Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Uttarakhand
|
FP/UK/ROAD/18605/2016
|
8B/UCP/06/154/2016/FC
|
Construction of motor road from Km. 4 of Rampur-Gawana motor road to village Surari in district Pauri.
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.25
|
IN-PRINCIPLE
|
06-Dec-2017
|
|
|
|
|
|
No
|
2
|
Uttarakhand
|
FP/UK/ROAD/15358/2015
|
8B/UCP/06/87/2017/FC
|
RJM Panghat to Guloli motor road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.225
|
IN-PRINCIPLE
|
31-Aug-2018
|
|
|
|
|
|
No
|
3
|
Uttarakhand
|
FP/UK/ROAD/8900/2014
|
8B/UCP/06/46/2018
|
Banswada-korodi-jalai-gair-kandara Motor Road
|
Road
|
EECDPWDUKM
|
2.06
|
IN-PRINCIPLE
|
29-Mar-2019
|
|
|
|
|
|
No
|
4
|
Uttarakhand
|
FP/UK/ROAD/17679/2016
|
8B/UCP/06/176/2016/FC
|
Nagjagai - Fegu - Barmwadi Motor Road
|
Road
|
EECDPWDUKM
|
1.451
|
IN-PRINCIPLE
|
13-Feb-2018
|
|
|
|
|
|
No
|
5
|
Uttarakhand
|
FP/UK/ROAD/17623/2016
|
8B/UCP/06/201/2016/FC
|
Lingwana to Saoru Ranital motor road
|
Road
|
PWD
|
1.4875
|
IN-PRINCIPLE
|
04-Jun-2019
|
|
|
|
|
|
No
|
6
|
Uttarakhand
|
FP/UK/ROAD/154869/2022
|
8B/UCP/06/40/2023/FC
|
Construction of road from Km 15 of BaijnathBageshwar motor road to Udalgaon in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.261
|
IN-PRINCIPLE
|
31-Aug-2023
|
|
|
|
|
|
No
|
7
|
Uttarakhand
|
FP/UK/ROAD/38290/2019
|
8B/UCP/06/75/2020/FC
|
Construction of Extension of Bankot to Burushkholi (Dharidhumlakot) Motor Road Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
4.856
|
IN-PRINCIPLE
|
25-Nov-2020
|
|
|
|
|
|
No
|
8
|
Uttarakhand
|
FP/UK/ROAD/37828/2018
|
8B/UCP/06/173/2019/FC
|
Construction of Motor bridge in Haat-Basti Motor Road
|
Road
|
EECDPWDUKM
|
0.06
|
IN-PRINCIPLE
|
05-Feb-2020
|
|
|
|
|
|
No
|
9
|
Uttarakhand
|
FP/UK/HYD/42080/2019
|
8B/UCP/01/195/2019/FC
|
Tankul 12 MW Small Hydro Project
|
Hydel
|
UJVN LIMITED (A GOVT. OF UTTARAKHAND ENTERPRISE)
|
9.397
|
IN-PRINCIPLE
|
18-May-2022
|
|
|
|
|
|
No
|
10
|
Uttarakhand
|
FP/UK/ROAD/37053/2018
|
8B/UCP/06/91/2020/FC
|
Pawadhar naini Jageshwar motor Road
|
Road
|
EE TY DIV PWD BERINAG
|
5.94
|
IN-PRINCIPLE
|
05-Aug-2021
|
|
|
|
|
|
No
|
11
|
Uttarakhand
|
FP/UK/Others/10660/2015
|
8B/UCP/09/63/2016
|
33/11 KV SUBSTATION AT GULAR IN DOGI PATTI OF NARENDRANAGAR BLOCK IN TEHRI DISTRICT
|
Others
|
EE EDD TEHRI UPCL
|
0.12
|
IN-PRINCIPLE
|
30-Mar-2017
|
|
|
|
|
|
No
|
12
|
Uttarakhand
|
FP/UK/ROAD/36098/2018
|
8B/UCP/06/163/2020/FC
|
Construction OF Soughar Pantgoun Chamarkhan Sageena Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.225
|
IN-PRINCIPLE
|
23-Sep-2021
|
|
|
|
|
|
No
|
13
|
Uttarakhand
|
FP/UK/ROAD/19460/2016
|
8B/UCP/06/166/2020/FC
|
Construction of Motor Road for connecting of Nadgal Village under CM Scheme at District Nainital
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.33
|
IN-PRINCIPLE
|
25-Oct-2023
|
|
|
|
|
|
No
|
14
|
Uttarakhand
|
