Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Himachal Pradesh FP/HP/SCH/19350/2016 FC/HPB/09/49/2021 Kendriya Vidyalaya, Ghumarwin School DEPUTY DIRECTOR 2.26 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Dec 2016
Stage-I Approval on : 31 Jul 2024
Compliance Report Submitted by User Agency on : 17 Sep 2025
13 Oct 2025
2 Uttar Pradesh FP/UP/Others/13881/2015 8B/UP/06/34/2018 Retail Outlet Others Essar Oil Limited 0.0768 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jul 2015
Stage-I Approval on : 16 Oct 2024
Compliance Report Submitted by User Agency on : 25 Aug 2025
13 Oct 2025
3 Daman and Diu FP/DD/ROAD/143323/2021 FC-6/DDB-73/2023-GNR Construction of Protection wall with Jampore Ghat for Extension of Jampore Sea front upto Varliwad School at Jampore, Moti Daman on forest land in Daman District. Road EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT WD I DAMAN 1.592 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Jun 2021
Stage-I Approval on : 03 Jan 2024
Compliance Report Submitted by User Agency on : 04 Mar 2025
09 Oct 2025
4 Jammu and Kashmir FP/JK/TRANS/155098/2022 9-JKB-026/2023-Jammu Stabilization of existing 220 KV Single Circuit Gladni Udhampur Transmission Line alongwith realignment on double circuit towers from location no. 158 upto Grid Station Udhampur laying foundations and Transmission Line JKPTCL(PDD), JAMMU AND KASHMIR 1.45 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Dec 2022
Stage-I Approval on : 24 Aug 2023
Compliance Report Submitted by User Agency on : 26 Jun 2025
07 Oct 2025
5 Chhattisgarh FP/CG/ROAD/126719/2021 FC-II/IROCH-19/2023 Rehabilitation & Upgrading to 2/4 laning with paved shoulder Under corridor Scheme on EPC Basis of Keonchi to Ratanpur Section on NH-45(Ex.) in the State of Chhattisgarh. Road CHIEF ENGINEER PWD NH RAIPUR CG 28.811 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Mar 2021
Stage-I Approval on : 24 Mar 2023
Compliance Report Submitted by User Agency on : 25 Aug 2025
06 Oct 2025
6 Chhattisgarh FP/CG/ROAD/147299/2021 FC-III/IROCH-06/2023 Widening of Existing Road from Ambikapur toRamanujganj 2-Lane/4-Lane Road NH No. 343 Road EXECUTIVE ENGINEER PWD NH DIVISION AMBIKAPUR 102.324 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Sep 2021
Stage-I Approval on : 09 Dec 2024
Compliance Report Submitted by User Agency on : 21 Aug 2025
06 Oct 2025
7 Haryana FP/HR/SCH/41500/2019 9-HRC093/2020-CHA MANAV RACHNA INTERNATIONAL INSTITUTE OF RESEARCH AND STUDIES School MANAV RACHNA INTERNATIONAL INSTITUTE OF RESEARCH AND STUDIES 13.684 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Sep 2019
Stage-I Approval on : 29 Dec 2023
Compliance Report Submitted by User Agency on : 30 Aug 2025
06 Oct 2025
8 Maharashtra FP/MH/ROAD/115156/2020 FC-I/MH-269/2022-NGP Improvement to Kerli - Kotoli - Nandgaon - Nandari Road SH-191 (Km 00/00 to Km 29/500) Part of Kerli Phata to Nandari Dist Kolhapur. Road SPECIAL PROJECT (P.W.) DIVISION, KOLHAPUR 2.15 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jan 2021
Stage-I Approval on : 24 May 2022
Compliance Report Submitted by User Agency on : 28 Jul 2025
06 Oct 2025
