Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Madhya Pradesh
|
FP/MP/MIN/142344/2021
|
8-01/2024-FC
|
Dhirauli Coal Block
|
Mining
|
STRATATECH MINERAL RESOURCES PRIVATE LIMITED
|
1397.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2021
|
Stage-I Approval on
|
:
|
24 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 May 2025
|
|
|
|
09 May 2025
|
2
|
Tamil Nadu
|
FP/TN/Others/23908/2017
|
4-TNB114/2023-CHN
|
Laying OFC along Theni Mallapuram route
|
Others
|
Jio Digital Fibre Private Limited
|
0.19
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Feb 2017
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Mar 2025
|
|
|
|
09 May 2025
|
3
|
Tamil Nadu
|
FP/TN/OFC/116522/2020
|
F.No. 4-TNB115/2023-CHN
|
Laying of underground OFC along Cumbam-Cumuli NH road from Lower camp to Kumuli through Suranganar RF
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.193
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2020
|
Stage-I Approval on
|
:
|
07 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jan 2025
|
|
|
|
09 May 2025
|
4
|
Uttar Pradesh
|
FP/UP/Others/141612/2021
|
8B/UP/06/213/2022/FC
|
CCONSTRUCTION OF M/S IOCL MORADABAD BY PROPOSED A RETAIL OUTLET PROTECTED LAND IS REQUIRED TO BE DIVERTED (FCA 1980 FOR NON FORESTRY PURPOSE) SITE SITUATED AT VILLAGE JYOTHI KHASRA NO. 24 ALONG NEHTAUR – HALDAUR ROAD (SH-12) KM 150-153 (RHS) TEHSIL DHAMPUR DISTRICT BIJNOR (U.P.)
|
Others
|
INDIAN OIL CORPORATION LIMITED
|
0.1954
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2021
|
Stage-I Approval on
|
:
|
19 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
09 May 2025
|
5
|
Madhya Pradesh
|
FP/MP/IRRIG/153417/2022
|
6-MPR021/2022-BHO
|
Badnawar Micro Lift Irrigation Scheme
|
Irrigation
|
Narmada Valley Development Authority
|
35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2022
|
Stage-I Approval on
|
:
|
07 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2023
|
|
|
|
08 May 2025
|
6
|
Uttarakhand
|
FP/UK/ROAD/11370/2015
|
8b/UCP/09/178/2015
|
Construction of Gajar to kwaralli Motor Road under PMGSY.
|
Road
|
PMGSY
|
5.31
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2015
|
Stage-I Approval on
|
:
|
15 Apr 2016
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
08 May 2025
|
7
|
Arunachal Pradesh
|
FP/AR/ROAD/142365/2021
|
3-AN-C-129/2022-GHY
|
Construction of Foot track from Tappa to karu km 43.2
|
Road
|
BORDER ROADS ORGANISATION 756 TASK FORCE
|
22.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2021
|
Stage-I Approval on
|
:
|
01 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
05 May 2025
|
|
|
|
07 May 2025
|
8
|
Madhya Pradesh
|
FP/MP/ROAD/41616/2019
|
6-MPB033/2022-BHO
|
Hinauti- Majhigawan road
|
Road
|
M S ULTRATECH CEMENTS LTD
|
0.77
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Aug 2019
|
Stage-I Approval on
|
:
|
09 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2025
|
|
|
|
07 May 2025
|
9
|
Uttar Pradesh
|
FP/UP/SCH/122782/2021
|
8B/UP/08/31/2022/FC
|
WATER SUPPLY PIPE LINE FROM GUNAYI GAHARPUR TO JNV MEJA KHAS CAMPUS
|
School
|
NAVODAYA VIDYALAYA SAMITI
|
0.0311
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Feb 2021
|
Stage-I Approval on
|
:
|
05 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2025
|
|
|
|
07 May 2025
|
10
|
Orissa
|
FP/OR/TRANS/153797/2022
|
5-ORC576/2023-BHU
|
2X160 MVA ,220/132 KV & 2X20 MVA, 220/33KV Grid Substation with associated 220 KV DC line from 400/200 KV PGCIL Grid Substation, Keonjhar to Turumunga & 132 KV LILO line from 132 KV Polaspanga-Karanjia SC line to Turumunga, Keonjhar
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
8.435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
06 May 2025
|
11
|
Karnataka
|
FP/KA/Pipeline/44313/2020
|
F.No.4-KRB1277/2021-BAN/
|
Bharmasagara LIS, Construction of rising main pipe line (CH : 36.225 to CH - 37.550 Km) parellel to NH-48 in Anagodu village, Davanagere Taluk & District
|
Pipeline
|
EXECUTIVE ENGINEER KNNL DAVANAGERE
|
0.789
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2020
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2025
|
|
|
|
04 May 2025
|
12
|
Bihar
|
FP/BR/Approach/125768/2021
|
FP/BR/Approach/125768/2021
|
The proposal for establishment of retail out-let dealership of M/s Indian Oil Corporation Ltd.
