| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Jammu and Kashmir
|
FP/JK/ROAD/47036/2020
|
FSt/Land/parivesh/07/2021
|
Construction of road from Cheerpora to Pakhtoon Pora (Gujarbasti)
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
0.57
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2020
|
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2026
|
|
|
|
04 Jun 2026
|
|
2
|
Maharashtra
|
FP/MH/ROAD/13978/2015
|
FC-II/MH-73/2017-NGP
|
Rehabilitation and upgradation of existing Buttibori-Wardha section of NH-361, km28.800-km80.000 to 4 lane configuration, in the state of Maharastra
|
Road
|
National Highways Authority of India
|
19.532
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jul 2015
|
|
Stage-I Approval on
|
:
|
06 Nov 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Mar 2026
|
|
|
|
04 Jun 2026
|
|
3
|
Uttarakhand
|
FP/UK/ROAD/8895/2014
|
8B/UCP/06/267/2015/FC
|
Construction of Mavadhar to Chamk Motor road under Distt Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.91
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Dec 2014
|
|
Stage-I Approval on
|
:
|
26 Jul 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
04 Jun 2026
|
|
4
|
Uttarakhand
|
FP/UK/ROAD/15092/2015
|
8B/UCP/06/68/2020/FC
|
Exaction fo Basera band to Kuna dhanyari
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.63
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Sep 2015
|
|
Stage-I Approval on
|
:
|
17 Feb 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Apr 2026
|
|
|
|
04 Jun 2026
|
|
5
|
Uttarakhand
|
FP/UK/ROAD/19182/2016
|
8B/UCP/06/78/2017/FC
|
Diwarikhol to Jokhni motar road
|
Road
|
EXECUTIVE ENGINEER
|
1.75
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2016
|
|
Stage-I Approval on
|
:
|
16 Apr 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2026
|
|
|
|
04 Jun 2026
|
|
6
|
Jammu and Kashmir
|
FP/JK/ROAD/45378/2020
|
9-JKC-032/2021-Jammu
|
Nallah Gouran to Murrara devi
|
Road
|
EE PMGSY UDH
|
8.525
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2020
|
|
Stage-I Approval on
|
:
|
14 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2026
|
|
|
|
01 Jun 2026
|
|
7
|
Jammu and Kashmir
|
FP/JK/ROAD/45647/2020
|
9-JKC-037/2021-Jammu
|
Construction of Road from Langa to Charkhoo
|
Road
|
EE PMGSY UDH
|
8.233125
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2020
|
|
Stage-I Approval on
|
:
|
09 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2026
|
|
|
|
01 Jun 2026
|
|
8
|
Jammu and Kashmir
|
FP/JK/ROAD/45843/2020
|
9-JKB021/2021-JAMMU
|
Upgradation and Maintenace of Road from L025 Larnoo Branar, Stage-U, Jk01-324,
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.8
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2020
|
|
Stage-I Approval on
|
:
|
07 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2026
|
|
|
|
01 Jun 2026
|
|
9
|
Jammu and Kashmir
|
FP/JK/ROAD/47152/2020
|
FST/Land/Parivesh/14/2020
|
Diversion of 0.153 ha. area for the construction of 160 meter double lane motorable bridge over Nallah Jhajjar on Pantal Jhajjar Road
|
Road
|
CHIEF ENGINEER PW (R&B) DEPARTMENT JAMMU
|
0.651
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2020
|
|
Stage-I Approval on
|
:
|
10 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2025
|
|
|
|
01 Jun 2026
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/155324/2022
|
8B/UCP/06/22/2023/FC
|
Construction of Diuli Gijrada Motor Road under State Sector in Vidhansabha Narengra Nagar of District Tehri Garhwal
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.255
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2022
|
|
Stage-I Approval on
|
:
|
