Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
01/04/2015
|
As per letter no 5786/12-1 dated 01-04-2015
|
|
2
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
07/04/2015
|
Objection Reply
|
|
3
|
Regional Office
|
EDS
|
State secretary
|
24/06/2015
|
SHORT NARRATIVE OF THE PROJECT DOES NOT GIVE ADEQUATE INFORMATION ABOUT THE PROJECT.
2. THE PERIOD FOR WHICH FOREST LAND IS PROPOSED TO BE DIVERTED IS NOT MENTIONED IN PARA-A -1 X.
3. VILLAGE WISE BREAKUP OF LAND NOT PROVIDED IN PARA-2.3.
4. BOTH THE ALTERNATIVES START FROM THE SAME POINT BUT, THEY ARE STATED TO START FROM DIFFERENT POINTS IN THE TEXT.
5. SCANNED COPY OF MAP OF LAND PROPOSED FOR CA USING GPS OR TOTAL STATION IS NOT PROPER.
6. COPY OF MAP IN SOI TOPOSHEET INDICATING LOCATION OF CA IS NOT CLEAR.
7. OWNER-WISE DETAILS OF NAP LAND SELECTED FOR MUCK DUMPING ALONGWITH MAP AND RECLAMATION PLAN IS NOT SUBMITTED.
8. WORKING PLAN PRESCRIPTION FOR THE AREA PROPOSED FOR DIVERSION AND ITS DISTANCE FROM BOUNDARY OF FOREST NOT GIVEN.
|
|
4
|
State secretary
|
EDS
|
Nodal Officer
|
26/06/2015
|
Plz reply to obj of RO-SHORT NARRATIVE OF THE PROJECT DOES NOT GIVE ADEQUATE INFORMATION ABOUT THE PROJECT. 2. THE PERIOD FOR WHICH FOREST LAND IS PROPOSED TO BE DIVERTED IS NOT MENTIONED IN PARA-A -1 X. 3. VILLAGE WISE BREAKUP OF LAND NOT PROVIDED IN PARA-2.3. 4. BOTH THE ALTERNATIVES START FROM THE SAME POINT BUT, THEY ARE STATED TO START FROM DIFFERENT POINTS IN THE TEXT. 5. SCANNED COPY OF MAP OF LAND PROPOSED FOR CA USING GPS OR TOTAL STATION IS NOT PROPER. 6. COPY OF MAP IN SOI TOPOSHEET INDICATING LOCATION OF CA IS NOT CLEAR. 7. OWNER-WISE DETAILS OF NAP LAND SELECTED FOR MUCK DUMPING ALONGWITH MAP AND RECLAMATION PLAN IS NOT SUBMITTED. 8. WORKING PLAN PRESCRIPTION FOR THE AREA PROPOSED FOR DIVERSION AND ITS DISTANCE FROM BOUNDARY OF FOREST NOT GIVEN.
|
|
5
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
27/06/2015
|
Plz reply to obj of RO-SHORT NARRATIVE OF THE PROJECT DOES NOT GIVE ADEQUATE INFORMATION ABOUT THE PROJECT. 2. THE PERIOD FOR WHICH FOREST LAND IS PROPOSED TO BE DIVERTED IS NOT MENTIONED IN PARA-A -1 X. 3. VILLAGE WISE BREAKUP OF LAND NOT PROVIDED IN PARA-2.3. 4. BOTH THE ALTERNATIVES START FROM THE SAME POINT BUT, THEY ARE STATED TO START FROM DIFFERENT POINTS IN THE TEXT. 5. SCANNED COPY OF MAP OF LAND PROPOSED FOR CA USING GPS OR TOTAL STATION IS NOT PROPER. 6. COPY OF MAP IN SOI TOPOSHEET INDICATING LOCATION OF CA IS NOT CLEAR. 7. OWNER-WISE DETAILS OF NAP LAND SELECTED FOR MUCK DUMPING ALONGWITH MAP AND RECLAMATION PLAN IS NOT SUBMITTED. 8. WORKING PLAN PRESCRIPTION FOR THE AREA PROPOSED FOR DIVERSION AND ITS DISTANCE FROM BOUNDARY OF FOREST NOT GIVEN.
