Ministry of Environment,Forest and Climate Change
Government of India
Maharashtra
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Maharashtra FP/MH/ROAD/152830/2022 FC-II/MH-240/2024-NGP Diversion of 6.3912 Ha of Forest Land for Satana Mangrul Road Road MINISTRY OF ROAD TRANSPORT & HIGHWAYS 6.3912 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Mar 2022
Stage-I Approval on : 26 Sep 2024
Compliance Report Submitted by User Agency on : 30 Dec 2024
06 Feb 2026
2 Maharashtra FP/MH/OFC/157624/2022 FLD-1423/C.R.60/F-10 Proposal For the Diversion of 0.561 Ha. For Laying Underground Optical Fiber Cable Along the Road in Tal. Parola & Muktainagar Dist. Jalgaon Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.561 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Jun 2022
Stage-I Approval on : 27 Mar 2023
Compliance Report Submitted by User Agency on : 26 Jun 2023
19 Jan 2026
3 Maharashtra FP/MH/ROAD/118805/2021 FC-III/MH-51/2022-NGP Upgradation of NH 353 C From Ashti to Sironcha in Section Allaplli to Sironcha Road NATIONAL HIGHWAY DIVISION GADCHIROLI 132.102 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jan 2021
Stage-I Approval on : 30 Jan 2023
Compliance Report Submitted by User Agency on : 09 Dec 2025
17 Dec 2025
4 Maharashtra FP/MH/ROAD/119248/2021 FC-III/MH-54/2022-NGP Up-gradation to2/4 lane with paved shoulder configuration of Gadichiroli-Sironcha of NH- 353 C in the State of Maharashtra by Ministry of Road Transport & Highways from Ashti to Sironcha in Gadhciroli Road NATIONAL HIGHWAY DIVISION GADCHIROLI 54.274 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jan 2021
Stage-I Approval on : 21 Nov 2023
Compliance Report Submitted by User Agency on : 09 Dec 2025
17 Dec 2025
5 Maharashtra FP/MH/MIN/17443/2016 FC-I/MH-341/2023-NGP Bhatadi Expansion open cast mine Mining Western Coalfields Ltd 0.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Feb 2016
Stage-I Approval on : 14 Jan 2025
Compliance Report Submitted by User Agency on : 14 Nov 2025
15 Dec 2025
6 Maharashtra FP/MH/MIN/17443/2016 FC-I/MH-341/2023-NGP Bhatadi Expansion open cast mine Mining Western Coalfields Ltd 0.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Feb 2016
Stage-I Approval on : 14 Jan 2025
Compliance Report Submitted by User Agency on : 14 Nov 2025
15 Dec 2025
7 Maharashtra FP/MH/MIN/8832/2014 FC-II/MH-165/2021-NGP Sakhari Irawati (Pouni-III)OC Mine Mining WESTERN COALFIELDS LIMITED 12.07 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jan 2015
Stage-I Approval on : 20 Mar 2025
Compliance Report Submitted by User Agency on : 27 Oct 2025
08 Dec 2025
8 Maharashtra FP/MH/TRANS/48241/2020 FC-II/MH-201-2022-NGP 220kv DC Line Padghe _ Wada & Kolshet - Wada To Kudus S/S Electrical Transmission line Transmission Line MAHATRANSCO 12.0225 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Aug 2020
Stage-I Approval on : 29 Aug 2025
Compliance Report Submitted by User Agency on : 11 Nov 2025
30 Nov 2025
9 Maharashtra FP/MH/TRANS/38296/2019 FC-II/MH-216/2023-NGP construction of220KV Kalmeshwar - Warud transmission Line Transmission Line MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD CIN NO U40109MH2005SGC153646 6.076 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Feb 2019
