Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Rajasthan
|
FP/RJ/Approach/149635/2021
|
8B/RAJ001/2023-JPR
|
Construction of Approach Road for Proposed Indian Oil Corporation Limited Retail Outlet on Birdhawal to Chhatargarh Road between KM Stone No. 43-44 (Chainage: 43/195 - 43/230) LHS in Kila No. 16, 17/2, Plot No. 23/30, Murba No. 19 Village-2 DOA, Tehsil - Suratgarh, District- Sri Ganganagar, Raj.
|
Approach Access
|
Indian Oil Corporation Limited
|
0.0614
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jan 2025
|
|
|
|
11 Mar 2025
|
2
|
Rajasthan
|
FP/RJ/TRANS/150764/2022
|
8B/RAJ030/2022-JPR
|
Avaada Energy Pvt Ltd. Solar Power Plant in Kolayat Tehsil , Bikaner - Bhadla -II PS 220 KV S/C Transmission Line
|
Transmission Line
|
AVAADA ENERGY PRIVATE LIMITED
|
0.9625
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jan 2022
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2024
|
|
|
|
05 Feb 2025
|
3
|
Rajasthan
|
FP/RJ/ROAD/40754/2019
|
8B/Raj/06/16/2020/FC
|
Construction of Approach Road for Proposed Nayara Energy Limited (Formerly Essar Oil Ltd.) Retail Outlet on Suratgarh - Sri Ganganagar NH-62 ,Between Chainage ms stone 209/390 -209/430(RHS)
|
Road
|
NAYARA ENERGY LIMITED
|
0.1685
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2019
|
Stage-I Approval on
|
:
|
17 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
05 Feb 2025
|
4
|
Rajasthan
|
FP/RJ/TRANS/120030/2021
|
8B/Raj/12/28/2021/FC
|
132 KV S/C Raisinghnagar - Jetsar (M/s NTPC) Transmission Line, District-Sri Ganganagar, Rajasthan (Total Length 17893 meters).
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD HANUMANGARH
|
0.0972
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Feb 2021
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2024
|
|
|
|
03 Feb 2025
|
5
|
Rajasthan
|
FP/RJ/ROAD/46675/2020
|
8B/RAJ/06/36/2020
|
Construction of Approach Road for Proposed Bio-Diesel Plant, on NH-62(Old-NH-15) Chainage No 209+621 to 209 +671(RHS)AT Chak 7 BLW,SQ No-55,Killa No 21-25 At Village- Kenchiya,Tehsil-Pilibanga , Dist
|
Road
|
M/S JUGGLER HAWK INDUSTRIES PVT. LTD.
|
0.2239
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jul 2020
|
Stage-I Approval on
|
:
|
05 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
13 Jan 2025
|
6
|
Rajasthan
|
FP/RJ/ROAD/18545/2016
|
8B-RAJ046/2022-JPR
|
Construction of Road from Manadar to Rowara Km 5/500 to 9/500
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2016
|
Stage-I Approval on
|
:
|
26 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2024
|
|
|
|
31 Dec 2024
|
7
|
Rajasthan
|
FP/RJ/TRANS/147919/2021
|
8B-RAJ022/2022-JPR
|
Construction for 132 KV S/C Setrawa-Sekhala Line , Tehsil -Balesar , District -Jodhpur (Rajasthan)
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
|
0.1404
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Oct 2021
|
Stage-I Approval on
|
:
|
09 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2024
|
|
|
|
13 Nov 2024
|
8
|
Rajasthan
|
FP/RJ/TRANS/23277/2016
|
8B/RAJ025/2023-JPR
|
“Construction of 11 kv Transmission Line Projects of Rajeev Gandhi Gram Vidyutikaran Yojana(RGGVY) in XII Plan for Between Shivshakti Stone Crusher Jinjhari to Village-Bhawan,Tehsil-Sojat,District Pali (Raj)”
|
Transmission Line
|
JODHPUR VIDHYUT VITRAN NIGAM LTD
|
1.764
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2016
|
Stage-I Approval on
|
:
|
22 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2024
|
|
|
|
13 Nov 2024
|
9
|
Rajasthan
|
FP/RJ/ROAD/144538/2021
|
8B-RAJ040/2022-JPR
|
Construction of Missing Link Road from NH 148 to Moroli via Peepli Patalwas Koliwada Dob Paplaj Mata Sar Dhaun (MDR-145) km 9.00 to 15.00, in the State of Rajasthan (Total Length 4.530 km)
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
3.0207
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jul 2021
|
Stage-I Approval on
|
:
|
20 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Sep 2024
|
|
|
|
05 Nov 2024
|
10
|
Rajasthan
|
FP/RJ/ROAD/6999/2014
|
8B/RJ/06/5/2015
|
Road from Dhikoniya to Talawara
|
Road
|
PUBLIC WORKS DEPARTMENT
|
7.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2014