|
|
6
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
27/06/2015
|
As per letter no 3111/12-1 dated 27-06-2015
|
|
7
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
30/06/2015
|
Objection
|
|
8
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
20/07/2015
|
objection reply
|
|
9
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
27/07/2015
|
Objection Reply
|
|
10
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
27/07/2015
|
The On line objections raised by Nodal officer/Reg. Officer on date 27.06.2015 has been clarified by Almora letter no 520/12-1 dated 27-07-2015.
|
|
11
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
28/07/2015
|
Please reply to objection no. 8 by entering the required information in Form A Part II itself.
|
|
12
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
29/07/2015
|
As per letter no 325/12-1 dated 29-07-2015
|
|
13
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
03/08/2015
|
Objection Reply
|
|
14
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
03/08/2015
|
Objection Reply
|
|
15
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
14/08/2015
|
The On line objections raised by Nodal officer/Reg. Officer on date 28.07.2015 has been clarified by Almora letter no 689/12-1 dated 01-08-2015.
|
|
16
|
Nodal Officer
|
REPLY
|
State secretary
|
16/08/2015
|
reply to obj by ro has been received from user agency through DFO and CF as per attached file and is being forwarded with consent
|
|
17
|
State secretary
|
REPLY
|
Regional Office
|
19/08/2015
|
reply to obj by ro has been received from user agency through DFO and CF as per attached file and is being forwarded with consent
|
|
18
|
Regional Office
|
EDS
|
State secretary
|
24/09/2015
|
1. In the reply of this office EDS dated 24-06-2015 submitted by State Govt on 19-08-2015, it is mentioned that quote reply to obj by ro has been received from user agency through DFO and CF as per attached file and is being forwarded with consent unquote. The State Govt is requested to submit point wise reply of this office EDS dated 24-06-2015 rather than simply forwarding the correspondences made between the State Govt and the subordinate offices/user agencies of the State. While submitting the point wise reply, it may be ensured that the annexures, if any, are attached in sequence of point wise reply only.
|
|
19
|
State secretary
|
EDS
|
Nodal Officer
|
28/09/2015
|
Plz reply to obj. of RO-1. In the reply of this office EDS dated 24-06-2015 submitted by State Govt on 19-08-2015, it is mentioned that quote reply to obj by ro has been received from user agency through DFO and CF as per attached file and is being forwarded with consent unquote. The State Govt is requested to submit point wise reply of this office EDS dated 24-06-2015 rather than simply forwarding the correspondences made between the State Govt and the subordinate offices/user agencies of the State. While submitting the point wise reply, it may be ensured that the annexures, if any, are attached in sequence of point wise reply only.
