Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/ROAD/16321/2015
|
8B/UCP/06/89/2016/FC
|
Forest Land Transfer Proposal for New Construction of Simli Sheleshwar Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.44
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2015
|
Stage-I Approval on
|
:
|
28 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2024
|
|
|
|
|
2
|
Uttarakhand
|
FP/UK/ROAD/9495/2015
|
8B/UCP/06/75/2017/FC
|
Construction of Atal adrash Village Dewing motor road
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.1
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2016
|
Stage-I Approval on
|
:
|
31 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2024
|
|
|
|
|
3
|
Uttarakhand
|
FP/UK/ROAD/11039/2015
|
8B/UCP/06/147/2016/FC
|
Construction of Diwalikhal-Kimoli to Narayanbagar Motor Road
|
Road
|
PWD CD GAIRSAIN
|
6.52
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2015
|
Stage-I Approval on
|
:
|
28 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2024
|
|
|
|
|
4
|
Uttarakhand
|
FP/UK/ROAD/9768/2015
|
1(115)/15
|
Const. of Bhunsal Chaund to Dobha Motor Road under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.49
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2015
|
Stage-I Approval on
|
:
|
02 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
20 Feb 2025
|
|
|
|
|
5
|
Uttarakhand
|
FP/UK/ROAD/16300/2015
|
1(116)/2016
|
Pandeykharak-Jijoli Govt. Polytechnic Link motor road in District-Bageshwar (CM Ghosna-668/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.957
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2015
|
Stage-I Approval on
|
:
|
06 Jul 2017
|
Compliance Report Submitted by User Agency on
|
:
|
21 Apr 2025
|
|
|
|
|
6
|
Uttarakhand
|
FP/UK/ROAD/18605/2016
|
8B/UCP/06/154/2016/FC
|
Construction of motor road from Km. 4 of Rampur-Gawana motor road to village Surari in district Pauri.
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.25
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2016
|
Stage-I Approval on
|
:
|
06 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
|
7
|
Uttarakhand
|
FP/UK/ROAD/38305/2019
|
8B/UCP/06/52/2020/FC
|
Construction of Ghansali Ghuttu km 13 to Kothar village M/R
|
Road
|
EEPMGSYTEHRI
|
1.818
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2019
|
Stage-I Approval on
|
:
|
28 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
31 May 2025
|
|
|
|
|
8
|
Uttarakhand
|
FP/UK/ROAD/28961/2017
|
8B/UCP/06/150/2018/FC
|
Construction of Motor road from Dungri to Koung-Pothani-Bounla
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.54
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2017
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jan 2025
|
|
|
|
|
9
|
Uttarakhand
|
FP/UK/ROAD/12313/2015
|
8B/UCP/06/180/2016/FC
|
Construction of Ghurshal to Saikot motor road. Under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.772
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
Stage-I Approval on
|
:
|
17 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/50196/2020
|
8B/UCP/06/68/2021/FC
|
Taituda to naini Motor road under PMGSY
|
Road
|
PIU PMGSY WORK GAIRSAIN
|
1.475
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2020
|
Stage-I Approval on
|
:
|
29 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
|
11
|
Uttarakhand
|
FP/UK/ROAD/8286/2014
|
8B/UCP/06/92/2018/FC
|
Construction of Jinoli-Tari-Sakdina motor road
|
Road
|
EE CD NAINITAL
|
1.6275
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2014
|
Stage-I Approval on
|
:
|
16 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2024
|
|
|
|
|
12
|
Uttarakhand
|
FP/UK/ROAD/15727/2015
|
1(268)/2016
|
Raunlek to Mohannagar-Jaggi-bagwan Motor Road
|
Road
|
EECDPWDUKM
|
2.126
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Oct 2015
|
Stage-I Approval on
|
:
|
12 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2024
|
|
|
|
|
13
|
Uttarakhand
|
FP/UK/ROAD/16722/2015
|
8B/UCP/06/130/2016/ FC
|
construction of NAULAPUR -KHETU- KEDARGALI -KONAGAD -GHODIYANA -BIRONKHAL MOTOR ROAD
