Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/TRANS/26388/2017 4-APA056/2018-CHN 765 KV Double Circuit line from Chilakaluripeta to Kadapa. Transmission Line POWER SYSTEM SOUTHERN INTERCONNECTOR TRANSMISSION SYSTEM LIMITED 74.486 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2017
Stage-I Approval on : 05 Apr 2018
Compliance Report Submitted by User Agency on : 28 Feb 2020
03 Feb 2021
2 Andhra Pradesh FP/AP/Pipeline/41405/2019 4-APB138/2021-VIJ KSR Prince Hatcheries Pipeline KSR PRINCE HATCHERIES 0.14 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2019
Stage-I Approval on : 22 Dec 2021
Compliance Report Submitted by User Agency on : 30 May 2023
16 Jun 2023
3 Andhra Pradesh FP/AP/TRANS/150705/2021 F.No.4-APB171/2022-VIJ Erection of 220 KV DC line from 400/220 KV SS Jammalamadugu to the proposed 220/132/33 KV SS at Bethamcherla in Kurnool District Transmission Line APTRANSCO KURNOOL 2.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2021
Stage-I Approval on : 03 Jan 2024
Compliance Report Submitted by User Agency on : 09 Apr 2024
01 Oct 2024
4 Andhra Pradesh FP/AP/TRANS/65723/2020 4-APC135/2021-VIJ 400/220 KV Overhead Transmission Line works from 400/220kV Kalpakka Substation to the proposed Cable Pot Head Station for HPCL Refinery at Vizag Transmission Line HPCL, VISAKH REFINERY 11.38 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2020
Stage-I Approval on : 11 Dec 2021
Compliance Report Submitted by User Agency on : 02 May 2023
10 May 2023
5 Andhra Pradesh FP/AP/TRANS/37314/2018 G.O.Ms.No.30 Making LILO arrangement of 132KV Tadepalli -Tadikonda line to the proposed 132/33KV AIIMS SS at Mangalagiri in Guntur district. Transmission Line EXECUTIVE ENGINEER CONSTRUCTION CRDA DIVISION GUNTUR 0.82 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 29 Aug 2019
Compliance Report Submitted by User Agency on : 08 Jul 2020
6 Andhra Pradesh FP/AP/ROAD/153799/2022 4-APB199/2022-VIJ Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Paderu to Araku section from Km 2.400 to Km 51.772 of NH-516E in the State of Andhra Pradesh under GNHCP on EPC Mode with Road MINISTRY OF ROAD TRANSPORT & HIGHWAYS 2.24 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2022
Stage-I Approval on : 19 Jan 2023
Compliance Report Submitted by User Agency on : 25 Aug 2023
05 Jun 2024
7 Andhra Pradesh FP/AP/ROAD/146577/2021 4-APA208/2023-VIJ Rehabilitation and up-gradation of National Highway-565 from Km 133.922 to Km 154.900 (Davupally to Mallapalem Junction) to two lanes with paved shoulders in the state of Andhra Pradesh u Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS-RO-VIJAYAWADA 38.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Aug 2021
Stage-I Approval on : 06 Nov 2023
Compliance Report Submitted by User Agency on : 29 Aug 2024
11 Oct 2024
8 Andhra Pradesh FP/AP/ROAD/30975/2017 4-APB063/2018-CHN Relaying of Visakha Valley School Road from NH-16 Jn., to Beach Road, Visakhapatnam Road BOIDI SESHARAO 1.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2018
Stage-I Approval on : 06 Jul 2018
Compliance Report Submitted by User Agency on : 22 Nov 2021
10 Jan 2022
9 Andhra Pradesh FP/AP/RAIL/17757/2016 4-APA013/2016-CHN Construction of New BG Railway line between Nadikudiand Srikalahasti Stations. Railway DEPUTY CHIEF PROJECT MANAGER WORLD CLASS 118.725 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2016
Stage-I Approval on : 20 Jul 2016
Compliance Report Submitted by User Agency on : 04 Aug 2021
30 Jul 2021
10 Andhra Pradesh FP/AP/Pipeline/42672/2019 4-APB124/2021-VIJ Laying of 20 inch gas Pipeline (about 31 km) from Offshore Platform to Onshore gas Terminal at Mallavaram Pipeline ONGC 3.26 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Oct 2019
Stage-I Approval on : 17 Sep 2021
Compliance Report Submitted by User Agency on : 28 Oct 2021
