PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : OR-027/2019
1. Location of the project/Scheme : Orissa
 (i) State / Union Territory : Orissa  (ii) District : Anugul  (iii) Forest Division : Angul  (iv) Area of forest land proposed for diversion (in ha.) : 18.131  (v)

Category of the Proposal: Railway
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Angul8.414Revenue Forest
2Angul9.717District Level Committee (D.L.C.) Forest
Total 18.131
Division 1. : Angul
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Anugul18.131
Total18.131
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
118.1310.3Eco 1
Total. 18.131


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tectona GrandisTeak023000
2Dalbergia LatifoliaSisso001000
3Aegle marmelosBela010000
4Cassia siameaChakhunda011101
5Polyainthia LongifoliaDebadaru000200
6Syzigium CuminiJamu000200
7Delonix RegiaKrushnachuda000001
8Diospyros melanoxylonKendu010000
9Madhuca indicaMahula0210501
10Azadirachta indicaNeem000200
11Butea monospermaPalasha001000
12Bombax CeibaSimili014000
13Misc. SpeciesMisc.000112
Total 0 820 131 5
Sub Total (No of Trees.) 47


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Tropical Moist Deciduous forest
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.3
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Elephant, Barking deer, Indian hare, Indian Pealoul, Blue Jay,Egrets,King fisher, Drongo
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 7501200
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1137Nischinta RFSadangiPL No.18 to 66    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 CAMAP
2 Form A
3 Lay Out MAP
4 Species Wise Tree
5 TOPO MAP OF CA LAND
6 Authorization
7
8 DGPS MAP of Diversion
9 Land Schedule Of Forest Land
10 land Schedule Of Forest Land
11 Suitability Certificate
12 Tree Enumeration List
13 Undertaking
14 Site Inspection Report
15 Basic Information
16 Recommendation

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Anugul6375002716824196.3960552437.8128/02/20191339.43953.9
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
AngulAngulDFOYesOne28/12/2019
 AngulCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
AngulAngulDFO RecommendedRecommended For diversion of 18.131 ha of forest land required for construction of 3th & 4th line between Jarapada Budhapank Railway project by E.co Railway.
AngulCF RecommendedRecommended for acceptanceYes
Nodal Officer RecommendedRecommended for diversion of 18.131 ha of forest land for construction of 3rd & 4th Railway Line between Jharpada Budhapanka with Flyover at Talcher Road Railway Project Ch.132.712 Km to 174.826 Km under Angul Forest Division of Angul district, Odisha by East Coast Railways for approval under Section 2 ii of Forest Conservation Act, 1980 subject to taking up eco friendly measures to mitigate of linear infrastructure on wildlife
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
OrissaState SecretaryRecommended25/06/2020 Recommended vide letter no 9688 dated 25.06.2020. State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
BhubaneswarRegional Office5-ORC423/2020-BHU31/07/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/OR/RAIL/39739/2019RAIL39739201922720,752,030.0020,752,030.0023/10/2020SBIN320297277328Corporation BankNEFT/RTGS (Challan)20/10/202021/10/2020
FP/OR/RAIL/39739/2019RAIL39739201929868,236,000.0068,236,000.0011/05/2021SBIN421131027504Union Bank Of IndiaNEFT/RTGS (Challan)03/05/202105/05/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 37   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)37
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Nischinta RFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/OR/RAIL/39739/201926 Jul 2021No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/OR/RAIL/39739/201910 Aug 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/OR/RAIL/39739/2019The compliance to the conditions imposed by GoI, MoEF & CC, IRO, Bhubaneswar as well as State Govt. is sent herewith vide this office letter No.11146 dated 08.07.2021 for according final approval.12 Aug 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/OR/RAIL/39739/201902 Sep 2021APPROVED