FP/UK/ROAD/26820/2017
|
8B/UCP/06/125/2018/FC
|
Widening and Improvement motor road starts from km 239 of State Highway 74 (Sirsa Bend) to Shaktifarm
|
Road
|
EXECUTIVE ENGINEER ADB
|
14.856
|
IN-PRINCIPLE
|
24-Apr-2019
|
|
|
|
|
|
No
|
15
|
Uttarakhand
|
FP/UK/ROAD/23941/2017
|
8B/UCP/06/63/2019/FC
|
Construction of Km-35 of Raipur-Kumalda-Kaddukhal Motor Road to Ghena
|
Road
|
PMGSY ID IIND NEW TEHRI
|
2.0825
|
IN-PRINCIPLE
|
17-Dec-2019
|
|
|
|
|
|
No
|
16
|
Uttarakhand
|
FP/UK/ROAD/23941/2017
|
8B/UCP/06/63/2019/FC
|
Construction of Km-35 of Raipur-Kumalda-Kaddukhal Motor Road to Ghena
|
Road
|
PMGSY ID IIND NEW TEHRI
|
2.0825
|
IN-PRINCIPLE
|
17-Dec-2019
|
|
|
|
|
|
No
|
17
|
Uttarakhand
|
FP/UK/ROAD/48913/2020
|
8B/UCP/06/56/2021/FC
|
Construction of Nandkeshri-Purna to Dhara Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.435
|
IN-PRINCIPLE
|
31-Mar-2021
|
|
|
|
|
|
No
|
18
|
Uttarakhand
|
FP/UK/ROAD/30646/2017
|
8B/UCP/06/68/2018
|
Jamnikhal Chaudio Barguru to Bhainskot Motor road
|
Road
|
PWD
|
1.785
|
IN-PRINCIPLE
|
14-Nov-2018
|
|
|
|
|
|
No
|
19
|
Uttarakhand
|
FP/UK/ROAD/36040/2018
|
8B/UCP/06/138/2019/FC
|
Construction of Jarti To Rima Motor road (Length 6.00 Km)
|
Road
|
PWDKAPKOT
|
1.54
|
IN-PRINCIPLE
|
25-Jan-2021
|
|
|
|
|
|
No
|
20
|
Uttarakhand
|
FP/UK/ROAD/9220/2015
|
8B/UCP/06/125/2015/FC
|
Chitai Pant-Haridatt petshali Inter college motor road till Petshal
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.43875
|
IN-PRINCIPLE
|
17-Nov-2020
|
|
|
|
|
|
No
|
21
|
Uttarakhand
|
FP/UK/ROAD/11082/2015
|
8B/UCP/06/129/2015/FC
|
Extenction of Pantgoun chamarkhan Sailapani motor Roa(Simaldhar to Sailapani milan)
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.935
|
IN-PRINCIPLE
|
13-Nov-2015
|
|
|
|
|
|
No
|
22
|
Uttarakhand
|
FP/UK/ROAD/8859/2014
|
8B/UCP/06/81/2015/FC
|
Saheed rajesh Adhikari Vinayak Dhunga Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.414
|
IN-PRINCIPLE
|
15-Jan-2018
|
|
|
|
|
|
No
|
23
|
Uttarakhand
|
FP/UK/ROAD/12840/2015
|
8B/UCP/06/90/2016/FC
|
Nauti-Chatoli to Jakhet (extension)
|
Road
|
PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND
|
0.17
|
IN-PRINCIPLE
|
14-Mar-2018
|
|
|
|
|
|
No
|
24
|
Uttarakhand
|
FP/UK/ROAD/40174/2019
|
8B/UCP/06/10/2020/FC
|
Construction of Javri to Jaikandi(extension Ajaipur to Kakola) MR
|
Road
|
PMGSY
|
1.501
|
IN-PRINCIPLE
|
25-Aug-2020
|
|
|
|
|
|
No
|
25
|
Uttarakhand
|
FP/UK/ROAD/41148/2019
|
8B/UCP/06/05/2021/FC
|
New Construction of Chamu to Bhandari Gaon Rajwar Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.555
|
IN-PRINCIPLE
|
29-Jan-2021
|
|
|
|
|
|
No
|
26
|
Uttarakhand
|
FP/UK/ROAD/34730/2018
|
8B/UCP/06/16/2021/FC
|
Pokhari-harishankar-chondi-rauta to Simlasu
|
Road
|
OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION PUBLIC WORKS DEPARTMENT POKHARI
|
1.18
|
IN-PRINCIPLE
|
23-Jul-2021
|
|
|
|
|
|
No
|
27
|
Uttarakhand