Stage-I Approval on : 20 Mar 2025
Compliance Report Submitted by User Agency on : 22 Sep 2025
20 Nov 2025
10 Maharashtra FP/MH/Others/30392/2017 FC-I-MH-133-2018-NGP laying OFC in Yavatmal-kita-kapra-sawar-chondi fata-babulgaon-mehamudpur fata-devgaon-pulgaon On ODR 17 From KM 0/00 to KM 15/00 forest area Others RJIL 0.16 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Jan 2018
Stage-I Approval on : 07 Jan 2019
Compliance Report Submitted by User Agency on : 29 Oct 2025
11 Nov 2025
11 Maharashtra FP/MH/RAIL/43265/2019 FC-II/MH-156/2021-NGP Diversion Of Forest Land For Panvel - Karjat Doubling Railway Line (Panvel - Karjat Section) In Raigad Dist Railway MUMBAI RAILWAY VIKAS CORPORATION LIMITED 9.1321 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Dec 2019
Stage-I Approval on : 30 May 2022
Compliance Report Submitted by User Agency on : 17 Sep 2025
11 Nov 2025
12 Maharashtra FP/MH/ROAD/146738/2021 FC-I/MH-398/2025-NGP Proposed construction of Bridge over Ramchandra Nalla near Evershine Nagar to Marve road in P/N ward by Municipal Corporation of Greater Mumbai. Road MUNICIPAL CORPORATION OF GREATER MUMBAI BRIDGES DEPARTMENT 0.7112 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Sep 2021
Stage-I Approval on : 23 Jan 2025
Compliance Report Submitted by User Agency on : 29 Oct 2025
11 Nov 2025
13 Maharashtra FP/MH/Others/40665/2019 FC-I/MH-243/2021-NGP Berthing Jetty, Conveyor Corridor with Backup Facilities and Approach Road for Raigad Cement Bulk Terminal of ACL Others ADANI CEMENTATION LIMITED 0.6497 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Jun 2019
Stage-I Approval on : 29 Oct 2021
Compliance Report Submitted by User Agency on : 25 Jul 2022
24 Oct 2025
14 Maharashtra FP/MH/ROAD/115156/2020 FC-I/MH-269/2022-NGP Improvement to Kerli - Kotoli - Nandgaon - Nandari Road SH-191 (Km 00/00 to Km 29/500) Part of Kerli Phata to Nandari Dist Kolhapur. Road SPECIAL PROJECT (P.W.) DIVISION, KOLHAPUR 2.15 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jan 2021
Stage-I Approval on : 24 May 2022
Compliance Report Submitted by User Agency on : 28 Jul 2025
06 Oct 2025
15 Maharashtra FP/MH/ROAD/31292/2018 FC-I-MH-86-2018-NGP NH-66 Kalmath to Zarap section Road NH DIVISION 2.8715 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jan 2018
Stage-I Approval on : 27 Feb 2018
Compliance Report Submitted by User Agency on : 31 Jul 2025
30 Sep 2025
16 Maharashtra FP/MH/RAIL/41780/2019 FC-II/MH-219/2023-NGP Third railway line between Kalyan and Kasara stations of 67.62 km in Ulhasnagar, Kalyan & Shahapur Talukas, Thane District, Maharashtra Railway CENTRAL RAILWAY CST MUMBAI 16.6846 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Aug 2019
Stage-I Approval on : 19 Jul 2024
Compliance Report Submitted by User Agency on : 23 Jul 2025
17 Sep 2025
17 Maharashtra FP/MH/ROAD/148050/2021 FC-II/MH-213/2023-NGP Construction of Balkum to Gaimukh DP Road (NH3 Connector Ghodbunder By-Pass) by Thane Municipal Corporation Road THANE MUNICIPAL CORPORATION PWD 12.2607 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Oct 2021
Stage-I Approval on : 24 Nov 2023
Compliance Report Submitted by User Agency on : 22 Jul 2025
29 Aug 2025
