Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
01/04/2015
|
As per letter no 5790/12-1 dated 01-04-2015
|
|
2
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
09/04/2015
|
NOC letter of Sarpanch is being submitted by user agency against essential details submitted by Forest Department
|
|
3
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
10/04/2015
|
As per letter no 5782/12-1 dated 10-04-2015
|
|
4
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
17/04/2015
|
Acknowledgement slip of recieving of original hard copy in DFO office
|
|
5
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
09/05/2015
|
1. Please give compartwise area details of Reserved Forests involved.
2. Please upload NoC from Van Panchayat involved
|
|
6
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
12/05/2015
|
As per enclose letter no 2538/12-1 dated 11-05-2015
|
|
7
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
20/05/2015
|
Objection Reply
|
|
8
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
23/05/2015
|
As pet latter no. 2726/12-1 dated 23/5/2015
|
|
9
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
27/05/2015
|
Objection Reply
|
|
10
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
29/05/2015
|
As per enclose letter no 2754/12-1 dated 29-05-2015
|
|
11
|
Regional Office
|
EDS
|
State secretary
|
13/07/2015
|
EDS letter attached.
|
|
12
|
State secretary
|
EDS
|
Nodal Officer
|
16/07/2015
|
Plz reply to obj of RO-EDS letter attached.
|
|
13
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
18/07/2015
|
Plz reply to obj of RO-EDS letter attached.
|
|
14
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
20/07/2015
|
As per latter no. 202/12-1 date 20/07/2015
|
|
15
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
01/08/2015
|
Objection
|
|
16
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
18/08/2015
|
The correction have been made as per the instruction received
|
|
17
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
20/08/2015
|
Objection
|
|
18
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
21/08/2015
|
The correction have been made as per the instruction received
|
|
19
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
01/09/2015
|
Objection
|
|
20
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
02/09/2015
|
The correction have been made as per the instruction received
|
|
21
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
04/09/2015
|
Objection Reply
|
|
22
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
10/09/2015
|
The On line objections raised by Nodal officer/Reg. Officer on date 18.07.2015 has been clarified by DFO Almora latter no 1371/12-1 dated 03-09-2015.
|
|
23
|
Nodal Officer
|
REPLY
|
State secretary
|
11/09/2015
|
this is the reply by user agency consider through CF and DFO
|
|
24
|
State secretary
|
REPLY
|
Regional Office
|
14/09/2015
|
this is the reply by user agency consider through CF and DFO
|
|
25
|
Regional Office
|
EDS
|
State secretary
|
24/09/2015
|
1.In the reply of this office EDS dated 13-07-2015 submitted by State Govt on 14-09-2015, it is mentioned that quote This is the reply by user agency consider through CF and DFO unquote. The State Govt is requested to submit point wise reply of this office EDS dated 13-07-2015 rather than simply forwarding the correspondences made between the State Govt and the subordinate offices/user agencies of the State. While submitting the point wise reply, it may be ensured that the annexures, if any, are attached in sequence of point wise reply only.
|
|
26
|
State secretary
|
EDS
|
Nodal Officer
|
24/09/2015
|
Plz reply to obj of RO-1.In the reply of this office EDS dated 13-07-2015 submitted by State Govt on 14-09-2015, it is mentioned that quote This is the reply by user agency consider through CF and DFO unquote. The State Govt is requested to submit point wise reply of this office EDS dated 13-07-2015 rather than simply forwarding the correspondences made between the State Govt and the subordinate offices/user agencies of the State. While submitting the point wise reply, it may be ensured that the annexures, if any, are attached in sequence of point wise reply only.
|
|
27
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
30/09/2015
|
please submit point wise reply on EDS raised by RO office dated 18-07-15
|
|
28
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
03/10/2015
|
As per letter no 1311/12-1 dated 03-10-2015
|
|
29
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
09/10/2015
|
Objection
|
|
30
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
23/10/2015
|
Chitai Pant-Haridatt petshali Inter college motor road till Petshal
|
|
31
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
28/10/2015
|
Objection
|
|
32
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
18/11/2015
|
The correction have been made as per the instruction received
|
|
33
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
20/11/2015
|
As per letter no 2645/12-1 dated 20-11-2015
|
|
34
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
26/11/2015
|
DFO may kindly provide point wise reply to objections raised by regional office along with numbered annexures supporting the same. DFO may give detailed reply along with his comments and annexures asked for.
