Ministry of Environment,Forest and Climate Change
Government of India
Orissa
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Orissa FP/OR/Others/14546/2015 5-ORC322/2017-BHU Infrastructure Project for Kurmitar & Rantha ML Others ODISHA MINING CORPORATION LTD 11.912 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2015
Stage-I Approval on : 29 Nov 2018
Compliance Report Submitted by User Agency on : 19 May 2020
29 May 2020
2 Orissa FP/OR/TRANS/153797/2022 5-ORC576/2023-BHU 2X160 MVA ,220/132 KV & 2X20 MVA, 220/33KV Grid Substation with associated 220 KV DC line from 400/200 KV PGCIL Grid Substation, Keonjhar to Turumunga & 132 KV LILO line from 132 KV Polaspanga-Karanjia SC line to Turumunga, Keonjhar Transmission Line ODISHA POWER TRANSMISSION CORPORATION LIMITED 8.435 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2022
Stage-I Approval on : 14 Mar 2024
Compliance Report Submitted by User Agency on : 29 Apr 2025
06 May 2025
3 Orissa FP/OR/MIN/28732/2017 8-28/2019-FC Banspani Iron Ore Mines Mining ODISHA MINING CORPORATION LTD 183.218 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2017
Stage-I Approval on : 04 Nov 2020
Compliance Report Submitted by User Agency on : 01 Oct 2021
16 Dec 2021
4 Orissa FP/OR/TRANS/40463/2019 5-ORB403/2019-BHU “Diversion of 400KV D/C Talcher – Meramundli Transmission Line” of PGCIL at Village Kamalang in Dhenkanal district, Odisha. Transmission Line POWERGRID KANHIA 0.378 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2019
Stage-I Approval on : 16 Jan 2020
Compliance Report Submitted by User Agency on : 22 Jan 2021
09 Feb 2021
5 Orissa FP/OR/TRANS/39618/2019 5-ORC426/2020-BHU For construction of a 132 KV 2 phase Transmission line from exiting 220/132/33 KV Grid sub-station at Therubali to proposed 132/25 KV switch yard of RTSS Bhalumaska of Odisha Power Transmission Corpor Transmission Line ODISHA POWER TRANSMISSION CORPORATION LIMITED 14.661 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2019
Stage-I Approval on : 10 Sep 2020
Compliance Report Submitted by User Agency on : 27 Apr 2023
23 May 2023
6 Orissa FP/OR/MIN/35045/2018 8-135/2003-FC vol.I DIVERSION OF UNBROKEN 59.606 HA FOREST LAND (57.515 HA FOR MINING & ANCILLARY ACTIVITIES INCLUDING 1.417 HA OF FOREST LAND DIVERTED EARLIER FOR SAFETY ZONE ALONG PART SURRENDER AREA + 2.091 HA FOR SAFETY ZONE ALONG M.L BOUNDARY) IN RESPECT OF SANINDPUR IRON & BAUXITE MINES OF M/S. RUNGTA SONS (P) LIMITED. Mining RUNGTA SONS PRIVATE LIMITED 59.606 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2018
Stage-I Approval on : 13 Jan 2020
Compliance Report Submitted by User Agency on : 07 Oct 2020
26 Nov 2020
7 Orissa FP/OR/TRANS/17794/2016 5-ORC306/2017-BHU 400 KV D/C tarnsmission line from LILO point to PGCIL Sundargarh Pooling Station by M/s Vedanta Ltd. Transmission Line VEDANTA LIMITED 6 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2016
Stage-I Approval on : 28 Feb 2017
Compliance Report Submitted by User Agency on : 03 Aug 2022
11 Aug 2022
8 Orissa FP/OR/ROAD/31054/2017 5-ORC463/2021-BHU Widening of existing 2-lane to 2-lane with 1.5m. wide paved shoulder from Km 0/0 to 81/00 & 93/0 to 119/0 of N.H-157 on EPC mode. Road EXECUTIVE ENGINEER NH DIVISION SAMBALPUR 27.343 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2017
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 19 Feb 2024
14 Mar 2024
9 Orissa FP/OR/MIN/155017/2022 8-18/2002-FC Vol BHUBANESWARI OCP Mining BHUBANESWARI OC EXPANSION MAHANADI COALFIELDS LIMITED 20.383 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2022