|
|
20
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
30/09/2015
|
please submit point wise reply on EDS raised by RO office dated 27-06-15- Plz reply to obj of RO-SHORT NARRATIVE OF THE PROJECT DOES NOT GIVE ADEQUATE INFORMATION ABOUT THE PROJECT. 2. THE PERIOD FOR WHICH FOREST LAND IS PROPOSED TO BE DIVERTED IS NOT MENTIONED IN PARA-A -1 X. 3. VILLAGE WISE BREAKUP OF LAND NOT PROVIDED IN PARA-2.3. 4. BOTH THE ALTERNATIVES START FROM THE SAME POINT BUT, THEY ARE STATED TO START FROM DIFFERENT POINTS IN THE TEXT. 5. SCANNED COPY OF MAP OF LAND PROPOSED FOR CA USING GPS OR TOTAL STATION IS NOT PROPER. 6. COPY OF MAP IN SOI TOPOSHEET INDICATING LOCATION OF CA IS NOT CLEAR. 7. OWNER-WISE DETAILS OF NAP LAND SELECTED FOR MUCK DUMPING ALONGWITH MAP AND RECLAMATION PLAN IS NOT SUBMITTED. 8. WORKING PLAN PRESCRIPTION FOR THE AREA PROPOSED FOR DIVERSION AND ITS D
|
|
21
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
03/10/2015
|
As per latter no. 1321/12-1 date 03/10/2015
|
|
22
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
09/10/2015
|
Objection
|
|
23
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
21/10/2015
|
objection reply
|
|
24
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
28/10/2015
|
As per latter no. 2352/12-1 (2) date 28/10/2015
|
|
25
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
31/10/2015
|
As per enclose letter no 1718/12-1 dated 30-10-2015
|
|
26
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
02/12/2015
|
CF may provide point wise reply to objections from nodal along with numbered annexures in support of the same. The present reply does not correspond to the points raised by regional office
|
|
27
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
05/12/2015
|
DFO may provide point wise reply to objections from nodal along with numbered annexures in support of the same. The present reply does not correspond to the points raised by regional office
|
|
28
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
10/12/2015
|
Objection
|
|
29
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
23/12/2015
|
objection reply
|
|
30
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
28/12/2015
|
Objection
|
|
31
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
01/01/2016
|
objection reply
|
|
32
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
06/01/2016
|
As per latter no 3369/12-1 dated 06-01-2016
|
|
33
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
06/01/2016
|
As per latter no 3369/12-1 dated 06-01-2016
|
|
34
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
12/01/2016
|
DFO may provide point wise reply objection by RO our latter no 1321/12-1 date 03/10/2015
|
|
35
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
14/01/2016
|
As par latter no 2352/12-01 date 28/10/2015
|
|
36
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
06/02/2016
|
plz attached the encloser with ans.
|
|
37
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
09/02/2016
|
As per latter no 3369/12-1(2) dated 09/02/2016
|
|
38
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
16/02/2016
|
As per letter no 2995/12-1 dated 12-02-2016
|
|
39
|
Nodal Officer
|
REPLY
|
State secretary
|
19/02/2016
|
the asked queries have been corrected and attach herewith in Eds Letter column.
|
|
40
|
State secretary
|
REPLY
|
Regional Office
|
20/02/2016
|
the asked queries have been corrected and attach herewith in Eds Letter column.
|
|
41
|
Regional Office
|
EDS
|
State secretary
|
21/02/2016
|
In the reply of dated 20-02-2016 State Govt has not submitted the reply on point 2,3,5, 6 and 8 of this office EDS dated 24-06-2015. The Annexure attached with the reply dated 20-02-2016 is also includes Annexure of some another proposal no.8859/2014. The State Govt advised to submit the georefrenced map showing digitally marked geocoordinates for area proposed for diversion on each turn of the road and every corner of the area proposed for CA and google earth map will not accepted.
|
|
42
|
State secretary
|
EDS
|
Nodal Officer
|
23/02/2016
|
In the reply of dated 20-02-2016 State Govt has not submitted the reply on point 2,3,5, 6 and 8 of this office EDS dated 24-06-2015. The Annexure attached with the reply dated 20-02-2016 is also includes Annexure of some another proposal no.8859/2014. The State Govt advised to submit the georefrenced map showing digitally marked geocoordinates for area proposed for diversion on each turn of the road and every corner of the area proposed for CA and google earth map will not accepted.
|
|
43
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
26/02/2016
|
In the reply of dated 20-02-2016 State Govt has not submitted the reply on point 2,3,5, 6 and 8 of this office EDS dated 24-06-2015. The Annexure attached with the reply dated 20-02-2016 is also includes Annexure of some another proposal no.8859/2014. The State Govt advised to submit the georefrenced map showing digitally marked geocoordinates for area proposed for diversion on each turn of the road and every corner of the area proposed for CA and google earth map will not accepted.
|
|
44
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
02/03/2016
|
as per letter no-3240/12-1 dated-02-03-2016.