18 Maharashtra FP/MH/TRANS/45600/2020 FC-III/MH-47/2022-NGP 132 KV DC Mul - SICOM Chandrapur Transmission line Transmission Line MSETCL EHV PROJECTS DIVISION CHANDRAPUR 44.0397 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 May 2020
Stage-I Approval on : 02 May 2022
Compliance Report Submitted by User Agency on : 21 Jul 2025
13 Aug 2025
19 Maharashtra FP/MH/ROAD/53479/2020 FC-I/MH-214/2021-NGP Pandharpur to Sangola Road, newly declared National Highway (NH-204) with a length of 31.158 km (Old Proposal No. FP/MH/ROAD/32901/2018) Road MINISTRY OF ROAD TRANSPORT & HIGHWAYS 2.4 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Nov 2020
Stage-I Approval on : 26 Feb 2022
Compliance Report Submitted by User Agency on : 15 Jul 2025
05 Aug 2025
20 Maharashtra FP/MH/Pipeline/157648/2022 FC-I/MH-376/2024-NGP Construction of 700 mm underground MIDC regular water supply line from MIDC Water Treatment Plant Poynad to GAIL India Limited Usar for PDH PP Plant Pipeline GAIL INDIA LIMITED 3.4151 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2022
Stage-I Approval on : 14 May 2024
Compliance Report Submitted by User Agency on : 06 Jun 2025
05 Aug 2025
21 Maharashtra FP/MH/TRANS/44469/2020 FC-I/MH335/2023- NGP Diversion of 3.064 ha. Forest land for Proposed 220 K.V. Umred to Ngbhid EHV Transmission Line Transmission Line EXECUTIVE ENGINEER EHV PROJECT DIV I MSETCL NAGPUR 3.064 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Feb 2020
Stage-I Approval on : 21 Mar 2025
Compliance Report Submitted by User Agency on : 16 Jun 2025
04 Aug 2025
22 Maharashtra FP/MH/IRRIG/127453/2021 FC-II/MH-211/2023-NGP PROPOSAL FOR DIVERSION OF FOREST LAND FOR CONSTRUCTION OF MINOR IRRIGATION TANK IN NIRUKHE VILLAGE TAL- KUDAL DIST- SINDHUDURG Irrigation EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION OROS – SINDHUDURGNAGARI 18.94 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Mar 2021
Stage-I Approval on : 15 Feb 2024
Compliance Report Submitted by User Agency on : 04 Dec 2024
18 Jul 2025
23 Maharashtra FP/MH/RAIL/147694/2021 FC-I/MH-369/2023-NGP Ranjangaon to Ukhalgaon Doubling of Railway line a part of Daund-Manmad Doubling of Railway track ProjectDaund Manmad Railway Railway CENTRAL RAILWAY 3.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Sep 2021
Stage-I Approval on : 02 Jan 2024
Compliance Report Submitted by User Agency on : 02 Jul 2025
09 Jul 2025
24 Maharashtra FP/MH/Approach/149393/2021 FC-I/MH-387/2024-NGP Diversion of 0.18 Ha. Protected Forest Land for Construction of Access/Approach Road to proposed Logistics Park along with Warehouses Project, including underground water pipeline, underground Electricity cable, drainage line & other ancillary activities. Approach Access NEHALKUMAR HASMUKHRAI GANDHI 0.18 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Nov 2021
Stage-I Approval on : 14 May 2024
Compliance Report Submitted by User Agency on : 07 Apr 2025
09 Jul 2025
25 Maharashtra FP/MH/ROAD/27126/2017 FC-I/MH-104/2019-NGP Proposed Construction of Goregaon-Mulund Link Road, at Village - Aarey, Gundgaon, Vihar & Nahur, District - Mumbai Suburban by MCGM Road MUNICIPAL CORPORATION OF GREATER MUMBAI 19.43 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jul 2017
Stage-I Approval on : 02 Jan 2024