10 Feb 2022
11 Andhra Pradesh FP/AP/ROAD/33878/2018 G.O.Ms No.133 Diversion of 1.79 Ha in Giddalur Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 1.79 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 May 2018
Stage-I Approval on : 30 Nov 2018
Compliance Report Submitted by User Agency on : 25 Oct 2023
12 Andhra Pradesh FP/AP/ROAD/33876/2018 4-APC191/2022-VIJ Diversion of 5.94 Ha in Nellore Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders in the State of Andhra Pradesh Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 5.94 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 May 2018
Stage-I Approval on : 02 Jun 2023
Compliance Report Submitted by User Agency on : 24 May 2024
20 Aug 2024
13 Andhra Pradesh FP/AP/ROAD/145376/2021 4-APB151/2022-VIJ Proposal for Diversion of 0.46 ha. land for alignment of approach road till main entrance gate of AIIMS (Eastern road-Bell mouth) in Compartment No.132, Mangalagiri Block of Tadepalli Reserve Forest in Guntur Division in favour of Executive Engineer (R&B) Division, Guntur., under FC Act 1980. Road ROADS AND BUILDINGS DEPARTMENT 0.46 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Jul 2021
Stage-I Approval on : 17 Sep 2022
Compliance Report Submitted by User Agency on : 27 May 2024
01 Jun 2024
14 Andhra Pradesh FP/AP/HYD/35371/2018 8-32/2019-FC Pumped Storage Component of Pinnapuram IREP Hydel GREENKO ENERGIES PRIVATE LIMITED 365.66 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Aug 2018
Stage-I Approval on : 23 Apr 2020
Compliance Report Submitted by User Agency on : 14 Apr 2021
24 May 2021
15 Andhra Pradesh FP/AP/OFC/36777/2018 4-APB098/2020-CHN Laying of Under Ground Optical Fiber Cable (OFC) Optical Fibre Cable Jio Digital Fibre Private Limited 2.18 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Oct 2018
Stage-I Approval on : 19 Jul 2023
Compliance Report Submitted by User Agency on : 31 Oct 2023
05 Jun 2024
16 Andhra Pradesh FP/AP/ROAD/64525/2020 4-APB125/2021-VIJ Diversion of 0.85 Ha of forest land in Compartment no-132,Tadepalli RF,Guntur division,for providing BT surface to the road from Brhamanandapuram Crurch to AIIMS road in f/o Municipal Commissioner,Ta Road COMMISSIONER ,TADEPALLI MUNICIPALITY 0.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2020
Stage-I Approval on : 18 Aug 2021
Compliance Report Submitted by User Agency on : 02 Feb 2022
07 Feb 2022
17 Andhra Pradesh FP/AP/IND/10371/2015 4-APB010/2015-CHN Development of Vashishta and S1 Deepwater Project Industry ONGC 0.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Feb 2015
Stage-I Approval on : 21 Aug 2015
Compliance Report Submitted by User Agency on : 29 Sep 2016
09 Jan 2017
18 Andhra Pradesh FP/AP/RAIL/147706/2021 4-APC145/2022-VIJ Diversion in an area of 32.25 Ha of forest land in Nandyal and Giddalur division for execution of various engineering works for laying of doubling railway line between Guntur and Guntakal stations". Railway INDIAN RAILWAY SOUTH CENTRAL RAILWAY 32.25 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Sep 2021
Stage-I Approval on : 10 Jun 2023
Compliance Report Submitted by User Agency on : 12 Jul 2024
20 Aug 2024
19 Andhra Pradesh FP/AP/ROAD/12568/2015 G.O.Ms.No.2 Karakavalasa Road to Marika Road EXICUTIVE ENGINEER 4.38 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Sep 2015
Stage-I Approval on : 02 Jan 2019
Compliance Report Submitted by User Agency on : 23 Aug 2023
20 Andhra Pradesh FP/AP/ROAD/28853/2017 4-APC132/2021-VIJ Upgradation of existing NH 30 from Km.169.770 to 236.150 of Vijayawada to Jagadalpur section to two lane with paved shoulders in the State of Andhra Pradesh Road MINISTRY OF ROAD TRANSPORT & HIGHWAYS 25.31 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Oct 2017
Stage-I Approval on : 28 Nov 2022
Compliance Report Submitted by User Agency on : 07 Nov 2024