|
Stage-I Approval on
|
:
|
04 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
05 Nov 2024
|
11
|
Rajasthan
|
FP/RJ/ROAD/6956/2014
|
8B/RJ/06/13/2015
|
Road from Nehroopur to Jhhiri
|
Road
|
PUBLIC WORKS DEPARTMENT
|
3.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2014
|
Stage-I Approval on
|
:
|
04 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
05 Nov 2024
|
12
|
Rajasthan
|
FP/RJ/WATER/145797/2021
|
8B/RAJ016/2023-JPR
|
Construction of Intake Well with Pump House, MCC Room, Raising Main Pipeline, Approach Road and HT Transmission Line in Area of Baisasing Dam District-Sirohi, Rajasthan
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
3.6975
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2021
|
Stage-I Approval on
|
:
|
11 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2024
|
|
|
|
07 Oct 2024
|
13
|
Rajasthan
|
FP/RJ/TRANS/143945/2021
|
8B/RAJ034/2022-JPR
|
Construction of Sikar-II_Neemrana 400 KV D/C Transmission Line(Twin HTLS*)in Rajasthan
|
Transmission Line
|
SIKAR NEW TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED)
|
13.0134
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2021
|
Stage-I Approval on
|
:
|
22 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Sep 2024
|
|
|
|
30 Sep 2024
|
14
|
Rajasthan
|
FP/RJ/ROAD/21362/2016
|
8B/RAJ026/2023-JPR
|
Development of Arain-Sarwad Highway, Section of SH-7E, from existing km 44.300 to km 0.000, in the state of Rajasthan
|
Road
|
PWD JAIPUR
|
1.2401
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Sep 2016
|
Stage-I Approval on
|
:
|
13 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
10 Sep 2024
|
15
|
Rajasthan
|
FP/RJ/TRANS/144853/2021
|
8B/RAJ018/2023-JPR
|
Construction of 765 KV D/C Sikar-II -Aligarh Transmission line, District- Sikar, Jaipur & Alwar (Rajasthan)” in Rajasthan Portion Ap-01 to Ap-180 Common Point Rajasthan State Boundary. Total Route Length 180.946 km
|
Transmission Line
|
SIKAR -II ALIGARH TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED)
|
15.8321
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2021
|
Stage-I Approval on
|
:
|
10 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2024
|
|
|
|
30 Aug 2024
|
16
|
Rajasthan
|
FP/RJ/ROAD/35096/2018
|
8B/RAJ030/2023-BHO
|
Construction of Road Widening & Strengthening of Manoharpur to Itwa Bhopji Via Nawalpura Charanwas (MDR-187)
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.4445
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Sep 2018
|
Stage-I Approval on
|
:
|
28 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2024
|
|
|
|
12 Jul 2024
|
17
|
Rajasthan
|
FP/RJ/ROAD/29601/2017
|
8B/UP/06/06/2018/FC
|
PROPOSED DIVERSION OF FOREST LAND FOR RENEWAL,WIDENING & STRENGTHENING OF SIKAR-HARSH ROAD (ODR-04)KM 8/750 TO 15/100 IN HARSHNATH PF VILLAGE- ANTRI TEHSIL-DHOD,DISTT.- SIKAR (RAJ.)
|
Road
|
PUBLIC WORKS DEPATMENT SIKAR
|
6.35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2017
|
Stage-I Approval on
|
:
|
28 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2023
|
|
|
|
08 Jul 2024
|
18
|
Rajasthan
|
FP/RJ/ROAD/21211/2016
|
8B/RAJ/06/22/2017/FC
|
Development of Tarnau-Deedwana-Laxmangarh-Mukundgarh, Section of SH-60, SH-20, SH-83, SH-82A & SH-8 from design chainage km 39.668 to km 205.300 of SH-60, in the state of Rajasthan
|
Road
|
PWD JAIPUR
|
84.248
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2016
|
Stage-I Approval on
|
:
|
06 Nov 2017
|
Compliance Report Submitted by User Agency on
|
:
|
02 Dec 2022
|
|
|
|
10 Jun 2024
|
19
|
Rajasthan
|
FP/RJ/ROAD/118453/2021
|
8B/RAJ031/2022-JPR
|
Construction of Road from Jalore City to Jalore Fort (Design Chainage 0+000 km to 5+176 km) Village, Tehsil and District- Jalore in State of Rajasthan
|
Road
|
MUNICIPAL COUNCIL JALORE
|
4.0144
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Feb 2021
|
Stage-I Approval on
|
:
|
20 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2023
|
|
|
|
10 Jun 2024
|
20
|
Rajasthan
|
FP/RJ/ROAD/31293/2018
|
8B/Raj/06/09/2020
|
Padisal –Jagta Basai- Ratta Khurd- Balan Basai-Shyamka-Ismailpur- Ganj- Kishangarhbas road.