|
|
35
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
28/11/2015
|
Objetion
|
|
36
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
02/03/2016
|
The correction have been made as per the instruction received
|
|
37
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
05/03/2016
|
objection
|
|
38
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
09/03/2016
|
The correction have been made as per the instruction received
|
|
39
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
10/03/2016
|
please given one side qus and one side ans
|
|
40
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
11/03/2016
|
The correction have been made as per the instruction received
|
|
41
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
15/03/2016
|
objection
|
|
42
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
06/05/2016
|
The correction have been made as per the instruction received
|
|
43
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
09/05/2016
|
objection
|
|
44
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
07/06/2016
|
The correction have been made as per the instruction received
|
|
45
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
10/06/2016
|
As per letter no 6372/12-1(2) dated 08-06-2016
|
|
46
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
17/06/2016
|
plz attached enclose
|
|
47
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
17/06/2016
|
plz all enclose no given
|
|
48
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
29/06/2016
|
The correction have been made as per the instruction received
|
|
49
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
02/09/2016
|
objection
|
|
50
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
06/09/2016
|
The correction have been made as per the instruction received
|
|
51
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
12/09/2016
|
objection
|
|
52
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
18/07/2017
|
The correction have been made as per the instruction received
|
|
53
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
24/07/2017
|
objection remove date 24-07-2017
|
|
54
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
27/07/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 30-09-2015 has been clarified by DFO Almora letter no 380/12-1 dated 24-07-2017
|
|
55
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
08/08/2017
|
find the letter attached
|
|
56
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
09/08/2017
|
find the letter attached
|
|
57
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
10/08/2017
|
objection
|
|
58
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
08/11/2017
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
21/12/2017
|
objection remove date 21-12-2017
|
|
60
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
22/12/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 08-08-2017 has been clarified by DFO Almora letter no 2548/12-1 dated 21-12-2017
|
|
61
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
01/01/2018
|
fin the letter attached
|
|
62
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
03/01/2018
|
fin the letter attached
|
|
63
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
04/01/2018
|
objection
|
|
64
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
01/06/2018
|
The correction have been made as per the instruction received
|
|
65
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
06/06/2018
|
oobjection date 06-06-2018
|
|
66
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
06/06/2018
|
The correction have been made as per the instruction received
|
|
67
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
07/06/2018
|
please provide complete information with forwarding letter and current date.
|
|
68
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
07/06/2018
|
The correction have been made as per the instruction received
|
|
69
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
11/06/2018
|
send back
|
|
70
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
11/06/2018
|
The correction have been made as per the instruction received
|
|
71
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
11/06/2018
|
send back
|
|
72
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
12/06/2018
|
The correction have been made as per the instruction received
|
|
73
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
12/06/2018
|
objection
|
|
74
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
15/06/2018
|
The correction have been made as per the instruction received
|
|
75
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
15/06/2018
|
objection reply
15-06-2018
|
|
76
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
18/06/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 01-01-2018 has been clarified by DFO Almora letter no 9619/12-1 dated 15-06-2018
|
|
77
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
26/06/2018
|
find the letter attached
|
|
78
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
26/06/2018
|
find the letter attached
|
|
79
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
26/06/2018
|
objection reply 26-06-2018
|
|
80
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
19/07/2018
|
The correction have been made as per the instruction received
|
|
81
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
20/07/2018
|
SEND BACK
|
|
82
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
23/07/2018
|
The correction have been made as per the instruction received
|
|
83
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
24/07/2018
|
objection reply
24-07-2018
|
|
84
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
26/07/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 26-06-2018 has been clarified by DFO Almora letter no 475/12-1 dated 24-07-2018
|
|
85
|
Nodal Officer
|
REPLY
|
State secretary
|
31/07/2018
|
The correction have been made as per the instruction received
|
|
86
|
State secretary
|
REPLY
|
Regional Office
|
01/08/2018
|
The correction have been made as per the instruction received
|
|
87
|
Regional Office
|
EDS
|
State secretary
|
08/08/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
88
|
State secretary
|
EDS
|
Nodal Officer
|
10/08/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
89
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
10/08/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
90
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
13/08/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
91
