PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UK-09/2020
1. Location of the project/Scheme : Uttarakhand
 (i) State / Union Territory : Uttarakhand  (ii) District : Tehri Garhwal  (iii) Forest Division : Tehri,New Tehri  (iv) Area of forest land proposed for diversion (in ha.) : 0.908  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Tehri,New Tehri0.3698Reserved Forest
2Tehri,New Tehri0.5382Civil Soyam land
Total 0.908
Division 1. : Tehri,New Tehri
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Tehri Garhwal0.908
Total0.908
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.9080.1Eco 5
Total. 0.908


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Quercus leucotricophoraBanj442000
Total 4 42 00 0
Sub Total (No of Trees.) 10


5. Working plan prescription for the forest land proposed for diversion : Protection working circle
6. Brief note on vulnerability of the forest area to erosion : Being hilly terrain, the problem of soil erosion to some extend cannot be ignored.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.001
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Leopard, Barking deer, Jackal, Monkey, Jungli Suar.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: NA (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
1 Tree Enumeration Details
2 CA land details and Gap filling Plantation Scheme
3 Recommendation
4 SIR DFO
5 Muck Dumping-NPV Sheet-RCC Piller-Lees Time-No violation FCA 1980
6 Alternative Alignment Cancel-No Alternate Land-Land Schedule-Project length Width-Bar chart- No work Certificate
7 Arial Distance Certificate
8 EDS reply letter EDS date-01-05-2020
9 District profile
10 EDS reply letter EDS date-13-07-2020

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tehri Garhwal3642001432684753.375312756.4902/07/20202668.063233.806
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Tehri,New TehriBhagirathiDFOYesOne22/01/2020
 BhagirathiCFYesOne14/02/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Tehri,New TehriBhagirathiDFO Recommended To facilitate local people for drinking water supply
BhagirathiCF RecommendedRecommendedYes
Nodal Officer RecommendedAs per file attached
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
UttarakhandState SecretaryRecommended29/03/2020 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
DehradunRegional Office8B/UCP/09/41/2020/FC22/09/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UK/WATER/41746/2019WATER4174620194781,208,882.001,208,882.002021-01-18PUNBH21018795199Corporation BankNEFT/RTGS (Challan)2020-12-102021-01-01
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 1.816   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1.816
  Status of CA Land so identified : Forest Area   Site Name : Tehri Range, Sarjula Beat, Sarjula - 1A   Location Details : Tehri Range, Sarjula Beat, Sarjula - 1A   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Tehri RangeRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UK/WATER/41746/201910 Oct 2024No DataAs per above information
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UK/WATER/41746/201921 Nov 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UK/WATER/41746/2019Approved In-PrincipleNo Data