Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/OFC/42713/2019
|
3106/Sec.II/2022/1939297
|
Laying of Under Ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.26
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2019
|
Stage-I Approval on
|
:
|
10 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/TRANS/26388/2017
|
4-APA056/2018-CHN
|
765 KV Double Circuit line from Chilakaluripeta to Kadapa.
|
Transmission Line
|
POWER SYSTEM SOUTHERN INTERCONNECTOR TRANSMISSION SYSTEM LIMITED
|
74.486
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 May 2017
|
Stage-I Approval on
|
:
|
05 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
28 Feb 2020
|
|
|
|
03 Feb 2021
|
3
|
Andhra Pradesh
|
FP/AP/Pipeline/41405/2019
|
4-APB138/2021-VIJ
|
KSR Prince Hatcheries
|
Pipeline
|
KSR PRINCE HATCHERIES
|
0.14
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jul 2019
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2023
|
|
|
|
16 Jun 2023
|
4
|
Andhra Pradesh
|
FP/AP/TRANS/150705/2021
|
F.No.4-APB171/2022-VIJ
|
Erection of 220 KV DC line from 400/220 KV SS Jammalamadugu to the proposed 220/132/33 KV SS at Bethamcherla in Kurnool District
|
Transmission Line
|
APTRANSCO KURNOOL
|
2.63
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2021
|
Stage-I Approval on
|
:
|
03 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2024
|
|
|
|
01 Oct 2024
|
5
|
Andhra Pradesh
|
FP/AP/TRANS/65723/2020
|
4-APC135/2021-VIJ
|
400/220 KV Overhead Transmission Line works from 400/220kV Kalpakka Substation to the proposed Cable Pot Head Station for HPCL Refinery at Vizag
|
Transmission Line
|
HPCL, VISAKH REFINERY
|
11.38
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2020
|
Stage-I Approval on
|
:
|
11 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2023
|
|
|
|
10 May 2023
|
6
|
Andhra Pradesh
|
FP/AP/TRANS/37314/2018
|
G.O.Ms.No.30
|
Making LILO arrangement of 132KV Tadepalli -Tadikonda line to the proposed 132/33KV AIIMS SS at Mangalagiri in Guntur district.
|
Transmission Line
|
EXECUTIVE ENGINEER CONSTRUCTION CRDA DIVISION GUNTUR
|
0.82
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2018
|
Stage-I Approval on
|
:
|
29 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2020
|
|
|
|
|
7
|
Andhra Pradesh
|
FP/AP/ROAD/153799/2022
|
4-APB199/2022-VIJ
|
Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Paderu to Araku section from Km 2.400 to Km 51.772 of NH-516E in the State of Andhra Pradesh under GNHCP on EPC Mode with
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
2.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2022
|
Stage-I Approval on
|
:
|
19 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2023
|
|
|
|
05 Jun 2024
|
8
|
Andhra Pradesh
|
FP/AP/ROAD/146577/2021
|
4-APA208/2023-VIJ
|
Rehabilitation and up-gradation of National Highway-565 from Km 133.922 to Km 154.900 (Davupally to Mallapalem Junction) to two lanes with paved shoulders in the state of Andhra Pradesh u
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS-RO-VIJAYAWADA
|
38.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
11 Oct 2024
|
9
|
Andhra Pradesh
|
FP/AP/ROAD/37340/2018
|
G.O.Ms.No.8
|
Lolangipadu to Pedapolam
|
Road
|
Executive Engineer PR Paderu
|
1.79
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2018
|
Stage-I Approval on
|
:
|
18 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
10
|
Andhra Pradesh
|
FP/AP/ROAD/30975/2017
|
4-APB063/2018-CHN
|
Relaying of Visakha Valley School Road from NH-16 Jn., to Beach Road, Visakhapatnam
|
Road
|
BOIDI SESHARAO
|
1.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2018
|
Stage-I Approval on
|
:
|
06 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2021
|
|
|
|
10 Jan 2022
|
11
|
Andhra Pradesh
|
FP/AP/RAIL/17757/2016
|
4-APA013/2016-CHN
|
Construction of New BG Railway line between Nadikudiand Srikalahasti Stations.
