Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
07/04/2016
|
please remove the objections file attached.
|
|
2
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
11/04/2016
|
The correction have been made as per the instruction received
|
|
3
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
26/04/2016
|
Please remove the objecitons 1- Number of trees are not matching in field report and Form A Part-2 2- Religious and historical Certificate for land of proposal not uploaded
|
|
4
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
28/04/2016
|
please find the attachment. Religious and historical Certificate for land of proposal not uploaded
|
|
5
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
04/05/2016
|
The correction have been made as per the instruction received
|
|
6
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
04/05/2016
|
Sir
please find the attachment.
|
|
7
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
05/05/2016
|
Please Check the letter
|
|
8
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
06/05/2016
|
sir please find the letter.
|
|
9
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
17/05/2016
|
The correction have been made as per the instruction received
|
|
10
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
19/05/2016
|
sir please find the attachments.
|
|
11
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
25/05/2016
|
Plz reply to obj of RO-The online proposal is returned back since hard copy has not been submitted to this office simultaneously. State Govt. may resubmit the proposal online after hard copy has been provided in Regional Office. As a proof scanned copy of the receipt of hard copy from the Regional Office may also be uploaded along with online proposal. Attached Letter No. Misc./II/ROC/COP/1/2013/1846 Dated 06.11.2015 may also be referred in this regard.
|
|
12
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
27/05/2016
|
Please remove the objection
|
|
13
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
30/05/2016
|
Please remove the objection.
|
|
14
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
06/06/2016
|
The correction have been made as per the instruction received
|
|
15
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
07/06/2016
|
Sir please find the attachments.
|
|
16
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
08/06/2016
|
Sir, Please receive information of the proaposal.
|
|
17
|
Regional Office
|
EDS
|
State secretary
|
28/06/2016
|
State Govt may attend shortcomings as per the attachment.
|
|
18
|
State secretary
|
EDS
|
Nodal Officer
|
29/06/2016
|
Plz reply to obj of RO-State Govt may attend shortcomings as per the attachment.
|
|
19
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
11/07/2016
|
Plz reply to obj of RO-State Govt may attend shortcomings as per the attachment.
|
|
20
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
12/07/2016
|
Please remove the objection
|
|
21
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
12/07/2016
|
Please remove the objections
|
|
22
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
21/07/2016
|
The correction have been made as per the instruction received
|
|
23
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
21/07/2016
|
according to nodal office guidelines dated 22 june 2016. your proper answar are not uploaded in part I additional information. please remove objection as per guidelines accordingly.
|
|
24
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
26/08/2016
|
The correction have been made as per the instruction received
|
|
25
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
30/08/2016
|
please remove obuection as per guidelines accordingly.
|
|
26
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
09/09/2016
|
The correction have been made as per the instruction received
|
|
27
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
14/09/2016
|
your proper answer are not upload in part I additional information.
|
|
28
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
21/09/2016
|
The correction have been made as per the instruction received
|
|
29
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
22/09/2016
|
Please letter with enclosure page no wise attached additional information.
|
|
30
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
18/10/2016
|
The correction have been made as per the instruction received
|
|
31
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
22/10/2016
|
accordingh to nodal office guidelines dated 22 june 2016. your proper answer are not uploaded in partI additional information. Please remove ojection as per guidelines accordingly.
|
|
32
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
17/04/2017
|
The correction have been made as per the instruction received
|
|
33
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
24/04/2017
|
proper answer are not uploaded in partI additional information. Please remove ojection as per guidelines accordingly.
|
|
34
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
11/05/2017
|
The correction have been made as per the instruction received
|
|
35
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
19/05/2017
|
Please attachment letter
|
|
36
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
07/06/2017
|
The correction have been made as per the instruction received
|
|
37
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
12/06/2017
|
Please remove the objection.
|
|
38
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
21/06/2017
|
The correction have been made as per the instruction received
|
|
39
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
24/06/2017
|
Please remove the objection.
|
|
40
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
10/07/2017
|
The correction have been made as per the instruction received
|
|
41
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
11/07/2017
|
Please eds date 12-07-2016 answer properly uploaded.
|
|
42
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
21/08/2017
|
The correction have been made as per the instruction received
|
|
43
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
23/08/2017
|
eds date 12-07-2016 answer properly not uploaded.please your own letter attached.
|
|
44
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
09/09/2017
|
The correction have been made as per the instruction received
|
|
45
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
12/09/2017
|
please CA map attached
|
|
46
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
12/09/2017
|
The correction have been made as per the instruction received
|
|
47
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
28/12/2017
|
sir, eds reply
|
|
48
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
15/01/2018
|
sir please find the information of the proposal.
|
|
49
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
17/01/2018
|
find the letter attached
|
|
50
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
17/01/2018
|
please remove the objection.
|
|
51
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
17/01/2018
|
Please remove the objection.
