Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
05/05/2018
|
As per letter no 3432/12-1 dated 03-05-2018
|
|
2
|
DFO (Champawat)
|
EDS
|
User Agency (piu.dehradun.morth@gmail.com)
|
05/05/2018
|
Please reply to objections as per letter attached
|
|
3
|
User Agency (piu.dehradun.morth@gmail.com)
|
REPLY
|
DFO (Champawat)
|
16/05/2018
|
The correction have been made as per the instruction received
|
|
4
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
16/05/2018
|
As per letter attached
|
|
5
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
22/06/2018
|
As per letter no 3959/12-1 dated 21-06-2018
|
|
6
|
DFO (Champawat)
|
EDS
|
User Agency (piu.dehradun.morth@gmail.com)
|
22/06/2018
|
Please reply to objections as per letter attached
|
|
7
|
User Agency (piu.dehradun.morth@gmail.com)
|
REPLY
|
DFO (Champawat)
|
28/06/2018
|
The correction have been made as per the instruction received
|
|
8
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
28/06/2018
|
as per letter attached
|
|
9
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
29/06/2018
|
Plz attachment enclose
|
|
10
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
03/07/2018
|
as per letter attached
|
|
11
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
18/07/2018
|
As per letter no 220/12-1 dated 17-07-2018
|
|
12
|
DFO (Champawat)
|
EDS
|
User Agency (piu.dehradun.morth@gmail.com)
|
19/07/2018
|
As per letter no 220/12-1 dated 17-07-2018
|
|
13
|
User Agency (piu.dehradun.morth@gmail.com)
|
REPLY
|
DFO (Champawat)
|
24/07/2018
|
The correction have been made as per the instruction received
|
|
14
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
25/07/2018
|
as per letter attached
|
|
15
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
02/08/2018
|
find the letter attached
|
|
16
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
06/08/2018
|
find the letter attached
|
|
17
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
08/08/2018
|
as per letter attached
|
|
18
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
09/08/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 02-08-2018 has been clarified by DFO Champawat letter no 490/12-1 dated 08-08-2018
|
|
19
|
Regional Office
|
EDS
|
State secretary
|
04/09/2018
|
Hard copy of the proposal has still not been submitted by the State Govt., which may be submitted to this office. State Govt. is required to submit hard copy of the proposal containing all original/authenticated photocopies of all the documents. Since, the proposal is return back.
|
|
20
|
State secretary
|
EDS
|
Nodal Officer
|
04/09/2018
|
Hard copy of the proposal has still not been submitted by the State Govt., which may be submitted to this office. State Govt. is required to submit hard copy of the proposal containing all original/authenticated photocopies of all the documents. Since, the proposal is return back.
|
|
21
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
06/09/2018
|
Hard copy of the proposal has still not been submitted by the State Govt., which may be submitted to this office. State Govt. is required to submit hard copy of the proposal containing all original/authenticated photocopies of all the documents. Since, the proposal is return back.
|
|
22
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
07/09/2018
|
Hard copy of the proposal has still not been submitted by the State Govt., which may be submitted to this office. State Govt. is required to submit hard copy of the proposal containing all original/authenticated photocopies of all the documents. Since, the proposal is return back.
|
|
23
|
DFO (Champawat)
|
EDS
|
User Agency (piu.dehradun.morth@gmail.com)
|
07/09/2018
|
Hard copy of the proposal has still not been submitted by the State Govt., which may be submitted to this office. State Govt. is required to submit hard copy of the proposal containing all original/authenticated photocopies of all the documents. Since, the proposal is return back.
|
|
24
|
User Agency (piu.dehradun.morth@gmail.com)
|
REPLY
|
DFO (Champawat)
|
11/09/2018
|
The correction have been made as per the instruction received
|
|
25
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
13/09/2018
|
as per letter attached
|
|
26
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
14/09/2018
|
The On line objections raised by Reg. Office/Nodal officer on date 06-09-2018. has been clarified by DFO Champawat letter no 811/12-1 dated 13-09-2018.
|
|
27
|
Nodal Officer
|
REPLY
|
State secretary
|
15/09/2018
|
The correction have been made as per the instruction received
|
|
28
|
State secretary
|
REPLY
|
Regional Office
|
17/09/2018
|
The correction have been made as per the instruction received
|
|
29
|
Regional Office
|
EDS
|
State secretary
|
04/10/2018
|
Kindly submit the case with the Honble NGT order as the case pertains to Char Dham.
