Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Himachal Pradesh
|
FP/HP/ROAD/154466/2022
|
FC/HPC/79/2023
|
Diversion of 19.5896 Ha. Forest land for Rehabilitation and Upgradation to Two lane with paved shoulder configuration & Strengthening of Padhar to Bijni (Package-VA) from Km 180.00 to Km 202.815 (Design Length 19.050 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR
|
19.5896
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jul 2022
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2025
|
|
|
|
04 Feb 2025
|
2
|
Rajasthan
|
FP/RJ/TRANS/120030/2021
|
8B/Raj/12/28/2021/FC
|
132 KV S/C Raisinghnagar - Jetsar (M/s NTPC) Transmission Line, District-Sri Ganganagar, Rajasthan (Total Length 17893 meters).
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD HANUMANGARH
|
0.0972
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Feb 2021
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2024
|
|
|
|
03 Feb 2025
|
3
|
Karnataka
|
FP/KA/MIN/48654/2020
|
F.No.4-KRB1348/2022-BAN/
|
To access existing approach road to M.L No 2545 Jaisinghpur Iron Ore Mines, Ramghad Block Forest, Jaisinghpur Village, Sandur Taluk, Bellary District. In favour of M/s Lakshmi Minerals, Hospet
|
Mining
|
LAKSHMI MINERALS
|
0.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Aug 2020
|
Stage-I Approval on
|
:
|
06 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2023
|
|
|
|
31 Jan 2025
|
4
|
Uttarakhand
|
FP/UK/ROAD/27732/2017
|
8B/UCP/06/64/2019/FC
|
Construction of Tharali Kurar Motor Road, km-15 to Gummar Lagga Gerur Link Motor Road under PMGSY in phase-XVI
|
Road
|
RES PMGSY KARANPERAYAG
|
1.825
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
Stage-I Approval on
|
:
|
17 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
31 Jan 2025
|
5
|
Uttarakhand
|
FP/UK/ROAD/38048/2019
|
8B/UCP/06/42/2020/FC
|
C/o Naugaon to Kanarichhina Motor road distt almora
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
1.377
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2019
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
30 Jan 2025
|
6
|
Haryana
|
FP/HR/ROAD/40712/2019
|
9-HRB090-2019-CHA
|
Diversion of 0.90 ha of forest land for Wdg. & Stg. of Meerut Sonipat Gohana Assand Kaithal Patiala road (Assand Kaithal Cheeka Patiala road ) S. H. No. 11 Km. Km. 231.44 to 234.21 & RD 234.41 to 234.
|
Road
|
EXECUTIVE ENGINEER
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2019
|
Stage-I Approval on
|
:
|
22 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2020
|
|
|
|
29 Jan 2025
|
7
|
Sikkim
|
FP/SK/Others/41900/2019
|
SK-UDHD-70/2021/FC
|
Diversion of 2 ha of forest land for garbage Management plant,Ringding, North sikkim by UDHD, GoS
|
Others
|
UDD GOVT OF SIKKIM
|
2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Sep 2019
|
Stage-I Approval on
|
:
|
29 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2025
|
|
|
|
29 Jan 2025
|
8
|
Sikkim
|
FP/SK/ROAD/122332/2021
|
SK/ROAD-72/2021/FC
|
Diversion of 1.0428 ha of forest land for construction of RCR from Narkhola to Upper Narkhola & Lower Narkhola in West Sikkim
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
1.0428
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
31 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
29 Jan 2025
|
9
|
Sikkim
|
FP/SK/ROAD/138431/2021
|
IRO/KOL/SK/ROAD/138431/2021
|
Construction of Rural Connectivity Road from NSH via Tadong to Upper Phodong
|
Road
|
RURAL DEVELOPMENT DEPARTMENT, GOVT OF SIKKIM
|
0.376
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Apr 2021
|
Stage-I Approval on
|
:
|
01 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
29 Jan 2025
|
10
|
Madhya Pradesh
|
FP/MP/ROAD/153796/2022
|
6-MPR039/2023-BHO
|
Additional Land Required for 4 Laning of Harda to Betul Section of National Highway (NH-47)from Temagav Km 30+000 to Chicholi Km 81+000(Length- 51 km) under BHARATMALA Pariyojna Economic Corridor (Phase-I) in three districts of Harda, Hoshangabad and Betul in the state of Madhya Pradesh on EPC Mode
|
Road
|
PRASHANT PATHAK
|
11.399
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2022
|
Stage-I Approval on
|
:
|
05 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jun 2024
|
|
|
|
28 Jan 2025
|
11
|
Uttarakhand
|
FP/UK/ROAD/34286/2018
|
8B/UCP/06/31/2020/FC
|
Gangani To Bhangeli Motor Road.