30 Dec 2024
21 Andhra Pradesh FP/AP/TRANS/25855/2017 G.O.Rt.No.127 132KV DC/SC line from 132/33KV SS Vengalayapalem to 25KV RTSS, Nallapadu Transmission Line EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR 0.51 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Apr 2017
Stage-I Approval on : 22 Jun 2017
Compliance Report Submitted by User Agency on : 20 Nov 2019
22 Andhra Pradesh FP/AP/Pipeline/42197/2019 4-APB130/2021-VIJ Pipeline to eastablish Avanti feeds Pipeline AVANTI FEEDS LIMITED 0.11 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Sep 2019
Stage-I Approval on : 18 Aug 2021
Compliance Report Submitted by User Agency on : 03 Jan 2022
07 Feb 2022
23 Andhra Pradesh FP/AP/Others/38959/2019 4-APB102/2020-CHN Diversion of forest land for erecting obstacle light mast for aviation purpose at Kadapa Airport Others AIRPORTS AUTHORITY OF INDIA, KADAPA 0.04 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jul 2019
Stage-I Approval on : 07 Dec 2020
Compliance Report Submitted by User Agency on : 13 Jan 2022
21 Feb 2022
24 Andhra Pradesh FP/AP/ROAD/25731/2017 4-APC053/2017-CHN Rehabilitation and Up-gradation of Eeppurpalem - Ongole section from Km 195+000 to Km 254+500 of NH-214A (New NH-216). Road HIGHWAYS 10.64 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Apr 2017
Stage-I Approval on : 29 Jan 2018
Compliance Report Submitted by User Agency on : 15 Jul 2022
15 Jul 2022
25 Andhra Pradesh FP/AP/ROAD/26324/2017 4-APB050/2017-CHN Upgradation of NH-67 from Km 589/000 to 641/000 i.e from Mydukur to Dornala’T’ junction to two lane with paved shoulders in the State of Andhra Pradesh under NHDP-IV on EPC basis. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 2.55 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 May 2017
Stage-I Approval on : 06 Sep 2018
Compliance Report Submitted by User Agency on : 17 Dec 2020
02 Jul 2021
26 Andhra Pradesh FP/AP/ROAD/29446/2017 4-APB052/2017-CHN Rehabilitation and up gradation of NH-42 (old N H – 219) from km. 58/600 to 140/680 (Palamaneru to Krishnagiri Border Section) to two lane with paved shoulders in the State of Andhra Pradesh. (3.93 Ha) Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 3.93 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Sep 2017
Stage-I Approval on : 04 Dec 2017
Compliance Report Submitted by User Agency on : 03 Sep 2021
23 Sep 2021
27 Andhra Pradesh FP/AP/QRY/121204/2021 4-APB141/2021-VIJ Grant of Quarry lease for Black Granite in favour of M/s. Sri Vasista Mining, A.P (Managing Partner: B.S Nithin Kumar Reddy) Quarrying M/S. SRI VASISTA MINING 4.96 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Feb 2021
Stage-I Approval on : 16 Nov 2022
Compliance Report Submitted by User Agency on : 08 Sep 2023
18 Nov 2023
28 Andhra Pradesh FP/AP/TRANS/27462/2017 4-APC084/2018-CHN Warangal (New) - Chilakaluripeta 756kV D/C Line Transmission Line WARORA KURNOOL TRANSMISSION LIMITED 18.86 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Aug 2017
Stage-I Approval on : 28 Nov 2018
Compliance Report Submitted by User Agency on : 18 Nov 2021
22 Aug 2022
29 Andhra Pradesh FP/AP/Others/147251/2021 4-APB196/2022-VIJ Diversion of 2.99 ha of forest land in compartment no.978, Gilmanfield Reserve Forest, Visakhapatnam Division for installation of desalination plant in favour of General Manager, Divi's Laboratories L Others DIVIS LABORATORIES LTD, UNIT-2 2.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Sep 2021
Stage-I Approval on : 06 Jan 2023
Compliance Report Submitted by User Agency on : 22 Dec 2023
07 Oct 2024
30 Andhra Pradesh FP/AP/Others/153264/2022 4-APC181/2022-VIJ INTEGRATED CORRIDOR (FOR LAYING OF TRANSMISSSION LINE, PIPE NETWORK AND ROAD) Others HIMACHAL INFRACON PRIVATE LIMITED 12.58 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2022