Compliance Report Submitted by User Agency on : 21 Jun 2025
01 Jul 2025
26 Maharashtra FP/MH/ROAD/20894/2016 FC-II/MH-147/2021-NGP Nashik-Peth Road, Section of NH-848 Road EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION NASHIK 7.332 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Aug 2016
Stage-I Approval on : 16 Jan 2023
Compliance Report Submitted by User Agency on : 04 May 2023
30 Jun 2025
27 Maharashtra FP/MH/IRRIG/39591/2019 8-33/2022-FC ASOLAMENDHA RENOVATION PROJECT Irrigation EXECUTIVE ENGINEER ASOLAMENDHA PROJECT RENOVATION DIVISION NO ONE MUL 315.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Jul 2019
Stage-I Approval on : 09 Aug 2024
Compliance Report Submitted by User Agency on : 12 Jun 2025
30 Jun 2025
28 Maharashtra FP/MH/Canal/150569/2021 FC-I/MH-350/2023-NGP Diversion of 3.27 ha. Forest land for construction of Upper Pravara Right Bank Canal Nilwande Dam Project Canal PRAMOD MANE 3.27 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Jan 2022
Stage-I Approval on : 13 Oct 2023
Compliance Report Submitted by User Agency on : 23 Jun 2025
30 Jun 2025
29 Maharashtra FP/MH/ROAD/146680/2021 FC-I/MH-390/2024-NGP Construction of proposed Bridge at Dharivali village at Marve road by Municipal Corporation of Greater Mumbai. Road MUNICIPAL CORPORATION OF GREATER MUMBAI BRIDGES DEPARTMENT 0.1702 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Sep 2021
Stage-I Approval on : 01 Aug 2024
Compliance Report Submitted by User Agency on : 09 May 2025
23 Jun 2025
30 Maharashtra FP/MH/ROAD/124762/2021 FC-II/MH-203/2022-NGP Diversion of 6.295 ha of Forest land for Pahur to Bodwad Road (NH- 753 L) (Old Proposal No- FP/MH/ROAD/42070/2019 Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS MUMBAI MAHARASHTRA 6.295 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Mar 2021
Stage-I Approval on : 06 Apr 2023
Compliance Report Submitted by User Agency on : 30 May 2025
09 Jun 2025
31 Maharashtra FP/MH/ROAD/152831/2022 FC-I/MH-349/2023-NGP Diversion of 3.9 Ha. of Forest land in Jamkhed to Sautada road Road MINISTRY OF ROAD TRANSPORT & HIGHWAYS 3.9 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jun 2022
Stage-I Approval on : 20 Oct 2023
Compliance Report Submitted by User Agency on : 05 Jun 2025
09 Jun 2025
32 Maharashtra FP/MH/Approach/152907/2022 FC-I/MH-383/2024-NGP Approach Road to Private land Approach Access DINESH PATEL 0.0216 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2022
Stage-I Approval on : 15 Mar 2024
Compliance Report Submitted by User Agency on : 12 Jun 2024
04 Jun 2025
33 Maharashtra FP/MH/IRRIG/142819/2021 8-34/2022-FC Sambarkund Medium Project At. Village Mahan Tal. Alibag Dist. Raigad Irrigation HETAWANE PROJECT SUB DIVISION, UMBARDE-PEN 263.5406 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jun 2021
Stage-I Approval on : 02 Aug 2024
Compliance Report Submitted by User Agency on : 14 May 2025
03 Jun 2025
34 Maharashtra FP/MH/ROAD/148478/2021 FLD-1922/CR-152/F-10 Diversion of Forest Land for construction of Palasdev- Malwadi- Bhawdi- Varkute to Karewadi to Kalthan No. 1 MDR 171 from Chainage Km. 5/829 to Km. 6/300. Road PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE 0.37672 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Oct 2021
