Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Orissa
|
FP/OR/MIN/16453/2015
|
5-ORC288/2016-BHU
|
Kalarangiatta Chromite Mines of M/s Ferro Alloys Corporation Ltd
|
Mining
|
FERRO ALLOYS CORPORATION LTD
|
23.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2015
|
Stage-I Approval on
|
:
|
21 Mar 2025
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2025
|
|
|
|
03 Oct 2025
|
2
|
Orissa
|
FP/OR/Others/9825/2015
|
5-ORB428/2020-BHU
|
Barbil - Angul Iron Ore Slurry Pipeline Project
|
Others
|
Jindal Steel & Power Ltd.
|
1.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jul 2015
|
Stage-I Approval on
|
:
|
24 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2025
|
|
|
|
08 Sep 2025
|
3
|
Orissa
|
FP/OR/MIN/140713/2021
|
8-96/1996-FC (PT.-I)
|
Guali Iron Ore Mines
|
Mining
|
ODISHA MINING CORPORATION LTD
|
194.683
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Apr 2021
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jun 2025
|
|
|
|
19 Aug 2025
|
4
|
Orissa
|
FP/OR/MIN/149499/2021
|
8-02/2023-FC
|
Laserda_Pacheri Manganese & Iron Block
|
Mining
|
MS THRIVENI EARTHMOVERS PRIVATE LIMITED
|
94.351
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2021
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2025
|
|
|
|
19 Aug 2025
|
5
|
Orissa
|
FP/OR/MIN/49169/2020
|
8-13/2022-FC
|
Kalamang West (Northern Part) Block Iron Ore Mines of Tata Steel BSL Limited.
|
Mining
|
M/s. Tata Steel Limited, Khopoli
|
42.608
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Sep 2020
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Sep 2024
|
|
|
|
30 Jul 2025
|
6
|
Orissa
|
FP/OR/TRANS/8680/2014
|
5-ORC312/2017-BHU
|
220 Kv Line Diversion from Loc-59 to 75
|
Transmission Line
|
OPTCL
|
7.102
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jan 2015
|
Stage-I Approval on
|
:
|
29 May 2017
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2025
|
|
|
|
10 Jul 2025
|
7
|
Orissa
|
FP/OR/ROAD/148087/2021
|
5-ORC597/2023-BHU
|
Rehabilitation and Upgradation to Four laning of 7.6 km stretch (km 229.00 to km 236.600) inside buffer zone of Similipal Tiger Reserve of Baharagora to Singhara Section (km 199.200 to km 310.806) of NH-6 in the State of Odisha under NHDP Phase- IV, on EPC mode
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BALASORE
|
32.225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2021
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2025
|
|
|
|
08 Jul 2025
|
8
|
Orissa
|
FP/OR/MIN/155017/2022
|
8-18/2002-FC Vol
|
BHUBANESWARI OCP
|
Mining
|
BHUBANESWARI OC EXPANSION MAHANADI COALFIELDS LIMITED
|
20.383
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2022
|
Stage-I Approval on
|
:
|
24 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2025
|
|
|
|
30 May 2025
|
9
|
Orissa
|
FP/OR/Others/23166/2016
|
5-ORC496/2022-BHU
|
: Kalamang (Sagasahi)-Dabuna Slurry& Water Pipelines Project of M/s Essar Steel India Ltd.