Stage-I Approval on : 27 Jul 2022
Compliance Report Submitted by User Agency on : 20 Oct 2022
07 Feb 2023
31 Andhra Pradesh FP/AP/MIN/30265/2017 4-APB062/2018-CHN Ellutla Barytes Mine of JC Vijaya Mining JC VIJAYA ELLUTLA BARYTES MINE 1.95 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2018
Stage-I Approval on : 21 Aug 2018
Compliance Report Submitted by User Agency on : 12 Oct 2018
02 Nov 2018
32 Andhra Pradesh FP/AP/QRY/26772/2017 4-APB076/2018-CHN Mining Proposal in favour of M/s Venkateswara Rocks,Chittoor District., Prop: P. Sudhakar Reddy. Quarrying MS VENKATESWARA ROCKS 4.69 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jun 2017
Stage-I Approval on : 12 Nov 2018
Compliance Report Submitted by User Agency on : 16 Oct 2019
07 Feb 2020
33 Andhra Pradesh FP/AP/Others/14866/2015 4-APB008/2015-CHN Peddavora to Macharla OFC Project, Idea Cellular Ltd - 0.30 Ha. Others IDEA CELLULAR LIMITED 0.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Aug 2015
Stage-I Approval on : 08 Jan 2016
Compliance Report Submitted by User Agency on : 04 Jul 2016
14 Jun 2016
34 Andhra Pradesh FP/AP/ROAD/36092/2018 G.O.Ms.No.03 Formation and Providing BT to the road from Vinayakapuram to Irkampeta of Chinturu mandal Road EEPIUKKD 1.54 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Sep 2018
Stage-I Approval on : 25 Feb 2020
Compliance Report Submitted by User Agency on : 08 Nov 2023
35 Andhra Pradesh FP/AP/IRRIG/16627/2015 4-APB019-2016-CHN Tarakarama Thirtha Sagaram Reservoir Project Irrigation WATER RESOURCES DEPARTMENT 4.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Nov 2015
Stage-I Approval on : 01 Nov 2016
Compliance Report Submitted by User Agency on : 19 Jul 2018
10 Jul 2018
36 Andhra Pradesh FP/AP/MIN/10909/2015 4-APB047/2017-CHN Quarry lease of Black granite over an extent of 4.83 Ha in Compt.No. 212 of Paradarami RF in favour of M/s Sai Joshitha Granites, Piler. Mining SAI JOSHITHA GRANITES 4.83 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Mar 2015
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 13 Nov 2018
37 Andhra Pradesh FP/AP/Others/30841/2017 4-APC066/2018-CHN Vijayawada-Dharmapuri Petroleum product Pipeline Project Others HINDUSTAN PETROLEUM CORPORATION LIMITED BANGALORE 16.57 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Dec 2017
Stage-I Approval on : 10 Sep 2018
Compliance Report Submitted by User Agency on : 11 Jan 2022
22 Aug 2022
38 Andhra Pradesh FP/AP/OFC/36007/2018 4-APB221/2023-VIJ Laying of Under ground Optical Fiber Cable (OFC) Optical Fibre Cable Jio Digital Fibre Private Limited 1.01 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Sep 2018
Stage-I Approval on : 17 Aug 2023
Compliance Report Submitted by User Agency on : 29 Dec 2023
16 Jan 2025
39 Andhra Pradesh FP/AP/TRANS/22375/2016 GO.Rt.No.87, Dt:17.04.2017 33 KV Transmission Line Transmission Line APSPDCL DHONE 0.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Nov 2016
Stage-I Approval on : 17 Apr 2017
Compliance Report Submitted by User Agency on : 28 Jun 2017
01 Aug 2017
40 Andhra Pradesh FP/AP/ROAD/26219/2017 4-APB046/2017-CHN Upgradation of NH-18 from Km 108/850 to 160/200 i.e from Rayachoty to Kadapa to two lane with paved shoulders in the State of Andhra Pradesh under NHDP-IV on EPC basis. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 1.81 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2017
Stage-I Approval on : 05 Oct 2017
Compliance Report Submitted by User Agency on : 19 Dec 2020
12 Oct 2021
41 Andhra Pradesh FP/AP/Pipeline/44624/2020 4-APB123/2021-VIJ Diversion of 0.1511 ha. of FL in compt. no.969 of Vempadu RF in Yelamanchili Range of Visakhapatnam Division for laying pipeline and construction of pump house in favour of M/s. DSR Biotech Hatcheries Pipeline M/S DSR BIOTECH HATCHERIES 0.1511 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Feb 2020