|
Railway
|
DEPUTY CHIEF PROJECT MANAGER WORLD CLASS
|
118.725
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2016
|
Stage-I Approval on
|
:
|
20 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Aug 2021
|
|
|
|
30 Jul 2021
|
12
|
Andhra Pradesh
|
FP/AP/Pipeline/42672/2019
|
4-APB124/2021-VIJ
|
Laying of 20 inch gas Pipeline (about 31 km) from Offshore Platform to Onshore gas Terminal at Mallavaram
|
Pipeline
|
ONGC
|
3.26
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Oct 2019
|
Stage-I Approval on
|
:
|
17 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Oct 2021
|
|
|
|
10 Feb 2022
|
13
|
Andhra Pradesh
|
FP/AP/ROAD/37337/2018
|
G.O.Ms.No.15
|
Magathapalem to Vedurupalli
|
Road
|
Executive Engineer PR Paderu
|
1.6
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2018
|
Stage-I Approval on
|
:
|
16 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
14
|
Andhra Pradesh
|
FP/AP/ROAD/29874/2017
|
4-APC129/2021-VIJ
|
Upgradation of NH-167B from Km 99/103 to 191/050 i.e from CS puram to Singarayakonda (Old NH 16 ) to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
9.33
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2017
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2024
|
|
|
|
|
15
|
Andhra Pradesh
|
FP/AP/ROAD/33876/2018
|
4-APC191/2022-VIJ
|
Diversion of 5.94 Ha in Nellore Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
5.94
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
02 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2024
|
|
|
|
20 Aug 2024
|
16
|
Andhra Pradesh
|
FP/AP/ROAD/33878/2018
|
G.O.Ms No.133
|
Diversion of 1.79 Ha in Giddalur Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
1.79
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
30 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2023
|
|
|
|
|
17
|
Andhra Pradesh
|
FP/AP/ROAD/145376/2021
|
4-APB151/2022-VIJ
|
Proposal for Diversion of 0.46 ha. land for alignment of approach road till main entrance gate of AIIMS (Eastern road-Bell mouth) in Compartment No.132, Mangalagiri Block of Tadepalli Reserve Forest in Guntur Division in favour of Executive Engineer (R&B) Division, Guntur., under FC Act 1980.
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
0.46
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2021
|
Stage-I Approval on
|
:
|
17 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2024
|
|
|
|
01 Jun 2024
|
18
|
Andhra Pradesh
|
FP/AP/HYD/35371/2018
|
8-32/2019-FC
|
Pumped Storage Component of Pinnapuram IREP
|
Hydel
|
GREENKO ENERGIES PRIVATE LIMITED
|
365.66
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Aug 2018
|
Stage-I Approval on
|
:
|
23 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
14 Apr 2021
|
|
|
|
24 May 2021
|
19
|
Andhra Pradesh
|
FP/AP/OFC/36777/2018
|
4-APB098/2020-CHN
|
Laying of Under Ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
2.18
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2018
|
Stage-I Approval on
|
:
|
19 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
05 Jun 2024
|
20
|
Andhra Pradesh
|
FP/AP/ROAD/64525/2020
|
4-APB125/2021-VIJ
|
Diversion of 0.85 Ha of forest land in Compartment no-132,Tadepalli RF,Guntur division,for providing BT surface to the road from Brhamanandapuram Crurch to AIIMS road in f/o Municipal Commissioner,Ta
|
Road
|
COMMISSIONER ,TADEPALLI MUNICIPALITY
|
0.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
18 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2022
|
|
|
|
07 Feb 2022
|
21
|
Andhra Pradesh
|
FP/AP/ROAD/37312/2018
|
G.O.Ms.No.9
|
Solabham to Ambalmamidi
|
Road
|
Executive Engineer PR Paderu
|
1.82
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2018
|
Stage-I Approval on
|
:
|
19 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
22
|
Andhra Pradesh
|
FP/AP/ROAD/34401/2018
|
G.O.Ms.No.119
|
Vantlamamidi PV R&B road to Vanjparthi
|
Road
|
Executive Engineer PR Paderu