16 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jun 2024
|
|
|
|
01 Jun 2026
|
|
11
|
Haryana
|
FP/HR/Approach/147272/2021
|
9-HRB001-2022-CHA
|
Shri Nath Ji Educational Society
|
Approach Access
|
SHRI NATH JI EDUCATIONAL SOCIETY
|
0.0162
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Sep 2021
|
|
Stage-I Approval on
|
:
|
06 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Aug 2024
|
|
|
|
27 May 2026
|
|
12
|
Orissa
|
FP/OR/MIN/50293/2020
|
8-07/2024-FC
|
KULDA EXPANSION OCP
|
Mining
|
KULDA EXPANSION OCP, BASUNDHARA AREA, MCL
|
134.69
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2021
|
|
Stage-I Approval on
|
:
|
10 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2026
|
|
|
|
27 May 2026
|
|
13
|
Uttarakhand
|
FP/UK/ROAD/19158/2016
|
8B/UCP/06/81/2020/FC
|
2 Lane Widening of NH 123 (507) Km 75 to 101 Motor Road in Distt. Uttrakashi
|
Road
|
NATIONAL HIGHWAY AUTHORTY OF INDIA PIU DEHRADUN
|
31.86
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Apr 2016
|
|
Stage-I Approval on
|
:
|
17 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2026
|
|
|
|
27 May 2026
|
|
14
|
Uttarakhand
|
FP/UK/ROAD/155241/2022
|
8B/UCP/06/56/2023/FC
|
Construction of Banwaldhar Jarmwar to Bainji Kandai Motor Road in district Rudraprayag
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.35
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 May 2022
|
|
Stage-I Approval on
|
:
|
04 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Apr 2025
|
|
|
|
27 May 2026
|
|
15
|
Orissa
|
FP/OR/TRANS/150350/2021
|
5-ORC546/2023-BHU
|
Construction of 132 KV D/C Transmission line from existing 132/33 KV D/C Grid Sub-Station at Brajarajnagar to proposed 132/33 KV Grid Sub-station at village Kudaloi in Lakhanpur Tahsil of Jharsuguda D
|
Transmission Line
|
OPTCL
|
13.465
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2021
|
|
Stage-I Approval on
|
:
|
03 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2026
|
|
|
|
25 May 2026
|
|
16
|
Uttarakhand
|
FP/UK/ROAD/8091/2014
|
8B/UCP/06/30/2015
|
Didihat to Pamsyari Motor Road
|
Road
|
P.M.G.S.Y Didihat
|
5.857
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jan 2015
|
|
Stage-I Approval on
|
:
|
08 Mar 2016
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2026
|
|
|
|
25 May 2026
|
|
17
|
Uttarakhand
|
FP/UK/ROAD/10925/2015
|
8B/UCP/06/229/2015/FC
|
sonala kandara to kanchula gain M/R
|
Road
|
PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND
|
4
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2015
|
|
Stage-I Approval on
|
:
|
12 Oct 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2025
|
|
|
|
25 May 2026
|
|
18
|
Uttarakhand
|
FP/UK/ROAD/20210/2016
|
8B/UCP/06/01/2017/FC
|
Construction of Paul Gaon Motor Road from N.H. 123
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.28
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2016
|
|
Stage-I Approval on
|
:
|
16 Jan 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2025
|
|
|
|
25 May 2026
|
|
19
|
Himachal Pradesh
|
FP/HP/Others/38375/2019
|
FC/HPB/09/68/2021
|
Govt. Degree College Chopal
|
Others
|
HIMACHAL PRADESH DEPARTMENT OF EDUCATION
|
0.9498
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2019
|
|
Stage-I Approval on
|
:
|
28 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Apr 2026
|
|
|
|
23 May 2026
|
|
20
|
Karnataka
|
FP/KA/RAIL/142190/2021
|
F.No.4-KRC 1497/2024-BAN
|
Construction of the Rail Depot under Bengaluru Sub-urban Rail project (BSRP) in Sy No. 124 Akkupete Village of Kasaba Hobli Devanahalli Taluk, Bangaloe Rural District.
|
Railway
|
KRIDE (RAIL INFRASTRUCTURE DEVELOPMENT COMPANY (KARNATAKA) LTD.