|
|
45
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
03/03/2016
|
objection
|
|
46
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
14/03/2016
|
The correction have been made as per the instruction received
|
|
47
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
15/03/2016
|
The correction have been made as per the instruction received
|
|
48
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
18/03/2016
|
as per letter no-3240/12-1 dated-02-03-2016.
|
|
49
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
19/03/2016
|
objection
|
|
50
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
21/03/2016
|
The correction have been made as per the instruction received
|
|
51
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
29/03/2016
|
as per letter no-4892/12-1(2) dated-28-03-2016.
|
|
52
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
30/03/2016
|
In the reply of dated 20-02-2016 State Govt has not submitted the reply on point 2,3,5, 6 and 8 of this office EDS dated 26-02-2016. The Annexure attached with the reply dated 29-03-2016
|
|
53
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
01/04/2016
|
objection
|
|
54
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
02/05/2016
|
The correction have been made as per the instruction received
|
|
55
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
05/05/2016
|
objection
|
|
56
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
20/05/2016
|
The correction have been made as per the instruction received
|
|
57
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
13/06/2016
|
plz send covering letter
|
|
58
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
16/06/2016
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
17/06/2016
|
as per letter no-6506/12-1(2) dated-17-06-2016.
|
|
60
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/06/2016
|
as par latter no 4682/12-01(2) dated 20/06/2016
|
|
61
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
22/06/2016
|
there is no annexure with reply, CF may provide annexure along with reply
|
|
62
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
23/06/2016
|
there is no annexure with reply, DFO may provide annexure along with reply
|
|
63
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
23/06/2016
|
objection
|
|
64
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
24/06/2016
|
The correction have been made as per the instruction received
|
|
65
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
29/06/2016
|
as per letter no-6760/12-1(2) dated-29-06-2016.
|
|
66
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
30/06/2016
|
As per letter no 4857/12-1 dated 30-06-2016
|
|
67
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
11/07/2016
|
CF may provide detailed point wise reply along with corrections and numbered annexure in support of the same.
|
|
68
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
13/07/2016
|
DFO may provide detailed point wise reply along with corrections and numbered annexure in support of the same.
|
|
69
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
14/07/2016
|
objection
|
|
70
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
28/07/2016
|
The correction have been made as per the instruction received
|
|
71
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
30/07/2016
|
as per letter no-761/12-1(2) dated-30-07-2016.
|
|
72
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
30/07/2016
|
DFO may provide detailed point wise reply along with corrections and numbered annexure in support of the same.
|
|
73
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
30/07/2016
|
objection
|
|
74
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
04/08/2016
|
The correction have been made as per the instruction received
|
|
75
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
05/08/2016
|
as per letter no-886/12-1(2) dated-05-08-2016.
|
|
76
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
10/08/2016
|
as per letter no-555/12-1 dated-10-08-2016.
|
|
77
|
Nodal Officer
|
REPLY
|
State secretary
|
02/09/2016
|
Required documents uploaded for your further necessary action.
|
|
78
|
State secretary
|
REPLY
|
Regional Office
|
05/09/2016
|
Required documents uploaded for your further necessary action.
|
|
79
|
Regional Office
|
EDS
|
State secretary
|
09/09/2016
|
find the letter attached.
|
|
80
|
State secretary
|
EDS
|
Nodal Officer
|
09/09/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
81
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
15/09/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
82
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
21/09/2016
|
As per letter no 947/12-1 dated 21-09-2016
|
|
83
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
26/09/2016
|
objection
|
|
84
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
19/10/2016
|
The correction have been made as per the instruction received
|
|
85
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
21/10/2016
|
As per letter no 2217/12-1 dated 21-10-2016
|
|
86
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
02/11/2016
|
send back
|
|
87
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
03/11/2016
|
In the point no 7 please clear that when the proposal hard copy send to nodal office mention date and letter number on it. Also provide to the DFO proposal hard copy receipt .
|
|
88
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
05/11/2016
|
The correction have been made as per the instruction received
|
|
89
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
06/11/2016
|
please give right information of point number 7.