|
Approach Access
|
KAMINI KUMARI
|
0.018
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2021
|
Stage-I Approval on
|
:
|
17 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
02 May 2025
|
13
|
Jharkhand
|
FP/JH/MIN/17211/2015
|
8-48/2008-FC Vol.
|
Amrapali OCP
|
Mining
|
CENTRAL COALFIELDS LIMITED
|
431.59
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2015
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2025
|
|
|
|
01 May 2025
|
14
|
Jharkhand
|
FP/JH/SubStation/41631/2019
|
FP/JH/SubStation/41631/2019
|
Forest proposal for the land provided by state government for construction of 132/33 KV G/S/S at Ramgarh, Village- Hathmara, under transmission circle, Hazaribag
|
Sub Station
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
4.046
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Aug 2019
|
Stage-I Approval on
|
:
|
21 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2025
|
|
|
|
01 May 2025
|
15
|
Uttarakhand
|
FP/UK/ROAD/11435/2015
|
8B/UCP/06/54/2016/FC
|
Under CM Announcement in Distt Dehradun Block Kalsi Construction of Road From Village Plan To Village Vihar
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.2715
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2015
|
Stage-I Approval on
|
:
|
26 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2024
|
|
|
|
01 May 2025
|
16
|
Uttarakhand
|
FP/UK/ROAD/20099/2016
|
8B/UCP/06/215/2016/FC
|
Vijaypur Pahadpani MR
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.91
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2016
|
Stage-I Approval on
|
:
|
10 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2025
|
|
|
|
01 May 2025
|
17
|
Uttarakhand
|
FP/UK/ROAD/27337/2017
|
8B/UCP/06/146/2020/FC
|
Construction of Duni Sukunda motor road Extension to Shobhakund motor road (Length 8.00 km)
|
Road
|
PWDKAPKOT
|
4.34
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2017
|
Stage-I Approval on
|
:
|
17 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2025
|
|
|
|
01 May 2025
|
18
|
Chhattisgarh
|
FP/CG/ROAD/37444/2018
|
FC-I/IROCH-09/2021
|
National Highway Authority of India (NHAI) , proposed Up-gradation of Champa-Korba-Chhuri-Katghora Section of NH-149B in the state of Chhattisgarh to two/ four lane with paved shoulder configuration, Package-I (0+00 to 38+150).
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR
|
4.493
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2019
|
Stage-I Approval on
|
:
|
03 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
30 Apr 2025
|
19
|
Madhya Pradesh
|
FP/MP/MIN/144129/2021
|
8-17/2023
|
Bandha Coal Mine
|
Mining
|
EMIL MINES AND MINERAL RESOURCES LIMITED
|
807.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2021
|
Stage-I Approval on
|
:
|
01 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2025
|
|
|
|
30 Apr 2025
|
20
|
Orissa
|
FP/OR/MIN/20092/2016
|
8-01/2019-FC
|
Tirigpahar Iron & Manganese Mine (Guruda Block)
|
Mining
|
TATA STEEL LIMITED SUKINDA CHROMITE MINE
|
80.826
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jun 2016
|
Stage-I Approval on
|
:
|
02 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2025
|
|
|
|
30 Apr 2025
|
21
|
Haryana
|
FP/HR/Approach/51883/2020
|
9-HRB139-2022-CHA
|
Construction of Prposed Path for Proposed MS/HSD Retail Outlet.
|
Approach Access
|
INDIAN OIL CORPORATION LIMITED, PANIPAT DIVISIONAL OFFICE, PANIPAT MARKETING COMPLEX, VILLAGE BAHOLI, P.O. PANIPAT REFINERY, DISTRICT PANIPAT (HARYANA)
|
0.0072
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
Stage-I Approval on
|
:
|
04 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2024
|
|
|
|
25 Apr 2025
|
22
|
Gujarat
|
FP/GJ/ROAD/27051/2017
|
FC-6/GJC-78/2023-GNR
|
Consultancy Services for Project Management Phase- I including Preparation of Detailed Project Report for Upgradation of Junction with NH-47-Limbdi-Surendranagar-Dhrangadhra of NH-51 in the State of Gujarat to Two Lane with Paved Shoulder Configuration (Package No: NH/IAHE/15).