Stage-I Approval on : 21 Jul 2022
Compliance Report Submitted by User Agency on : 25 Feb 2025
29 May 2025
35 Maharashtra FP/MH/ROAD/148484/2021 FLD-2022/CR-159/F-10 Diversion of Forest Land for construction of Walchandnagar- Anthurne- Shelgaon- Vyahali- Kauthali MDR 76 from Chainage Km. 25/000 to Km. 26/540 Road PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE 0.6583 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Oct 2021
Stage-I Approval on : 18 Jul 2022
Compliance Report Submitted by User Agency on : 25 Feb 2025
24 Apr 2025
36 Maharashtra FP/MH/ROAD/148490/2021 FLD-1922/CR153/F-10 Diversion of Forest Land for construction of Palasdev- Nhavi- Vyahli Road MDR 190 from Chainage Km. 1/485 to Km. 2/256 and 3/330 to Km. 3/630 Road PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE 0.96363 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Oct 2021
Stage-I Approval on : 18 Jul 2022
Compliance Report Submitted by User Agency on : 25 Feb 2025
24 Apr 2025
37 Maharashtra FP/MH/ROAD/155480/2022 FC-I/MH-332/2023-NGP Widening of existing Shri Krishna Nagar bridge Road MUNICIPAL CORPORATION OF GREATER MUMBAI 0.0728 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Jun 2022
Stage-I Approval on : 08 Aug 2023
Compliance Report Submitted by User Agency on : 23 Jul 2024
24 Apr 2025
38 Maharashtra FP/MH/Others/149089/2021 FC-II/MH-183/2022-NGP Proposal for Diversion of 5.733 Ha. of Restored Private Forest land (Restored before 25/10/1980) for Non-Forest purpose i.e., Eco Tourism Project Others GOVIND JIVRAJBHAI VAGHANI 5.733 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Nov 2021
Stage-I Approval on : 17 Mar 2023
Compliance Report Submitted by User Agency on : 29 Jan 2025
11 Apr 2025
39 Maharashtra FP/MH/Pipeline/153017/2022 FC-IIMH-2152023-NGP Proposal for diversion of Forest land for laying underground Natural Gas Pipeline alongwith Optical Fiber Cable (OFC) for NAGPUR to JHARSUGUDA pipeline stretch passing through district Nagpur, Bhandara and Gondiya (Maharashtra/MP Border) in the state of Maharashtra in favour of GAIL (India) Limited. Pipeline GAIL INDIA LIMITED 9.4714 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2022
Stage-I Approval on : 03 Oct 2024
Compliance Report Submitted by User Agency on : 17 Dec 2024
11 Apr 2025
40 Maharashtra FP/MH/Pipeline/155566/2022 FC-I/MH-206/2023-NGP Urmodi Project Tal Man Distric Satara PDN work Pipeline EXECUTIVE ENGINEER URMODI DAM DIVISION SATARA 28.297 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jun 2022
Stage-I Approval on : 10 Nov 2023
Compliance Report Submitted by User Agency on : 25 Mar 2025
05 Apr 2025
41 Maharashtra FP/MH/ROAD/142109/2021 FC-I/MH-260/2022-NGP Diversion of 4.0122 Ha. Mangrove forest land for construction of Ghansoli to Airoli Creek Bridge at Ghansoli Navi Mumbai, District Thane, State Maharashtra. Road NAVI MUMBAI MUNICIPAL CORPORATION (NMMC) 4.0122 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 May 2021
Stage-I Approval on : 22 Nov 2022
Compliance Report Submitted by User Agency on : 04 Mar 2025
26 Mar 2025
42 Maharashtra FP/MH/ROAD/148480/2021 FLD-2022/CR-161/F-10 Diversion of Forest Land for construction of Shelgaon Telodha- Gotondi- Pitkeshwar- Kati- MDR 192 from Chainage Km. 4/000 to Km. 4/150 and form Km 10/200 to Km 11/400. Road PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE 0.99358 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Oct 2021