Stage-I Approval on : 24 Sep 2024
Compliance Report Submitted by User Agency on : 19 May 2025
30 May 2025
10 Orissa FP/OR/ROAD/42674/2019 5-ORB414/2020-BHU Approach Road Road INDIAN OIL, JAJPUR 0.04 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Oct 2019
Stage-I Approval on : 18 May 2020
Compliance Report Submitted by User Agency on : 28 Mar 2024
13 Apr 2024
11 Orissa FP/OR/Others/149695/2021 5-ORA620/2023-BHU NALCO Conveyor Cooridor System Others NALCO 41.297 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Nov 2021
Stage-I Approval on : 22 Dec 2023
Compliance Report Submitted by User Agency on : 09 Jul 2024
23 Sep 2024
12 Orissa FP/OR/MIN/18729/2016 8-116/2002-FC Vol-I Mahagiri Mines (Chromite) of M/s. IMFA Ltd Mining Indian Metals & Ferro Alloys Ltd 7.397 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Mar 2016
Stage-I Approval on : 20 Oct 2016
Compliance Report Submitted by User Agency on : 26 Sep 2017
30 Oct 2018
13 Orissa FP/OR/MIN/18726/2016 8-16/2016-FC Sukinda Mines (Chromite) of M/S. IMFA Ltd Mining Indian Metals & Ferro Alloys Ltd 115.05 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Mar 2016
Stage-I Approval on : 20 Oct 2016
Compliance Report Submitted by User Agency on : 10 Nov 2017
22 Jun 2018
14 Orissa FP/OR/ROAD/35474/2018 5-ORB389/2019-BHU Proposed approach road from NH 520 to Kamanda Steel Plan of Rungta Mines Ltd. Road MS RUNGTA MINES LIMITED 0.28 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Aug 2018
Stage-I Approval on : 30 Jul 2019
Compliance Report Submitted by User Agency on : 20 Mar 2020
23 Mar 2020
15 Orissa FP/OR/Pipeline/147725/2021 5-ORB512/2022-BHU Natural Gas Pipeline to Rourkela Steel Plant under Bokaro Angul Pipeline Project of JHBDPL Phase-II Project Pipeline GAIL INDIA LIMITED 0.4571 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Sep 2021
Stage-I Approval on : 06 May 2022
Compliance Report Submitted by User Agency on : 06 Jan 2023
16 Mar 2023
16 Orissa FP/OR/MIN/32796/2018 8-25/2021-FC SIARMAL OCP OF MAHANADI COALFIELDS LIMITED Mining SIARMAL OCP MAHANADI COALFIELDS LIMITED 349.709 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Mar 2018
Stage-I Approval on : 21 Apr 2022
Compliance Report Submitted by User Agency on : 30 Sep 2022
03 Nov 2022
17 Orissa FP/OR/HYD/39171/2019 5-ORB436/2020-BHU Upper Indravati Pump Storage Hydro Project Hydel ODISHA HYDRO POWER CORPORATION LIMITED 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Feb 2019
Stage-I Approval on : 21 Dec 2020
Compliance Report Submitted by User Agency on : 08 Nov 2021
29 Dec 2021
18 Orissa FP/OR/MIN/30980/2017 8-01/2020-FC Naini Open Cast Project (Coal), (Rated Capcity 10 MTPA, Singareni Collieries Company Ltd., Angul, Dist- Odisha) Mining SCCL NAINI 783.275 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2017
Stage-I Approval on : 28 Jul 2021
Compliance Report Submitted by User Agency on : 21 Sep 2022
12 Oct 2022
19 Orissa FP/OR/ROAD/23286/2016 5-ORC332/2017-BHU Widening to two lane carriage way from 327/700 to 413/700km of NH-326 (erstwhile form 16/0 to 102/000 of SH-25) under Vijayawada – Ranchi corridor with state Koraput & Malkangiri district in the state of Odisha Road EXECUTIVE ENGINEER, NH DIVISION, JEYPORE 10.635 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2016
Stage-I Approval on : 05 Mar 2018
Compliance Report Submitted by User Agency on : 27 Jun 2024
30 Jul 2024
20 Orissa FP/OR/Approach/64022/2020 5-ORB460/2021-BHU CONSTRUCTION OF RESIDENTIAL AND SERVICE BUILDINGS AND ALLIED INFRASTRUCTURE FOR SHIFTING OF EXPLORATION CAMP FROM GOPALPUR, DIST-SUNDARGARH TO LAKHANPUR, DIST- JHARSUGUDA Approach Access CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED 0.047 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2020