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
39.37
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2017
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
24 Apr 2025
|
23
|
Maharashtra
|
FP/MH/ROAD/148484/2021
|
FLD-2022/CR-159/F-10
|
Diversion of Forest Land for construction of Walchandnagar- Anthurne- Shelgaon- Vyahali- Kauthali MDR 76 from Chainage Km. 25/000 to Km. 26/540
|
Road
|
PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE
|
0.6583
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2021
|
Stage-I Approval on
|
:
|
18 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
24 Apr 2025
|
24
|
Maharashtra
|
FP/MH/ROAD/148490/2021
|
FLD-1922/CR153/F-10
|
Diversion of Forest Land for construction of Palasdev- Nhavi- Vyahli Road MDR 190 from Chainage Km. 1/485 to Km. 2/256 and 3/330 to Km. 3/630
|
Road
|
PUBLIC WORKS SUB-DIVISION INDAPUR, PWD (EAST), PUNE
|
0.96363
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2021
|
Stage-I Approval on
|
:
|
18 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
24 Apr 2025
|
25
|
Maharashtra
|
FP/MH/ROAD/155480/2022
|
FC-I/MH-332/2023-NGP
|
Widening of existing Shri Krishna Nagar bridge
|
Road
|
MUNICIPAL CORPORATION OF GREATER MUMBAI
|
0.0728
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jun 2022
|
Stage-I Approval on
|
:
|
08 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
24 Apr 2025
|
26
|
Orissa
|
FP/OR/IND/12884/2015
|
5-ORC279/2016-BHU
|
NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT
|
Industry
|
NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT
|
25.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2015
|
Stage-I Approval on
|
:
|
01 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2025
|
|
|
|
24 Apr 2025
|
27
|
Jharkhand
|
FP/JH/MIN/140599/2021
|
8-24/2023-FC
|
CHANDRAGUPT OCP
|
Mining
|
CHANDRAGUPT OCP
|
699.38
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Apr 2021
|
Stage-I Approval on
|
:
|
27 May 2024
|
Compliance Report Submitted by User Agency on
|
:
|
10 Mar 2025
|
|
|
|
23 Apr 2025
|
28
|
Madhya Pradesh
|
FP/MP/TRANS/152571/2022
|
6-MPR032/2022-BHO
|
PAYLI Multi Village Rural Water Supply Scheme
|
Transmission Line
|
MADHYA PARDESH JAL NIGAM MARYADIT JABALPUR
|
13.18
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2022
|
Stage-I Approval on
|
:
|
26 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2024
|
|
|
|
22 Apr 2025
|
29
|
Himachal Pradesh
|
FP/HP/ROAD/25347/2017
|
FC/HPB/64/2023
|
C/o Link Road from Domehar-Navi Road Km 0/0 to 5/241
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
3.2322
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2020
|
Stage-I Approval on
|
:
|
18 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2025
|
|
|
|
21 Apr 2025
|
30
|
Manipur
|
FP/MN/ROAD/154423/2022
|
3-MNC 033/2022-SHI
|
Diversion of 98.00 ha. of Forest Land for Widening and improvement of Yaingangpokpi-Nagaland Road Section of NH-202 into two laning with paved shoulder of 0.000km from Laikot to Finch Corner 30.970 k
|
Road
|
NHIDCL BO IMPHAL
|
98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Apr 2022
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2025
|
|
|
|
21 Apr 2025
|
31
|
Sikkim
|
FP/SK/TRANS/145497/2021
|
IRO/KOL/SK/TRANS/145497/2021
|
Extension of Three Phase 11 KV Weasel Line and Installation of 25 KVA Outdoor Type Distribution Sub-Station along with Extension of L.T. Line at Sakhimdara, Dhoban and Nayapatal (72nd Battalion SSB Ou
|
Transmission Line
|
POWER DEPTT
|
2.87
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2021
|
Stage-I Approval on
|
:
|
26 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Apr 2025
|
|
|
|
21 Apr 2025
|
32
|
Madhya Pradesh
|
FP/MP/ROAD/36650/2018
|
6-MPB070/2020-BHO
|
Making Road for Vipassana Center
|
Road
|
VIPASSANA TRUST JABALPUR
|
0.105
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2018
|
Stage-I Approval on
|
:
|
10 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Feb 2025
|
|
|
|
19 Apr 2025
|
33
|
Sikkim
|