9 Orissa FP/OR/MIN/153549/2022 8-14/2023-FC Proposal for diversion of 66.242 ha. including safety zone of 2.09 ha. of forest land in respect of Netrabandha Pahar west iron ore block in favour of Ms. Raga Tradecon Pvt ltd under bonai forest divi Mining RAGA TRADECON PRIVATE LIMITED 66.242 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Mar 2022
Stage-I Approval on : 21 Dec 2023
Compliance Report Submitted by User Agency on : 18 Aug 2025
05 Oct 2025
10 Karnataka FP/KA/Others/31165/2018 8-17/1994-FC Vol. SMIORE Downhill Conveyor System (DCS) from Kammathuru Iron Ore Mine to PMBR (BMM) Siding towards Mining Related Infrastructure development under Comprehensive Environment Plan for Mining Impact Zone (CEPMIZ) in Mining Lease No. 2678 (Old 2580/1179). Others THE SANDUR MANGANESE AND IRON ORES LIMITED 2.4313888 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jan 2018
Stage-I Approval on : 15 Oct 2019
Compliance Report Submitted by User Agency on : 16 Jun 2025
03 Oct 2025
11 Orissa FP/OR/MIN/16453/2015 5-ORC288/2016-BHU Kalarangiatta Chromite Mines of M/s Ferro Alloys Corporation Ltd Mining FERRO ALLOYS CORPORATION LTD 23.8 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Nov 2015
Stage-I Approval on : 21 Mar 2025
Compliance Report Submitted by User Agency on : 09 Sep 2025
03 Oct 2025
12 Rajasthan FP/RJ/WATER/154215/2022 8B/RAJ/028/2023-JPR Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi (Rajasthan) Drinking Water PUBLIC HEALTH ENGINEERING DEPARMENT RAJASTHAN 4.9975 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jul 2022
Stage-I Approval on : 10 Aug 2023
Compliance Report Submitted by User Agency on : 06 Aug 2025
03 Oct 2025
13 Bihar FP/BR/Approach/156522/2022 FP/BR/Approach/156522/2022 Diversion of 0.020625 ha of forest land for construction of approach road for opening retail outlet of IOCL on Bachhota-Alauli M.D.R. Road in Khagaria district of Bihar. Approach Access KHUSHI KUMARI 0.02063 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jun 2022
Stage-I Approval on : 06 Mar 2023
Compliance Report Submitted by User Agency on : 08 Sep 2025
30 Sep 2025
14 Maharashtra FP/MH/ROAD/31292/2018 FC-I-MH-86-2018-NGP NH-66 Kalmath to Zarap section Road NH DIVISION 2.8715 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jan 2018
Stage-I Approval on : 27 Feb 2018
Compliance Report Submitted by User Agency on : 31 Jul 2025
30 Sep 2025
15 Tamil Nadu FP/TN/IRRIG/118339/2021 4-TNB097/2022-CHN Construction of Fuse Plug pertaining to Thandarampattu Taluk of Tiruvannamalai District Irrigation AEE PWD SATHANUR DAM 0.9 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jan 2021
Stage-I Approval on : 03 Oct 2023
Compliance Report Submitted by User Agency on : 16 Apr 2025
30 Sep 2025
16 Uttar Pradesh FP/UP/Others/47337/2020 8B/UP/06/90/2022/FC Protected Forest Land Proposed to be Diverted for Exit/Entry Approach to Bharat Petroleum Corporation LTD. Retail Outlet on Sambhal-Bahjoi Road (SH-51) Km Stone No 79 (L.H.S) Khasra No-325, Village-Panwasa, Tehsil-Sambhal, District-Sambhal Others BHARAT PETROLEUM CORPORATION LIMITED MEERUT 0.1041 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Dec 2020
Stage-I Approval on : 29 Aug 2024
Compliance Report Submitted by User Agency on : 18 Sep 2025
27 Sep 2025
17 Tamil Nadu FP/TN/IRRIG/51078/2020 4-TNB119/2024-CHN Reconstruction of dilapidated Head Sluice,Bed Dam, Retaining wall and Culvert in Malattar Channel in Villupuram District Irrigation EE, WRD., VILUPPURAM 0.186 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Oct 2020