|
Road
|
PMGSY ID UTTARKASHI
|
1.316
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2018
|
Stage-I Approval on
|
:
|
09 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2024
|
|
|
|
28 Jan 2025
|
12
|
Chhattisgarh
|
FP/CG/Pipeline/151253/2022
|
FC-I/IROCH-18/2022
|
B S Sponge Pvt Ltd Laying of Pipeline
|
Pipeline
|
B.S.SPONGE PVT. LTD.
|
0.144
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2022
|
Stage-I Approval on
|
:
|
22 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2024
|
|
|
|
27 Jan 2025
|
13
|
Madhya Pradesh
|
FP/MP/MIN/49537/2020
|
8-34/2021-FC
|
Bikram Coal Mine
|
Mining
|
COAL MINE BIRLA CORPORATION LIMITED
|
151.095
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2020
|
Stage-I Approval on
|
:
|
21 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2025
|
|
|
|
27 Jan 2025
|
14
|
Bihar
|
FP/BR/Others/48533/2020
|
FP/BR/OTHERS/48533/2020
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-60 Road in Purnea district of Bihar.
|
Others
|
PRADIP KUMAR SAH
|
0.01275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Aug 2020
|
Stage-I Approval on
|
:
|
20 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
26 Jan 2025
|
15
|
Madhya Pradesh
|
FP/MP/WATER/145554/2021
|
6-MPB062/2023-BHO
|
Rajghat Multi Village Scheme
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
3.885
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2021
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
24 Jan 2025
|
16
|
Madhya Pradesh
|
FP/MP/WATER/145554/2021
|
6-MPB062/2023-BHO
|
Rajghat Multi Village Scheme
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
3.885
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2021
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
24 Jan 2025
|
17
|
Maharashtra
|
FP/MH/Others/17764/2016
|
FC-I/MH-69/2017-NGP
|
Diversion of forest land for construction of disaster management works of sky walk, buy pass road, drainage line & sewage treatment plant at Saptashrungi Gad, Tal- Kalwan, Dist- Nashik.
|
Others
|
EXECUTIVE ENGINEER TRIBAL PUBLIC WORKS DIVISION KALWAN
|
0.8567
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2016
|
Stage-I Approval on
|
:
|
17 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2025
|
|
|
|
24 Jan 2025
|
18
|
Orissa
|
FP/OR/MIN/150133/2021
|
8-06/2023-FC
|
Subhadra OCP
|
Mining
|
Mahanadi Coalfields Limited
|
125.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2022
|
Stage-I Approval on
|
:
|
05 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
24 Jan 2025
|
19
|
Arunachal Pradesh
|
FP/AR/ROAD/116857/2020
|
3-AN-A-179/2023/GHY
|
Diversion of Forest Land for Construction of Nelya-Dhaula Road from Km 0.910 to Km 34.124 and link road to Bhawani post of Km 2.39 (Net length= Km 35.604) by Border Roads Organisation under Tawang District of Arunachal Pradesh
|
Road
|
BORDER ROADS ORGANISATION 763 TF
|
89.298
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2020
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
23 Jan 2025
|
20
|
Maharashtra
|
FP/MH/Others/123612/2021
|
FC-I/MH-386/2024-NGP
|
CONSTRUCTION OF APPROACH WATER BOUND MECADAM ROAD IS TO BE PASSING THROUGH THE RESERVED FOREST G.No.2731,AT-VILLAGE-KADUS (RANMALA) TAL-KHED DIST-PUNE.