FP/SK/ROAD/122247/2021
|
SK/ROAD-46/2021/FC
|
Diversion of 0.3708 Ha of forest land for const of RCR from SPWD Melli Road to Kerabari zero in Melli S Sikkim by RDD GoS
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.3708
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
31 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 Apr 2025
|
|
|
|
17 Apr 2025
|
34
|
Uttarakhand
|
FP/UK/ROAD/29205/2017
|
8B/UCP/06/23/2020/FC
|
Construction of Kharlekh Bhanar Km 1 to Nakana Ba sora Motor road (Length 5.00 Km)
|
Road
|
PMGSY
|
3.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Sep 2017
|
Stage-I Approval on
|
:
|
22 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2024
|
|
|
|
15 Apr 2025
|
35
|
Himachal Pradesh
|
FP/HP/HYD/14396/2015
|
8B/HP/01/116/2017
|
MANIMAHESH ENTERPRISES
|
Hydel
|
M/S MANIMAHESH ENTERPRISES
|
0.7649
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2015
|
Stage-I Approval on
|
:
|
01 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
11 Apr 2025
|
36
|
Maharashtra
|
FP/MH/Others/149089/2021
|
FC-II/MH-183/2022-NGP
|
Proposal for Diversion of 5.733 Ha. of Restored Private Forest land (Restored before 25/10/1980) for Non-Forest purpose i.e., Eco Tourism Project
|
Others
|
GOVIND JIVRAJBHAI VAGHANI
|
5.733
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Nov 2021
|
Stage-I Approval on
|
:
|
17 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
11 Apr 2025
|
37
|
Maharashtra
|
FP/MH/Pipeline/153017/2022
|
FC-IIMH-2152023-NGP
|
Proposal for diversion of Forest land for laying underground Natural Gas Pipeline alongwith Optical Fiber Cable (OFC) for NAGPUR to JHARSUGUDA pipeline stretch passing through district Nagpur, Bhandara and Gondiya (Maharashtra/MP Border) in the state of Maharashtra in favour of GAIL (India) Limited.
|
Pipeline
|
GAIL INDIA LIMITED
|
9.4714
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2022
|
Stage-I Approval on
|
:
|
03 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2024
|
|
|
|
11 Apr 2025
|
38
|
Uttar Pradesh
|
FP/UP/Others/26336/2017
|
8B/UP/06/250/2021/FC
|
Ex-Post Facto Proposal 0.4368Protected Forest Land Proposed to be diverted for service land road to Om Residency developed by Neostar Reality Pvt.Ltd. and Ruhialkhand Projects Ltd. on NH-30(Old NH-24) Bareilly Shahjahanpur Road between KM.267-268, Ch. 267.640 (LHS) in Bareilly District
|
Others
|
NEO STAR REALTY PVT LTD
|
0.4368
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 May 2017
|
Stage-I Approval on
|
:
|
15 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
11 Apr 2025
|
39
|
Uttar Pradesh
|
FP/UP/Pipeline/115789/2020
|
P-85/81-2-2021-800(98)/2021
|
Forest Land Proposed to be diverted for laying of 4'', 6'', 8'', 10'' dia steel gas pipeline along Bareilly Mod to Pakka Pul from Ch. 0.00 to 4.00, Bareilly Mod- Pipraula Ahmadpur SH-29 from Ch. 469.0
|
Pipeline
|
Hindustan Petroleum Corporation Limited
|
0.66
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2020
|
Stage-I Approval on
|
:
|
04 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
10 Apr 2025
|
40
|
Himachal Pradesh
|
FP/HP/ROAD/32474/2018
|
8B/HP/06/99/2019/FC
|
BANOUN KANCHI SE GHARA ROAD KM 0/0 TO 4/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2018
|
Stage-I Approval on
|
:
|
21 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2025
|
|
|
|
08 Apr 2025
|
41
|
Himachal Pradesh
|
FP/HP/Others/123004/2021
|
FC/HPB/09/52/2021
|
Diversion of 0.561098 hectare of Forest Land for the Construction of Sewerage Treatment Plant 5.00 MLD for Zone No. 1 within the Jurisdiction of Bilaspur Forest Division
|
Others
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.56109
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2021
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2025
|
|
|
|
08 Apr 2025
|
42
|
Haryana
|
FP/HR/TRANS/140597/2021
|
9-HRB093-2021-CHA
|
Construction of 220 KV DC line from Existing 400/220 KV Sub Station Dhanonda to Proposed 220 KV Sub Station Deroli Ahir in district Mahendergarh Haryana.