|
Road
|
PWD
|
2.43
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2015
|
Stage-I Approval on
|
:
|
19 Oct 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2024
|
|
|
|
|
14
|
Uttarakhand
|
FP/UK/ROAD/10464/2015
|
1(482)/2015
|
Shumbhoo ki chauki to Dadau-Panjiya-Banasar-Thurau MR extention
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.8536
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2015
|
Stage-I Approval on
|
:
|
30 Sep 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2024
|
|
|
|
|
15
|
Uttarakhand
|
FP/UK/ROAD/40897/2019
|
1(14)/2020
|
Construction Of Danda Guveen (Gram Sabha Guveen) Motor Road in Bironkhal Block, District Pauri Garhwal, Uttarakhand
|
Road
|
PWD
|
0.99
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2019
|
Stage-I Approval on
|
:
|
18 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Mar 2025
|
|
|
|
|
16
|
Uttarakhand
|
FP/UK/ROAD/26799/2017
|
8B/UCP/06/139/2018/FC
|
Silkyara (Shivgufa) to Manjgaon motor road.
|
Road
|
EXECUTIVE ENGINEER PD PWD UTTARKASHI
|
1.31
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2017
|
Stage-I Approval on
|
:
|
20 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jun 2024
|
|
|
|
|
17
|
Uttarakhand
|
FP/UK/ROAD/10568/2015
|
8B/UCP/06/90/2015-FC
|
Telunga (Majaf) to Gholdiyani Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.925
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2015
|
Stage-I Approval on
|
:
|
12 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2024
|
|
|
|
|
18
|
Uttarakhand
|
FP/UK/ROAD/37269/2018
|
8B/UCP/06/157/2021/FC
|
Construction of Miyagad Kunara Motor Road in Block Mori, District: Uttarkashi
|
Road
|
PWD
|
2.8175
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2018
|
Stage-I Approval on
|
:
|
30 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
19
|
Uttarakhand
|
FP/UK/ROAD/46634/2020
|
8B/UCP/06/11/2021/FC
|
Construction of motor road in district Nainital under Ramgarh Block via Nathuwakhan Suyalbari motor road, chhimi to Matela till Tola Bhumiya dev Mandir
|
Road
|
EE CD NAINITAL
|
1.755
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2020
|
Stage-I Approval on
|
:
|
17 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Dec 2024
|
|
|
|
|
20
|
Uttarakhand
|
FP/UK/ROAD/14200/2015
|
01(82)/2018
|
Construction of Roong Sirkha Motor Road KM-3.00
|
Road
|
CONSTRUCTION DIVISION PWD ASKOTE
|
0.45
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jul 2015
|
Stage-I Approval on
|
:
|
25 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2025
|
|
|
|
|
21
|
Uttarakhand
|
FP/UK/ROAD/43504/2019
|
1(16)/2020
|
In District pauri garhwal construction of Kothila-Khitotiya motor Road from NH band
|
Road
|
PWD
|
0.945
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Dec 2019
|
Stage-I Approval on
|
:
|
18 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Mar 2025
|
|
|
|
|
22
|
Uttarakhand
|
FP/UK/ROAD/8938/2014
|
1(163)/2014
|
Sunaldi to jastadi Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.7825
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Dec 2014
|
Stage-I Approval on
|
:
|
14 Jun 2016
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2025
|
|
|
|
|
23
|
Uttarakhand
|
FP/UK/ROAD/16239/2015
|
8B/UCP/06/3/2016/FC
|
Forest Land Transfer Proposal for Construction of Gwala Bherni Motor Road Under C.M.Ghosna
|
Road
|
PUBLIC WORKS DEPARTMENT
|
4.957
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Oct 2015
|
Stage-I Approval on
|
:
|
24 Nov 2017
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2025
|
|
|
|
|
24
|
Uttarakhand
|
FP/UK/ROAD/62388/2020
|
8B/UCP/06/80/2021/FC
|
Construction of Gwad -didoli-riktoli-partoli-kimoli Motor road
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
2.2
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2020
|
Stage-I Approval on
|
:
|
29 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 May 2025
|
|
|
|
|
25
|
Uttarakhand
|
FP/UK/ROAD/43022/2019
|
1(10)/2020
|