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
13/08/2018
|
objection
|
|
92
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
29/12/2018
|
The correction have been made as per the instruction received
|
|
93
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
31/12/2018
|
covering letter ke sat prastut kare dt 31-12-2018
|
|
94
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
05/09/2019
|
The correction have been made as per the instruction received
|
|
95
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
09/09/2019
|
objection reply dated 09-09-2019
|
|
96
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
09/09/2019
|
send back
|
|
97
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
09/09/2019
|
objection reply dated 09-09-2019
|
|
98
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
09/09/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 10-08-2019 has been clarified by DFO Almora letter no 1180/12-1 dated 09-09-2019
|
|
99
|
Nodal Officer
|
REPLY
|
State secretary
|
13/09/2019
|
The correction have been made as per the instruction received
|
|
100
|
State secretary
|
REPLY
|
Regional Office
|
14/09/2019
|
The correction have been made as per the instruction received
|
|
101
|
Regional Office
|
EDS
|
State secretary
|
01/10/2019
|
State Govt may attend the following shortcomings as per the attachment here
|
|
102
|
State secretary
|
EDS
|
Nodal Officer
|
03/10/2019
|
State Govt may attend the following shortcomings as per the attachment here
|
|
103
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
03/10/2019
|
State Govt may attend the following shortcomings as per the attachment here
|
|
104
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
03/10/2019
|
State Govt may attend the following shortcomings as per the attachment here
|
|
105
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
04/10/2019
|
objection reply dated 4-10-2019
|
|
106
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
15/10/2019
|
The correction have been made as per the instruction received
|
|
107
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
25/10/2019
|
objection reply dated 25-10-2019
|
|
108
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
30/10/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 03-10-2019 has been clarified by DFO Almora letter no 1882/12-1 dated 25-10-2019
|
|
109
|
Nodal Officer
|
REPLY
|
State secretary
|
31/10/2019
|
The correction have been made as per the instruction received
|
|
110
|
State secretary
|
REPLY
|
Regional Office
|
31/10/2019
|
The correction have been made as per the instruction received
|
|
111
|
Regional Office
|
EDS
|
State secretary
|
19/11/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
112
|
State secretary
|
EDS
|
Nodal Officer
|
20/11/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
113
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
20/11/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
114
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
21/11/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
115
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
25/11/2019
|
objection reply dated25-11-2019
|
|
116
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
10/01/2020
|
The correction have been made as per the instruction received
|
|
117
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
16/01/2020
|
objection reply dated 16-01-2020
|
|
118
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
16/01/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 20-11-2019 has been clarified by Dfo Almora letter no 3190/12-1 dated 15-01-2020
|
|
119
|
Nodal Officer
|
REPLY
|
State secretary
|
20/01/2020
|
The correction have been made as per the instruction received
|
|
120
|
State secretary
|
REPLY
|
Regional Office
|
20/01/2020
|
The correction have been made as per the instruction received
|
|
121
|
Regional Office
|
EDS
|
State secretary
|
04/02/2020
|
State Government may attend the shortcomings as per the attachment.
|
|
122
|
State secretary
|
EDS
|
Nodal Officer
|
04/02/2020
|
State Government may attend the shortcomings as per the attachment.
|
|
123
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
04/02/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
124
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
05/02/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
125
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
11/02/2020
|
objection reply dated 11-02-2020
|
|
126
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
21/07/2020
|
The correction have been made as per the instruction received
|
|
127
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
04/08/2020
|
objection reply dated 04-08-2020
|
|
128
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
06/08/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 04-02-2020 has been clarified by Dfo Almora letter no 650/12-1 dated 04-08-2020.
|
|
129
|
Nodal Officer
|
REPLY
|
State secretary
|
12/08/2020
|
The correction have been made as per the instruction received
|
|
130
|
State secretary
|
REPLY
|
Regional Office
|
12/08/2020
|
The correction have been made as per the instruction received
|
|
131
|
Regional Office
|
EDS
|
State secretary
|
29/08/2020
|
State Govt may attend the following shortcoming as per the attachment here
|
|
132
|
State secretary
|
EDS
|
Nodal Officer
|
29/08/2020
|
State Govt may attend the following shortcoming as per the attachment here
|
|
133
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
29/08/2020
|
State Govt may attend the following shortcoming as per the attachment here
|
|
134
|
CF (North Kumaun)
|
EDS
|
DFO (Almora)
|
05/09/2020
|
State Govt may attend the following shortcoming as per the attachment here
|
|
135
|
DFO (Almora)
|
EDS
|
User Agency (eecdalmorapwd@rediffmail.com)
|
08/09/2020
|
objection dated 8-09-2020
|
|
136
|
User Agency (eecdalmorapwd@rediffmail.com)
|
REPLY
|
DFO (Almora)
|
14/10/2020
|
The correction have been made as per the instruction received
|
|
137
|
DFO (Almora)
|
REPLY
|
CF (North Kumaun)
|
15/10/2020
|
eds reply dated 15-10-2020
|
|
138
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
17/10/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 29-08-2020 has been clarified by Dfo Almora letter no 2147/12-1 dated 10-10-2020
|
|
139
|
Nodal Officer
|
REPLY
|
State secretary
|
20/10/2020
|
The correction have been made as per the instruction received
|
|
140
|
State secretary
|
REPLY
|
Regional Office
|
20/10/2020
|
The correction have been made as per the instruction received
|
|