|
Transmission Line
|
HVPNL REWARI
|
0.8085
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2021
|
Stage-I Approval on
|
:
|
29 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
07 Apr 2025
|
43
|
Haryana
|
FP/HR/TRANS/142899/2021
|
9-HRB042-2022-CHA
|
Construction of 132 KV S/C Transmission Line from 220 KV Sub Station Deroli Ahir to Seka under Forest division and district Mahendergarh Hayrana.
|
Transmission Line
|
HVPNL REWARI
|
0.5352
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jul 2021
|
Stage-I Approval on
|
:
|
26 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
07 Apr 2025
|
44
|
Jharkhand
|
FP/JH/MIN/38798/2019
|
8-56/2009-FC Vol.
|
Pakri Barwadih North-West Quarry (PB-A) Coal Block of M/s NTPC Ltd
|
Mining
|
NTPC - PAKRI BARWADIH COAL MINING PROJECT
|
331.198
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2019
|
Stage-I Approval on
|
:
|
26 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2024
|
|
|
|
07 Apr 2025
|
45
|
Uttar Pradesh
|
FP/UP/Others/42798/2019
|
8B/UP/09/206/2022/FC
|
Diversion proposal to lay Kandla-Gorakhpur LPG Pipeline -KGPL- (Unnao-Gorakhpur Section) pipeline through Unnao, Rae Bareli, Pratapgarh, Allahabad, Bhadohi, Varanasi, Jaunpur, Ghazipur, Azamgarh, Mau, Gorakhpur, Deoria and Lucknow Forest Divisions in Uttar Pradesh
|
Others
|
IHB LIMITED
|
3.9806
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Nov 2019
|
Stage-I Approval on
|
:
|
29 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2025
|
|
|
|
07 Apr 2025
|
46
|
Uttar Pradesh
|
FP/UP/Approach/145304/2021
|
8B/UP/06/01/2024/FC
|
IOCL Retail Outlet on Bareilly-Shahjahanpur Road (NH-30/Old NH-24), In KM Stone No. 279 (CH: 278.543 RHS), At Gata No. 805, Village: Bakarganj, Tehsil-Faridpur, District: Bareilly
|
Approach Access
|
INDIAN OIL CORPORATION
|
0.187
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2021
|
Stage-I Approval on
|
:
|
21 May 2024
|
Compliance Report Submitted by User Agency on
|
:
|
22 Mar 2025
|
|
|
|
07 Apr 2025
|
47
|
Uttar Pradesh
|
FP/UP/Approach/153494/2022
|
8B/UP/06/123/2023/FC
|
Proposed BPCL Retail Outlet on Deoria-Kasia Road (SH-79) Near Km. Stone No. 16 (LHS) at Khasra No. – 1034, Village:-Sirwaniya, Tehsil:-Deoria, District:-Deoria
|
Approach Access
|
BHARAT PETROLEUM CORPORATION LIMITED
|
0.071528
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2022
|
Stage-I Approval on
|
:
|
12 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2025
|
|
|
|
07 Apr 2025
|
48
|
Maharashtra
|
FP/MH/Pipeline/155566/2022
|
FC-I/MH-206/2023-NGP
|
Urmodi Project Tal Man Distric Satara PDN work
|
Pipeline
|
EXECUTIVE ENGINEER URMODI DAM DIVISION SATARA
|
28.297
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2022
|
Stage-I Approval on
|
:
|
10 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Mar 2025
|
|
|
|
05 Apr 2025
|
49
|
Uttarakhand
|
FP/UK/ROAD/23224/2016
|
8B/UCP/06/159/2019/FC/14
|
Construction of Rikhari-Wachham motor road Km 40 to Kuwari in District-Bageshwar
|
Road
|
PMGSY
|
19.084
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2016
|
Stage-I Approval on
|
:
|
30 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2024
|
|
|
|
04 Apr 2025
|
50
|
Telangana
|
FP/TG/ROAD/62783/2020
|
4-TSB224/2021-HYD
|
BT road from MRL02-Mallapoor to Challagarga via Lolam, Govindpally, BeliaThanda, Dhammannapet of Indalwai(m),Nizamabad District under PMGSY-III
|
Road
|
DPRE PIU NIZAMABAD
|
4.5151
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2020
|
Stage-I Approval on
|
:
|
21 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2023
|
|
|
|
04 Apr 2025
|
|