FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/21943/2016   (ii). Name of Project for which Forest Land is required : Dadua to Sirola Waya Mayali Patakhal Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed road for connectivity of Unconnected village Dadua to Sirola Waya Mayali Patakhal which total population 596 and road length is 2.00 km.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 55.36   (viii). Area of forest land proposed for diversion(in ha.): 1.1375   (ix). Non-forest land required for this project(in ha.): 3.4825   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : PWD   (ii). Address1 : T.D.,P.W.D. SRINAGAR , H.Q.- KIRTINAGAR, TEHRI GARHWAL, UTTARAKHAND   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Tehri Garhwal   (vi). Pin : 249161   (vii). Landmark : NIL   (viii). Email address : eepwdkirtinagar@rediffmail.com   (ix). Landline Telephone No. : 1370-260070   (x). Fax No. : 1370-260070   (xi). Mobile No. : 9412346710   (xii). Website (if any) : http://pwd.uk.gov.in   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Yatendra   (ii). Middle Name: Singh   (iii). Last Name: Rawat   (iv). Gender: Male   (v). Designation: Assistant Engineer   (vi). Address 1: T.D.,P.W.D. SRINAGAR , H.Q.- KIRTINAGAR, TEHRI GARHWAL, UTTARAKHAND   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Tehri Garhwal   (x). Tehsil: Devprayag   (xi). Pin: 249161   (xii). Landmark: NIL   (xiii). Email Address: eepwdkirtinagar@rediffmail.com   (xiv). Landline Telephone No.: 1370-260070   (xv). Fax No.: 01370260070   (xvi). Mobile No.: 9411143667   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Narendranagar,Munikireti1.13753.4825
Total1.13753.4825
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tehri Garhwal1.13753.4825
Total1.13753.4825
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Dadua (Pali, Pali Dangwalon ki)0.89552.3975
2Patakhal (Noali)0.2421.085
Total 1.1375 3.4825
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road1.13753.4825
Total 1.1375 3.4825
C. Maps of forest land proposed to be diverted
Division 1. : Narendranagar,Munikireti
  (i). Area of forest land proposed to be diverted(in ha.) : 1.1375   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.1375    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 11050
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Yes   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Tehri Garhwal
  (a). Village: Dadua,Sirola   (b). Area(in ha.): 2.275   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 1279   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Land schedule, lambai chaodai, bar chart, karya prarambh na hone ka praman patra
2NPV, RCC, leej avadhi, van sanragshak 1980, Catch ment treatment plan
3Atihasik sthal na hone ka praman patra, vanya jeev and vanaspati ko chati na pahuchaye jane ka praman patra, labhanvit hone wale parivaro ki suchi, leej rent, Sthal upyuktta praman patra, Nakal Khasra
4Geological report
5Hawai duri praman patra, Bhu arjan praman patra
6Sayunkth nirikshan aakhya, vrikshon ka sampurn vivran
7Aitihasik sthal na hone ka praman patra, Vanyajeev vanspati ko chati na pahuchaye jene ka praman patra,Labhanvit hone wale parivaar,Leej rent praman patra,Sthal Upyukta praman patra,Nakal Khasra
8muck dumping
9Administrative and financial approval
10EDS Apatti answer 14-07-2017
11Query at dated 30-10-2017 answer at dated 24-01-2018
12EDS at dated 22-02-2018
13CA Map not show properly at date 27-04-2018 after short cumming the answer at dated 19-05-2018 the CA map Show properly
14EDS Query 09-08-2018 answer at dated 10-08-2018