Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Himachal Pradesh
|
FP/HP/SCH/19350/2016
|
FC/HPB/09/49/2021
|
Kendriya Vidyalaya, Ghumarwin
|
School
|
DEPUTY DIRECTOR
|
2.26
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2016
|
Stage-I Approval on
|
:
|
31 Jul 2024
|
Compliance Report Submitted by User Agency on
|
:
|
17 Sep 2025
|
|
|
|
13 Oct 2025
|
2
|
Uttar Pradesh
|
FP/UP/Others/13881/2015
|
8B/UP/06/34/2018
|
Retail Outlet
|
Others
|
Essar Oil Limited
|
0.0768
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jul 2015
|
Stage-I Approval on
|
:
|
16 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2025
|
|
|
|
13 Oct 2025
|
3
|
Daman and Diu
|
FP/DD/ROAD/143323/2021
|
FC-6/DDB-73/2023-GNR
|
Construction of Protection wall with Jampore Ghat for Extension of Jampore Sea front upto Varliwad School at Jampore, Moti Daman on forest land in Daman District.
|
Road
|
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT WD I DAMAN
|
1.592
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jun 2021
|
Stage-I Approval on
|
:
|
03 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2025
|
|
|
|
09 Oct 2025
|
4
|
Jammu and Kashmir
|
FP/JK/TRANS/155098/2022
|
9-JKB-026/2023-Jammu
|
Stabilization of existing 220 KV Single Circuit Gladni Udhampur Transmission Line alongwith realignment on double circuit towers from location no. 158 upto Grid Station Udhampur laying foundations and
|
Transmission Line
|
JKPTCL(PDD), JAMMU AND KASHMIR
|
1.45
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Dec 2022
|
Stage-I Approval on
|
:
|
24 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2025
|
|
|
|
07 Oct 2025
|
5
|
Chhattisgarh
|
FP/CG/ROAD/126719/2021
|
FC-II/IROCH-19/2023
|
Rehabilitation & Upgrading to 2/4 laning with paved shoulder Under corridor Scheme on EPC Basis of Keonchi to Ratanpur Section on NH-45(Ex.) in the State of Chhattisgarh.
|
Road
|
CHIEF ENGINEER PWD NH RAIPUR CG
|
28.811
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2021
|
Stage-I Approval on
|
:
|
24 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2025
|
|
|
|
06 Oct 2025
|
6
|
Chhattisgarh
|
FP/CG/ROAD/147299/2021
|
FC-III/IROCH-06/2023
|
Widening of Existing Road from Ambikapur toRamanujganj 2-Lane/4-Lane Road NH No. 343
|
Road
|
EXECUTIVE ENGINEER PWD NH DIVISION AMBIKAPUR
|
102.324
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2021
|
Stage-I Approval on
|
:
|
09 Dec 2024
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2025
|
|
|
|
06 Oct 2025
|
7
|
Haryana
|
FP/HR/SCH/41500/2019
|
9-HRC093/2020-CHA
|
MANAV RACHNA INTERNATIONAL INSTITUTE OF RESEARCH AND STUDIES
|
School
|
MANAV RACHNA INTERNATIONAL INSTITUTE OF RESEARCH AND STUDIES
|
13.684
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2019
|
Stage-I Approval on
|
:
|
29 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2025
|
|
|
|
06 Oct 2025
|
8
|
Maharashtra
|
FP/MH/ROAD/115156/2020
|
FC-I/MH-269/2022-NGP
|
Improvement to Kerli - Kotoli - Nandgaon - Nandari Road SH-191 (Km 00/00 to Km 29/500) Part of Kerli Phata to Nandari Dist Kolhapur.
|
Road
|
SPECIAL PROJECT (P.W.) DIVISION, KOLHAPUR
|
2.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2021
|
Stage-I Approval on
|
:
|
24 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jul 2025
|
|
|
|
06 Oct 2025
|
9
|
Orissa
|
FP/OR/MIN/153549/2022
|
8-14/2023-FC
|
Proposal for diversion of 66.242 ha. including safety zone of 2.09 ha. of forest land in respect of Netrabandha Pahar west iron ore block in favour of Ms. Raga Tradecon Pvt ltd under bonai forest divi
|
Mining
|
RAGA TRADECON PRIVATE LIMITED
|
66.242
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2022
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2025
|
|
|
|
05 Oct 2025
|
10
|
Karnataka
|
FP/KA/Others/31165/2018
|
8-17/1994-FC Vol.