|
|
30
|
State secretary
|
EDS
|
Nodal Officer
|
05/10/2018
|
Kindly submit the case with the Honble NGT order as the case pertains to Char Dham.
|
|
31
|
Nodal Officer
|
REPLY
|
State secretary
|
09/10/2018
|
Order of Hon.NGT dated 26-9-18 is attached herewith. Hon. NGT has not passed any direction against processing of forest clearances.
|
|
32
|
State secretary
|
REPLY
|
Regional Office
|
09/10/2018
|
Order of Hon.NGT dated 26-9-18 is attached herewith. Hon. NGT has not passed any direction against processing of forest clearances
|
|
33
|
Regional Office
|
EDS
|
State secretary
|
30/10/2018
|
Please submit the proposal in view of honble supreme court order
|
|
34
|
State secretary
|
EDS
|
Nodal Officer
|
31/10/2018
|
Please submit the proposal in view of honble supreme court order
|
|
35
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
31/10/2018
|
Please submit the proposal in view of honble supreme court order
|
|
36
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
12/11/2018
|
Please submit the proposal in view of honble supreme court order
|
|
37
|
DFO (Champawat)
|
EDS
|
User Agency (piu.dehradun.morth@gmail.com)
|
12/11/2018
|
Please submit the proposal in view of honble supreme court order
|
|
38
|
User Agency (piu.dehradun.morth@gmail.com)
|
REPLY
|
DFO (Champawat)
|
04/02/2019
|
The correction have been made as per the instruction received
|
|
39
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
06/02/2019
|
as per attached letter
|
|
40
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
06/02/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 31-10.2018 has been clarified by DFO Almora letter no 2630/12-1 dated 06-02-2019
|
|
41
|
Nodal Officer
|
REPLY
|
State secretary
|
06/02/2019
|
correction has been made as per instructions received
|
|
42
|
State secretary
|
REPLY
|
Regional Office
|
07/02/2019
|
correction has been made as per instructions received
|
|
43
|
Regional Office
|
EDS
|
State secretary
|
20/02/2019
|
EDS attached
|
|
44
|
State secretary
|
EDS
|
Nodal Officer
|
20/02/2019
|
EDS attached
|
|
45
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
21/02/2019
|
EDS attached
|
|
46
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
22/02/2019
|
EDS attached
|
|
47
|
DFO (Champawat)
|
EDS
|
User Agency (piu.dehradun.morth@gmail.com)
|
01/03/2019
|
Eds attached
|
|
48
|
User Agency (piu.dehradun.morth@gmail.com)
|
REPLY
|
DFO (Champawat)
|
03/06/2020
|
The correction have been made as per the instruction received
|
|
49
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
05/06/2020
|
as per as attached letter
|
|
50
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
09/06/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 21-02-2020 has been clarified by Dfo Champawat letter no 3168/12-1 dated 05-06-2020.
|
|
51
|
Nodal Officer
|
REPLY
|
State secretary
|
11/06/2020
|
The correction have been made as per the instruction received
|
|
52
|
State secretary
|
REPLY
|
Regional Office
|
11/06/2020
|
The correction have been made as per the instruction received
|
|
53
|
Regional Office
|
EDS
|
State secretary
|
18/06/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
54
|
State secretary
|
EDS
|
Nodal Officer
|
19/06/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
55
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
19/06/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
56
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
01/07/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
57
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
03/07/2020
|
the shortcomings mentioned in the attached document.
|
|
58
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
13/10/2022
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
14/10/2022
|
As per letter.
|
|
60
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
14/10/2022
|
As per letter no 1152/12-1 dated 13-10-2022
|
|
61
|
Nodal Officer
|
REPLY
|
State secretary
|
15/10/2022
|
The correction have been made as per the instruction received
|
|
62
|
State secretary
|
REPLY
|
Regional Office
|
17/10/2022
|
The correction have been made as per the instruction received
|
|
63
|
Regional Office
|
EDS
|
State secretary
|
28/10/2022
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
64
|
State secretary
|
EDS
|
Nodal Officer
|
29/10/2022
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
65
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
29/10/2022
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
66
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
01/11/2022
|
Do needful action as per EDS
|
|
67
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
02/11/2022
|
As per attached letter
|
|
68
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
08/12/2022
|
The correction have been made as per the instruction received
|
|
69
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
12/12/2022
|
Please Provide hard copy .