|
3.11
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2018
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
23
|
Andhra Pradesh
|
FP/AP/ROAD/23801/2017
|
G.O.Rt.No.68
|
Diversion of Forest land for formation and BT to the road including construction of culverts from ZPP road to Sirasaguda
|
Road
|
Executive Engineer PR Paderu
|
3.3854
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2017
|
Stage-I Approval on
|
:
|
22 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
24
|
Andhra Pradesh
|
FP/AP/ROAD/23794/2017
|
G.O.Rt.No.69
|
Formation & BT to the road including construction of Culverts from ZPP road to Dhanasanivalasa
|
Road
|
Executive Engineer PR Paderu
|
4.7637
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2017
|
Stage-I Approval on
|
:
|
24 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
25
|
Andhra Pradesh
|
FP/AP/ROAD/44671/2020
|
4-APB108/2021-VIJ
|
Dabbagunta to Pallapudungada
|
Road
|
EXICUTIVE ENGINEER
|
4.36
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2020
|
Stage-I Approval on
|
:
|
05 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jan 2024
|
|
|
|
|
26
|
Andhra Pradesh
|
FP/AP/IND/10371/2015
|
4-APB010/2015-CHN
|
Development of Vashishta and S1 Deepwater Project
|
Industry
|
ONGC
|
0.49
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2015
|
Stage-I Approval on
|
:
|
21 Aug 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2016
|
|
|
|
09 Jan 2017
|
27
|
Andhra Pradesh
|
FP/AP/RAIL/147706/2021
|
4-APC145/2022-VIJ
|
Diversion in an area of 32.25 Ha of forest land in Nandyal and Giddalur division for execution of various engineering works for laying of doubling railway line between Guntur and Guntakal stations".
|
Railway
|
INDIAN RAILWAY SOUTH CENTRAL RAILWAY
|
32.25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2021
|
Stage-I Approval on
|
:
|
10 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
20 Aug 2024
|
28
|
Andhra Pradesh
|
FP/AP/ROAD/12568/2015
|
G.O.Ms.No.2
|
Karakavalasa Road to Marika
|
Road
|
EXICUTIVE ENGINEER
|
4.38
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2015
|
Stage-I Approval on
|
:
|
02 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2023
|
|
|
|
|
29
|
Andhra Pradesh
|
FP/AP/ROAD/28853/2017
|
4-APC132/2021-VIJ
|
Upgradation of existing NH 30 from Km.169.770 to 236.150 of Vijayawada to Jagadalpur section to two lane with paved shoulders in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
25.31
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Oct 2017
|
Stage-I Approval on
|
:
|
28 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Nov 2024
|
|
|
|
30 Dec 2024
|
30
|
Andhra Pradesh
|
FP/AP/TRANS/25855/2017
|
G.O.Rt.No.127
|
132KV DC/SC line from 132/33KV SS Vengalayapalem to 25KV RTSS, Nallapadu
|
Transmission Line
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR
|
0.51
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2017
|
Stage-I Approval on
|
:
|
22 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2019
|
|
|
|
|
31
|
Andhra Pradesh
|
FP/AP/Pipeline/42197/2019
|
4-APB130/2021-VIJ
|
Pipeline to eastablish Avanti feeds
|
Pipeline
|
AVANTI FEEDS LIMITED
|
0.11
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Sep 2019
|
Stage-I Approval on
|
:
|
18 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2022
|
|
|
|
07 Feb 2022
|
32
|
Andhra Pradesh
|
FP/AP/Others/38959/2019
|
4-APB102/2020-CHN
|
Diversion of forest land for erecting obstacle light mast for aviation purpose at Kadapa Airport
|
Others
|
AIRPORTS AUTHORITY OF INDIA, KADAPA
|
0.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2019
|
Stage-I Approval on
|
:
|
07 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jan 2022
|
|
|
|
21 Feb 2022
|
33
|
Andhra Pradesh
|
FP/AP/ROAD/25731/2017
|
4-APC053/2017-CHN
|
Rehabilitation and Up-gradation of Eeppurpalem - Ongole section from Km 195+000 to Km 254+500 of NH-214A (New NH-216).
