh
|
FP/HP/Others/123004/2021
|
FC/HPB/09/52/2021
|
Diversion of 0.561098 hectare of Forest Land for the Construction of Sewerage Treatment Plant 5.00 MLD for Zone No. 1 within the Jurisdiction of Bilaspur Forest Division
|
Others
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.56109
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2021
|
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2025
|
|
|
|
08 Apr 2025
|
|
31
|
Himachal Pradesh
|
FP/HP/ROAD/120302/2021
|
FC/HPB/06/13/2022
|
Proposal for Diversion of forest land measuring 2.4589 ha. in Village Kathali from R/D 127/450 to 128/250 for four laning of Solan-Kaitlighat section of NH-22 (Now NH-05) from Km. 106.139 to Km 129.05
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMLA
|
2.4589
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2021
|
|
Stage-I Approval on
|
:
|
07 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Feb 2025
|
|
|
|
02 Apr 2025
|
|
32
|
Himachal Pradesh
|
FP/HP/ROAD/147914/2021
|
FC/HPB/50/2023
|
C/O Ambulance road from NH-205 to Kamna Devi of portion vinod sharma house to Kamna Devi Ward No.8 Boileauganj Shimla RD 0/0 to 0/425.
|
Road
|
Commissioner MCS
|
0.2143
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2021
|
|
Stage-I Approval on
|
:
|
05 Jul 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
02 Apr 2025
|
|
33
|
Himachal Pradesh
|
FP/HP/ROAD/152261/2022
|
FC/HPC/06/155/2022
|
Diversion of 7.2834 Ha. Forest land for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km 51.00 to Km 72.00 (Package IIA) (Design Length 18.450 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR
|
7.2834
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jul 2022
|
|
Stage-I Approval on
|
:
|
05 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2025
|
|
|
|
01 Apr 2025
|
|
34
|
Himachal Pradesh
|
FP/HP/ROAD/15861/2015
|
B/HP/06/27/2018/FC
|
Construction of link road from Upper Jamli to Baron Kathana road km.0/0 to 6/700
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.276
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Oct 2015
|
|
Stage-I Approval on
|
:
|
21 Jun 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
23 Mar 2025
|
|
35
|
Himachal Pradesh
|
FP/HP/ROAD/148886/2021
|
FC/HPB/06/153/2022
|
Two laning with paved shoulders from End of Hamirpur Bypass (Chil Bahal) to Bhangbar section via Jwalamukhi from km 138+295 to Km 175+270 (Package IV) of existing NH 88 (New NH-3 & 303)
|
Road
|
National Highways Authority of India
|
2.1338
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2021
|
|
Stage-I Approval on
|
:
|
23 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2025
|
|
|
|
23 Mar 2025
|
|
36
|
Himachal Pradesh
|
FP/HP/HYD/49792/2020
|
FC/HPB/01/77/2021
|
Lower Bhagair 1 MW SHEP
|
Hydel
|
SHIV SHAKTI ENTERPRISES
|
0.7903
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2020
|
|
Stage-I Approval on
|
:
|
09 Jan 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2024
|
|
|
|
25 Feb 2025
|
|
37
|
Himachal Pradesh
|
FP/HP/ROAD/25608/2017
|
8B/HP/06/80/2019/FC
|
CONSTRUCTION OF LINK ROAD TO KUFRI-NIHON-KHEEL-DEMELA IN G.P. – KUFRI KM. 0/0 TO 8/100.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
4
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2017
|
|
Stage-I Approval on
|
:
|
22 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jan 2025
|
|
|
|
19 Feb 2025
|
|
38
|
Himachal Pradesh
|
FP/HP/ROAD/20377/2016
|
8B/HP/06/41/2017/FC
|
Construction of Link Road to Harizan Basti Kalehri.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.6123
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2016
|
|
Stage-I Approval on
|
:
|
10 Oct 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2024
|
|
|
|
18 Feb 2025
|
|
39
|
Himachal Pradesh
|
FP/HP/ROAD/37860/2018
|
8b/hp//06/47/2021/FC
|
C/O LINK ROAD FROM DANDHAL TO JARAL KM 0/0 TO 2/00.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.2222
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2019
|
|
Stage-I Approval on
|
:
|
26 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2024
|
|
|
|
18 Feb 2025
|
|
40
|
Himachal Pradesh
|
FP/HP/Pipeline/39422/2019
|
8B/HP/02/29/2020
|
C/O BALI CHOWKI AND MULTI VILLAGE GROUP PIPED WATER SUPPLY SCHEME FOR PART OF SERAJ BLOCK OF MANDI DISTRICT. (H.P.)