|
Others
|
ArcelorMittal Nippon Steel India Limited
|
16.466
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2016
|
Stage-I Approval on
|
:
|
25 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 May 2025
|
|
|
|
27 May 2025
|
10
|
Orissa
|
FP/OR/TRANS/153797/2022
|
5-ORC576/2023-BHU
|
2X160 MVA ,220/132 KV & 2X20 MVA, 220/33KV Grid Substation with associated 220 KV DC line from 400/200 KV PGCIL Grid Substation, Keonjhar to Turumunga & 132 KV LILO line from 132 KV Polaspanga-Karanjia SC line to Turumunga, Keonjhar
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
8.435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
06 May 2025
|
11
|
Orissa
|
FP/OR/MIN/20092/2016
|
8-01/2019-FC
|
Tirigpahar Iron & Manganese Mine (Guruda Block)
|
Mining
|
TATA STEEL LIMITED SUKINDA CHROMITE MINE
|
80.826
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jun 2016
|
Stage-I Approval on
|
:
|
02 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2025
|
|
|
|
30 Apr 2025
|
12
|
Orissa
|
FP/OR/IND/12884/2015
|
5-ORC279/2016-BHU
|
NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT
|
Industry
|
NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT
|
25.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2015
|
Stage-I Approval on
|
:
|
01 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2025
|
|
|
|
24 Apr 2025
|
13
|
Orissa
|
FP/OR/MIN/39199/2019
|
8-25/2022-FC
|
Raikela, Bahamba and Tensa Iron & Manganese Mines of Sri C.P. Sharma
|
Mining
|
ANIL KUMAR SHARMA POWER OF ATTORNEY OF LATE CP SHARMA
|
67.352
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2019
|
Stage-I Approval on
|
:
|
04 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2025
|
|
|
|
25 Mar 2025
|
14
|
Orissa
|
FP/OR/MIN/39355/2019
|
8-280/1989-FC Vol.
|
Integrated Lakhanpur-Belpahar-Lilari Opencast Project
|
Mining
|
INTEGRATED LAKHANPUR-BELPAHAR-LILARI OCP
|
417.073
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Mar 2019
|
Stage-I Approval on
|
:
|
27 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Nov 2024
|
|
|
|
19 Feb 2025
|
15
|
Orissa
|
FP/OR/Others/147445/2021
|
5-ORC548/2023-BHU
|
Srikakulam - Angul Pipeline (SAPL)Project_Mainline
|
Others
|
GAIL INDIA LIMITED
|
6.1487
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2021
|
Stage-I Approval on
|
:
|
17 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2025
|
|
|
|
14 Feb 2025
|
16
|
Orissa
|
FP/OR/MIN/150133/2021
|
8-06/2023-FC
|
Subhadra OCP
|
Mining
|
Mahanadi Coalfields Limited
|
125.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2022
|
Stage-I Approval on
|
:
|
05 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
24 Jan 2025
|
17
|
Orissa
|
FP/OR/MIN/11934/2015
|
8-14/2016-FC
|
Kaliapani Chromite Mines, Village:Kaliapani,Tehsil: Sukinda, Dist. Jajpur , Odisha.
|
Mining
|
BALASORE ALLOYS LTD
|
64.119
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jan 2016
|
Stage-I Approval on
|
:
|
18 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2025
|
|
|
|
22 Jan 2025
|
18
|
Orissa
|
FP/OR/ROAD/52400/2020
|
5-ORB479/2021-BHU
|
Diversion of 2.62 Hectre forest land for Construction of 4 lane carriage way with service road of Belpahar bypass from Km 0/0 to Km 2/971 for the year 2019-20 Under MCL fund
|
Road
|
EXECUTIVE ENGINEER ROAD AND BUILDING DIVSION JHARSUGDA
|
2.622
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2020
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
14 Jan 2025
|
19
|
Orissa
|
FP/OR/TRANS/119219/2021
|
5-ORC473/2021-BHU
|
33 K.V power line corridor on N.B.L.S tower from 220/33kV grid sub-station at Khairiput, Govindpalli of OPTCL to 33kV sub-station site near Saptadhara H.E.P of Avantika Power Projects
|
Transmission Line
|
SRI AVANTIKA POWER PROJECTS LIMITED
|
10.803
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2021
|
Stage-I Approval on
|
:
|
03 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2024
|
|
|
|
14 Jan 2025
|
20
|
Orissa
|
FP/OR/ROAD/150863/2022
|
5-ORC543/2022-BHU
|
