Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Telangana
|
FP/TG/ROAD/32933/2018
|
4-TSC160/2019-CHN
|
Diversion of Forest land in Bhupalpally Division for Widening from Single lane to Double lane road of Khammampally to Bhupalpally road from km 12/2 to 19/6 in Jayashanker Bhupalpally Dist - 4.2339 Ha
|
Road
|
R AND B DIVISION WARANGAL
|
8.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2018
|
Stage-I Approval on
|
:
|
27 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2025
|
|
|
|
23 Sep 2025
|
2
|
Telangana
|
FP/TG/ROAD/120196/2021
|
4-TSB214/2021-HYD
|
Formation of BT road from MRL 13 Chamanpally to Kushnapally of Vemanapally Mandal of Mancherial District - 1.5259 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
1.5259
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2021
|
Stage-I Approval on
|
:
|
30 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Feb 2025
|
|
|
|
28 Aug 2025
|
3
|
Telangana
|
FP/TG/Others/44802/2020
|
4-TSB171/2020-CHN
|
Establishment of APCO 25 tower for Phase II Network in Medchal District - 0.0995 Ha
|
Others
|
TELANGANA STATE POLICE DEPARTMENT
|
0.0995
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2020
|
Stage-I Approval on
|
:
|
09 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Oct 2024
|
|
|
|
28 Aug 2025
|
4
|
Telangana
|
FP/TG/ROAD/62783/2020
|
4-TSB224/2021-HYD
|
BT road from MRL02-Mallapoor to Challagarga via Lolam, Govindpally, BeliaThanda, Dhammannapet of Indalwai(m),Nizamabad District under PMGSY-III
|
Road
|
DPRE PIU NIZAMABAD
|
4.5151
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2020
|
Stage-I Approval on
|
:
|
21 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2023
|
|
|
|
04 Apr 2025
|
5
|
Telangana
|
FP/TG/ROAD/38500/2019
|
4-TSB213/2021-HYD
|
Laying of BT Road from R&B road to Chinnagudipet via parvathipet in dahegoan Mandal of Komarambheem district - 2.1004 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
2.1004
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2019
|
Stage-I Approval on
|
:
|
03 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2025
|
|
|
|
02 Apr 2025
|
6
|
Telangana
|
FP/TG/OFC/142849/2021
|
4-TSB282/2022-HYD
|
Laying of OFC along the road within the existing RoW for execution of T-Fiber Project in Nagarjunasagar division of Nalgonda District - 1.3105 Ha
|
Optical Fibre Cable
|
TELANGANA FIBER GRID CORPORATION LIMITED
|
1.3105
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 May 2021
|
Stage-I Approval on
|
:
|
27 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2024
|
|
|
|
13 Mar 2025
|
7
|
Telangana
|
FP/TG/ROAD/120206/2021
|
4-TSB191/2021-HYD
|
Formation of BT road from MRL 01 Nennel to Kushnapally via Konampet of Nennel Mandal of Mancherial District - 3.2493 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
3.2493
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2021
|
Stage-I Approval on
|
:
|
14 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2023
|
|
|
|
13 Mar 2025
|
8
|
Telangana
|
FP/TG/ROAD/143347/2021
|
4-TSB199/2021-HYD
|
Upgradation andWidening of existing road from earthen road to BT standards of PWD road at Mediguda to Moregoan of Godiguda Mandal of Adilabad District - 4.847 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
4.847
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jun 2021
|
Stage-I Approval on
|
:
|
30 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2023
|
|
|
|
10 Mar 2025
|
9
|
Telangana
|
FP/TG/OFC/150296/2021
|
4-TSB337/2023-HYD
|
Laying of OFC along the road within the existing RoW for execution of T-Fiber Project in Medak District - 2.7283 Ha
|
Optical Fibre Cable
|
TELANGANA FIBER GRID CORPORATION LIMITED
|
2.7283
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2021
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
25 Feb 2025
|
10
|
Telangana
|
FP/TG/OFC/145010/2021
|
4-TSB320/2022-HYD
|
Laying of OFC along the road within the existing RoW for execution of T-Fiber Project in Asifabad division of Komarambheem Asifabad District - 3.8561 Ha
|
Optical Fibre Cable
|
TELANGANA FIBER GRID CORPORATION LIMITED
|
3.8561
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2021
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
21 Feb 2025
|
11
|
Telangana
|
FP/TG/OFC/145452/2021
|
4-TSB314/2022-HYD
|
Laying of OFC along the road within the existing RoW for execution of T-Fiber Project in Kagaznagar division of Komarambheem Asifabad District - 1.8584 Ha
|
Optical Fibre Cable
|
TELANGANA FIBER GRID CORPORATION LIMITED
