Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Orissa
|
FP/OR/Others/14546/2015
|
5-ORC322/2017-BHU
|
Infrastructure Project for Kurmitar & Rantha ML
|
Others
|
ODISHA MINING CORPORATION LTD
|
11.912
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2015
|
Stage-I Approval on
|
:
|
29 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2020
|
|
|
|
29 May 2020
|
2
|
Orissa
|
FP/OR/TRANS/153797/2022
|
5-ORC576/2023-BHU
|
2X160 MVA ,220/132 KV & 2X20 MVA, 220/33KV Grid Substation with associated 220 KV DC line from 400/200 KV PGCIL Grid Substation, Keonjhar to Turumunga & 132 KV LILO line from 132 KV Polaspanga-Karanjia SC line to Turumunga, Keonjhar
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
8.435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
06 May 2025
|
3
|
Orissa
|
FP/OR/MIN/28732/2017
|
8-28/2019-FC
|
Banspani Iron Ore Mines
|
Mining
|
ODISHA MINING CORPORATION LTD
|
183.218
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2017
|
Stage-I Approval on
|
:
|
04 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Oct 2021
|
|
|
|
16 Dec 2021
|
4
|
Orissa
|
FP/OR/TRANS/40463/2019
|
5-ORB403/2019-BHU
|
“Diversion of 400KV D/C Talcher – Meramundli Transmission Line” of PGCIL at Village Kamalang in Dhenkanal district, Odisha.
|
Transmission Line
|
POWERGRID KANHIA
|
0.378
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
Stage-I Approval on
|
:
|
16 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jan 2021
|
|
|
|
09 Feb 2021
|
5
|
Orissa
|
FP/OR/TRANS/39618/2019
|
5-ORC426/2020-BHU
|
For construction of a 132 KV 2 phase Transmission line from exiting 220/132/33 KV Grid sub-station at Therubali to proposed 132/25 KV switch yard of RTSS Bhalumaska of Odisha Power Transmission Corpor
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
14.661
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2019
|
Stage-I Approval on
|
:
|
10 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Apr 2023
|
|
|
|
23 May 2023
|
6
|
Orissa
|
FP/OR/MIN/35045/2018
|
8-135/2003-FC vol.I
|
DIVERSION OF UNBROKEN 59.606 HA FOREST LAND (57.515 HA FOR MINING & ANCILLARY ACTIVITIES INCLUDING 1.417 HA OF FOREST LAND DIVERTED EARLIER FOR SAFETY ZONE ALONG PART SURRENDER AREA + 2.091 HA FOR SAFETY ZONE ALONG M.L BOUNDARY) IN RESPECT OF SANINDPUR IRON & BAUXITE MINES OF M/S. RUNGTA SONS (P) LIMITED.
|
Mining
|
RUNGTA SONS PRIVATE LIMITED
|
59.606
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2018
|
Stage-I Approval on
|
:
|
13 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2020
|
|
|
|
26 Nov 2020
|
7
|
Orissa
|
FP/OR/TRANS/17794/2016
|
5-ORC306/2017-BHU
|
400 KV D/C tarnsmission line from LILO point to PGCIL Sundargarh Pooling Station by M/s Vedanta Ltd.
|
Transmission Line
|
VEDANTA LIMITED
|
6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2016
|
Stage-I Approval on
|
:
|
28 Feb 2017
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2022
|
|
|
|
11 Aug 2022
|
8
|
Orissa
|
FP/OR/ROAD/31054/2017
|
5-ORC463/2021-BHU
|
Widening of existing 2-lane to 2-lane with 1.5m. wide paved shoulder from Km 0/0 to 81/00 & 93/0 to 119/0 of N.H-157 on EPC mode.