|
18.6
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 May 2021
|
|
Stage-I Approval on
|
:
|
28 Oct 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 May 2026
|
|
|
|
23 May 2026
|
|
21
|
Himachal Pradesh
|
FP/HP/Others/153006/2022
|
FC/HPB/14/2023
|
Construction Solid Waste Management Plant at Kasol G.P.Kasol
|
Others
|
RURAL DEVELOPMENT DEPARTMENT & PANCHAYATI RAJ DEPARTMENT
|
0.1982
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2022
|
|
Stage-I Approval on
|
:
|
22 Nov 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Feb 2026
|
|
|
|
22 May 2026
|
|
22
|
Jammu and Kashmir
|
FP/JK/HYD/45204/2020
|
FST/Land/Parivesh/23/2021
|
KISHANGANGA HE PROJECT
|
Hydel
|
KISHANGANGA POWER STATION
|
0.9574
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2020
|
|
Stage-I Approval on
|
:
|
31 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
22 May 2026
|
|
23
|
Jammu and Kashmir
|
FP/JK/ROAD/45448/2020
|
9-JKB016/2021-JAMMU
|
Upgradation of Road T01 Supply Morh to Kainthgali
|
Road
|
EE PMGSY UDH
|
2.2585
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 May 2020
|
|
Stage-I Approval on
|
:
|
03 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2026
|
|
|
|
22 May 2026
|
|
24
|
Jammu and Kashmir
|
FP/JK/ROAD/48778/2020
|
9-JKC-051/2021-Jammu
|
Construction of Road From Ganjote to Phallni-II Package No JK 14-572
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
14.31
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Aug 2020
|
|
Stage-I Approval on
|
:
|
13 Aug 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2026
|
|
|
|
22 May 2026
|
|
25
|
Jammu and Kashmir
|
FP/JK/ROAD/143979/2021
|
FST-Land/0FC/18/2022-02
|
Constt. of T/Road Gair Bus Stand to Kali Dabbar
|
Road
|
BDOCHANUNTA
|
0.11
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2021
|
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2026
|
|
|
|
22 May 2026
|
|
26
|
Uttarakhand
|
FP/UK/ROAD/11811/2015
|
8B/UCP/06/08/2016/FC
|
construction of Road from Km 8 ( Matakhali ) of Arkani-Khandukhal-Muchhyali Motor Road to Village utrasu Devalgaon via Kolta Muchhyali in District Pauri Garhwal.
|
Road
|
PUBLIC WORK DEPARTMENT
|
4.435
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2015
|
|
Stage-I Approval on
|
:
|
16 Apr 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2026
|
|
|
|
22 May 2026
|
|
27
|
Goa
|
FP/GA/TRANS/146162/2021
|
F.No.4-GOB1380/2022-BAN
|
Netravali UG Cabling
|
Transmission Line
|
GOA ELECTRICITY DEPARTMENT
|
0.85632
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
10 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2026
|
|
|
|
14 May 2026
|
|
28
|
Karnataka
|
FP/KA/ROAD/29278/2017
|
F.No.4-KRB1161/2018-BAN
|
For formation of approach road connecting existing road to our crusher in Chitradurga District in favour of Veeresh, Partner, M/s SHIVAPARAM CONSTRUCTIONS STONE CRUSHER, T. Yammiganuru Grama, Holalkere Taluk, Chitradurga District.
|
Road
|
SHIVAPARAM CONSTRACTION
|
0.692
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2017
|
|
Stage-I Approval on
|
:
|
18 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jan 2026
|
|
|
|
14 May 2026
|
|
29
|
Meghalaya
|
FP/ML/MIN/40422/2019
|
3-MGC017/2022-SHI
|
Madan Pyrda Chiehruphi Block -2 Limestone Mines
|
Mining
|
GREEN VALLIEY INDUTRIES LIMITED
|
11.09
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2019
|
|
Stage-I Approval on
|
:
|
01 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jun 2025
|
|
|
|
14 May 2026
|
|
30
|
Karnataka
|
FP/KA/IND/26447/2017
|
F.No.4-KRB 1346/2022-BAN
|
BALDOTA STEEL AND POWER LIMITED
|
Industry
|
AARESS IRON AND STEEL LIMITED
|
1.745
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2017
|
|
Stage-I Approval on
|
:
|
21 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2025
|
|
|
|
13 May 2026
|
|
31
|
Telangana
|
FP/TG/IRRIG/14273/2015
|
4-TSB111/2017-CHN
|