|
1.8584
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jul 2021
|
Stage-I Approval on
|
:
|
10 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
07 Nov 2024
|
12
|
Telangana
|
FP/TG/ROAD/42054/2019
|
4-TSB178/2021-HYD
|
Use of access of existing road from Srisailam Highway to Lemoor Village in Kandukur Mandal, Rangareddy District - 0.9717 Ha
|
Road
|
TUMFOR AGRI FARMS LLP
|
0.9717
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Sep 2019
|
Stage-I Approval on
|
:
|
11 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2024
|
|
|
|
04 Nov 2024
|
13
|
Telangana
|
FP/TG/ROAD/43497/2019
|
4-TSB179/2021-HYD
|
Access to existing approach road to the agriculture lands in Ibrahimpur RF of Yadadri District - 0.549 Ha
|
Road
|
S VIDYASAGAR, SAGAR APT, RAJBHAVAN ROAD, HYDERABAD
|
0.53
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2019
|
Stage-I Approval on
|
:
|
29 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Aug 2024
|
|
|
|
04 Nov 2024
|
14
|
Telangana
|
FP/TG/TRANS/144135/2021
|
4-TSB308/2022-HYD
|
Erection of 132kv DC/SC Overhead line from 220/132kv SS Fabcity to proposed 132/33kv SS Kandukur in Rangareddy District - 1.9716 Ha
|
Transmission Line
|
TSTRANSCO
|
1.9716
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2021
|
Stage-I Approval on
|
:
|
02 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2024
|
|
|
|
10 Oct 2024
|
15
|
Telangana
|
FP/TG/ROAD/138479/2021
|
4-TSC229/2021-HYD
|
Formation of road from Manala to Marrimadla from km 1/0 to 9/0 and Improvements to Mendora crossing to Rudrangi via Manal road from km 29/7 to 30/5 in Rajanna Siricilla District - 9.9985 Ha
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
10.841
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2021
|
Stage-I Approval on
|
:
|
11 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
29 Jul 2024
|
16
|
Telangana
|
FP/TG/ROAD/21649/2016
|
4-TSC021/2016-CHN
|
Improvement of existing Road from Nakerrekal to Mallampally of NH- 365 in Warangal District - 24.80 Ha
|
Road
|
ROADS AND BUILDINGS DEPARTMENT NATIONAL HIGHWAY DIVISION
|
24.8
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2016
|
Stage-I Approval on
|
:
|
12 Jan 2017
|
Compliance Report Submitted by User Agency on
|
:
|
02 Oct 2020
|
|
|
|
16 Apr 2024
|
17
|
Telangana
|
FP/TG/ROAD/126851/2021
|
4-TSC184/2021-HYD
|
Widening and Strengthening of existing intermediate lane /two lane to two lane with pavedshoulder from km 678/555 to km 699/655 of nirmal to khanapur section of NH-61 on EPC mode in Nirmal district -
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
17.498
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Mar 2021
|
Stage-I Approval on
|
:
|
18 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2022
|
|
|
|
28 Dec 2023
|
18
|
Telangana
|
FP/TG/RAIL/148038/2021
|
4-TSC324/2023-HYD
|
Construction of Railway line from Vishnupuram Railway Station to (5x800MW) Yadadri Thermal Power Station and laying of raw water pipe line from river Krishna to YTPS at Veerlapalem(V), Dameracheral
|
Railway
|
TELANGANA STATE POWER GENERATION CORPORATION LIMITED
|
13.195
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2021
|
Stage-I Approval on
|
:
|
27 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2023
|
|
|
|
15 Dec 2023
|
19
|
Telangana
|
FP/TG/IRRIG/30173/2017
|
4-TSB124/2018-CHN
|
Excavation of Left Flank main canal and 8-R Distributory for Neelwai Project (Package -12) in Mancherial District - 18.083 Ha
|
Irrigation
|
Irrigation Department
|
18.083
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Nov 2017
|
Stage-I Approval on
|
:
|
12 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2022
|
|
|
|
14 Dec 2023
|
20
|
Telangana
|
FP/TG/TRANS/46239/2020
|
4-TSC263/2022-HYD
|
Laying of 220 kv double circuit line to extend power supply to Yacharam Thanda pump house in Nizamabad and Kamareddy District - 6.086 Ha
|
Transmission Line
|
TSTRANSCO
|
6.086
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2020
|
Stage-I Approval on
|
:
|
11 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Oct 2023
|
|
|
|
12 Dec 2023
|
21
|
Telangana
|
FP/TG/ROAD/37010/2018
|
4-TSB238/2022-HYD
|
Improvements to Banswada Uppalwai Road from km 17/080 to 18/278 & 22/180 to 23/042 in Kamareddy District - 4.7231
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
4.7231
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Nov 2018
|
Stage-I Approval on
|
:
|
12 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
11 Aug 2023
|
|
|
|