|
SMIORE Downhill Conveyor System (DCS) from Kammathuru Iron Ore Mine to PMBR (BMM) Siding towards Mining Related Infrastructure development under Comprehensive Environment Plan for Mining Impact Zone (CEPMIZ) in Mining Lease No. 2678 (Old 2580/1179).
|
Others
|
THE SANDUR MANGANESE AND IRON ORES LIMITED
|
2.4313888
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2018
|
Stage-I Approval on
|
:
|
15 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jun 2025
|
|
|
|
03 Oct 2025
|
11
|
Orissa
|
FP/OR/MIN/16453/2015
|
5-ORC288/2016-BHU
|
Kalarangiatta Chromite Mines of M/s Ferro Alloys Corporation Ltd
|
Mining
|
FERRO ALLOYS CORPORATION LTD
|
23.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2015
|
Stage-I Approval on
|
:
|
21 Mar 2025
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2025
|
|
|
|
03 Oct 2025
|
12
|
Rajasthan
|
FP/RJ/WATER/154215/2022
|
8B/RAJ/028/2023-JPR
|
Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi (Rajasthan)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARMENT RAJASTHAN
|
4.9975
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jul 2022
|
Stage-I Approval on
|
:
|
10 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2025
|
|
|
|
03 Oct 2025
|
13
|
Bihar
|
FP/BR/Approach/156522/2022
|
FP/BR/Approach/156522/2022
|
Diversion of 0.020625 ha of forest land for construction of approach road for opening retail outlet of IOCL on Bachhota-Alauli M.D.R. Road in Khagaria district of Bihar.
|
Approach Access
|
KHUSHI KUMARI
|
0.02063
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2022
|
Stage-I Approval on
|
:
|
06 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2025
|
|
|
|
30 Sep 2025
|
14
|
Maharashtra
|
FP/MH/ROAD/31292/2018
|
FC-I-MH-86-2018-NGP
|
NH-66 Kalmath to Zarap section
|
Road
|
NH DIVISION
|
2.8715
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2018
|
Stage-I Approval on
|
:
|
27 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2025
|
|
|
|
30 Sep 2025
|
15
|
Tamil Nadu
|
FP/TN/IRRIG/118339/2021
|
4-TNB097/2022-CHN
|
Construction of Fuse Plug pertaining to Thandarampattu Taluk of Tiruvannamalai District
|
Irrigation
|
AEE PWD SATHANUR DAM
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jan 2021
|
Stage-I Approval on
|
:
|
03 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
30 Sep 2025
|
16
|
Uttar Pradesh
|
FP/UP/Others/47337/2020
|
8B/UP/06/90/2022/FC
|
Protected Forest Land Proposed to be Diverted for Exit/Entry Approach to Bharat Petroleum Corporation LTD. Retail Outlet on Sambhal-Bahjoi Road (SH-51) Km Stone No 79 (L.H.S) Khasra No-325, Village-Panwasa, Tehsil-Sambhal, District-Sambhal
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED MEERUT
|
0.1041
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2020
|
Stage-I Approval on
|
:
|
29 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
18 Sep 2025
|
|
|
|
27 Sep 2025
|
17
|
Tamil Nadu
|
FP/TN/IRRIG/51078/2020
|
4-TNB119/2024-CHN
|
Reconstruction of dilapidated Head Sluice,Bed Dam, Retaining wall and Culvert in Malattar Channel in Villupuram District
|
Irrigation
|
EE, WRD., VILUPPURAM
|
0.186
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2020
|
Stage-I Approval on
|
:
|
13 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2025
|
|
|
|
26 Sep 2025
|
18
|
Assam
|
FP/AS/TRANS/142618/2021
|
3-AS-C-093/2022/GHY
|
DIVERSION PROPOSAL OF PROPOSED 18.028 HA AREA OF FOREST LAND FOR CONSTRUCTION AND COMMISSIONING OF 132 KV TRANSMISSION LINE FROM AGIA GSS TO GOALPARA TSS AT RAKHAYASHINI PRF UNDER GOALPARA FOREST DIVISION
|
Transmission Line
|
O/O THE CHIEF PROJECT DIRECTOR, CENTRAL ORGANIZATION FOR RAILWAY ELECTRIFICATION, GUWAHATI
|
18.028
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2021
|
Stage-I Approval on
|
:
|
01 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jun 2024
|
|
|
|
25 Sep 2025
|
19
|
Haryana
|
FP/HR/ROAD/44420/2020
|
9558
|
Diversion of 0.16 Ha of forest land for non- forest purpose for the project “Construction of 6 Lane access controlled Highway from DND Maharani Bagh to Junction near KMP Expressway with NH-148N Delhi-Vadodara Expressway Section of NH-148NA
|
Road
|
CMU, MATHURA, NHAI
|
0.16
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2020
|
Stage-I Approval on
|
:
|
15 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
24 Sep 2025
|
20
|
Telangana
|
FP/TG/ROAD/32933/2018
|
4-TSC160/2019-CHN
|
Diversion of Forest land in Bhupalpally Division for Widening from Single lane to Double lane road of Khammampally to Bhupalpally road from km 12/2 to 19/6 in Jayashanker Bhupalpally Dist - 4.2339 Ha
|
Road
|
R AND B DIVISION WARANGAL
|
8.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2018
|
Stage-I Approval on
|
:
|
27 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2025
|
|
|
|
23 Sep 2025
|
21
|
Haryana
|
FP/HR/Approach/149814/2021
|
FCA/915
|
Retail Outlet of Indian Oil Corporation Ltd.