Stage-I Approval on : 13 Mar 2024
Compliance Report Submitted by User Agency on : 10 Jul 2025
26 Sep 2025
18 Assam FP/AS/TRANS/142618/2021 3-AS-C-093/2022/GHY DIVERSION PROPOSAL OF PROPOSED 18.028 HA AREA OF FOREST LAND FOR CONSTRUCTION AND COMMISSIONING OF 132 KV TRANSMISSION LINE FROM AGIA GSS TO GOALPARA TSS AT RAKHAYASHINI PRF UNDER GOALPARA FOREST DIVISION Transmission Line O/O THE CHIEF PROJECT DIRECTOR, CENTRAL ORGANIZATION FOR RAILWAY ELECTRIFICATION, GUWAHATI 18.028 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 May 2021
Stage-I Approval on : 01 Sep 2022
Compliance Report Submitted by User Agency on : 07 Jun 2024
25 Sep 2025
19 Haryana FP/HR/ROAD/44420/2020 9558 Diversion of 0.16 Ha of forest land for non- forest purpose for the project “Construction of 6 Lane access controlled Highway from DND Maharani Bagh to Junction near KMP Expressway with NH-148N Delhi-Vadodara Expressway Section of NH-148NA Road CMU, MATHURA, NHAI 0.16 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Feb 2020
Stage-I Approval on : 15 Dec 2020
Compliance Report Submitted by User Agency on : 15 Jan 2025
24 Sep 2025
20 Telangana FP/TG/ROAD/32933/2018 4-TSC160/2019-CHN Diversion of Forest land in Bhupalpally Division for Widening from Single lane to Double lane road of Khammampally to Bhupalpally road from km 12/2 to 19/6 in Jayashanker Bhupalpally Dist - 4.2339 Ha Road R AND B DIVISION WARANGAL 8.5 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Apr 2018
Stage-I Approval on : 27 Sep 2023
Compliance Report Submitted by User Agency on : 06 Aug 2025
23 Sep 2025
21 Haryana FP/HR/Approach/149814/2021 FCA/915 Retail Outlet of Indian Oil Corporation Ltd. Approach Access M/S INDIAN OIL CORPORATION LTD 0.09252 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Dec 2021
Stage-I Approval on : 05 Sep 2024
Compliance Report Submitted by User Agency on : 26 Apr 2025
19 Sep 2025
22 Himachal Pradesh FP/HP/HYD/49387/2020 FC/HPB/01/177/2022 Integrated Kashang Stage II & III Hydel HIMACHAL PRADESH POWER CORPORATION LTD 0.4148 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Sep 2020
Stage-I Approval on : 01 Oct 2024
Compliance Report Submitted by User Agency on : 27 Aug 2025
18 Sep 2025
23 Jammu and Kashmir FP/JK/Others/153306/2022 9-JKA-060/2022-Jammu Ms Prince Fuel Station Others CHETAN MAHAJAN 0.208 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Mar 2022
Stage-I Approval on : 22 Jun 2024
Compliance Report Submitted by User Agency on : 02 May 2025
18 Sep 2025
24 Karnataka FP/KA/TRANS/38788/2019 F.No.KRC1287/2021-BAN Construction of the Proposed 110kV S/c Line on DC Towers from the existing 110/11kV Thogarsi sub-station to the proposed 10MVA 110/11kV sub-station at Kuppagudde in Soraba Taluk, Shivamogga District. Transmission Line KARNATAKA POWER TRANSMISSION CORPORATION LIMITED 6.073276 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Feb 2019
Stage-I Approval on : 02 Jun 2022
Compliance Report Submitted by User Agency on : 13 Aug 2025
18 Sep 2025
25 Madhya Pradesh FP/MP/WATER/151757/2022 6-MPB016/2023-BHO Gond Deosar Multi Village Rural Water Supply Scheme Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT 4.8057 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2022