Stage-I Approval on : 04 May 2021
Compliance Report Submitted by User Agency on : 12 Mar 2024
21 May 2024
21 Orissa FP/OR/MIN/8707/2014 8-46/2018-FC Khandbandh Iron Ore Mines Mining ODISHA MINING CORPORATION LTD 345.189 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jan 2017
Stage-I Approval on : 31 Jan 2019
Compliance Report Submitted by User Agency on : 03 Sep 2021
16 Dec 2021
22 Orissa FP/OR/TRANS/30962/2017 5-ORC418/2020-BHU 132 KV Transmission Line from 132/33 KV to Kamanda Steel Plant at- Village Kamanda, Sundargarh to grid Barbil Keonjhar. Transmission Line RUNGTA MINES LTD 35.507 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Dec 2017
Stage-I Approval on : 25 Jun 2020
Compliance Report Submitted by User Agency on : 19 Feb 2021
31 Mar 2021
23 Orissa FP/OR/IND/45465/2020 5-ORC568/2023-BHU 3.00 MMTPA Alumina Refinery with 150 MW co-generation Power Plant at Kansariguda in Rayagada district, Odisha by M/s Hindalco Industries Limited-Aditya Alumina Refinery Project Industry ADITYA ALUMINIUM 38.062 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 May 2020
Stage-I Approval on : 29 Dec 2023
Compliance Report Submitted by User Agency on : 16 Jul 2024
28 Aug 2024
24 Orissa FP/OR/Pipeline/45293/2020 5-ORB457/2021-BHU Execution of 02 Nos. of Individual Rural Piped Water Supply Projects pertaining to Jharsuguda district including five years of Pipeline RURAL WATER SUPPLY & SANITATION KEONJHAR 4.046 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Apr 2020
Stage-I Approval on : 06 Apr 2021
Compliance Report Submitted by User Agency on : 20 Jul 2023
31 Jul 2023
25 Orissa FP/OR/RAIL/49967/2020 5-ORA466/2021-BHU Angul-Gopalprasad-Puttagadia-Jarapada-Tentuloi New BG Railway Line Railway EAST COAST RAILWAY 125.355 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Sep 2020
Stage-I Approval on : 03 Dec 2021
Compliance Report Submitted by User Agency on : 02 Feb 2023
22 Feb 2023
26 Orissa FP/OR/IND/16543/2015 5-ORB477/2021-BHU Expansion of Line-II at Jharsuguda Cement Works (JCW) Industry ULTRATECH CEMENT LIMITED 0.799 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Nov 2015
Stage-I Approval on : 03 Dec 2021
Compliance Report Submitted by User Agency on : 27 Dec 2023
25 Jan 2024
27 Orissa FP/OR/IND/12884/2015 5-ORC279/2016-BHU NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT Industry NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT 25.76 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 May 2015
Stage-I Approval on : 01 Nov 2016
Compliance Report Submitted by User Agency on : 11 Apr 2025
24 Apr 2025
28 Orissa FP/OR/TRANS/139357/2021 5-ORB478/2021-BHU Modification of 132 KV Budhipadar - Jorabaga line. Transmission Line OPTCL. 0.827 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Mar 2021
Stage-I Approval on : 30 Dec 2021
Compliance Report Submitted by User Agency on : 06 Apr 2023
18 Apr 2023
29 Orissa FP/OR/MIN/10335/2015 8-27/2017-FC Daitari Conveyor Corridor (2.5 MTPA) Mining ODISHA MINING CORPORATION LTD 106.016 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jul 2016
Stage-I Approval on : 27 Sep 2017
Compliance Report Submitted by User Agency on : 02 Dec 2019
22 Mar 2021
30 Orissa FP/OR/MIN/150133/2021 8-06/2023-FC Subhadra OCP Mining Mahanadi Coalfields Limited 125.24 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jan 2022
Stage-I Approval on : 05 Dec 2023
Compliance Report Submitted by User Agency on : 30 Dec 2024