|
Approach Access
|
M/S INDIAN OIL CORPORATION LTD
|
0.09252
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2021
|
Stage-I Approval on
|
:
|
05 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2025
|
|
|
|
19 Sep 2025
|
22
|
Himachal Pradesh
|
FP/HP/HYD/49387/2020
|
FC/HPB/01/177/2022
|
Integrated Kashang Stage II & III
|
Hydel
|
HIMACHAL PRADESH POWER CORPORATION LTD
|
0.4148
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Sep 2020
|
Stage-I Approval on
|
:
|
01 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
18 Sep 2025
|
23
|
Jammu and Kashmir
|
FP/JK/Others/153306/2022
|
9-JKA-060/2022-Jammu
|
Ms Prince Fuel Station
|
Others
|
CHETAN MAHAJAN
|
0.208
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Mar 2022
|
Stage-I Approval on
|
:
|
22 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2025
|
|
|
|
18 Sep 2025
|
24
|
Karnataka
|
FP/KA/TRANS/38788/2019
|
F.No.KRC1287/2021-BAN
|
Construction of the Proposed 110kV S/c Line on DC Towers from the existing 110/11kV Thogarsi sub-station to the proposed 10MVA 110/11kV sub-station at Kuppagudde in Soraba Taluk, Shivamogga District.
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
6.073276
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2019
|
Stage-I Approval on
|
:
|
02 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2025
|
|
|
|
18 Sep 2025
|
25
|
Madhya Pradesh
|
FP/MP/WATER/151757/2022
|
6-MPB016/2023-BHO
|
Gond Deosar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.8057
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2022
|
Stage-I Approval on
|
:
|
08 Jul 2025
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2025
|
|
|
|
17 Sep 2025
|
26
|
Maharashtra
|
FP/MH/RAIL/41780/2019
|
FC-II/MH-219/2023-NGP
|
Third railway line between Kalyan and Kasara stations of 67.62 km in Ulhasnagar, Kalyan & Shahapur Talukas, Thane District, Maharashtra
|
Railway
|
CENTRAL RAILWAY CST MUMBAI
|
16.6846
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2019
|
Stage-I Approval on
|
:
|
19 Jul 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2025
|
|
|
|
17 Sep 2025
|
27
|
Himachal Pradesh
|
FP/HP/ROAD/150852/2022
|
FC/HPB/06/111/2022
|
C/O of link road from PHC Badahari Gurshali to Village Dawath Km 0/00 to 1/500.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.4614
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jan 2022
|
Stage-I Approval on
|
:
|
18 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
16 Sep 2025
|
28
|
Madhya Pradesh
|
FP/MP/WATER/151448/2022
|
6-MPB028/2023-BHO
|
Gond Devsar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.9627
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2022
|
Stage-I Approval on
|
:
|
08 Jul 2025
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2025
|
|
|
|
16 Sep 2025
|
29
|
Uttar Pradesh
|
FP/UP/ROAD/117639/2020
|
8B/UP/06/03/2024/FC
|
Forest Land Proposed for Widening & Strengthening of Chopan-Mahalpur Road to Parsoi Road from Km. No. 0.000 to Km. No. 20.600 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District:Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
15.567
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2020
|
Stage-I Approval on
|
:
|
05 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
02 Sep 2025
|
|
|
|
15 Sep 2025
|
30
|
Gujarat
|
FP/GJ/IND/29375/2017
|
FC-6/GJC-72/2023-GNR
|
Hazira Capacity Expansion Project (HCEP)
|
Industry
|
Shell Energy India Private Limited
|
12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2019
|
Stage-I Approval on
|
:
|
05 Nov 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
12 Sep 2025
|
31
|
Uttarakhand
|
FP/UK/ROAD/150404/2021
|
8B/UCP/06/05/2023/FC
|
Construction of Billekh to Gaira motor road
|
Road
|
EXECUTIVE ENGINEER
|
1.68
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2021
|
Stage-I Approval on
|
:
|
20 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
12 Sep 2025
|
32
|
Himachal Pradesh
|
FP/HP/ROAD/74345/2020
|
FC/HPB/06/152/2022
|
C/O Ambulance road from Fire Brigade road for the building in Daizy Bank Estate Lower Jakhu Shimla Ward No-16 KM 0/0 To 0/45.