Stage-I Approval on : 24 Aug 2022
Compliance Report Submitted by User Agency on : 25 Feb 2025
26 Mar 2025
43 Maharashtra FP/MH/ROAD/143865/2021 FLD-2023/CR.177/F-10 DIVERSION OF FOREST LAND INVOLVED UNDER THE PROJECT OF CONSTRUCTION OF ROAD FROM MAJAREWADI TO GHOSARWAD MDR-92 IN VILLAGE-GHOSARWAD, TAH. SHIROL DISTRICT KOLHAPUR (M.S.) Road CHIEF ENGINEER, PWD, REGION - PUNE 0.738 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jun 2021
Stage-I Approval on : 25 Jul 2023
Compliance Report Submitted by User Agency on : 02 Jan 2026
10 Mar 2025
44 Maharashtra FP/MH/ROAD/29294/2017 FC-I/MH-92/2018-NGP NH-66 TALGAON TO KALMATH Road PWD NAGPUR 3.4659 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Sep 2017
Stage-I Approval on : 23 May 2018
Compliance Report Submitted by User Agency on : 07 Feb 2025
11 Feb 2025
45 Maharashtra FP/MH/ROAD/145651/2021 FC-I/MH-393/2024-NGP Approach Road from Degaon To Karandi K.B. Road GRAMPANCHAYAT DEGAON 0.825 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jan 2022
Stage-I Approval on : 30 Aug 2024
Compliance Report Submitted by User Agency on : 28 Jan 2025
06 Feb 2025
46 Maharashtra FP/MH/Others/17764/2016 FC-I/MH-69/2017-NGP Diversion of forest land for construction of disaster management works of sky walk, buy pass road, drainage line & sewage treatment plant at Saptashrungi Gad, Tal- Kalwan, Dist- Nashik. Others EXECUTIVE ENGINEER TRIBAL PUBLIC WORKS DIVISION KALWAN 0.8567 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Feb 2016
Stage-I Approval on : 17 Jul 2018
Compliance Report Submitted by User Agency on : 10 Jan 2025
24 Jan 2025
47 Maharashtra FP/MH/Others/123612/2021 FC-I/MH-386/2024-NGP CONSTRUCTION OF APPROACH WATER BOUND MECADAM ROAD IS TO BE PASSING THROUGH THE RESERVED FOREST G.No.2731,AT-VILLAGE-KADUS (RANMALA) TAL-KHED DIST-PUNE. Others V.S.KARPE 0.068 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Feb 2021
Stage-I Approval on : 17 May 2024
Compliance Report Submitted by User Agency on : 15 Jan 2025
23 Jan 2025
48 Maharashtra FP/MH/TRANS/125061/2021 FC-II/MH-226/2023-NGP 220kv Padghe Wada for Abitghar S/S Transmission Line. Transmission Line MAHATRANSCO 12.7435 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Mar 2021
Stage-I Approval on : 11 Jun 2024
Compliance Report Submitted by User Agency on : 08 Oct 2024
17 Jan 2025
49 Maharashtra FP/MH/TRANS/125061/2021 FC-II/MH-226/2023-NGP 220kv Padghe Wada for Abitghar S/S Transmission Line. Transmission Line MAHATRANSCO 12.7435 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Mar 2021
Stage-I Approval on : 11 Jun 2024
Compliance Report Submitted by User Agency on : 08 Oct 2024
17 Jan 2025
50 Maharashtra FP/MH/RAIL/154664/2022 FC-I/MH-314/2023-NGP Diversion of Forest Land for doubling of existing Broad-Gauge line from Nira- Lonand Section of Pune- Miraj BG Railway Line Railway DY. CHIEF ENGINEER (CON.), CR, PUNE 0.02 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Apr 2022
Stage-I Approval on : 29 May 2023
Compliance Report Submitted by User Agency on : 24 Dec 2024
17 Jan 2025
1234567
Please wait ...