|
FP/UK/ROAD/34380/2018
|
8B/UCP/06/209/2019/FC
|
Kathiyan to Dirnad Motor Road Under PMGSY
|
Road
|
EXECUTIVE ENGINEER
|
3.0835
|
IN-PRINCIPLE
|
06-Aug-2020
|
|
|
|
|
|
No
|
28
|
Uttarakhand
|
FP/UK/Others/6746/2014
|
8B/UCP/09/82/2014
|
homeguards and civil defence CTI
|
Others
|
UTTARAKHAND HOMEGUARDS AND CIVIL DEFENCE
|
5
|
IN-PRINCIPLE
|
05-Feb-2015
|
|
|
|
|
|
No
|
29
|
Uttarakhand
|
FP/UK/ROAD/8837/2014
|
8B/UCP/06/142/2015-FC
|
shaheed mohan singh motor road
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.35
|
IN-PRINCIPLE
|
08-Oct-2015
|
|
|
|
|
|
No
|
30
|
Uttarakhand
|
FP/UK/Others/31184/2018
|
8B/UCP/09/59/2018/FC
|
Diversion of Forest Land on Lease for Establishment of Hot mix plant on NH-58
|
Others
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
0.18
|
IN-PRINCIPLE
|
04-Jul-2018
|
|
|
|
|
|
No
|
31
|
Uttarakhand
|
FP/UK/ROAD/42172/2019
|
8B/UCP/06/30/2021/FC
|
Motor road from End point of Dhar payankoti Motor road to Syalsaor Panyali Bantolikhal Nailchaami Motor road
|
Road
|
PWD
|
3.9737
|
IN-PRINCIPLE
|
22-Jul-2021
|
|
|
|
|
|
No
|
32
|
Uttarakhand
|
FP/UK/ROAD/10762/2015
|
8B/UCP/06/40/2016
|
Construction of Bungidhar Mehalchauri Bachhuwaban MR, km-25 to Syuni Talli Motor Road under PMGSY
|
Road
|
RES PMGSY KARANPERAYAG
|
2.73
|
IN-PRINCIPLE
|
22-Jan-2018
|
|
|
|
|
|
No
|
33
|
Uttarakhand
|
FP/UK/ROAD/9291/2015
|
8B/UCP/06/62/2015/FC
|
CONSTRUCTION OF RICHI MALLI MOHANRI MALLA BAGADWAR MALLA BHAKUNIYA MOTOR ROAD
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.065
|
IN-PRINCIPLE
|
17-Aug-2015
|
|
|
|
|
|
No
|
34
|
Uttarakhand
|
FP/UK/ROAD/11055/2015
|
8B/UCP/06/17/2017/FC
|
Construction of Mamni-Uroli Motor Road under State sectore
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.1
|
IN-PRINCIPLE
|
01-Dec-2017
|
|
|
|
|
|
No
|
35
|
Uttarakhand
|
FP/UK/ROAD/10159/2015
|
8B/UCP/06/126/2016/FC
|
Construction of Kuloli Munra Devikhal Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
3.22
|
IN-PRINCIPLE
|
30-Dec-2016
|
|
|
|
|
|
No
|
36
|
Uttarakhand
|
FP/UK/TRANS/39376/2019
|
8B/UCP/04/146/2021/FC
|
JANPAD PAURI KE ANTARGAT 400KV DOUBLE CIRCUT VISHNUPRAYAG MUZAFFARNAGAR PARESHAN LINE KE KSHTIGRAST TOWER SANKHYA 266 KE STHAN PER DO TOWRON KA NIRMAN
|
Transmission Line
|
UPPCL
|
3.893
|
IN-PRINCIPLE
|
10-Jan-2022
|
|
|
|
|
|
No
|
37
|
Uttarakhand
|
FP/UK/ROAD/11204/2015
|
8B/UCP/06/249/2015/FC
|
Nandi Sailsain Mathurgoun Motor road
|
Road
|
PWD
|
0.8225
|
IN-PRINCIPLE
|
28-Dec-2017
|
|
|
|
|
|
No
|
38
|
Uttarakhand
|
FP/UK/ROAD/38635/2019
|
8B/UCP/06/52/2021/FC
|
GIC Chaundi-Virshan Sera Motor Road
|
Road
|
OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION PUBLIC WORKS DEPARTMENT POKHARI
|
1.75
|
IN-PRINCIPLE
|
26-Aug-2021
|
|
|
|
|
|
No
|
39
|
Uttarakhand
|
FP/UK/Others/149743/2021
|
8B/UCP/09/61/2022/FC
|
Trenching Ground SWM
|
Others
|
NAGAR PANCHAYAT SATPULI
|
0.6
|
IN-PRINCIPLE
|