Improvement of Road from Kharabhuin PWD road chhak to Khandahata P.S.road via-Sankulei, Ghantabania, Panasaputuli road for the year 2018-19
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DIVISION BOUDH
|
6.098
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
Stage-I Approval on
|
:
|
18 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Dec 2024
|
|
|
|
14 Jan 2025
|
21
|
Orissa
|
FP/OR/RAIL/45694/2020
|
5-ORA528/2022-BHU
|
Khurda Road - Bolangir New BG Rail Link Project i.e. from Km112-180
|
Railway
|
EAST COAST RAILWAY
|
594.618
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jun 2020
|
Stage-I Approval on
|
:
|
13 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2024
|
|
|
|
13 Jan 2025
|
22
|
Orissa
|
FP/OR/Pipeline/123665/2021
|
5-ORB549/2023-BHU
|
Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project
|
Pipeline
|
NUMALIGARH REFINERY LIMITED
|
3.347
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Dec 2024
|
|
|
|
18 Dec 2024
|
23
|
Orissa
|
FP/OR/ROAD/154639/2022
|
5-ORC627/2024-BHU
|
CONSTRUCTION OF PROPOSED APPROACH ROAD FROM JUMKA PAHAR BLOCK OF RUNGTA MINES LTD TO THE EXISTING KOIRA BELAKUDAR PATAMUNDA ROAD
|
Road
|
RUNGTA MINES LTD
|
13.077
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2022
|
Stage-I Approval on
|
:
|
25 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
12 Nov 2024
|
|
|
|
30 Nov 2024
|
24
|
Orissa
|
FP/OR/Others/30598/2017
|
5-ORB539/2022-BHU
|
Underground Water Pipeline & 11KV Power line fro Karo River to Steel Plant of M/s SREE METALIKS LIMITED situated at Village Loidapada ,Dist Keonjhar,Odisha
|
Others
|
SREE METALIKS LTD
|
0.764
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Dec 2017
|
Stage-I Approval on
|
:
|
17 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2024
|
|
|
|
20 Nov 2024
|
25
|
Orissa
|
FP/OR/Others/149695/2021
|
5-ORA620/2023-BHU
|
NALCO Conveyor Cooridor System
|
Others
|
NALCO
|
41.297
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2024
|
|
|
|
23 Sep 2024
|
26
|
Orissa
|
FP/OR/MIN/150048/2021
|
8-08/2023-FC
|
Diversion of 156.978 Ha virgin forest land under section 2(ii) of Forest Conservation Act, 1980 for Mining and ancillary activities within Jumka Pathiriposhi pahar Iron ore block of M/s Rungta Mines L
|
Mining
|
RUNGTA MINES LTD
|
156.978
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2021
|
Stage-I Approval on
|
:
|
28 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2024
|
|
|
|
12 Sep 2024
|
27
|
Orissa
|
FP/OR/IRRIG/12758/2015
|
5-ORC292/2016-BHU
|
SANDUL IRRIGATION PROJECT
|
Irrigation
|
KALAHANDI INVESTIGATION DIVISION
|
7.535
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Sep 2015
|
Stage-I Approval on
|
:
|
18 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
10 Sep 2024
|
28
|
Orissa
|
FP/OR/IND/45465/2020
|
5-ORC568/2023-BHU
|
3.00 MMTPA Alumina Refinery with 150 MW co-generation Power Plant at Kansariguda in Rayagada district, Odisha by M/s Hindalco Industries Limited-Aditya Alumina Refinery Project
|
Industry
|
ADITYA ALUMINIUM
|
38.062
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2020
|
Stage-I Approval on
|
:
|
29 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2024
|
|
|
|
28 Aug 2024
|
29
|
Orissa
|
FP/OR/TRANS/156567/2022
|
5-ORB589/2023-BHU
|
CONSTRUCTION OF 11KV OVERHEAD TRANSMISSION LINE FROM JALDIHI VILLAGE TO JUMKA PATHIRIPOSHI PAHAR IRON ORE BLOCK OF MS RUNGTA MINES LIMITED
|
Transmission Line
|
RUNGTA MINES LTD
|
3.104
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2022
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2024
|
|
|
|
23 Aug 2024
|
30
|
Orissa
|
FP/OR/RAIL/29907/2017
|
5-ORA374/2019-BHU
|
Khurda Road Bolangir New B.G. Raillink Project Phase-II i.e. from 238-289
|
Railway
|
EAST COAST RAILWAY
|
69.77
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Nov 2017
|
Stage-I Approval on
|
:
|
20 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2024
|
|
|
|
16 Aug 2024
|
31
|
Orissa
|
FP/OR/MIN/40025/2019
|
8-63/2011-FC Vol.