|
|
70
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
13/12/2022
|
The correction have been made as per the instruction received
|
|
71
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
16/12/2022
|
Please find the letter and make correction as per instructions.
|
|
72
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
20/12/2022
|
The correction have been made as per the instruction received
|
|
73
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
23/12/2022
|
Please do corrections as per attached letter.
|
|
74
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
24/12/2022
|
The correction have been made as per the instruction received
|
|
75
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
07/01/2023
|
Please do same forest land total area in part-I B 2.3 & B 2.4
|
|
76
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
10/01/2023
|
The correction have been made as per the instruction received
|
|
77
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
11/01/2023
|
Please do same forest land total area in part-I B 2.3 & B 2.4
|
|
78
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
31/01/2023
|
The correction have been made as per the instruction received
|
|
79
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
09/02/2023
|
Correction have been make as per instructions
|
|
80
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
23/02/2023
|
As per letter no 2289/12-1 dated 17-02-2023
|
|
81
|
Nodal Officer
|
REPLY
|
State secretary
|
28/02/2023
|
The correction have been made as per the instruction received
|
|
82
|
State secretary
|
REPLY
|
Regional Office
|
28/02/2023
|
The correction have been made as per the instruction received
|
|
83
|
Regional Office
|
EDS
|
State secretary
|
16/03/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
84
|
State secretary
|
EDS
|
Nodal Officer
|
21/03/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
85
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
21/03/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
86
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
23/03/2023
|
Do needful action as per EDS
|
|
87
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
26/03/2023
|
Do needful action as per instructions.
|
|
88
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
04/06/2023
|
The correction have been made as per the instruction received
|
|
89
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
09/06/2023
|
As per attached letter
|
|
90
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
26/06/2023
|
As per letter no 3616/12-1 dated 20-06-2023
|
|
91
|
Nodal Officer
|
REPLY
|
State secretary
|
04/07/2023
|
The correction have been made as per the instruction received
|
|
92
|
State secretary
|
REPLY
|
Regional Office
|
04/07/2023
|
The correction have been made as per the instruction received
|
|
93
|
Regional Office
|
EDS
|
State secretary
|
27/07/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
94
|
State secretary
|
EDS
|
Nodal Officer
|
31/07/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
95
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
03/08/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
96
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
03/08/2023
|
Do needful action as per the attachment here
|
|
97
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
04/08/2023
|
Do needful action as per the attached letter
|
|
98
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
10/08/2023
|
The correction have been made as per the instruction received
|
|
99
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
11/08/2023
|
The correction have been made as per the instruction
|
|
100
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
24/08/2023
|
As per letter no 456/12-1 dated 22-08-2023
|
|
101
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
05/09/2023
|
dfo may upload correct KML file of CA area
|
|
102
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
06/09/2023
|
dfo may upload correct KML file of CA area
|
|
103
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
06/09/2023
|
The correction have been made as per the instruction
|
|
104
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
06/09/2023
|
The correction have been made as per the instruction
|
|
105
|
Nodal Officer
|
REPLY
|
State secretary
|
08/09/2023
|
The correction have been made as per the instruction
|
|
106
|
State secretary
|
REPLY
|
Regional Office
|
08/09/2023
|
The correction have been made as per the instruction
|
|
107
|
Regional Office
|
EDS
|
State secretary
|
30/10/2023
|
The proposal was discussed in the REC meeting held on 27.10.2023. State Government is requested to take necessary action as per the discussion made in the meeting. Minutes of the meeting will be sent separately.
|
|
108
|
State secretary
|
EDS
|
Nodal Officer
|
02/11/2023
|
The proposal was discussed in the REC meeting held on 27.10.2023. State Government is requested to take necessary action as per the discussion made in the meeting. Minutes of the meeting will be sent separately.
|
|
109
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
10/11/2023
|
The proposal has been discussed in the meeting of FRCM held on 30.10.2023. State Government is requested to take necessary action as per the discussion made in the meeting. Minutes of the meeting will be sent separately.
|
|
110
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
02/12/2023
|
The proposal has been discussed in the meeting of FRCM held on 30.10.2023. State Government is requested to take necessary action as per the discussion made in the meeting. Minutes of the meeting will be sent separately.