Stage-I Approval on : 08 Jul 2025
Compliance Report Submitted by User Agency on : 23 Aug 2025
17 Sep 2025
26 Maharashtra FP/MH/RAIL/41780/2019 FC-II/MH-219/2023-NGP Third railway line between Kalyan and Kasara stations of 67.62 km in Ulhasnagar, Kalyan & Shahapur Talukas, Thane District, Maharashtra Railway CENTRAL RAILWAY CST MUMBAI 16.6846 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Aug 2019
Stage-I Approval on : 19 Jul 2024
Compliance Report Submitted by User Agency on : 23 Jul 2025
17 Sep 2025
27 Himachal Pradesh FP/HP/ROAD/150852/2022 FC/HPB/06/111/2022 C/O of link road from PHC Badahari Gurshali to Village Dawath Km 0/00 to 1/500. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 0.4614 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jan 2022
Stage-I Approval on : 18 Sep 2024
Compliance Report Submitted by User Agency on : 27 Aug 2025
16 Sep 2025
28 Madhya Pradesh FP/MP/WATER/151448/2022 6-MPB028/2023-BHO Gond Devsar Multi Village Rural Water Supply Scheme Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT 4.9627 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jan 2022
Stage-I Approval on : 08 Jul 2025
Compliance Report Submitted by User Agency on : 23 Aug 2025
16 Sep 2025
29 Uttar Pradesh FP/UP/ROAD/117639/2020 8B/UP/06/03/2024/FC Forest Land Proposed for Widening & Strengthening of Chopan-Mahalpur Road to Parsoi Road from Km. No. 0.000 to Km. No. 20.600 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District:Sonbhadra Road PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA 15.567 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2020
Stage-I Approval on : 05 Aug 2024
Compliance Report Submitted by User Agency on : 02 Sep 2025
15 Sep 2025
30 Gujarat FP/GJ/IND/29375/2017 FC-6/GJC-72/2023-GNR Hazira Capacity Expansion Project (HCEP) Industry Shell Energy India Private Limited 12 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Sep 2019
Stage-I Approval on : 05 Nov 2024
Compliance Report Submitted by User Agency on : 07 May 2025
12 Sep 2025
31 Uttarakhand FP/UK/ROAD/150404/2021 8B/UCP/06/05/2023/FC Construction of Billekh to Gaira motor road Road EXECUTIVE ENGINEER 1.68 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Dec 2021
Stage-I Approval on : 20 Oct 2023
Compliance Report Submitted by User Agency on : 27 Aug 2025
12 Sep 2025
32 Himachal Pradesh FP/HP/ROAD/74345/2020 FC/HPB/06/152/2022 C/O Ambulance road from Fire Brigade road for the building in Daizy Bank Estate Lower Jakhu Shimla Ward No-16 KM 0/0 To 0/45. Road Commissioner MCS 0.0112 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Dec 2020
Stage-I Approval on : 17 Feb 2025
Compliance Report Submitted by User Agency on : 18 Aug 2025
11 Sep 2025
33 Himachal Pradesh FP/HP/SubStation/148224/2021 FC/HPB/12/178/2022 Construction of 33/11 KV Electrical Sub Center Shri Naina Devi Ji which falls in the Jurisdiction of Modar Village, Tehsil Shri Naina Devi Ji at Swarghat, Bilaspur District, H.P Sub Station HIMACHAL PRADESH STATE ELECTRICITY BOARD 0.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Oct 2021
Stage-I Approval on : 22 Nov 2023
Compliance Report Submitted by User Agency on : 20 Aug 2025
11 Sep 2025