|
Others
|
V.S.KARPE
|
0.068
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2021
|
Stage-I Approval on
|
:
|
17 May 2024
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
23 Jan 2025
|
21
|
Madhya Pradesh
|
FP/MP/ROAD/149613/2021
|
6-MPB055/2023-BHO
|
Diversion of 2.06 ha of forest land for construction of Begamganj sultanganj road under FCA 1980
|
Road
|
MPRDC BHOPAL DIVISION
|
2.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2022
|
Stage-I Approval on
|
:
|
18 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
22 Jan 2025
|
22
|
Orissa
|
FP/OR/MIN/11934/2015
|
8-14/2016-FC
|
Kaliapani Chromite Mines, Village:Kaliapani,Tehsil: Sukinda, Dist. Jajpur , Odisha.
|
Mining
|
BALASORE ALLOYS LTD
|
64.119
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jan 2016
|
Stage-I Approval on
|
:
|
18 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2025
|
|
|
|
22 Jan 2025
|
23
|
Uttarakhand
|
FP/UK/ROAD/18757/2016
|
8B/UCP/06/59/2017/FC
|
Fatgali-Damoli-Malujhal-Ukhalso motor road in District Bageshwar (CM Ghosna-804/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
4.103
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2016
|
Stage-I Approval on
|
:
|
27 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
22 Jan 2025
|
24
|
Uttarakhand
|
FP/UK/ROAD/41387/2019
|
8B/UCP/06/187/2019/FC
|
RAMA TO SYALUKA
|
Road
|
PMGSYID PUROLA
|
4.536
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2019
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
21 Jan 2025
|
25
|
Himachal Pradesh
|
FP/HP/Others/40164/2019
|
8B/HP/09/36/2020/FC
|
C/O AE office at Kelodhar in Tehsil Chachiot District Mandi.
|
Others
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
0.0576
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2019
|
Stage-I Approval on
|
:
|
14 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2024
|
|
|
|
17 Jan 2025
|
26
|
Maharashtra
|
FP/MH/TRANS/125061/2021
|
FC-II/MH-226/2023-NGP
|
220kv Padghe Wada for Abitghar S/S Transmission Line.
|
Transmission Line
|
MAHATRANSCO
|
12.7435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Mar 2021
|
Stage-I Approval on
|
:
|
11 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2024
|
|
|
|
17 Jan 2025
|
27
|
Maharashtra
|
FP/MH/TRANS/125061/2021
|
FC-II/MH-226/2023-NGP
|
220kv Padghe Wada for Abitghar S/S Transmission Line.
|
Transmission Line
|
MAHATRANSCO
|
12.7435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Mar 2021
|
Stage-I Approval on
|
:
|
11 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2024
|
|
|
|
17 Jan 2025
|
28
|
Maharashtra
|
FP/MH/RAIL/154664/2022
|
FC-I/MH-314/2023-NGP
|
Diversion of Forest Land for doubling of existing Broad-Gauge line from Nira- Lonand Section of Pune- Miraj BG Railway Line
|
Railway
|
DY. CHIEF ENGINEER (CON.), CR, PUNE
|
0.02
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2022
|
Stage-I Approval on
|
:
|
29 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Dec 2024
|
|
|
|
17 Jan 2025
|
29
|
Andhra Pradesh
|
FP/AP/OFC/36007/2018
|
4-APB221/2023-VIJ
|
Laying of Under ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
1.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2018
|
Stage-I Approval on
|
:
|
17 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2023
|
|
|
|
16 Jan 2025
|
30
|
Gujarat
|
FP/GJ/Others/34353/2018
|
6-GJB045/2019-BHO
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Banaskantha District
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
0.4117
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2018
|
Stage-I Approval on
|
:
|
06 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2023
|
|
|
|
16 Jan 2025
|
31
|
Maharashtra
|
FP/MH/Pipeline/155620/2022
|
FC-I/MH-391/2024-NGP
|
Rediversion of forest land for Uran Usar Pipeline Project
|
Pipeline
|
GAIL INDIA LTD
|
1.783
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 May 2022
|
Stage-I Approval on
|
:
|
05 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jan 2025
|
|
|
|
16 Jan 2025
|
32
|
Maharashtra
|
FP/MH/VELEC/157219/2022
|
FC-I/MH-388/2024-NGP
|
Diversion of forest land from G. no 191 at Solashi Tal. Koregaon G no 1010 at village Vele Tal Wai for laying of overhead 440 volt L.T Aerial Bunche cable ABC twisted electric line
|
Village Electricity
|
DY.EXECUTIVE ENGINEER M.S.E.D.C. LTD WATHER STATION DIT.SATARA..