Construction and Commissioning of Nelikal L.I Scheme on Nagarjuna Sagar Reservoir - 3.1346 Ha
|
Irrigation
|
TELANGANA STATE IRRIGATION DEVELOPMENT CORPORATION
|
3.1346
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2015
|
|
Stage-I Approval on
|
:
|
09 Apr 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Nov 2025
|
|
|
|
12 May 2026
|
|
32
|
Uttarakhand
|
FP/UK/ROAD/15295/2015
|
8B/UCP/06/58/2017/FC
|
Soliya-Bajani-Majuliya motor road in District-Bageshwar (CM Ghosna-803/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.148
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2015
|
|
Stage-I Approval on
|
:
|
05 Aug 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2025
|
|
|
|
11 May 2026
|
|
33
|
Uttar Pradesh
|
FP/UP/ROAD/23560/2017
|
8B/UP/06/203/2023
|
Forest Land Proposed to be Diverted for Construction of Bridge and Approach over Kuano River on Border of District Balrampur & Shiddarthnagar at Chorghata Ghat from Ramghosi(Utraula-Sadullanagar) badhani Chafa Road
|
Road
|
CDPWDBALRAMPUR
|
0.552
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2017
|
|
Stage-I Approval on
|
:
|
27 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2026
|
|
|
|
08 May 2026
|
|
34
|
Arunachal Pradesh
|
FP/AR/ROAD/153722/2022
|
3 ANC/268/2024/GHY
|
Proposal for diversion of 27.19 ha of forest land for construction of Tamen to Dollungmukh Road (Phase 1) 42.03 km to 72.03 km
|
Road
|
BAMANG RAJU
|
27.19
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
|
Stage-I Approval on
|
:
|
12 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Apr 2026
|
|
|
|
06 May 2026
|
|
35
|
Assam
|
FP/AS/TRANS/119559/2021
|
3-AS-C-096/2022/GHY
|
Diversion of Forest Land for 11 nos. of Tower Location (123 to 136A) against “Diversion work of 132KV S/C Haflong-Jiribam transmission line of POWERGRID in the section between tower location no. 104 to location no. 164 for facilitating the construction of NH-54 (E) under Borail Wildlife Sanctuary under Cachar Dist. of Assam State
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
9.23
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jan 2021
|
|
Stage-I Approval on
|
:
|
09 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2025
|
|
|
|
06 May 2026
|
|
36
|
Assam
|
FP/AS/MIN/146691/2021
|
3-AS-B-103/2022/GHY
|
Forest diversion proposal to drill 06 Development wells from DPDU cluster of area 2.75 ha in Kasomarigaon Addl PML
|
Mining
|
JORHAT ASSET ONGC
|
2.75
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2021
|
|
Stage-I Approval on
|
:
|
16 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Feb 2026
|
|
|
|
06 May 2026
|
|
37
|
Chhattisgarh
|
FP/CG/Others/152258/2022
|
FC-I/IROCH-15/2022
|
New District Court Buillding
|
Others
|
PWD B AND R DIVISION SURAJPUR
|
1.82
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2022
|
|
Stage-I Approval on
|
:
|
12 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2026
|
|
|
|
06 May 2026
|
|
38
|
Maharashtra
|
FP/MH/Pipeline/155612/2022
|
FC-I/MH-392/2024-NGP
|
Diversion of forest land for Uran Usar Pipeline Project
|
Pipeline
|
GAIL INDIA LTD
|
3.9443
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 May 2022
|
|
Stage-I Approval on
|
:
|
16 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Feb 2026
|
|
|
|
06 May 2026
|
|
39
|
Madhya Pradesh
|
FP/MP/IRRIG/139995/2021
|
6-MPA016/2021-BHO
|
ISP KALISINDH PHASE-II MICRO LIFT IRRIGATION PROJECT SCHEME (PIPELINE)
|
Irrigation
|
EE ND DIVISION NO TWENTY MANDLESHWAR
|
147.09
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Apr 2021
|
|
Stage-I Approval on
|
:
|
07 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jul 2022
|
|
|
|
05 May 2026
|
|
40
|
Haryana
|
FP/HR/Approach/43044/2019
|
9183
|
Diversion For access to the petrol pump of HPCL on KAITHAL-KURUKSHETRA ROAD(MDR-119), At TEEK, Distt. KAITHAL, HARYANA, bearing khasra no.-66//1/2,66//2.