|
Road
|
EXECUTIVE ENGINEER NH DIVISION SAMBALPUR
|
27.343
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2017
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2024
|
|
|
|
14 Mar 2024
|
9
|
Orissa
|
FP/OR/MIN/155017/2022
|
8-18/2002-FC Vol
|
BHUBANESWARI OCP
|
Mining
|
BHUBANESWARI OC EXPANSION MAHANADI COALFIELDS LIMITED
|
20.383
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2022
|
Stage-I Approval on
|
:
|
24 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2025
|
|
|
|
30 May 2025
|
10
|
Orissa
|
FP/OR/ROAD/42674/2019
|
5-ORB414/2020-BHU
|
Approach Road
|
Road
|
INDIAN OIL, JAJPUR
|
0.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2019
|
Stage-I Approval on
|
:
|
18 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2024
|
|
|
|
13 Apr 2024
|
11
|
Orissa
|
FP/OR/Others/149695/2021
|
5-ORA620/2023-BHU
|
NALCO Conveyor Cooridor System
|
Others
|
NALCO
|
41.297
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2024
|
|
|
|
23 Sep 2024
|
12
|
Orissa
|
FP/OR/MIN/18729/2016
|
8-116/2002-FC Vol-I
|
Mahagiri Mines (Chromite) of M/s. IMFA Ltd
|
Mining
|
Indian Metals & Ferro Alloys Ltd
|
7.397
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2016
|
Stage-I Approval on
|
:
|
20 Oct 2016
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2017
|
|
|
|
30 Oct 2018
|
13
|
Orissa
|
FP/OR/MIN/18726/2016
|
8-16/2016-FC
|
Sukinda Mines (Chromite) of M/S. IMFA Ltd
|
Mining
|
Indian Metals & Ferro Alloys Ltd
|
115.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2016
|
Stage-I Approval on
|
:
|
20 Oct 2016
|
Compliance Report Submitted by User Agency on
|
:
|
10 Nov 2017
|
|
|
|
22 Jun 2018
|
14
|
Orissa
|
FP/OR/ROAD/35474/2018
|
5-ORB389/2019-BHU
|
Proposed approach road from NH 520 to Kamanda Steel Plan of Rungta Mines Ltd.
|
Road
|
MS RUNGTA MINES LIMITED
|
0.28
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2018
|
Stage-I Approval on
|
:
|
30 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2020
|
|
|
|
23 Mar 2020
|
15
|
Orissa
|
FP/OR/Pipeline/147725/2021
|
5-ORB512/2022-BHU
|
Natural Gas Pipeline to Rourkela Steel Plant under Bokaro Angul Pipeline Project of JHBDPL Phase-II Project
|
Pipeline
|
GAIL INDIA LIMITED
|
0.4571
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Sep 2021
|
Stage-I Approval on
|
:
|
06 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2023
|
|
|
|
16 Mar 2023
|
16
|
Orissa
|
FP/OR/MIN/32796/2018
|
8-25/2021-FC
|
SIARMAL OCP OF MAHANADI COALFIELDS LIMITED
|
Mining
|
SIARMAL OCP MAHANADI COALFIELDS LIMITED
|
349.709
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2018
|
Stage-I Approval on
|
:
|
21 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Sep 2022
|
|
|
|
03 Nov 2022
|
17
|
Orissa
|
FP/OR/HYD/39171/2019
|
5-ORB436/2020-BHU
|
Upper Indravati Pump Storage Hydro Project
|
Hydel
|
ODISHA HYDRO POWER CORPORATION LIMITED
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2019
|
Stage-I Approval on
|
:
|
21 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2021
|
|
|
|
29 Dec 2021
|
18
|
Orissa
|
FP/OR/MIN/30980/2017
|
8-01/2020-FC
|
Naini Open Cast Project (Coal), (Rated Capcity 10 MTPA, Singareni Collieries Company Ltd., Angul, Dist- Odisha)
|
Mining
|
SCCL NAINI
|
783.275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2017
|
Stage-I Approval on
|
:
|
28 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Sep 2022
|
|
|
|
12 Oct 2022
|
19
|
Orissa
|
FP/OR/ROAD/23286/2016
|
5-ORC332/2017-BHU
|
Widening to two lane carriage way from 327/700 to 413/700km of NH-326 (erstwhile form 16/0 to 102/000 of SH-25) under Vijayawada – Ranchi corridor with state Koraput & Malkangiri district in the state of Odisha
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION, JEYPORE
|
10.635
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2016
|
Stage-I Approval on
|
:
|
05 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
30 Jul 2024
|
20
|
Orissa
|
FP/OR/Approach/64022/2020
|
5-ORB460/2021-BHU
|
CONSTRUCTION OF RESIDENTIAL AND SERVICE BUILDINGS AND ALLIED INFRASTRUCTURE FOR SHIFTING OF EXPLORATION CAMP FROM GOPALPUR, DIST-SUNDARGARH TO LAKHANPUR, DIST- JHARSUGUDA
|
Approach Access
|
CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
|
0.047
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
04 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2024
|
|
|
|
21 May 2024
|
21
|
Orissa
|
FP/OR/MIN/8707/2014
|
8-46/2018-FC
|
Khandbandh Iron Ore Mines
|
Mining
|
ODISHA MINING CORPORATION LTD
|
345.189
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2017
|
Stage-I Approval on
|
:
|
31 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2021
|
|
|
|
16 Dec 2021
|
22
|
Orissa
|
FP/OR/TRANS/30962/2017
|
5-ORC418/2020-BHU
|
132 KV Transmission Line from 132/33 KV to Kamanda Steel Plant at- Village Kamanda, Sundargarh to grid Barbil Keonjhar.
|
Transmission Line
|
RUNGTA MINES LTD
|
35.507
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Dec 2017
|
Stage-I Approval on
|
:
|
25 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2021
|
|
|
|
31 Mar 2021
|
23
|
Orissa
|
FP/OR/IND/45465/2020
|
5-ORC568/2023-BHU
|
3.00 MMTPA Alumina Refinery with 150 MW co-generation Power Plant at Kansariguda in Rayagada district, Odisha by M/s Hindalco Industries Limited-Aditya Alumina Refinery Project
|
Industry
|
ADITYA ALUMINIUM
|
38.062
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2020
|
Stage-I Approval on
|
:
|
29 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2024
|
|
|
|
28 Aug 2024
|
24
|
Orissa
|
FP/OR/Pipeline/45293/2020
|
5-ORB457/2021-BHU
|
Execution of 02 Nos. of Individual Rural Piped Water Supply Projects pertaining to Jharsuguda district including five years of
|
Pipeline
|
RURAL WATER SUPPLY & SANITATION KEONJHAR
|
4.046
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2020
|
Stage-I Approval on
|
:
|
06 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2023
|
|
|
|
31 Jul 2023
|
25
|
Orissa
|
FP/OR/RAIL/49967/2020
|
5-ORA466/2021-BHU
|
Angul-Gopalprasad-Puttagadia-Jarapada-Tentuloi New BG Railway Line
|
Railway
|
EAST COAST RAILWAY
|
125.355
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Sep 2020
|
Stage-I Approval on
|
:
|
03 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2023
|
|
|
|
22 Feb 2023
|
26
|
Orissa
|
FP/OR/IND/16543/2015
|
5-ORB477/2021-BHU
|
Expansion of Line-II at Jharsuguda Cement Works (JCW)
|
Industry
|
ULTRATECH CEMENT LIMITED
|
0.799
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2015
|
Stage-I Approval on
|
:
|
03 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
25 Jan 2024
|
27
|
Orissa
|
FP/OR/IND/12884/2015
|
5-ORC279/2016-BHU
|
NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT
|
Industry
|
NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT
|
25.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2015
|
Stage-I Approval on
|
:
|
01 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2025
|
|
|
|
24 Apr 2025
|
28
|
Orissa
|
FP/OR/TRANS/139357/2021
|
5-ORB478/2021-BHU
|
Modification of 132 KV Budhipadar - Jorabaga line.
|
Transmission Line
|
OPTCL.
|
0.827
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2021
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2023
|
|
|
|
18 Apr 2023
|
29
|
Orissa
|
FP/OR/MIN/10335/2015
|
8-27/2017-FC
|
Daitari Conveyor Corridor (2.5 MTPA)
|
Mining
|
ODISHA MINING CORPORATION LTD
|
106.016
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2016
|
Stage-I Approval on
|
:
|
27 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
02 Dec 2019
|
|
|
|
22 Mar 2021
|
30
|
Orissa
|
FP/OR/MIN/150133/2021
|
8-06/2023-FC
|
Subhadra OCP
|
Mining
|
Mahanadi Coalfields Limited
|
125.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2022
|
Stage-I Approval on
|
:
|
05 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
24 Jan 2025
|
31
|
Orissa
|
FP/OR/TRANS/38561/2019
|
5-ORC417/2020-BHU
|
Construction of 132 KV Transmission Line from 400/220/132 KV Grid Sub-Station at- Lapanga to Proposed RTSS at- Rengali.