34 Uttarakhand FP/UK/ROAD/27119/2017 8B/UCP/06/57/2018/FC Construction of Harsila to Sima motor road Length(4.00km) Road PWDKAPKOT 2.519 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jul 2017
Stage-I Approval on : 15 May 2021
Compliance Report Submitted by User Agency on : 30 Jul 2025
11 Sep 2025
35 Orissa FP/OR/Others/9825/2015 5-ORB428/2020-BHU Barbil - Angul Iron Ore Slurry Pipeline Project Others Jindal Steel & Power Ltd. 1.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jul 2015
Stage-I Approval on : 24 Sep 2020
Compliance Report Submitted by User Agency on : 12 Jun 2025
08 Sep 2025
36 Madhya Pradesh FP/MP/ROAD/156438/2022 6-MPR038/2023-BHO 4 Laning of Indore-Muktainagar Section of NH-753L from Boregaon Buzurg, Khandwa District in MP Design Ch. 139+000 to Muktainagar, Jalgaon District in MH Design Ch. 216+278 (length 77.278 km) under Bharatmala Pariyojana in the state of Madhya Pradesh Road National Highways Authority of India 87.5709 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jun 2022
Stage-I Approval on : 29 Dec 2023
Compliance Report Submitted by User Agency on : 29 Jan 2024
05 Sep 2025
37 Sikkim FP/SK/ROAD/42185/2019 1848/FCA/FEWMD Diversion of 0.1502 ha of forest land for const of road from NH10 near Andheri Jhora to Samdur Village at Samdur East Sikkim by R&B Deptt. GoS Road PUBLIC WORKS DEPARTMENT 0.1502 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Oct 2019
Stage-I Approval on : 06 Mar 2020
Compliance Report Submitted by User Agency on : 17 May 2025
04 Sep 2025
38 Haryana FP/HR/Approach/153753/2022 153753/397 Sangeet Resorts Approach Access SANGEET RESORTS 0.033 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2022
Stage-I Approval on : 18 Jul 2025
Compliance Report Submitted by User Agency on : 20 Aug 2025
02 Sep 2025
39 Manipur FP/MN/TRANS/36731/2018 3-MN C 105/2019-SHI Construction of 132 KV single circuit transmission line on double circuit towers from Rengpang to Tamenglong under North Eastern Region Power System Improvement Project (NERPSIP) Transmission Line MANIPUR STATE POWER COMPANY LIMITED 56.833 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Oct 2018
Stage-I Approval on : 30 Jan 2020
Compliance Report Submitted by User Agency on : 03 Jul 2025
02 Sep 2025
40 Manipur FP/MN/ROAD/153434/2022 3-MNC 055/2022-SHI Forest Proposal for widening / improvement of existing road chakpikarong - sajik - Aiqejang (0 to 19.5 KM) to NHSL specification under project sewak in the state of Manipur Road 84 RCC (GREF) 22.045 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jun 2022
Stage-I Approval on : 18 Jan 2023
Compliance Report Submitted by User Agency on : 29 Apr 2025
02 Sep 2025
41 Punjab FP/PB/Approach/146634/2021 9-PBB311/2023-CHA Approach Access Road to B-Site IOCL Retail Outlet Approach Access APPROACH ACCESS FOR INDIAN OIL CORPORATION (IOCL) 0.0102 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2021
Stage-I Approval on : 29 May 2025
Compliance Report Submitted by User Agency on : 28 Jul 2025
02 Sep 2025
42 Uttarakhand FP/UK/ROAD/34380/2018 8B/UCP/06/209/2019/FC Kathiyan to Dirnad Motor Road Under PMGSY Road EXECUTIVE ENGINEER 3.0835 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2018
Stage-I Approval on : 06 Aug 2020
Compliance Report Submitted by User Agency on : 30 Jul 2025
01 Sep 2025