|
Approach Access
|
HINDUSTAN PETROLEUM COORPERATION LIMITED
|
0.0152
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2019
|
|
Stage-I Approval on
|
:
|
21 Feb 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2026
|
|
|
|
01 May 2026
|
|
41
|
Himachal Pradesh
|
FP/HP/ROAD/51576/2020
|
FC/HPB/85/2023
|
C/O Link road from Garbage Collection Centre Totu Bye pass road to Village Matholi KM 0/0 to 1/00.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.4635
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Oct 2020
|
|
Stage-I Approval on
|
:
|
19 Jan 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2026
|
|
|
|
30 Apr 2026
|
|
42
|
Himachal Pradesh
|
FP/HP/ROAD/70377/2020
|
FC/HPB/06/50/2021
|
Construction of Link Road from Kanol to Morch Road Km 0/0 to 9/140.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
4.5259
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2020
|
|
Stage-I Approval on
|
:
|
19 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
28 Feb 2026
|
|
|
|
30 Apr 2026
|
|
43
|
Ladakh
|
FP/LA/ROAD/152696/2022
|
o 9-JKA-001/2024-Jammu
|
Construction of Re-Alignment Of Various Stretches Between Pandrass - Pashkyum (Net Length – 31.00 Kms) on Road Zozila – Kargil – Leh (NH-1) To NHDL Specifications Through EPC Mode Under Project Vijay
|
Road
|
HQ 762 BRTF C/O 56 APO
|
0.3625
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2022
|
|
Stage-I Approval on
|
:
|
04 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Apr 2026
|
|
|
|
30 Apr 2026
|
|
44
|
Bihar
|
FP/BR/Others/32677/2018
|
FP/BR/Others/32677/2018
|
The proposal for establishment of retail out-let dealership of M/S HPCL
|
Others
|
SIDHARTH SINGH
|
0.006
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2018
|
|
Stage-I Approval on
|
:
|
05 Mar 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Feb 2026
|
|
|
|
29 Apr 2026
|
|
45
|
Bihar
|
FP/BR/Approach/156110/2022
|
FP/BR/Approach/156110/2022
|
Diversion of 0.03975 ha of forest land for construction of approach road for opening retail outlet of HPCL on NH-19 Chhapra-Majhi Road in Saran district of Bihar.
|
Approach Access
|
RANA SINGH
|
0.03975
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2022
|
|
Stage-I Approval on
|
:
|
13 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
29 Apr 2026
|
|
46
|
Jammu and Kashmir
|
FP/JK/ROAD/142163/2021
|
FST-Land0FC/91/2021-02
|
BRO PROJECT SAMPARK 31TF 110 RCC CONSTRUCTION OF MALAI BRIDGE(KM 55.05),KHURD(KM 53.45) BRIDGE ON RAM(REASI ARNAS MAHORE) ROAD
|
Road
|
BRO, 110 RCC
|
0.362
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2021
|
|
Stage-I Approval on
|
:
|
06 Oct 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2026
|
|
|
|
29 Apr 2026
|
|
47
|
Uttar Pradesh
|
FP/UP/ROAD/147420/2021
|
8B/UP/06/38/2022/FC
|
Proposed Protected Forest Land to be diverted for development of Road Widening four lan along old road Carriage Way from km 0.800 to 5.100 0f Bareilly Cantt Road in District - Bareilly (U.P.)
|
Road
|
CONSTRUCTION DIVISION BUILDING PWD BAREILLY
|
7.055
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Sep 2021
|
|
Stage-I Approval on
|
:
|
07 Nov 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2026
|
|
|
|
29 Apr 2026
|
|
48
|
Himachal Pradesh
|
FP/HP/ROAD/143552/2021
|
FC/HPC/65/2023
|
C/O link road from Drawl to Jaishi Km 0/0 to 7/965
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.4794
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2021
|
|
Stage-I Approval on
|
:
|
07 Aug 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Apr 2026
|
|
|
|
23 Apr 2026
|
|
49
|
Uttarakhand
|
FP/UK/ROAD/39655/2019
|
8B/UCP/06/86/2020/FC
|
Construction of approach road from Nawali from Km. 11 of Laxmikhan-Nathuwakhan-Pura-Qurab motor road to Losgayani in Ramgarh Block of District Nainital
|
Road
|
EE CD NAINITAL
|
0.936
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2019
|
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2026
|
|
|
|
23 Apr 2026
|
|
50
|
Uttar Pradesh
|
FP/UP/ROAD/144793/2021
|
8B/UP/06/295/2021/FC
|
Construction of 6 Lane 'Ganga Expressway' (Expandable upto 8 Lane), an access controlled Green field Expressway in district Meerut, Hapur, Bulandsahar, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raibareli, Partapgarh & Paryagraj, (CH 7+900-CH 601+847 Km) total length 593.947 Kms.
|
Road
|
UPEIDA (GANGA EXPRESSWAY)
|
121.4716
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Oct 2021
|
|
Stage-I Approval on
|
:
|
16 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Apr 2026
|
|
|
|
22 Apr 2026
|
|