|
|
90
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
11/11/2016
|
The correction have been made as per the instruction received
|
|
91
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
15/11/2016
|
objection remove
|
|
92
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
16/11/2016
|
As per letter no 1473/12-1 dated 16-11-2016
|
|
93
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
17/11/2016
|
find the letter
|
|
94
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
18/11/2016
|
find the letter
|
|
95
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
18/11/2016
|
objection
|
|
96
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
03/02/2017
|
The correction have been made as per the instruction received
|
|
97
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
08/02/2017
|
objection
|
|
98
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
21/02/2017
|
The correction have been made as per the instruction received
|
|
99
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
28/02/2017
|
objection
|
|
100
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
09/03/2017
|
The correction have been made as per the instruction received
|
|
101
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
09/03/2017
|
attachment letter not avilable
|
|
102
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
18/03/2017
|
The correction have been made as per the instruction received
|
|
103
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
23/03/2017
|
objection removed date
23-03-2017
all documents related to these objection are attached in part I
|
|
104
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
23/03/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 17-11-2016 has been clarified by DFO Almora letter no 6370/12-1 dated 22-03-2017
|
|
105
|
Nodal Officer
|
REPLY
|
State secretary
|
03/04/2017
|
Required documents uploaded for your further necessary action.
|
|
106
|
State secretary
|
REPLY
|
Regional Office
|
07/04/2017
|
Required documents uploaded for your further necessary action.
|
|
107
|
Regional Office
|
EDS
|
State secretary
|
16/05/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
108
|
State secretary
|
EDS
|
Nodal Officer
|
18/05/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
109
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
30/05/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
110
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
01/06/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
111
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
03/06/2017
|
objection
|
|
112
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
19/06/2017
|
The correction have been made as per the instruction received
|
|
113
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
21/06/2017
|
objection remove date
21-06-2017
|
|
114
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
22/06/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 30-05-2017 has been clarified by DFO Almora letter no 9015/12-1 dated 21-06-2017
|
|
115
|
Nodal Officer
|
REPLY
|
State secretary
|
04/07/2017
|
Required documents uploaded for your further necessary action.
|
|
116
|
State secretary
|
REPLY
|
Regional Office
|
05/07/2017
|
Required documents uploaded for your further necessary action.
|
|
117
|
Regional Office
|
EDS
|
State secretary
|
21/07/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
118
|
State secretary
|
REPLY
|
Regional Office
|
24/07/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
119
|
Regional Office
|
EDS
|
State secretary
|
03/08/2017
|
In reply of the observation for providing hard copy of the proposal containing original documents the State Govt forwarded the case through online portal attaching the copy of EDS of this office nonetheless the reply in this regard. May provide original proposal folder to this office as desired vide EDS dated 21-07-2017.
|
|
120
|
State secretary
|
EDS
|
Nodal Officer
|
08/08/2017
|
In reply of the observation for providing hard copy of the proposal containing original documents the State Govt forwarded the case through online portal attaching the copy of EDS of this office nonetheless the reply in this regard. May provide original proposal folder to this office as desired vide EDS dated 21-07-2017.
|
|
121
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
08/08/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
122
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
09/08/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
123
|
DFO (Almora)
|
EDS
|
User Agency (anandb070@gmail.com)
|
09/08/2017
|
objection
|
|
124
|
User Agency (anandb070@gmail.com)
|
REPLY
|
DFO (Almora)
|
10/08/2017
|
The correction have been made as per the instruction received
|
|
125
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
11/08/2017
|
objection remove date
11-08-2017
|
|
126
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
17/08/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 08-08-2017 has been clarified by DFO Almora letter no 800/12-1 dated 11-08-2017
|
|
127
|
Nodal Officer
|
REPLY
|
State secretary
|
24/08/2017
|
Required documents uploaded for your further necessary action.
|
|
128
|
State secretary
|
REPLY
|
Regional Office
|
25/08/2017
|
Required documents uploaded for your further necessary action.
|
|