|
Pipeline
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
4.32
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2019
|
|
Stage-I Approval on
|
:
|
30 Apr 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2024
|
|
|
|
18 Feb 2025
|
|
41
|
Himachal Pradesh
|
FP/HP/WATER/43930/2020
|
8B/HP/09/63/2020/FC
|
Augmentation of various Water Supply Schemes in GP Tandi, Saroa, Tharjoon, Musrani, Bassi, Devdhar, Kharshi and Kotla in Gohar Block Tehsil Chachiot District Mandi.
|
Drinking Water
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
3.6
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jan 2020
|
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2024
|
|
|
|
18 Feb 2025
|
|
42
|
Himachal Pradesh
|
FP/HP/ROAD/154466/2022
|
FC/HPC/79/2023
|
Diversion of 19.5896 Ha. Forest land for Rehabilitation and Upgradation to Two lane with paved shoulder configuration & Strengthening of Padhar to Bijni (Package-VA) from Km 180.00 to Km 202.815 (Design Length 19.050 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR
|
19.5896
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jul 2022
|
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2025
|
|
|
|
04 Feb 2025
|
|
43
|
Himachal Pradesh
|
FP/HP/Others/40164/2019
|
8B/HP/09/36/2020/FC
|
C/O AE office at Kelodhar in Tehsil Chachiot District Mandi.
|
Others
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
0.0576
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2019
|
|
Stage-I Approval on
|
:
|
14 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2024
|
|
|
|
17 Jan 2025
|
|
44
|
Himachal Pradesh
|
FP/HP/SCH/21873/2016
|
8B/HP/09/30/2017
|
Govt. Degree College Sihunta
|
School
|
DIRECTORATE OF HIGHER EDUCATION
|
1.5298
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2016
|
|
Stage-I Approval on
|
:
|
31 Jul 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Nov 2024
|
|
|
|
19 Dec 2024
|
|
45
|
Himachal Pradesh
|
FP/HP/MIN/129370/2021
|
FC/HPB/47/2023
|
Mining Lease of Sh. Vinod Kumar Auctioned Area for extraction of minor minerals like Sand, Stone and Bajri from river bed of son khad
|
Mining
|
M/S VINOD KUMAR (MINING)
|
0.7984
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2021
|
|
Stage-I Approval on
|
:
|
17 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2024
|
|
|
|
19 Dec 2024
|
|
46
|
Himachal Pradesh
|
FP/HP/MIN/119019/2021
|
FC/HPB/56/2023
|
Mining Lease of Sh. Vinod Kumar Auctioned Area for extraction of minor minerals like Sand, Stone and Bajri from river bed of son khad.
|
Mining
|
M/S VINOD KUMAR (MINING)
|
1.7674
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
|
Stage-I Approval on
|
:
|
17 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2024
|
|
|
|
27 Nov 2024
|
|
47
|
Himachal Pradesh
|
FP/HP/Others/122895/2021
|
FC/HPC/09/53/2022
|
Construction of Setting up of National Disaster Response Force (NDRF) Battalion at Tehsil Balh District Mandi (HP)
|
Others
|
COMMANDANT 14TH BN NDRF
|
23.97
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2021
|
|
Stage-I Approval on
|
:
|
11 Dec 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Oct 2024
|
|
|
|
25 Nov 2024
|
|
48
|
Himachal Pradesh
|
FP/HP/Others/42960/2019
|
8B/HP/09/60/2020/FC
|
C/o Building and Campus of GDC Telka, Distt. Chamba, H.P.
|
Others
|
DIRECTOR OF HIGHER EDUCATION
|
2.83
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2019
|
|
Stage-I Approval on
|
:
|
30 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Aug 2024
|
|
|
|
18 Nov 2024
|
|
49
|
Himachal Pradesh
|
FP/HP/WATER/151171/2022
|
FC/HPB/08/110/2022
|
Source Augmentation & Improvement of LWSS Kathwari & its adjoining villages in GP Bie, BariGumanoo, Sadhyana, Sehli, Sai, kashan, Sadoh and Tarnoh Tehsil Sadar Distt. Mandi (H.P).
|
Drinking Water
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.5214
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2022
|
|
Stage-I Approval on
|
:
|
13 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
18 Nov 2024
|
|
50
|
Himachal Pradesh
|
FP/HP/ROAD/47684/2020
|
FC/HPB/62/2023
|
C/O Ambulance road Dhali Chowk to Durga Colony
|
Road
|
Commissioner MCS
|
0.1287
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2020
|
|
Stage-I Approval on
|
:
|
01 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
10 Nov 2024
|
|