43 Madhya Pradesh FP/MP/IRRIG/30442/2017 6-MPR005/2022-BHO Baroda ... Irrigation Project Irrigation WATER RESOURCES DIVISION NO ONE SAGAR 21.06 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Nov 2017
Stage-I Approval on : 09 Dec 2022
Compliance Report Submitted by User Agency on : 20 Jun 2025
31 Aug 2025
44 Karnataka FP/KA/TRANS/42334/2019 F.No.4-KRB1296/2021-BAN Diversion of 0.98Ha of Sonnenahalli Deemed Forest for construction of 400kV D/C Quad Tumkur (Vasantanarsapur) - Yelahanka Transmission line Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 0.98 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Oct 2019
Stage-I Approval on : 16 Jul 2021
Compliance Report Submitted by User Agency on : 18 Mar 2024
29 Aug 2025
45 Maharashtra FP/MH/ROAD/148050/2021 FC-II/MH-213/2023-NGP Construction of Balkum to Gaimukh DP Road (NH3 Connector Ghodbunder By-Pass) by Thane Municipal Corporation Road THANE MUNICIPAL CORPORATION PWD 12.2607 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Oct 2021
Stage-I Approval on : 24 Nov 2023
Compliance Report Submitted by User Agency on : 22 Jul 2025
29 Aug 2025
46 Telangana FP/TG/Others/44802/2020 4-TSB171/2020-CHN Establishment of APCO 25 tower for Phase II Network in Medchal District - 0.0995 Ha Others TELANGANA STATE POLICE DEPARTMENT 0.0995 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Feb 2020
Stage-I Approval on : 09 Nov 2020
Compliance Report Submitted by User Agency on : 23 Oct 2024
28 Aug 2025
47 Telangana FP/TG/ROAD/120196/2021 4-TSB214/2021-HYD Formation of BT road from MRL 13 Chamanpally to Kushnapally of Vemanapally Mandal of Mancherial District - 1.5259 Ha Road PANCHAYAT RAJ ENGINEERING DEPARTMENT 1.5259 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jan 2021
Stage-I Approval on : 30 Oct 2021
Compliance Report Submitted by User Agency on : 04 Feb 2025
28 Aug 2025
48 Uttar Pradesh FP/UP/Others/41408/2019 3083 Reliance 4G Project for Laying of OFC along with road on SH-101(Palia-Trikulia-Khajuria Road) from Km82.20 to Km119.50, NH-730(Pilibhit-Betia-Assam Road) from Km88.00 to Km92.50 & SH-21(Bilraya-Panwari Road) from Km1.50 to Km8.60 and from Km18.70 to Km26.00 ,Total Km56.20 & 0.5924 Ha. in NorthKheri Forest Division, District Lakimpur Kheri-UP. Others Reliance Jeo Infocomm Ltd 0.5924 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Aug 2019
Stage-I Approval on : 27 Mar 2023
Compliance Report Submitted by User Agency on : 21 Aug 2025
26 Aug 2025
49 Uttarakhand FP/UK/ROAD/10393/2015 8B/UCP/06/124/2015-FC Bartoli-Banthok Motor Road(Part I) Road CONSTRUCTION DIVISION PWD ALMORA 2.705 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Feb 2015
Stage-I Approval on : 08 Oct 2015
Compliance Report Submitted by User Agency on : 02 Jul 2025
26 Aug 2025
50 Chhattisgarh FP/CG/ROAD/119866/2021 FC-III/IROCH-04/2022 Development of Economic Corridors, Inter-corridors, feeder routes and Coastal Road to improve the efficiency of freight movement in India (Lot-3/Odisha & Jharkhand/Package-2) Raipur-Vishakhapatnam (Ch. 0.000 - Ch. 124.661) in the State of Chhattisgarh under Bharatmala Pariyojana. (Forest Proposal is for between km 42+844 to Km 124.661) Road NHAI PIU DHAMTARI 228.0425 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Jan 2021
Stage-I Approval on : 12 Apr 2022
Compliance Report Submitted by User Agency on : 04 Jul 2025
22 Aug 2025