07 Dec 2023
|
22
|
Telangana
|
FP/TG/ROAD/20260/2016
|
4/TSB/246/2022-HYD
|
Widening of Single Road to Double Road of Sirikonda - Vemulawada Road from km 0/0 to 20/5 in Nizamabad District - 4.971 Ha
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
4.971
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2016
|
Stage-I Approval on
|
:
|
05 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Mar 2023
|
|
|
|
04 Dec 2023
|
23
|
Telangana
|
FP/TG/Pipeline/149645/2021
|
4-TSB236/2022-HYD
|
Renovation / Laying of underground RAW water pipeline besides the existing pipeline from Iravendi Village to ITC Bhadrachalam Paper Boards Ltd., Sarapaka in Bhadradri Kothagudem District - 4.2768 Ha
|
Pipeline
|
ITC LIMITED
|
4.2768
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2021
|
Stage-I Approval on
|
:
|
07 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2023
|
|
|
|
23 Nov 2023
|
24
|
Telangana
|
FP/TG/ROAD/120907/2021
|
4-TSB233/2022-HYD
|
Construction of road from Devakkapet to Thatipally road from km 0/0 to 10/0 in Nizamabad District - 4.938 Ha
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
4.938
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jan 2021
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
11 Aug 2023
|
|
|
|
22 Nov 2023
|
25
|
Telangana
|
FP/TG/OFC/142041/2021
|
4-TSB281/2022-HYD
|
Laying of OFC along the road within the existing RoW for execution of T-Fiber Project in Nalgonda District - 1.0935 Ha
|
Optical Fibre Cable
|
TELANGANA FIBER GRID CORPORATION LIMITED
|
1.0935
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 May 2021
|
Stage-I Approval on
|
:
|
25 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2023
|
|
|
|
10 Nov 2023
|
26
|
Telangana
|
FP/TG/ROAD/147456/2021
|
4-TSB298/2022-HYD
|
Formation of approach road from Nagarjunasagar main road to reach the VipasyanaMeditation Centre and Other Residential Dwelings situated in diffeent Sy.nos of Sahebnagar (v) of Hayathnagar (M) in Rang
|
Road
|
B SATYAPRAKASH RAO
|
0.8819
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2021
|
Stage-I Approval on
|
:
|
14 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jun 2023
|
|
|
|
20 Jul 2023
|
27
|
Telangana
|
FP/TG/ROAD/44018/2020
|
4-TSB183/2021-HYD
|
Widening and Strengthening of road from Km 180/0 to Km 223/0 Nizamabad and Jagadapur section of NH63 in Mancherial District - 4.3999 Ha
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
4.772
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2020
|
Stage-I Approval on
|
:
|
09 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
14 Mar 2023
|
|
|
|
08 May 2023
|
28
|
Telangana
|
FP/TG/ROAD/46627/2020
|
4-TSB244/2022-HYD
|
Laying of approach road to proposed Municipal Solid Waste (MSW) Treatment and Disposal facility located at Pyaranagar (V), Sangareddy District
|
Road
|
COMMISSIONER GHMC
|
0.6228
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2020
|
Stage-I Approval on
|
:
|
05 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2022
|
|
|
|
28 Apr 2023
|
29
|
Telangana
|
FP/TG/WATER/18118/2016
|
4-TSB037/2016-CHN
|
Telangana Water Grid - Segment No.8/2, Singuru Medak Sub-Segment, Medak Dist , 3.582 Ha
|
Drinking Water
|
TELANGANA DRINKING WATER SUPPLY PROJECT
|
3.582
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2016
|
Stage-I Approval on
|
:
|
06 Mar 2017
|
Compliance Report Submitted by User Agency on
|
:
|
31 Aug 2019
|
|
|
|
20 Mar 2023
|
30
|
Telangana
|
FP/TG/RAIL/138554/2021
|
4-TSC182/2021-HYD
|
DCL Railway Siding 2 and its associated activities at Suryapet District -8.02 Ha
|
Railway
|
DECCAN CEMENTS LIMITED
|
8.02
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Mar 2021
|
Stage-I Approval on
|
:
|
30 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2022
|
|
|
|
15 Mar 2023
|
31
|
Telangana
|
FP/TG/ROAD/27346/2017
|
4-TSB177/2021-HYD
|
Allotment of 0.0989 ha FL for laying of Road from Factory main gate wall upto outside of the factory in Suryapeta District
|
Road
|
NCL INDUSTRIES LIMITED
|
0.0989
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2017
|
Stage-I Approval on
|
:
|
09 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2022
|
|
|
|
09 Mar 2023
|
32
|
Telangana
|
FP/TG/OFC/153136/2022
|
4-TSB288/2022-HYD
|
Laying of OFC along the road within the existing RoW for execution of T-Fiber Project in Medchal District - 0.0468 Ha Ha
|
Optical Fibre Cable
|
TELANGANA FIBER GRID CORPORATION LIMITED
|
0.0468
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Mar 2022
|