|
Road
|
Commissioner MCS
|
0.0112
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Dec 2020
|
Stage-I Approval on
|
:
|
17 Feb 2025
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2025
|
|
|
|
11 Sep 2025
|
33
|
Himachal Pradesh
|
FP/HP/SubStation/148224/2021
|
FC/HPB/12/178/2022
|
Construction of 33/11 KV Electrical Sub Center Shri Naina Devi Ji which falls in the Jurisdiction of Modar Village, Tehsil Shri Naina Devi Ji at Swarghat, Bilaspur District, H.P
|
Sub Station
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD
|
0.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2021
|
Stage-I Approval on
|
:
|
22 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2025
|
|
|
|
11 Sep 2025
|
34
|
Uttarakhand
|
FP/UK/ROAD/27119/2017
|
8B/UCP/06/57/2018/FC
|
Construction of Harsila to Sima motor road Length(4.00km)
|
Road
|
PWDKAPKOT
|
2.519
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jul 2017
|
Stage-I Approval on
|
:
|
15 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2025
|
|
|
|
11 Sep 2025
|
35
|
Orissa
|
FP/OR/Others/9825/2015
|
5-ORB428/2020-BHU
|
Barbil - Angul Iron Ore Slurry Pipeline Project
|
Others
|
Jindal Steel & Power Ltd.
|
1.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jul 2015
|
Stage-I Approval on
|
:
|
24 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2025
|
|
|
|
08 Sep 2025
|
36
|
Madhya Pradesh
|
FP/MP/ROAD/156438/2022
|
6-MPR038/2023-BHO
|
4 Laning of Indore-Muktainagar Section of NH-753L from Boregaon Buzurg, Khandwa District in MP Design Ch. 139+000 to Muktainagar, Jalgaon District in MH Design Ch. 216+278 (length 77.278 km) under Bharatmala Pariyojana in the state of Madhya Pradesh
|
Road
|
National Highways Authority of India
|
87.5709
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2022
|
Stage-I Approval on
|
:
|
29 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2024
|
|
|
|
05 Sep 2025
|
37
|
Sikkim
|
FP/SK/ROAD/42185/2019
|
1848/FCA/FEWMD
|
Diversion of 0.1502 ha of forest land for const of road from NH10 near Andheri Jhora to Samdur Village at Samdur East Sikkim by R&B Deptt. GoS
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.1502
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2019
|
Stage-I Approval on
|
:
|
06 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2025
|
|
|
|
04 Sep 2025
|
38
|
Haryana
|
FP/HR/Approach/153753/2022
|
153753/397
|
Sangeet Resorts
|
Approach Access
|
SANGEET RESORTS
|
0.033
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
18 Jul 2025
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2025
|
|
|
|
02 Sep 2025
|
39
|
Manipur
|
FP/MN/TRANS/36731/2018
|
3-MN C 105/2019-SHI
|
Construction of 132 KV single circuit transmission line on double circuit towers from Rengpang to Tamenglong under North Eastern Region Power System Improvement Project (NERPSIP)
|
Transmission Line
|
MANIPUR STATE POWER COMPANY LIMITED
|
56.833
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2018
|
Stage-I Approval on
|
:
|
30 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2025
|
|
|
|
02 Sep 2025
|
40
|
Manipur
|
FP/MN/ROAD/153434/2022
|
3-MNC 055/2022-SHI
|
Forest Proposal for widening / improvement of existing road chakpikarong - sajik - Aiqejang (0 to 19.5 KM) to NHSL specification under project sewak in the state of Manipur
|
Road
|
84 RCC (GREF)
|
22.045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2022
|
Stage-I Approval on
|
:
|
18 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
02 Sep 2025
|
41
|
Punjab
|
FP/PB/Approach/146634/2021
|
9-PBB311/2023-CHA
|
Approach Access Road to B-Site IOCL Retail Outlet
|
Approach Access
|
APPROACH ACCESS FOR INDIAN OIL CORPORATION (IOCL)
|
0.0102
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
29 May 2025
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jul 2025