|
Transmission Line
|
OPTCL
|
6.278
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2019
|
Stage-I Approval on
|
:
|
25 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2024
|
|
|
|
15 Apr 2024
|
32
|
Orissa
|
FP/OR/RAIL/39739/2019
|
5-ORC423/2020-BHU
|
Proposal for diversion of 18.131ha of forest land for construction of 3rd & 4th Railway line from Jarapada-Budhapank
|
Railway
|
DEPUTY CHIEF ENGINEER CON-1
|
18.131
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Apr 2019
|
Stage-I Approval on
|
:
|
31 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
10 Aug 2021
|
|
|
|
02 Sep 2021
|
33
|
Orissa
|
FP/OR/Pipeline/36091/2018
|
5-ORB387/2019-BHU
|
Joda to Paradeep Iron Ore Slurry Pipelines System [Alignment under Non-RoW]of M/s JSW Utkal Steel Ltd.
|
Pipeline
|
JSW UTKAL STEEL LIMITED
|
0.654
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Sep 2018
|
Stage-I Approval on
|
:
|
12 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2020
|
|
|
|
27 Jul 2020
|
34
|
Orissa
|
FP/OR/Others/26300/2017
|
8-68/2018-FC
|
Development of Outer Harbour, Inner Harbour including Western Dock & Mechanization of existing Operational berths by M/s Paradip Port Trust, Odisha
|
Others
|
PARADIP PORT TRUST
|
75.635
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 May 2017
|
Stage-I Approval on
|
:
|
31 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2023
|
|
|
|
21 Sep 2023
|
35
|
Orissa
|
FP/OR/RAIL/32565/2018
|
5-ORC441/2021-BHU
|
Khurda Road Bolangir New B.G.Raillink Project Phase IV i.e. from Km 180-238
|
Railway
|
EAST COAST RAILWAY
|
13.22
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2018
|
Stage-I Approval on
|
:
|
09 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Nov 2022
|
|
|
|
18 Nov 2022
|
36
|
Orissa
|
FP/OR/ROAD/24576/2017
|
5-ORA357/2018-BHU
|
Rehabilitation and upgradation to two/four laning of Talchar-Dubari-Chandikhole section of NH-200 in Odisha
|
Road
|
National Highways Authority of India
|
176.231
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2017
|
Stage-I Approval on
|
:
|
05 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Nov 2020
|
|
|
|
03 Dec 2020
|
37
|
Orissa
|
FP/OR/RAIL/35352/2018
|
5-ORC471/2021-BHU
|
Construction of 3rd Railway line between Vizianagaram to Titlagarh under East Coast Railway by Rail Vikas Nigam Limited.
|
Railway
|
CHIEF PROJECT MANGERRAIL VIKAS NIGAM LIMITED
|
5.858
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2018
|
Stage-I Approval on
|
:
|
07 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2022
|
|
|
|
10 Aug 2022
|
38
|
Orissa
|
FP/OR/IND/10338/2015
|
5-ORB295/2016-BHU
|
Tata Steel Special Economic Zone at Gopalpur in Ganjam District, Odisha.
|
Industry
|
Tata Steel Limited, Jamshedpur
|
3.792
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2015
|
Stage-I Approval on
|
:
|
19 Dec 2016
|
Compliance Report Submitted by User Agency on
|
:
|
26 Oct 2018
|
|
|
|
24 Oct 2018
|
39
|
Orissa
|
FP/OR/TRANS/38533/2019
|
5-ORC416/2020-BHU
|
Construction of 220 KV Lilo Transmission line from LOC No. 331 of Existing 220 KV Rengali Tarkera Line to proposed 220/ 33 KV Grid Sub-station at Deogarh.