|
Road
|
HIGHWAYS
|
10.64
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Apr 2017
|
Stage-I Approval on
|
:
|
29 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2022
|
|
|
|
15 Jul 2022
|
34
|
Andhra Pradesh
|
FP/AP/OFC/62261/2020
|
4-APB188/2022-VIJ
|
Laying of Under Ground Optical Fiber Cable (OFC) between Udayagiri-Duttalur
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.19
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Nov 2020
|
Stage-I Approval on
|
:
|
26 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
35
|
Andhra Pradesh
|
FP/AP/ROAD/26324/2017
|
4-APB050/2017-CHN
|
Upgradation of NH-67 from Km 589/000 to 641/000 i.e from Mydukur to Dornala’T’ junction to two lane with paved shoulders in the State of Andhra Pradesh under NHDP-IV on EPC basis.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
2.55
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 May 2017
|
Stage-I Approval on
|
:
|
06 Sep 2018
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2020
|
|
|
|
02 Jul 2021
|
36
|
Andhra Pradesh
|
FP/AP/OFC/35350/2018
|
G.O.Ms.No.10
|
Laying of Under ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
4.64
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2018
|
Stage-I Approval on
|
:
|
31 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
37
|
Andhra Pradesh
|
FP/AP/ROAD/29446/2017
|
4-APB052/2017-CHN
|
Rehabilitation and up gradation of NH-42 (old N H – 219) from km. 58/600 to 140/680 (Palamaneru to Krishnagiri Border Section) to two lane with paved shoulders in the State of Andhra Pradesh. (3.93 Ha)
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
3.93
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Sep 2017
|
Stage-I Approval on
|
:
|
04 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2021
|
|
|
|
23 Sep 2021
|
38
|
Andhra Pradesh
|
FP/AP/QRY/121204/2021
|
4-APB141/2021-VIJ
|
Grant of Quarry lease for Black Granite in favour of M/s. Sri Vasista Mining, A.P (Managing Partner: B.S Nithin Kumar Reddy)
|
Quarrying
|
M/S. SRI VASISTA MINING
|
4.96
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2021
|
Stage-I Approval on
|
:
|
16 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2023
|
|
|
|
18 Nov 2023
|
39
|
Andhra Pradesh
|
FP/AP/TRANS/27462/2017
|
4-APC084/2018-CHN
|
Warangal (New) - Chilakaluripeta 756kV D/C Line
|
Transmission Line
|
WARORA KURNOOL TRANSMISSION LIMITED
|
18.86
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2017
|
Stage-I Approval on
|
:
|
28 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
18 Nov 2021
|
|
|
|
22 Aug 2022
|
40
|
Andhra Pradesh
|
FP/AP/Others/147251/2021
|
4-APB196/2022-VIJ
|
Diversion of 2.99 ha of forest land in compartment no.978, Gilmanfield Reserve Forest, Visakhapatnam Division for installation of desalination plant in favour of General Manager, Divi's Laboratories L
|
Others
|
DIVIS LABORATORIES LTD, UNIT-2
|
2.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Sep 2021
|
Stage-I Approval on
|
:
|
06 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2023
|
|
|
|
07 Oct 2024
|
41
|
Andhra Pradesh
|
FP/AP/Others/153264/2022
|
4-APC181/2022-VIJ
|
INTEGRATED CORRIDOR (FOR LAYING OF TRANSMISSSION LINE, PIPE NETWORK AND ROAD)
|
Others
|
HIMACHAL INFRACON PRIVATE LIMITED
|
12.58
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
Stage-I Approval on
|
:
|
27 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Oct 2022
|
|
|
|
07 Feb 2023
|
42
|
Andhra Pradesh
|
FP/AP/MIN/30265/2017
|
4-APB062/2018-CHN
|
Ellutla Barytes Mine of JC Vijaya
|
Mining
|
JC VIJAYA ELLUTLA BARYTES MINE
|
1.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2018
|
Stage-I Approval on
|
:
|
21 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
12 Oct 2018
|
|
|
|
02 Nov 2018
|
43
|
Andhra Pradesh
|
FP/AP/QRY/26772/2017
|
4-APB076/2018-CHN
|
Mining Proposal in favour of M/s Venkateswara Rocks,Chittoor District., Prop: P. Sudhakar Reddy.