|
|
52
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
06/02/2018
|
The correction have been made as per the instruction received
|
|
53
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
23/04/2018
|
Sir, EDS objection remove.
|
|
54
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
25/04/2018
|
please attach relevant documents
|
|
55
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
26/04/2018
|
Sir EDS objection reply.
|
|
56
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
04/05/2018
|
please attach relevant documents.
|
|
57
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
21/06/2018
|
please remove the objection.
|
|
58
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
09/08/2018
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
23/08/2018
|
Please remove the objection.
|
|
60
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
20/11/2018
|
The correction have been made as per the instruction received
|
|
61
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
20/12/2018
|
Sir,
The EDS objection has been removed.
|
|
62
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
29/12/2018
|
sir please receive the information of the proposal.
|
|
63
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
08/01/2019
|
Plz reply to obj of RO-State Govt may attend shortcomings as per the attachment.
|
|
64
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
10/01/2019
|
please remove the objection.
|
|
65
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
14/01/2019
|
Please remove the objection.
|
|
66
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
25/01/2019
|
The correction have been made as per the instruction received
|
|
67
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
02/02/2019
|
Sir,
EDS Objection Has Been Removed By User Agency.
|
|
68
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
15/02/2019
|
sir please receive the information of the proposal.
|
|
69
|
Nodal Officer
|
REPLY
|
State secretary
|
13/03/2019
|
The correction have been made as per the instruction received
|
|
70
|
State secretary
|
REPLY
|
Regional Office
|
26/03/2019
|
The correction have been made as per the instruction received
|
|
71
|
Regional Office
|
EDS
|
State secretary
|
30/04/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
72
|
State secretary
|
EDS
|
Nodal Officer
|
02/05/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
73
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
02/05/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
74
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
06/05/2019
|
please remove the objection.
|
|
75
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
08/05/2019
|
please remove the objection.
|
|
76
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
07/08/2019
|
The correction have been made as per the instruction received
|
|
77
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
29/08/2019
|
please remove the objection.
|
|
78
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
31/08/2019
|
The correction have been made as per the instruction received
|
|
79
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
20/09/2019
|
sir, EDS objection has been remove by user agency.
|
|
80
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
23/09/2019
|
Sir Please received the information this proposal
|
|
81
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
05/10/2019
|
please send rectified eds as hard copy with corrected annexure
|
|
82
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
09/10/2019
|
please send rectified eds as hard copy with corrected annexure
|
|
83
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
14/10/2019
|
please send rectified eds as hard copy with corrected annexure
|
|
84
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
14/10/2019
|
The correction have been made as per the instruction received
|
|
85
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
11/11/2019
|
From the office of the Additional Chief Conservator of Forest and forest coservation Office has sent the post on 26.09.2019 by post. A copy of the invoice is attached.
|
|
86
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
07/12/2019
|
Sir Please received the information this proposal
|
|
87
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
17/12/2019
|
find the letter attached
|
|
88
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
17/12/2019
|
Sir Please remove the objection
|
|
89
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
21/12/2019
|
sir please remove the objection.
|
|
90
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
04/01/2020
|
The correction have been made as per the instruction received
|
|
91
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
26/01/2020
|
Sir, EDS objection has been removed.
|
|
92
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
03/02/2020
|
Sir Please received the information this proposal
|
|
93
|
Nodal Officer
|
REPLY
|
State secretary
|
07/02/2020
|
Required documents uploaded for your further necessary action.
|
|
94
|
State secretary
|
REPLY
|
Regional Office
|
07/02/2020
|
The correction have been made as per the instruction received
|
|
95
|
Regional Office
|
EDS
|
State secretary
|
19/02/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
96
|
State secretary
|
EDS
|
Nodal Officer
|
19/02/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
97
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
21/02/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
98
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
22/02/2020
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
99
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
27/02/2020
|
please remove the objection.
|
|
100
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
08/07/2020
|
The correction have been made as per the instruction received
|
|
101
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
27/07/2020
|
EDS objection no 01 has not correction. user agency may mark beneficariy village add in KML file and show their path distance from existing chamoli-paleth-sartoli motor road.
|
|
102
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
27/11/2020
|
The correction have been made as per the instruction received
|
|
103
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdgpr1@gmail.com)
|
30/12/2020
|
EDS objection no 01 has not correction. user agency may mark beneficariy village add in KML file and show their path distance from existing chamoli-paleth-sartoli motor road.
|
|
104
|
User Agency (eepdgpr1@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
02/01/2021
|
The correction have been made as per the instruction received
|
|
105
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
08/01/2021
|
Sir, EDS objection has been removed by user agency.
|
|
106
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
13/01/2021
|
Sir Please received the information this proposal
|
|
107
|
Nodal Officer
|
REPLY
|
State secretary
|
01/02/2021
|
Required documents uploaded for your further necessary action.
|
|
108
|
State secretary
|
REPLY
|
Regional Office
|
01/02/2021
|
Required documents uploaded for your further necessary action.
|
|