|
Road
|
PUBLIC WORKS DEPARTMENT NCRPB DIVISION ALWAR
|
5.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2018
|
Stage-I Approval on
|
:
|
07 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2022
|
|
|
|
10 Jun 2024
|
21
|
Rajasthan
|
FP/RJ/ROAD/140782/2021
|
8B/RAJ007/2022-JPR
|
Construction of Proposed Road from Ghoda Gati to Meharangarh Fort, District-Jodhpur in State of Rajasthan (Total Length 2300 meters)
|
Road
|
JODHPUR DEVELOPMENT AUTHORITY, JODHPUR
|
3.579
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2021
|
Stage-I Approval on
|
:
|
08 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 May 2023
|
|
|
|
10 Jun 2024
|
22
|
Rajasthan
|
FP/RJ/ROAD/18883/2016
|
8B/Raj/06/19/2020/FC
|
Widening and Curve Improvement on Existing Road Alignment .
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
4.47
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2016
|
Stage-I Approval on
|
:
|
30 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2022
|
|
|
|
22 Apr 2024
|
23
|
Rajasthan
|
FP/RJ/TRANS/43798/2020
|
8B/RAJ019/2023-JPR
|
Construction of 11 kv Transmission Line for Rural Electrification of Bera Sukh Sagar to Village Sand Mangra, Khejdi Ka Bala,Lakha ka Khet, Tehsil-Sojat,District Pali (Raj)
|
Transmission Line
|
JODHPUR VIDHYUT VITRAN NIGAM LTD
|
0.8491
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2020
|
Stage-I Approval on
|
:
|
30 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2024
|
|
|
|
20 Mar 2024
|
24
|
Rajasthan
|
FP/RJ/TRANS/152039/2022
|
8B/RAJ036/2022-JPR
|
“Construction of 33 KV Transmission Line Overhead/ Underground 33 KV XLPE 300 Sq. mm Cable From 400 KV GSS Bhadla to HPCL Rajasthan Refinery Ltd Nachana District -Jaisalmer”
|
Transmission Line
|
JODHPUR VIDYUT VITRAN NIGAM LIMITED , JAISALMER
|
1.5206
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Feb 2022
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jan 2024
|
|
|
|
20 Mar 2024
|
25
|
Rajasthan
|
FP/RJ/TRANS/148899/2021
|
8B/RAJ043/2022-JPR
|
Construction of 132 KV S/C Transmission Line for Power Evacuation from 150 MW Chhattargarh Solar Project of NTPC Renewable Energy Limited (A wholly owned subsidiary of NTPC Limited) to 220 KV Chhattargarh Grid Sub Station District-Bikaner in the State of Rajasthan
|
Transmission Line
|
NTPC RENEWABLE ENERGY LIMITED
|
3.9007
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2021
|
Stage-I Approval on
|
:
|
18 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2024
|
|
|
|
04 Mar 2024
|
26
|
Rajasthan
|
FP/RJ/Pipeline/147451/2021
|
8-B-Raj009/2022-JPR
|
“Laying of Under ground of 8”/12” Dia Carbon Steel Gas Pipeline Along the NH-8 Road Within the Existing Row from Tapping Point NH-8 Jaipur -Ajmer- Bypass Tiraha at Gagwana to Mangliyawas Tapping Point (Length 35.00 Km)in District-Ajmer(Rajasthan) by Indraprastha Gas Limited.”
|
Pipeline
|
INDRAPRASTHA GAS LIMITED
|
3.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Sep 2021
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jan 2024
|
|
|
|
14 Feb 2024
|
27
|
Rajasthan
|
FP/RJ/Pipeline/147495/2021
|
8-B-Raj008/2022-JPR
|
“Laying of Under ground of 8”/12” Dia Carbon Steel Gas Pipeline Along the NH-8 Road Within the Existing Row from Tapping Point NH-8 Jaipur -Ajmer- Bypass Tiraha via Kishangarh to Bandar Sindari (Length 38.800 Km) in District-Ajmer(Rajasthan) by Indraprastha Gas Limited.