|
Quarrying
|
MS VENKATESWARA ROCKS
|
4.69
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2017
|
Stage-I Approval on
|
:
|
12 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2019
|
|
|
|
07 Feb 2020
|
44
|
Andhra Pradesh
|
FP/AP/Others/14866/2015
|
4-APB008/2015-CHN
|
Peddavora to Macharla OFC Project, Idea Cellular Ltd - 0.30 Ha.
|
Others
|
IDEA CELLULAR LIMITED
|
0.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2015
|
Stage-I Approval on
|
:
|
08 Jan 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2016
|
|
|
|
14 Jun 2016
|
45
|
Andhra Pradesh
|
FP/AP/ROAD/36092/2018
|
G.O.Ms.No.03
|
Formation and Providing BT to the road from Vinayakapuram to Irkampeta of Chinturu mandal
|
Road
|
EEPIUKKD
|
1.54
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2018
|
Stage-I Approval on
|
:
|
25 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2023
|
|
|
|
|
46
|
Andhra Pradesh
|
FP/AP/ROAD/36017/2018
|
G.O.Ms.No.16
|
Providing BT to the Road from ZP road at Kothapalli to Nelakota via. Vemularai
|
Road
|
EEPIUKKD
|
3.2802
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2018
|
Stage-I Approval on
|
:
|
14 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2023
|
|
|
|
|
47
|
Andhra Pradesh
|
FP/AP/OFC/148408/2021
|
1769/Section-II/2023
|
Laying of Optical Fibre Cable (OFC) along existing Right of Way of the Roads passing through Forests under Proddatur WL Division
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.36
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2021
|
Stage-I Approval on
|
:
|
23 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2024
|
|
|
|
|
48
|
Andhra Pradesh
|
FP/AP/IRRIG/16627/2015
|
4-APB019-2016-CHN
|
Tarakarama Thirtha Sagaram Reservoir Project
|
Irrigation
|
WATER RESOURCES DEPARTMENT
|
4.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2015
|
Stage-I Approval on
|
:
|
01 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2018
|
|
|
|
10 Jul 2018
|
49
|
Andhra Pradesh
|
FP/AP/ROAD/7882/2014
|
10984/2014,FCA3
|
Providing BT surface to the road from Sapparla to Galikonda in G.K.Veedhi Mandal
|
Road
|
Executive Engineer PR Paderu
|
4.027
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2014
|
Stage-I Approval on
|
:
|
05 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2023
|
|
|
|
|
50
|
Andhra Pradesh
|
FP/AP/ROAD/141402/2021
|
4-APB170/2022-VIJ
|
Road from Vetaganivalasa to Thangalam in Pachipenta Mandal of Vizianagaram District
|
Road
|
EXICUTIVE ENGINEER
|
3.37
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2021
|
Stage-I Approval on
|
:
|
07 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2024
|
|
|
|
|
|