|
|
111
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
11/12/2023
|
The proposal has been discussed in the meeting of FRCM held on 30.10.2023. State Government is requested to take necessary action as per the discussion made in the meeting. Minutes of the meeting will be sent separately.
|
|
112
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
19/12/2023
|
The correction have been made as per the instruction received
|
|
113
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
27/12/2023
|
Correction have been made as per instructions
|
|
114
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
30/01/2024
|
As per letter no 1740/12-1 dated 09-01-2024
|
|
115
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
15/02/2024
|
DFO/user agency is requested to attend the shortcomings as per the attached document.
|
|
116
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
16/02/2024
|
requested to attend the shortcomings as per the document attached.
|
|
117
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
22/02/2024
|
requested to attend the shortcomings as per the document attached.
|
|
118
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
27/02/2024
|
The correction have been made as per the instruction received
|
|
119
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
03/03/2024
|
Please give your objection answer in fixed performa . One side object and second side answer.
|
|
120
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
20/04/2024
|
The correction have been made as per the instruction received
|
|
121
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
26/04/2024
|
please submitt hord copy of your reply of objections
|
|
122
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
29/04/2024
|
The correction have been made as per the instruction received
|
|
123
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
30/04/2024
|
Please provide hard copy of propsal in 5 copies.
|
|
124
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
01/05/2024
|
The correction have been made as per the instruction received
|
|
125
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
07/05/2024
|
the correction have been made as per given instructions.
|
|
126
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
15/05/2024
|
As per letter no 2938/12-1 dated 9-05-2024
|
|
127
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
25/05/2024
|
CF/DFO/user agency is requested to attend the shortcomings as per the attached document.
|
|
128
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
29/05/2024
|
DFO/user agency is requested to attend the shortcomings as per the attached document.
|
|
129
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
29/05/2024
|
Do needful action as per the attached letter
|
|
130
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
30/05/2024
|
The correction have been made as per the instruction received
|
|
131
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
30/05/2024
|
Please provide hard copy of propsal in 5 copies.
|
|
132
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
30/05/2024
|
The correction have been made as per the instruction received
|
|
133
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
30/05/2024
|
Correction have been made as per instructions
|
|
134
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
01/06/2024
|
Plz send hard copy this office
|
|
135
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
01/06/2024
|
HARD COPY HAS BEEN SENT TO CF OFFICE.
|
|
136
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
18/06/2024
|
As per letter no 3212/12-1 dated 07-06-2024
|
|
137
|
Nodal Officer
|
REPLY
|
State secretary
|
15/07/2024
|
as per attached file
|
|
138
|
State secretary
|
REPLY
|
Regional Office
|
19/07/2024
|
EDS Reply by the nodal officer
|
|
139
|
Regional Office
|
EDS
|
State secretary
|
22/08/2024
|
State Government is requested to attend the shortcomings as per the letter attached.
|
|
140
|
State secretary
|
EDS
|
Nodal Officer
|
23/08/2024
|
Kindly attend EDS query
|
|
141
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
30/08/2024
|
As per attachment
|
|
142
|
CF (North Kumaun)
|
EDS
|
DFO (Champawat)
|
06/09/2024
|
As per attachment
|
|
143
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
06/09/2024
|
As per attached letter
|
|
144
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
24/09/2024
|
The correction have been made as per the instruction received
|
|
145
|
DFO (Champawat)
|
EDS
|
User Agency (nhlohaghat@gmail.com)
|
01/10/2024
|
Please upload the corrections as per the instructions recieved.
|
|
146
|
User Agency (nhlohaghat@gmail.com)
|
REPLY
|
DFO (Champawat)
|
03/10/2024
|
The correction have been made as per the instruction received
|
|
147
|
DFO (Champawat)
|
REPLY
|
CF (North Kumaun)
|
05/10/2024
|
The correction have been done.
|
|
148
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
06/11/2024
|
As Per Letter No-1005/12-1-2
Dated -18/10/2024
|
|
149
|
Nodal Officer
|
REPLY
|
State secretary
|
14/11/2024
|
Please find the EDS reply
|
|
150
|
State secretary
|
EDS
|
Nodal Officer
|
20/11/2024
|
The uploaded copy of EDS reply which is uploaded on 14.11.2024 is not shown here so kindly reupload it so further action can be taken
|
|
151
|
Nodal Officer
|
REPLY
|
State secretary
|
25/11/2024
|
As per instruction recvd...
|
|