27-Dec-2022
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
40
|
Uttarakhand
|
FP/UK/ROAD/120677/2021
|
8B/UCP/06/60/2022/FC
|
Construction of Panyapodi Toli Gwalgaon Motor Road 7.750 Km
|
Road
|
CONSTRUCTION DIVISION PWD ASKOTE
|
3.875
|
IN-PRINCIPLE
|
25-Oct-2023
|
|
|
|
|
|
No
|
41
|
Uttarakhand
|
FP/UK/IRRIG/155063/2022
|
8b/UCP/09/78/2022/FC
|
Construction of Diversion Head at Baur River for Kaladhungi Canal in 0.35 ha Reserved Forest of Ramnagar Forest Division
|
Irrigation
|
EXECUTIVE ENGINEER IRRIGATION DIVISION NAINITAL
|
0.35
|
IN-PRINCIPLE
|
24-Dec-2024
|
|
|
|
|
|
No
|
42
|
Uttarakhand
|
FP/UK/ROAD/46607/2020
|
8B/UCP/06/15/2021/FC
|
New construction of motor road from Pangkatara to Khalar under developmental Betalghat of Vidhan Sabha constituency of Nainital district under state plan
|
Road
|
EE CD NAINITAL
|
1.71
|
IN-PRINCIPLE
|
18-Feb-2021
|
|
|
|
|
|
No
|
43
|
Uttarakhand
|
FP/UK/ROAD/9552/2015
|
8B/UCP/06/61/2015-FC
|
Jwarnari Buksar Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
4.8338
|
IN-PRINCIPLE
|
08-Oct-2015
|
|
|
|
|
|
No
|
44
|
Uttarakhand
|
FP/UK/Others/21811/2016
|
8B/UCP/09/14/2017/FC
|
polution abedment of river koshi at ramnagar(nainital)
|
Others
|
UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM
|
0.9488
|
IN-PRINCIPLE
|
30-Jun-2017
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
45
|
Uttarakhand
|
FP/UK/ROAD/38909/2019
|
8B/UCP/06/33/2020/FC
|
Maletha Gwartola to Semwal Gawn Motor road
|
Road
|
PWD
|
0.2795
|
IN-PRINCIPLE
|
13-Mar-2020
|
|
|
|
|
|
No
|
46
|
Uttarakhand
|
FP/UK/ROAD/30064/2017
|
8B/UCP/06/04/2018
|
Under state sector in district Chamoli , constituency Karanprayag construction of new motor road "Khet Gadhera to Kheti Jakhet Chaurasen "
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
1.41
|
IN-PRINCIPLE
|
07-Mar-2018
|
|
|
|
|
|
No
|
47
|
Uttarakhand
|
FP/UK/ROAD/14124/2015
|
8B/UCP/06/186/2015/FC
|
Javri To Jaikandi Motor Road
|
Road
|
PMGSY
|
3.15
|
IN-PRINCIPLE
|
14-Mar-2016
|
|
|
|
|
|
No
|
48
|
Uttarakhand
|
FP/UK/ROAD/146663/2021
|
8B/UCP/06/66/2023/FC
|
Up-gradation & 4-laning of Bhaniyawala - Rishikesh Road (Spur) of NH-7 from km 0.000 to km 20.600 in the State of Uttarakhand.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, VASANT VIHAR, PIU, DEHRADUN
|
19.8345
|
IN-PRINCIPLE
|
26-Dec-2024
|
|
|
|
|
|
No
|
49
|
Uttarakhand
|
FP/UK/ROAD/43934/2020
|
8B/UCP/06/138/2020/FC
|
Construction of Rauta-Malkoti-Sera Motor Road in Block-Pokhari, District-Chamoli under State Sector
|
Road
|
OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION PUBLIC WORKS DEPARTMENT POKHARI
|
1.89
|
IN-PRINCIPLE
|
25-Feb-2021
|
|
|
|
|
|
No
|
50
|
Uttarakhand
|
FP/UK/ROAD/10119/2015
|
8B/UCP/06/109/2016/FC
|
Extension of Bagoli Koti Motor Road in district Chamoli
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.219
|
IN-PRINCIPLE
|
19-May-2020
|
|
|
|
|
|
No
|
|