|
Manoharpur Coal Mine Project
|
Mining
|
ODISHA COAL AND POWER LIMITED
|
15.701
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2019
|
Stage-I Approval on
|
:
|
20 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jun 2024
|
|
|
|
06 Aug 2024
|
32
|
Orissa
|
FP/OR/ROAD/23286/2016
|
5-ORC332/2017-BHU
|
Widening to two lane carriage way from 327/700 to 413/700km of NH-326 (erstwhile form 16/0 to 102/000 of SH-25) under Vijayawada – Ranchi corridor with state Koraput & Malkangiri district in the state of Odisha
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION, JEYPORE
|
10.635
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2016
|
Stage-I Approval on
|
:
|
05 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
30 Jul 2024
|
33
|
Orissa
|
FP/OR/TRANS/33277/2018
|
5-ORC406/2020-BHU
|
Odisha Power Transmission Corporation Limited (OPTCL)
|
Transmission Line
|
OPTCL
|
7.184
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2018
|
Stage-I Approval on
|
:
|
14 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2024
|
|
|
|
25 Jul 2024
|
34
|
Orissa
|
FP/OR/RAIL/20055/2016
|
5-ORC349/2018-BHU
|
NTPC LTD,DARLIPALI SUPER THERMAL POWER PROJECT
|
Railway
|
NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT
|
19.43
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2016
|
Stage-I Approval on
|
:
|
18 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2024
|
|
|
|
26 Jun 2024
|
35
|
Orissa
|
FP/OR/Others/32590/2018
|
5-ORB399/2019-BHU
|
Installation of pipeline over a length 4.748 km for drawal of water from river Mahanadi to Boudh Distillery in Odisha
|
Others
|
BOUDH DISTILLERY PVT LTD
|
0.966
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2018
|
Stage-I Approval on
|
:
|
04 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2024
|
|
|
|
31 May 2024
|
36
|
Orissa
|
FP/OR/IRRIG/22787/2016
|
5-ORC345/2018-BHU
|
For Construction of Additional Spillway of Hirakud Dam Project, Burla
|
Irrigation
|
EXECUTIVE ENGGINEER MAIN DAM DIVISION BURLA
|
9.441
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Dec 2016
|
Stage-I Approval on
|
:
|
01 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2024
|
|
|
|
28 May 2024
|
37
|
Orissa
|
FP/OR/Others/31590/2018
|
5-ORC481/2021-BHU
|
Dabuna – Sankari Tailing & Water Pipelines Project of M/s Essar Steel India Limited.
|
Others
|
ArcelorMittal Nippon Steel India Limited
|
12.728
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2018
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2024
|
|
|
|
28 May 2024
|
38
|
Orissa
|
FP/OR/TRANS/38533/2019
|
5-ORC416/2020-BHU
|
Construction of 220 KV Lilo Transmission line from LOC No. 331 of Existing 220 KV Rengali Tarkera Line to proposed 220/ 33 KV Grid Sub-station at Deogarh.
|
Transmission Line
|
OPTCL
|
21.159
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2019
|
Stage-I Approval on
|
:
|
25 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2024
|
|
|
|
21 May 2024
|
39
|
Orissa
|
FP/OR/Approach/64022/2020
|
5-ORB460/2021-BHU
|
CONSTRUCTION OF RESIDENTIAL AND SERVICE BUILDINGS AND ALLIED INFRASTRUCTURE FOR SHIFTING OF EXPLORATION CAMP FROM GOPALPUR, DIST-SUNDARGARH TO LAKHANPUR, DIST- JHARSUGUDA
|
Approach Access
|
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
|
0.047
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
04 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2024
|
|
|
|
21 May 2024
|
40
|
Orissa
|
FP/OR/Others/154167/2022
|
5-ORB530/2022-BHU
|
Proposal for Diversion of 0.700 hectares of forest area Proposed Water Conductor System from Mandira Dam to Power House Point of M/s. GEDCOL SAIL Power Corporation Limited near Laing village of Rajgan
|
Others
|
GEDCOL SAIL POWER CORPORATION LIMITED
|
0.7
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Apr 2022
|
Stage-I Approval on
|
:
|
20 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Mar 2024
|
|
|
|
24 Apr 2024
|
41
|
Orissa
|
FP/OR/TRANS/38561/2019
|
5-ORC417/2020-BHU
|
Construction of 132 KV Transmission Line from 400/220/132 KV Grid Sub-Station at- Lapanga to Proposed RTSS at- Rengali.