Construction of VILLAGE SYUNSI TO AAMKULAUN MOTOR ROAD IN BIROKHAL BLOCK DISTT PAURI GARHWAL UTTARAKHAND
|
Road
|
PWD
|
0.99
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2019
|
Stage-I Approval on
|
:
|
03 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2024
|
|
|
|
|
26
|
Uttarakhand
|
FP/UK/ROAD/20210/2016
|
8B/UCP/06/01/2017/FC
|
Construction of Paul Gaon Motor Road from N.H. 123
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.28
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2016
|
Stage-I Approval on
|
:
|
16 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2025
|
|
|
|
|
27
|
Uttarakhand
|
FP/UK/ROAD/8917/2014
|
1(46)/2018
|
Ramkot to Pattharkot
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.63
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
20 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
|
28
|
Uttarakhand
|
FP/UK/ROAD/8912/2014
|
1(84)/15
|
Kanalichina to Lwanthi Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.62
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
01 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/8915/2014
|
1(95)/15
|
badabe to undana motor road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.27
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
13 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2025
|
|
|
|
|
30
|
Uttarakhand
|
FP/UK/ROAD/8912/2014
|
1(84)/15
|
Kanalichina to Lwanthi Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.62
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
01 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
|
31
|
Uttarakhand
|
FP/UK/ROAD/154869/2022
|
8B/UCP/06/40/2023/FC
|
Construction of road from Km 15 of BaijnathBageshwar motor road to Udalgaon in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.261
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2022
|
Stage-I Approval on
|
:
|
31 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2025
|
|
|
|
|
32
|
Uttarakhand
|
FP/UK/ROAD/8248/2014
|
8B/UCP/06/91/2018/FC
|
Darmoli-Pitholi motor road.
|
Road
|
EE CD NAINITAL
|
1.19
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2014
|
Stage-I Approval on
|
:
|
17 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2025
|
|
|
|
|
33
|
Uttarakhand
|
FP/UK/ROAD/36547/2018
|
8B/UCP/06/82/2021/FC
|
Narayanbagar-Chopta Motor Road to Paithani Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.583
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2019
|
Stage-I Approval on
|
:
|
17 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
|
34
|
Uttarakhand
|
FP/UK/ROAD/151552/2022
|
8B/UCP/06/51/2022/FC
|
c/o Manan to Chandrapur Link Motor road
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
1.08
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2022
|
Stage-I Approval on
|
:
|
04 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Apr 2025
|
|
|
|
|
35
|
Uttarakhand
|
FP/UK/ROAD/8888/2014
|
8B/UCP/06/119/2018/FC
|
Baluwakot to Kanda Motor Road Km 2.000
|
Road
|
CONSTRUCTION DIVISION PWD ASKOTE
|
1.85
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Dec 2014
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2024
|
|
|
|
|
36
|
Uttarakhand
|
FP/UK/WATER/41746/2019
|
8B/UCP/09/41/2020/FC
|
Chamba Nagar (Re-organization) Pumping Drinking Water Supply Scheme
|
Drinking Water
|
UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM
|
0.908
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Aug 2019
|
Stage-I Approval on
|
:
|
22 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2024
|
|
|
|
|
37
|
Uttarakhand
|
FP/UK/ROAD/46607/2020
|
8B/UCP/06/15/2021/FC
|
New construction of motor road from Pangkatara to Khalar under developmental Betalghat of Vidhan Sabha constituency of Nainital district under state plan
|
Road
|
EE CD NAINITAL
|
1.71
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2020
|
Stage-I Approval on
|
:
|
18 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2024
|
|
|
|
|
38
|
Uttarakhand
|
FP/UK/ROAD/10386/2015
|
8B/UCP/06/69/2016/FC
|
Naugaon-Barhkot-Tilari LVR upgradation to Motor Road and surface painting