|
Pipeline
|
INDRAPRASTHA GAS LIMITED
|
3.88
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2021
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jan 2024
|
|
|
|
14 Feb 2024
|
28
|
Rajasthan
|
FP/RJ/IRRIG/30576/2017
|
8B/Raj/02/15/2021/FC
|
Construction of canal (LMC& RMC) for gararda medium irrigation project distt. bundi
|
Irrigation
|
EXECUTIVE ENGINEER WR PROJECT DIV BUNDI
|
18.567
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 May 2018
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2023
|
|
|
|
14 Feb 2024
|
29
|
Rajasthan
|
FP/RJ/ROAD/20390/2016
|
8B/Raj/06/36/2019/FC
|
BT ROAD FROM NAL TO DUNGRA ,RISHABHDEV,UDAIPUR
|
Road
|
PWD RISBHABHDEV II
|
1.63
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2017
|
Stage-I Approval on
|
:
|
27 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jan 2023
|
|
|
|
12 Feb 2024
|
30
|
Rajasthan
|
FP/RJ/ROAD/35275/2018
|
8B/RAJ023/2022-JPR
|
Construction of Road from Silpur Road to Palanpur ,District-Karauli (Rajasthan)
|
Road
|
PUBLIC DEPARTMENT WORK KARAULI
|
1.179
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2018
|
Stage-I Approval on
|
:
|
06 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2023
|
|
|
|
12 Feb 2024
|
31
|
Rajasthan
|
FP/RJ/WATER/33714/2018
|
8B/Raj/08/20/2021/FC
|
Fluoride Control Project for Remaining Villages of Tehsil Beawar
|
Drinking Water
|
PHED
|
7.0484
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 May 2018
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2023
|
|
|
|
02 Feb 2024
|
32
|
Rajasthan
|
FP/RJ/IND/153357/2022
|
8B/RAJ011/2023-JPR
|
Laying of railway line for private siding for Cement plant.
|
Industry
|
WONDER CEMENT LIMITED
|
7.3792
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Mar 2022
|
Stage-I Approval on
|
:
|
04 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jan 2024
|
|
|
|
02 Feb 2024
|
33
|
Rajasthan
|
FP/RJ/Others/146292/2021
|
8B/RAJ051/2022-JPR
|
Construction and Renovation works at Machia Fort and Construction of Approach Road from Kaylana Main Road to Machia Fort at Jodhpur (Rajasthan)
|
Others
|
JODHPUR DEVELOPMENT AUTHORITY, JODHPUR
|
3.9133
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2022
|
Stage-I Approval on
|
:
|
05 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Aug 2023
|
|
|
|
29 Nov 2023
|
34
|
Rajasthan
|
FP/RJ/TRANS/145974/2021
|
8B/RAJ026/2022-JPR
|
Construction of 220 kV Transmission Line
|
Transmission Line
|
SBE Renewables Ten Private Limited
|
0.175
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2021
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2023
|
|
|
|
24 Nov 2023
|
35
|
Rajasthan
|
FP/RJ/TRANS/142368/2021
|
8B/RAJ038/2022-JPR
|
Diversion of 3.3896 ha. Forest Land with re-diversion of 0.0832 ha. Already diverted forest land for Construction of 11 KV HT line from 33/11 KV Bekariya Substation to Wolkem Industries Ltd. Kheratarla Mine Situated near Uparla and Nichala Khera, Tehsil – Bali & Kotra , District – Pali & Udaipur, Rajasthan
|
Transmission Line
|
WOLKEM INDUSTRIES LIMITED
|
3.3896
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2021
|
Stage-I Approval on
|
:
|
21 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Aug 2023
|
|
|
|
09 Nov 2023
|
36
|
Rajasthan
|
FP/RJ/ROAD/20888/2016
|
8B/RAJ/06/14/2018
|
Construction BT road from SH-29 (Km. 139/500) to Lorda Road under RRSMP funded by the World Bank
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
2.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Sep 2016
|
Stage-I Approval on
|
:
|
27 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2022
|
|
|
|
09 Nov 2023
|
37
|
Rajasthan
|
FP/RJ/TRANS/40778/2019
|
8B/Raj/04/34/2020/FC
|
Construction of 33 KV Transmission Line Lothiyana GSS to Proposed 33/11 KV Mandesara GSS, Tehsil- Rawatbhata, District - Chittorgarh (Raj.)