24 Jan 2025
31 Orissa FP/OR/TRANS/38561/2019 5-ORC417/2020-BHU Construction of 132 KV Transmission Line from 400/220/132 KV Grid Sub-Station at- Lapanga to Proposed RTSS at- Rengali. Transmission Line OPTCL 6.278 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jan 2019
Stage-I Approval on : 25 Jun 2020
Compliance Report Submitted by User Agency on : 24 Jan 2024
15 Apr 2024
32 Orissa FP/OR/RAIL/39739/2019 5-ORC423/2020-BHU Proposal for diversion of 18.131ha of forest land for construction of 3rd & 4th Railway line from Jarapada-Budhapank Railway DEPUTY CHIEF ENGINEER CON-1 18.131 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Apr 2019
Stage-I Approval on : 31 Jul 2020
Compliance Report Submitted by User Agency on : 10 Aug 2021
02 Sep 2021
33 Orissa FP/OR/Pipeline/36091/2018 5-ORB387/2019-BHU Joda to Paradeep Iron Ore Slurry Pipelines System [Alignment under Non-RoW]of M/s JSW Utkal Steel Ltd. Pipeline JSW UTKAL STEEL LIMITED 0.654 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Sep 2018
Stage-I Approval on : 12 Jul 2019
Compliance Report Submitted by User Agency on : 09 Jul 2020
27 Jul 2020
34 Orissa FP/OR/Others/26300/2017 8-68/2018-FC Development of Outer Harbour, Inner Harbour including Western Dock & Mechanization of existing Operational berths by M/s Paradip Port Trust, Odisha Others PARADIP PORT TRUST 75.635 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 May 2017
Stage-I Approval on : 31 Dec 2018
Compliance Report Submitted by User Agency on : 19 May 2023
21 Sep 2023
35 Orissa FP/OR/RAIL/32565/2018 5-ORC441/2021-BHU Khurda Road Bolangir New B.G.Raillink Project Phase IV i.e. from Km 180-238 Railway EAST COAST RAILWAY 13.22 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Mar 2018
Stage-I Approval on : 09 Feb 2021
Compliance Report Submitted by User Agency on : 02 Nov 2022
18 Nov 2022
36 Orissa FP/OR/ROAD/24576/2017 5-ORA357/2018-BHU Rehabilitation and upgradation to two/four laning of Talchar-Dubari-Chandikhole section of NH-200 in Odisha Road National Highways Authority of India 176.231 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Feb 2017
Stage-I Approval on : 05 Dec 2018
Compliance Report Submitted by User Agency on : 10 Nov 2020
03 Dec 2020
37 Orissa FP/OR/RAIL/35352/2018 5-ORC471/2021-BHU Construction of 3rd Railway line between Vizianagaram to Titlagarh under East Coast Railway by Rail Vikas Nigam Limited. Railway CHIEF PROJECT MANGERRAIL VIKAS NIGAM LIMITED 5.858 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Aug 2018
Stage-I Approval on : 07 Sep 2021
Compliance Report Submitted by User Agency on : 03 Aug 2022
10 Aug 2022
38 Orissa FP/OR/IND/10338/2015 5-ORB295/2016-BHU Tata Steel Special Economic Zone at Gopalpur in Ganjam District, Odisha. Industry Tata Steel Limited, Jamshedpur 3.792 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Aug 2015
Stage-I Approval on : 19 Dec 2016
Compliance Report Submitted by User Agency on : 26 Oct 2018
24 Oct 2018
39 Orissa FP/OR/TRANS/38533/2019 5-ORC416/2020-BHU Construction of 220 KV Lilo Transmission line from LOC No. 331 of Existing 220 KV Rengali Tarkera Line to proposed 220/ 33 KV Grid Sub-station at Deogarh. Transmission Line OPTCL 21.159 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2019
Stage-I Approval on : 25 Jun 2020
Compliance Report Submitted by User Agency on : 23 Apr 2024
21 May 2024
40 Orissa FP/OR/Pipeline/123665/2021 5-ORB549/2023-BHU Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project Pipeline NUMALIGARH REFINERY LIMITED 3.347 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Feb 2021