Stage-I Approval on
|
:
|
28 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2022
|
|
|
|
23 Jan 2023
|
33
|
Telangana
|
FP/TG/TRANS/35482/2018
|
4-TSB141/2018-CHN
|
construction of 11 kv transmission line for the release of 1 no 96 HP NDS load to TDWSP department for 24 hrs power supply from existing tandur MHQ feeder in Tandur Mandal in Mancherial District
|
Transmission Line
|
TSNPDCL
|
1.904
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2018
|
Stage-I Approval on
|
:
|
01 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
27 Sep 2022
|
|
|
|
02 Jan 2023
|
34
|
Telangana
|
FP/TG/Others/141273/2021
|
4-TSB227/2021-HYD
|
Establishment of one Coy of 141 Bn CRPF and police force at Chennapuram (V) Cherla (M) Bhadradri Kothagudem district for Anti Extremist Operation Cherla – Pamida – Kistaram Axis of Telangana and Chhat
|
Others
|
TELANGANA STATE POLICE DEPARTMENT
|
1.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Oct 2021
|
Stage-I Approval on
|
:
|
11 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2022
|
|
|
|
28 Nov 2022
|
35
|
Telangana
|
FP/TG/Others/151342/2022
|
4-TSB241/2022-HYD
|
Establishment of Police Outpost (CRPF Battalion) at Unjapalli Village of Vaddipeta GP of Cherla Mandal in Bhadrachalam Division - 1.987 Ha
|
Others
|
TELANGANA STATE POLICE DEPARTMENT
|
1.987
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2022
|
Stage-I Approval on
|
:
|
06 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2022
|
|
|
|
28 Nov 2022
|
36
|
Telangana
|
FP/TG/ROAD/27534/2017
|
4-TSB109/2017-CHN
|
Widening and Upgradaton of Nakrekal - Nagarjunasagar section of NH-565 from km 75/460 to 73/395 in Nelikal Rf in Nalgonda district -0.9723 ha
|
Road
|
EXICUTIVE ENGINEER
|
0.9723
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2017
|
Stage-I Approval on
|
:
|
29 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2022
|
|
|
|
30 Aug 2022
|
37
|
Telangana
|
FP/TG/Canal/121753/2021
|
4-TSB230/2021-HYD
|
Construction of Thurkapally Canal system including Distributory Network in Yadadri Bhuvanagiri District - 2.104 ha
|
Canal
|
Irrigation Department
|
2.104
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Feb 2021
|
Stage-I Approval on
|
:
|
29 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2022
|
|
|
|
30 Aug 2022
|
38
|
Telangana
|
FP/TG/TRANS/42842/2019
|
4-TSB182/2021-HYD
|
Erection of LILO of 220kV UG cable Gachibowli to Miyapur and Erragadda to the proposed Raidurg SS in Rangareddy District -1.0016 Ha
|
Transmission Line
|
TSTRANSCO
|
1.0016
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Nov 2019
|
Stage-I Approval on
|
:
|
26 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2022
|
|
|
|
27 Jul 2022
|
39
|
Telangana
|
FP/TG/TRANS/24773/2017
|
4-TSB077/2017-CHN
|
Construction of 33 Kv DC line to existing NH44 Road between Bibipur thanda to new 33/11 KV SS Thirmanpally with connected lines under TDWSP in Nizamabad Dist, 1.799 ha
|
Transmission Line
|
TSNPDCL
|
1.799
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 May 2017
|
Stage-I Approval on
|
:
|
20 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2022
|
|
|
|
27 Jul 2022
|
40
|
Telangana
|
FP/TG/ROAD/142433/2021
|
4-TSB232/2021-HYD
|
Construction of 4 lane access controlled New Green Field Highway section of NH 365 BG Khammam Devarpalli from Thallampadu to Somavaram village in Khammam District - 1.8571 Ha
|
Road
|
NHAI PIU KHAMMAM
|
1.8571
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 May 2021
|
Stage-I Approval on
|
:
|
27 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 Mar 2022
|
|
|
|
29 Jun 2022
|
41
|
Telangana
|
FP/TG/RAIL/34880/2018
|
4-TSC164/2019-CHN
|
Construction of Railway line from Manuguru railway station to Bhadradri Thermal power station in Bhadradri Kothagudem district - 25.8435 Ha
|
Railway
|
TELANGANA STATE POWER GENERATION CORPORATION LIMITED
|
25.8435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2018
|
Stage-I Approval on
|
:
|
04 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Apr 2022
|
|
|
|
26 May 2022
|
42
|
Telangana
|
FP/TG/TRANS/27465/2017
|
4-TSA133/2018-CHN
|
765 kV D/C Warora Pool Warangal (New) Transmission Line
|
Transmission Line
|
WARORA KURNOOL TRANSMISSION LIMITED
|
45.1009
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2017
|
Stage-I Approval on
|
:
|
13 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Apr 2022
|
|
|
|
20 May 2022
|
43
|
Telangana
|
FP/TG/ROAD/32342/2018
|
4-TSA134/2018-CHN
|
4 - Laning of NH- 363 HKC in Telangana.