|
0.64
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2022
|
Stage-I Approval on
|
:
|
11 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2024
|
|
|
|
16 Jan 2025
|
33
|
Jharkhand
|
FP/JH/SCH/27020/2017
|
FP/JH/SCH/27020/2017
|
Jwahar Navodaya Vidyalaya, Palamau-I
|
School
|
NAVODAYA VIDYALAYA SAMITI
|
9.71
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2017
|
Stage-I Approval on
|
:
|
24 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Nov 2024
|
|
|
|
15 Jan 2025
|
34
|
Uttarakhand
|
FP/UK/ROAD/39349/2019
|
8B/UCP/06/76/2020/FC
|
Diversion of forest land for widening and strengthening of existing road from Km 399.000 to Km 460.000 of NH-07 (Old NH-58) under Badrinath Forest Division in Chamoli District of Uttarakhand.
|
Road
|
MORTH (NHIDCL)
|
40.8916
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Mar 2019
|
Stage-I Approval on
|
:
|
29 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2024
|
|
|
|
15 Jan 2025
|
35
|
Uttarakhand
|
FP/UK/ROAD/45667/2020
|
8B/UCP/06/101/2020/FC
|
Kalimati Chittor Ghaishen to Upper talai
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.5225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jun 2020
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2024
|
|
|
|
15 Jan 2025
|
36
|
Orissa
|
FP/OR/ROAD/52400/2020
|
5-ORB479/2021-BHU
|
Diversion of 2.62 Hectre forest land for Construction of 4 lane carriage way with service road of Belpahar bypass from Km 0/0 to Km 2/971 for the year 2019-20 Under MCL fund
|
Road
|
EXECUTIVE ENGINEER ROAD AND BUILDING DIVSION JHARSUGDA
|
2.622
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2020
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
14 Jan 2025
|
37
|
Orissa
|
FP/OR/TRANS/119219/2021
|
5-ORC473/2021-BHU
|
33 K.V power line corridor on N.B.L.S tower from 220/33kV grid sub-station at Khairiput, Govindpalli of OPTCL to 33kV sub-station site near Saptadhara H.E.P of Avantika Power Projects
|
Transmission Line
|
SRI AVANTIKA POWER PROJECTS LIMITED
|
10.803
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2021
|
Stage-I Approval on
|
:
|
03 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2024
|
|
|
|
14 Jan 2025
|
38
|
Orissa
|
FP/OR/ROAD/150863/2022
|
5-ORC543/2022-BHU
|
Improvement of Road from Kharabhuin PWD road chhak to Khandahata P.S.road via-Sankulei, Ghantabania, Panasaputuli road for the year 2018-19
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DIVISION BOUDH
|
6.098
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
Stage-I Approval on
|
:
|
18 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Dec 2024
|
|
|
|
14 Jan 2025
|
39
|
Sikkim
|
FP/SK/ROAD/36928/2018
|
SK/ROAD-82/2021/FC
|
Diversion of 141.124 ha. forest land for non forest use in Toong Partem Pt. 4865 Tamze Border Road Forest Proposal
|
Road
|
ITBP GANGTOK
|
141.124
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2018
|
Stage-I Approval on
|
:
|
06 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2024
|
|
|
|
14 Jan 2025
|
40
|
Chhattisgarh
|
FP/CG/ROAD/35248/2018
|
FC-II/IROCH-11/2022
|
Panduka Mudagaon Road
|
Road
|
PROJECT DIRECTOR CSRSP PWD RAIPUR
|
24.569
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2018
|
Stage-I Approval on
|
:
|
12 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
13 Jan 2025
|
41
|
Chhattisgarh
|
FP/CG/SCH/153246/2022
|
FC-II/IROCH-13/2022
|
TRIBAL DEVELOPMENT KANKER, Establishment of Eklavya Modern Residential School, At Village Anjani, Tehsil-Kanker, District- North Bastar, Kanker (C.G.)