Stage-I Approval on : 08 Jul 2021
Compliance Report Submitted by User Agency on : 15 Feb 2022
22 Jul 2022
42 Andhra Pradesh FP/AP/ROAD/37747/2018 G.O.Ms.No.34 Road from Vanjari to Korrapadu Road Executive Engineer PR Paderu 1.88 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Dec 2018
Stage-I Approval on : 03 Oct 2019
Compliance Report Submitted by User Agency on : 09 Nov 2023
43 Andhra Pradesh FP/AP/ROAD/10475/2015 3343/ Section-II/2016 Rehabilitation & upgradation of NH-221 from km 32/735 to 71/200. Road HIGHWAYS 0.52 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Apr 2016
Stage-I Approval on : 25 Jul 2016
Compliance Report Submitted by User Agency on : 24 Sep 2016
16 Feb 2017
44 Andhra Pradesh FP/AP/ROAD/150396/2021 4-APB192/2022-VIJ Widening to two lane with paved shoulders of Rayachoty - Vempalli section of newly declared NH-440 from km 0/0 to 53/600 in the state of Andhra Pradesh under EPC mode Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 0.76 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 May 2022
Stage-I Approval on : 27 Mar 2023
Compliance Report Submitted by User Agency on : 04 Aug 2023
16 Jan 2024
45 Andhra Pradesh FP/AP/QRY/155444/2022 4-APB189/2022-VIJ Proposal for diversion of 4.84 ha of forest land in compartment no.102, Janapadu RF, Guntur Division for quarry lease for limestone (Minor) filed by Sri G. Pavan Kumar Reddy. Quarrying PAVAN KUMAR REDDY GOTTIMUKKALA 4.84 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 May 2022
Stage-I Approval on : 07 Apr 2023
Compliance Report Submitted by User Agency on : 18 Mar 2024
46 Andhra Pradesh FP/AP/Others/26189/2017 4-APB037/2017-CHN 132/33KV Sub-Station AIIMS Others EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 May 2017
Stage-I Approval on : 20 Jun 2017
Compliance Report Submitted by User Agency on : 26 Jun 2018
25 Jun 2018
47 Andhra Pradesh FP/AP/TRANS/14620/2015 4-APC027/2016-CHN 400 KV D/C Hindupur to Kadapa Power Transmission Line. Transmission Line POWER GRID CORPORATION OF INDIA LTD 24.204 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Dec 2015
Stage-I Approval on : 17 Feb 2017
Compliance Report Submitted by User Agency on : 27 Feb 2020
03 Feb 2021
48 Andhra Pradesh FP/AP/ROAD/49639/2020 4-APA209/2023-VIJ Rehabilitation and Upgradation to two lane with paved shoulder configuration of Koyyuru to Paderu section from Km 120/000 to Km 260/100(Design chainage Km Km 120+000 To Km 253+974) of NH-516Ein the state of Andhra Pradesh Road REGIONAL OFFICER,MINISTRY OF ROAD TRANSPORT AND HIGHWAYS, VIJAYAWADA 65.95 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Sep 2020
Stage-I Approval on : 06 Jul 2023
Compliance Report Submitted by User Agency on : 26 Sep 2023
12 Feb 2024
49 Andhra Pradesh FP/AP/Others/148951/2021 4-APB187/2022-VIJ Diversion of 0.99 Ha. of forest land in Compt. No. 4 of Nizampatnam RF, Repalle Range, Guntur Division & District of Andhra Pradesh for extension of Quay / Jetty of existing Nizampatnam Fishery Harbour during Phase II Development. Others AP MARITIME INFRASTRUCTURE DEVELOPMENT CORPORATION 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Nov 2021
Stage-I Approval on : 22 Sep 2022
Compliance Report Submitted by User Agency on : 30 Jul 2024
20 Aug 2024
50 Andhra Pradesh FP/AP/Others/33635/2018 4-APB079/2018-CHN Diversion of 0.39 Ha of forest land for construction of Percolation Tank in Sy. No. 901, Compt. No. 487 of Tarimela RF of Singanamala mandal of Ananthapuramu District in Ananthapuramu Range of Ananthapuramu Division in favour of Technical Director, Rural Development Trust, Ananthapuramu. Others RURAL DEVELOPMENT TRUST ANANTHAPURAMU 0.39 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 May 2018
Stage-I Approval on : 25 Oct 2018
Compliance Report Submitted by User Agency on : 30 Apr 2019
04 Jun 2019