|
Transmission Line
|
OPTCL
|
21.159
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2019
|
Stage-I Approval on
|
:
|
25 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2024
|
|
|
|
21 May 2024
|
40
|
Orissa
|
FP/OR/Pipeline/123665/2021
|
5-ORB549/2023-BHU
|
Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project
|
Pipeline
|
NUMALIGARH REFINERY LIMITED
|
3.347
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Dec 2024
|
|
|
|
18 Dec 2024
|
41
|
Orissa
|
FP/OR/DISP/43480/2019
|
5-ORC439/2020-BHU
|
Centers of Excellence ,AIIMS Bhubaneswar
|
Dispensary/Hospital
|
DIRECTOR AIIMS BHUBANESWAR
|
10.58
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2019
|
Stage-I Approval on
|
:
|
07 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2021
|
|
|
|
30 Dec 2021
|
42
|
Orissa
|
FP/OR/TRANS/33277/2018
|
5-ORC406/2020-BHU
|
Odisha Power Transmission Corporation Limited (OPTCL)
|
Transmission Line
|
OPTCL
|
7.184
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2018
|
Stage-I Approval on
|
:
|
14 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2024
|
|
|
|
25 Jul 2024
|
43
|
Orissa
|
FP/OR/MIN/149499/2021
|
8-02/2023-FC
|
Laserda_Pacheri Manganese & Iron Block
|
Mining
|
MS THRIVENI EARTHMOVERS PRIVATE LIMITED
|
94.351
|
Pending at HO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2021
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2025
|
|
|
|
|
44
|
Orissa
|
FP/OR/TRANS/22467/2016
|
5-ORC320/2017-BHU
|
LILO of Both Circuits of Rourkela-Raigarh 400KV D/C transmission line (2nd line) at Jharsuguda (Sundargarh) Sub-Station
|
Transmission Line
|
POWER GRID CORPORATION OF INDIA LTD
|
24.424
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2016
|
Stage-I Approval on
|
:
|
04 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2019
|
|
|
|
26 Jul 2019
|
45
|
Orissa
|
FP/OR/MIN/18611/2016
|
8-55/2018-FC
|
Ghoraburhani Sagasahi Iron Ore Block of Essar Steel India Limited
|
Mining
|
ArcelorMittal Nippon Steel India Limited
|
126.401
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2016
|
Stage-I Approval on
|
:
|
06 Mar 2019
|
Compliance Report Submitted by User Agency on
|
:
|
19 Oct 2020
|
|
|
|
15 Dec 2020
|
46
|
Orissa
|
FP/OR/ROAD/46616/2020
|
5-ORB433/2020-BHU
|
Construction of link road on forest land for Page Industry Ltd. to provide connectivity to the project area.
|
Road
|
IDCO
|
0.307
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2020
|
Stage-I Approval on
|
:
|
21 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2020
|
|
|
|
22 Jan 2021
|
47
|
Orissa
|
FP/OR/Others/147445/2021
|
5-ORC548/2023-BHU
|
Srikakulam - Angul Pipeline (SAPL)Project_Mainline
|
Others
|
GAIL INDIA LIMITED
|
6.1487
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2021
|
Stage-I Approval on
|
:
|
17 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2025
|
|
|
|
14 Feb 2025
|
48
|
Orissa
|
FP/OR/ROAD/20160/2016
|
5-ORC358/2018-BHU
|
Widening & strengthening to NH-220 from km 35/700 to 71/120 km (Rairangpur - Jashipur section
|
Road
|
EXECUTIVE ENGINEER NHDIVISION BARIPADA
|
7.8199
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2016
|
Stage-I Approval on
|
:
|
18 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2023
|
|
|
|
20 Apr 2023
|
49
|
Orissa
|
FP/OR/QRY/32655/2018
|
5-ORB369/2018-BHU
|
Khindo Stone Quarry
|
Quarrying
|
TAHSILDAR KANIHA
|
1.214
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2018
|
Stage-I Approval on
|
:
|
29 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2021
|
|
|
|
08 Jun 2021
|
50
|
Orissa
|
FP/OR/TRANS/10367/2015
|
5-ORC274/2016-BHU
|
Proposal for diversion of 11.377 ha of forest land in Reserve Forest,Jungle Block & Patra Jungle for 220 KV S/C Transmission Line on D/C Tower from existing 220/33 K/V Sub-Station at Laxmipur to premises of Nalco at Damanjodi in Koraput District of Odisha
|
Transmission Line
|
NATIONAL ALUMINIUM COMPANY
|
11.377
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2015
|
Stage-I Approval on
|
:
|
05 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2017
|
|
|
|
04 Aug 2017
|
|