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.553
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2015
|
Stage-I Approval on
|
:
|
25 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2024
|
|
|
|
|
39
|
Uttarakhand
|
FP/UK/ROAD/10416/2015
|
1(190)/2015
|
Ratkhet To Jharkot Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.05
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2015
|
Stage-I Approval on
|
:
|
01 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
|
40
|
Uttarakhand
|
FP/UK/ROAD/10396/2015
|
1(554)/2015
|
construction of Cheri Bangla Mathigaon motor road
|
Road
|
PWD
|
2.275
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2015
|
Stage-I Approval on
|
:
|
07 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
|
41
|
Uttarakhand
|
FP/UK/ROAD/34350/2018
|
8B/UCP/06/67/2019/FC
|
Pura Inter college through Kool-Birkhan-Sood motor road.
|
Road
|
EE CD NAINITAL
|
1.458
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2018
|
Stage-I Approval on
|
:
|
09 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2025
|
|
|
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/12006/2015
|
1(25)/2017
|
Construction of Tolab to Pandi Motor Road under District secter
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.63
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Apr 2015
|
Stage-I Approval on
|
:
|
06 Jul 2017
|
Compliance Report Submitted by User Agency on
|
:
|
20 Feb 2025
|
|
|
|
|
43
|
Uttarakhand
|
FP/UK/ROAD/17177/2015
|
8B/UCP/06/95/2017/FC
|
Chapoli to Takoli-Chamogi via Bhainswari motor road
|
Road
|
PWD
|
1.746
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2015
|
Stage-I Approval on
|
:
|
30 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
05 May 2025
|
|
|
|
|
44
|
Uttarakhand
|
FP/UK/ROAD/48741/2020
|
8B/UCP/06/63/2021/FC
|
Construction of Sansman-Kaudiyala motor road to connect it NH-58 in District Tehri Garhwal
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.225
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2020
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jun 2024
|
|
|
|
|
45
|
Uttarakhand
|
FP/UK/ROAD/48741/2020
|
8B/UCP/06/63/2021/FC
|
Construction of Sansman-Kaudiyala motor road to connect it NH-58 in District Tehri Garhwal
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.225
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2020
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jun 2024
|
|
|
|
|
46
|
Uttarakhand
|
FP/UK/ROAD/42084/2019
|
1(94)/2020
|
New Construction of Patharkhani to Selkatiya, Dubaliya, Vijurkanda, Dhuira Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.847
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2019
|
Stage-I Approval on
|
:
|
07 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
|
47
|
Uttarakhand
|
FP/UK/ROAD/42148/2019
|
1(93)/2020
|
New Construction of Sukauli Gankot to Rawalgaon Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.765
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2019
|
Stage-I Approval on
|
:
|
07 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
|
48
|
Uttarakhand
|
FP/UK/ROAD/42088/2019
|
1(91)/2020
|
New construction of Machinakholi to Kanari Vishad Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.81
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2019
|
Stage-I Approval on
|
:
|
07 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2025
|
|
|
|
|
49
|
Uttarakhand
|
FP/UK/ROAD/29385/2017
|
8B/UCP/06/47/2018/FC
|
Dewal-Mundoli Motor Road to G.I.C. Mundoli Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.288
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2017
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jul 2024
|
|
|
|
|
50
|
Uttarakhand
|
FP/UK/ROAD/48913/2020
|
8B/UCP/06/56/2021/FC
|
Construction of Nandkeshri-Purna to Dhara Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.435
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Aug 2020
|
Stage-I Approval on
|
:
|
31 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
|
|