|
Transmission Line
|
OPTCL
|
6.278
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2019
|
Stage-I Approval on
|
:
|
25 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2024
|
|
|
|
15 Apr 2024
|
42
|
Orissa
|
FP/OR/ROAD/42674/2019
|
5-ORB414/2020-BHU
|
Approach Road
|
Road
|
INDIAN OIL, JAJPUR
|
0.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2019
|
Stage-I Approval on
|
:
|
18 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2024
|
|
|
|
13 Apr 2024
|
43
|
Orissa
|
FP/OR/ROAD/31054/2017
|
5-ORC463/2021-BHU
|
Widening of existing 2-lane to 2-lane with 1.5m. wide paved shoulder from Km 0/0 to 81/00 & 93/0 to 119/0 of N.H-157 on EPC mode.
|
Road
|
EXECUTIVE ENGINEER NH DIVISION SAMBALPUR
|
27.343
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2017
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2024
|
|
|
|
14 Mar 2024
|
44
|
Orissa
|
FP/OR/SCH/26930/2017
|
5-ORB425/2020
|
Kalinga Institute of Social Sciences, a sister concern of KIIT
|
School
|
KALINGA INSTITUTE SOCIAL SCIENCES
|
4.032
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jul 2017
|
Stage-I Approval on
|
:
|
17 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2024
|
|
|
|
21 Feb 2024
|
45
|
Orissa
|
FP/OR/ROAD/154500/2022
|
5-ORB540/2022-BHU
|
Proposed Approach Road
|
Road
|
TATA STEEL LIMITED KHONDBOND IRON AND MN MINES
|
0.051
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2022
|
Stage-I Approval on
|
:
|
31 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 Feb 2024
|
|
|
|
20 Feb 2024
|
46
|
Orissa
|
FP/OR/MIN/18827/2016
|
8-17/2001-FC Vol
|
Nuagaon Iron Ore Block of M/s JSW Steel Ltd, Guali
|
Mining
|
JSW STEEL LTD
|
63.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2016
|
Stage-I Approval on
|
:
|
14 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2023
|
|
|
|
12 Feb 2024
|
47
|
Orissa
|
FP/OR/IND/16543/2015
|
5-ORB477/2021-BHU
|
Expansion of Line-II at Jharsuguda Cement Works (JCW)
|
Industry
|
ULTRATECH CEMENT LIMITED
|
0.799
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2015
|
Stage-I Approval on
|
:
|
03 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
25 Jan 2024
|
48
|
Orissa
|
FP/OR/MIN/149706/2021
|
5-ORB552/2023-BHU
|
Diversion of 0.03 Ha forest land involved in Safety Zone Area of Roida II Iron Ore Block for passing through of approach road into the mine
|
Mining
|
NARBHERAM POWER AND STEEL PRIVATE LIMITED
|
0.03
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2021
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2023
|
|
|
|
23 Jan 2024
|
49
|
Orissa
|
FP/OR/TRANS/37011/2018
|
5-ORC448/2021-BHU
|
220 KV TRANSMISSION LINE FROM EXISTING 220/132/33KV GRID SUBSTATION AT SADEIPALI,BOLANGIR TO PROPOSED 220/132 KV GRID SUB-STATION AT KESINGA.
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
39.196
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2018
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2023
|
|
|
|
02 Jan 2024
|
50
|
Orissa
|
FP/OR/TRANS/37011/2018
|
5-ORC448/2021-BHU
|
220 KV TRANSMISSION LINE FROM EXISTING 220/132/33KV GRID SUBSTATION AT SADEIPALI,BOLANGIR TO PROPOSED 220/132 KV GRID SUB-STATION AT KESINGA.
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
39.196
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2018
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2023
|
|
|
|
02 Jan 2024
|
|