Stage-I Approval on : 28 Mar 2023
Compliance Report Submitted by User Agency on : 07 Dec 2024
18 Dec 2024
41 Orissa FP/OR/DISP/43480/2019 5-ORC439/2020-BHU Centers of Excellence ,AIIMS Bhubaneswar Dispensary/Hospital DIRECTOR AIIMS BHUBANESWAR 10.58 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Dec 2019
Stage-I Approval on : 07 Jan 2021
Compliance Report Submitted by User Agency on : 21 Dec 2021
30 Dec 2021
42 Orissa FP/OR/TRANS/33277/2018 5-ORC406/2020-BHU Odisha Power Transmission Corporation Limited (OPTCL) Transmission Line OPTCL 7.184 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Apr 2018
Stage-I Approval on : 14 Sep 2020
Compliance Report Submitted by User Agency on : 24 Jun 2024
25 Jul 2024
43 Orissa FP/OR/MIN/149499/2021 8-02/2023-FC Laserda_Pacheri Manganese & Iron Block Mining MS THRIVENI EARTHMOVERS PRIVATE LIMITED 94.351 Pending at HO for Stage-II
Proposal received(at Nodal Officer)electronically on : 22 Nov 2021
Stage-I Approval on : 21 Dec 2023
Compliance Report Submitted by User Agency on : 19 Jun 2025
44 Orissa FP/OR/TRANS/22467/2016 5-ORC320/2017-BHU LILO of Both Circuits of Rourkela-Raigarh 400KV D/C transmission line (2nd line) at Jharsuguda (Sundargarh) Sub-Station Transmission Line POWER GRID CORPORATION OF INDIA LTD 24.424 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Nov 2016
Stage-I Approval on : 04 Aug 2017
Compliance Report Submitted by User Agency on : 20 Jul 2019
26 Jul 2019
45 Orissa FP/OR/MIN/18611/2016 8-55/2018-FC Ghoraburhani Sagasahi Iron Ore Block of Essar Steel India Limited Mining ArcelorMittal Nippon Steel India Limited 126.401 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2016
Stage-I Approval on : 06 Mar 2019
Compliance Report Submitted by User Agency on : 19 Oct 2020
15 Dec 2020
46 Orissa FP/OR/ROAD/46616/2020 5-ORB433/2020-BHU Construction of link road on forest land for Page Industry Ltd. to provide connectivity to the project area. Road IDCO 0.307 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jun 2020
Stage-I Approval on : 21 Oct 2020
Compliance Report Submitted by User Agency on : 23 Dec 2020
22 Jan 2021
47 Orissa FP/OR/Others/147445/2021 5-ORC548/2023-BHU Srikakulam - Angul Pipeline (SAPL)Project_Mainline Others GAIL INDIA LIMITED 6.1487 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Sep 2021
Stage-I Approval on : 17 Feb 2023
Compliance Report Submitted by User Agency on : 03 Feb 2025
14 Feb 2025
48 Orissa FP/OR/ROAD/20160/2016 5-ORC358/2018-BHU Widening & strengthening to NH-220 from km 35/700 to 71/120 km (Rairangpur - Jashipur section Road EXECUTIVE ENGINEER NHDIVISION BARIPADA 7.8199 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Oct 2016
Stage-I Approval on : 18 Jul 2018
Compliance Report Submitted by User Agency on : 11 Apr 2023
20 Apr 2023
49 Orissa FP/OR/QRY/32655/2018 5-ORB369/2018-BHU Khindo Stone Quarry Quarrying TAHSILDAR KANIHA 1.214 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Mar 2018
Stage-I Approval on : 29 May 2020
Compliance Report Submitted by User Agency on : 03 May 2021
08 Jun 2021
50 Orissa FP/OR/TRANS/10367/2015 5-ORC274/2016-BHU Proposal for diversion of 11.377 ha of forest land in Reserve Forest,Jungle Block & Patra Jungle for 220 KV S/C Transmission Line on D/C Tower from existing 220/33 K/V Sub-Station at Laxmipur to premises of Nalco at Damanjodi in Koraput District of Odisha Transmission Line NATIONAL ALUMINIUM COMPANY 11.377 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Mar 2015
Stage-I Approval on : 05 Aug 2016
Compliance Report Submitted by User Agency on : 26 Sep 2017
04 Aug 2017