|
School
|
TRIBAL DEVELOPMENT KANKER
|
6.66
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Mar 2022
|
Stage-I Approval on
|
:
|
03 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
13 Jan 2025
|
42
|
Jharkhand
|
FP/JH/SubStation/36590/2018
|
FP/JH/SubStation/36590/2018
|
Forest proposal for the land provided by state government for construction of 132/33 KV G/S/S at Barhi, Village- Khodahar, under transmission circle, Hazaribag
|
Sub Station
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
4.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2018
|
Stage-I Approval on
|
:
|
14 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2024
|
|
|
|
13 Jan 2025
|
43
|
Orissa
|
FP/OR/RAIL/45694/2020
|
5-ORA528/2022-BHU
|
Khurda Road - Bolangir New BG Rail Link Project i.e. from Km112-180
|
Railway
|
EAST COAST RAILWAY
|
594.618
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jun 2020
|
Stage-I Approval on
|
:
|
13 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2024
|
|
|
|
13 Jan 2025
|
44
|
Rajasthan
|
FP/RJ/ROAD/46675/2020
|
8B/RAJ/06/36/2020
|
Construction of Approach Road for Proposed Bio-Diesel Plant, on NH-62(Old-NH-15) Chainage No 209+621 to 209 +671(RHS)AT Chak 7 BLW,SQ No-55,Killa No 21-25 At Village- Kenchiya,Tehsil-Pilibanga , Dist
|
Road
|
M/S JUGGLER HAWK INDUSTRIES PVT. LTD.
|
0.2239
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jul 2020
|
Stage-I Approval on
|
:
|
05 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
13 Jan 2025
|
45
|
Sikkim
|
FP/SK/ROAD/49640/2020
|
Sk-NHIDCL-10/2021/FC
|
Diversion of 119.92 ha of forest land for const of road from Roleph to Menla under East Sikkim by NHIDCL
|
Road
|
NHIDCL RHENOK
|
119.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Sep 2020
|
Stage-I Approval on
|
:
|
20 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2022
|
|
|
|
13 Jan 2025
|
46
|
Uttarakhand
|
FP/UK/ROAD/29432/2017
|
8B/UCP/06/105/2017
|
Bayana to Syaba motor road
|
Road
|
PMGSY ID UTTARKASHI
|
3.318
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Sep 2017
|
Stage-I Approval on
|
:
|
26 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2024
|
|
|
|
13 Jan 2025
|
47
|
Madhya Pradesh
|
FP/MP/ROAD/149386/2021
|
6-MPR036/2023-BHO
|
Diversion of 6.93 ha of forest land under FCA 1980 for Construction of Garhi Ahmedpur Road
|
Road
|
MPRDC BHOPAL DIVISION
|
6.93
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2022
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
12 Jan 2025
|
48
|
Madhya Pradesh
|
FP/MP/WATER/151775/2022
|
6-MPB048/2023-BHO
|
Gond Deosar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.8959
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2022
|
Stage-I Approval on
|
:
|
23 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
10 Jan 2025
|
49
|
Tamil Nadu
|
FP/TN/TRANS/150320/2021
|
4-TNB100/2023-CHN
|
Erection of 230KV DC line on MC towers by making LILO of existing Ottiyambakkam to Omega feeder - II at the proposed Mambakkam 230/110KV Substation
|
Transmission Line
|
TAMIL NADU TRANSMISSION CORPORATION LIMITED
|
4.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2024
|
|
|
|
10 Jan 2025
|
50
|
Uttarakhand
|
FP/UK/ROAD/45839/2020
|
8B/UCP/06/97/2020/FC
|
Thano Bhogpur Motor road KM 3 to 240 mitre PSC Motor Bridge
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.986
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2020
|
Stage-I Approval on
|
:
|
28 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2024
|
|
|
|
09 Jan 2025
|
|