|
|
|
|
02 Sep 2025
|
42
|
Uttarakhand
|
FP/UK/ROAD/34380/2018
|
8B/UCP/06/209/2019/FC
|
Kathiyan to Dirnad Motor Road Under PMGSY
|
Road
|
EXECUTIVE ENGINEER
|
3.0835
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2018
|
Stage-I Approval on
|
:
|
06 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2025
|
|
|
|
01 Sep 2025
|
43
|
Madhya Pradesh
|
FP/MP/IRRIG/30442/2017
|
6-MPR005/2022-BHO
|
Baroda ... Irrigation Project
|
Irrigation
|
WATER RESOURCES DIVISION NO ONE SAGAR
|
21.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2017
|
Stage-I Approval on
|
:
|
09 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2025
|
|
|
|
31 Aug 2025
|
44
|
Karnataka
|
FP/KA/TRANS/42334/2019
|
F.No.4-KRB1296/2021-BAN
|
Diversion of 0.98Ha of Sonnenahalli Deemed Forest for construction of 400kV D/C Quad Tumkur (Vasantanarsapur) - Yelahanka Transmission line
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
0.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2019
|
Stage-I Approval on
|
:
|
16 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2024
|
|
|
|
29 Aug 2025
|
45
|
Maharashtra
|
FP/MH/ROAD/148050/2021
|
FC-II/MH-213/2023-NGP
|
Construction of Balkum to Gaimukh DP Road (NH3 Connector Ghodbunder By-Pass) by Thane Municipal Corporation
|
Road
|
THANE MUNICIPAL CORPORATION PWD
|
12.2607
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2021
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jul 2025
|
|
|
|
29 Aug 2025
|
46
|
Telangana
|
FP/TG/Others/44802/2020
|
4-TSB171/2020-CHN
|
Establishment of APCO 25 tower for Phase II Network in Medchal District - 0.0995 Ha
|
Others
|
TELANGANA STATE POLICE DEPARTMENT
|
0.0995
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2020
|
Stage-I Approval on
|
:
|
09 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Oct 2024
|
|
|
|
28 Aug 2025
|
47
|
Telangana
|
FP/TG/ROAD/120196/2021
|
4-TSB214/2021-HYD
|
Formation of BT road from MRL 13 Chamanpally to Kushnapally of Vemanapally Mandal of Mancherial District - 1.5259 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
1.5259
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2021
|
Stage-I Approval on
|
:
|
30 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Feb 2025
|
|
|
|
28 Aug 2025
|
48
|
Uttar Pradesh
|
FP/UP/Others/41408/2019
|
3083
|
Reliance 4G Project for Laying of OFC along with road on SH-101(Palia-Trikulia-Khajuria Road) from Km82.20 to Km119.50, NH-730(Pilibhit-Betia-Assam Road) from Km88.00 to Km92.50 & SH-21(Bilraya-Panwari Road) from Km1.50 to Km8.60 and from Km18.70 to Km26.00 ,Total Km56.20 & 0.5924 Ha. in NorthKheri Forest Division, District Lakimpur Kheri-UP.
|
Others
|
Reliance Jeo Infocomm Ltd
|
0.5924
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Aug 2019
|
Stage-I Approval on
|
:
|
27 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2025
|
|
|
|
26 Aug 2025
|
49
|
Uttarakhand
|
FP/UK/ROAD/10393/2015
|
8B/UCP/06/124/2015-FC
|
Bartoli-Banthok Motor Road(Part I)
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.705
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2015
|
Stage-I Approval on
|
:
|
08 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2025
|
|
|
|
26 Aug 2025
|
50
|
Chhattisgarh
|
FP/CG/ROAD/119866/2021
|
FC-III/IROCH-04/2022
|
Development of Economic Corridors, Inter-corridors, feeder routes and Coastal Road to improve the efficiency of freight movement in India (Lot-3/Odisha & Jharkhand/Package-2) Raipur-Vishakhapatnam (Ch. 0.000 - Ch. 124.661) in the State of Chhattisgarh under Bharatmala Pariyojana. (Forest Proposal is for between km 42+844 to Km 124.661)
|
Road
|
NHAI PIU DHAMTARI
|
228.0425
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2021
|
Stage-I Approval on
|
:
|
12 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2025
|
|
|
|
22 Aug 2025
|
|