|
Road
|
National Highways Authority of India
|
62.25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2018
|
Stage-I Approval on
|
:
|
13 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 May 2022
|
|
|
|
13 May 2022
|
44
|
Telangana
|
FP/TG/Others/43424/2019
|
4-TSB217/2021-HYD
|
Hassan Cherlapalli LPG Pipeline Project (HCPL)
|
Others
|
Hindustan Petroleum Corporation Limited
|
0.5769
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Feb 2020
|
Stage-I Approval on
|
:
|
17 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2022
|
|
|
|
31 Jan 2022
|
45
|
Telangana
|
FP/TG/TRANS/29323/2017
|
4-TSB166/2020-CHN
|
Erection of 220KV DC Line from 400/220/132 KV SS Gajwel to 220/132 KV SS Siddipet in Sidipet District - 4.4824 Ha
|
Transmission Line
|
TSTRANSCO
|
4.4824
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2017
|
Stage-I Approval on
|
:
|
11 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Sep 2021
|
|
|
|
07 Dec 2021
|
46
|
Telangana
|
FP/TG/TRANS/42277/2019
|
4-TSC180/2021-HYD
|
Erection of 400 KV overhead line from TSPA junction to 400 kv Rayadurg GIS along outer side of ORR line in Rangareddy District - 6.7076 Ha
|
Transmission Line
|
TSTRANSCO
|
6.7076
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Sep 2019
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2021
|
|
|
|
07 Dec 2021
|
47
|
Telangana
|
FP/TG/TRANS/38380/2019
|
4-TSC137/2018-CHN
|
Construction of 220 Kv multi circuit line and UG cable from 400/220 kv SS Narsapur to the proposed 220/132/33 KV Bowrampet SS in Medchal district in association with evacuation of power from 2*800
|
Transmission Line
|
TSTRANSCO
|
10.1437
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2019
|
Stage-I Approval on
|
:
|
07 Mar 2019
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2021
|
|
|
|
29 Nov 2021
|
48
|
Telangana
|
FP/TG/TRANS/21666/2016
|
4-TSA065/2017-CHN
|
Construction of 220 kv DC line from existing 400/200 kv SS Dichipally to proposed 143 MW Solar energy power plant near kanakal Village, Nizamabad District - 14.8906 ha
|
Transmission Line
|
TSTRANSCO
|
14.8906
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2016
|
Stage-I Approval on
|
:
|
20 Feb 2017
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2021
|
|
|
|
29 Nov 2021
|
49
|
Telangana
|
FP/TG/TRANS/20619/2016
|
4-TSC76/2017-CHN
|
Julurupadu to Manuguru - 400KV DC Line - 37.7154 Ha
|
Transmission Line
|
TSTRANSCO
|
37.7154
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2016
|
Stage-I Approval on
|
:
|
17 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2021
|
|
|
|
29 Nov 2021
|
50
|
Telangana
|
FP/TG/TRANS/20618/2016
|
4-TSC075/2017-CHN
|
Julurupadu to KTPS - 400KV DC Line -29.6878 Ha
|
Transmission Line
|
TSTRANSCO
|
29.6878
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2016
|
Stage-I Approval on
|
:
|
11 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2021
|
|
|
|
29 Nov 2021
|
|