|
Transmission Line
|
AJMER VIDHYUT VITRAN NIGAM LIMITED
|
11.8905
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jul 2019
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2023
|
|
|
|
30 Oct 2023
|
38
|
Rajasthan
|
FP/RJ/DISP/50853/2020
|
8B/RAJ042/2022-JPR
|
PROPOSED DIVERSION OF 0.60 HECT. AREA FOR CONSTRUCTION OF “CHC, NECHHWA”,SIKAR SALASAR ROAD , VILLAGE- NECHHWA, RANGE - LAXMANGARH ,TEHSIL- LAXMANGARH, DISTT- SIKAR (RAJ.)
|
Dispensary/Hospital
|
CHC NECHHWA,SIKAR (RAJ)
|
0.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2020
|
Stage-I Approval on
|
:
|
20 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2023
|
|
|
|
30 Oct 2023
|
39
|
Rajasthan
|
FP/RJ/ROAD/20389/2016
|
8B/RAJ/06/26/2019/FC
|
BT ROAD FROM ALSIGARH TO NAL PHALLA ROAD
|
Road
|
PWD GIRWA II
|
2.67
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jun 2017
|
Stage-I Approval on
|
:
|
11 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jun 2023
|
|
|
|
25 Oct 2023
|
40
|
Rajasthan
|
FP/RJ/ROAD/33680/2018
|
8B/RAJ/06/18/2019/FC
|
Widening / Strengthening / Up-gradation to two lane with paved shoulder from existing chainage km 250.600 to 266.843 (Wajwana-Banswara) Section of NH-927A in the State of Rajasthan
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
4.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2018
|
Stage-I Approval on
|
:
|
03 Sep 2019
|
Compliance Report Submitted by User Agency on
|
:
|
15 Dec 2022
|
|
|
|
20 Oct 2023
|
41
|
Rajasthan
|
FP/RJ/ROAD/36870/2018
|
8B/RAJ037/2022-JPR
|
Construction of Road from Aproach Road SH-22 to Silpur Km 0/0 to 3/400”
|
Road
|
PUBLIC DEPARTMENT WORK KARAULI
|
1.641
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Nov 2018
|
Stage-I Approval on
|
:
|
20 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2023
|
|
|
|
19 Oct 2023
|
42
|
Rajasthan
|
FP/RJ/TRANS/45697/2020
|
8B/Raj/04/45/2020
|
Bikaner(PG)-Khetri (S/S) 765 KV D/C Transmission Line
|
Transmission Line
|
BIKANER KHETRI TRANSMISSION LIMITED
|
5.9738
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jun 2020
|
Stage-I Approval on
|
:
|
03 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Aug 2023
|
|
|
|
17 Oct 2023
|
43
|
Rajasthan
|
FP/RJ/MIN/142600/2021
|
8B/RAJ003/2023-JPR
|
Diversion of 10.4162 Ha. Forest Land In Favour of RDSA MINING LLP For Opencast Marble Mining (Plot No.02/2019 in Revenue Village – Kela Mela, Tehsil- Pipalkhunth, District – Pratapgarh, Rajasthan
|
Mining
|
RDSA MINING LLP
|
10.4162
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2021
|
Stage-I Approval on
|
:
|
10 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Sep 2023
|
|
|
|
05 Oct 2023
|
44
|
Rajasthan
|
FP/RJ/ROAD/140508/2021
|
8B-RAJ035/2022-JPR
|
“Construction of Widening and Strengthening Road from Viratnagar (NH-248A) to Chilpali Mod (NH-148) Via Teori , Sewra Palri, Palri Tiraha , Ghota, Sawami ki Dhani, Badshahpur, Gudha Baijanathpura ,Todalari , Tehsil–Viratnagar ,District -Jaipur (Rajasthan)”
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN
|
4.314
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Apr 2021
|
Stage-I Approval on
|
:
|
01 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 Apr 2023
|
|
|
|
05 Oct 2023
|
45
|
Rajasthan
|
FP/RJ/ROAD/38474/2019
|
8B/Raj/06/42/2020/FC
|
Construction of Approach Road for Proposed Hindustan petroleum Retail Outlet on Ganganagar -Bikaner NH-15(R.H.SIDE) ,Between Chainage ms stone 89/760 to 89/841.40,Lunkaransar-Malkisar at Village- Chak -2 BHM, Tehsil-Lunkaransar, District Bikaner
|
Road
|
Hindustan Petroleum Corporation Limited
|
0.1276
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2019
|
Stage-I Approval on
|
:
|
15 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jun 2023
|
|
|
|
30 Aug 2023
|
46
|
Rajasthan
|
FP/RJ/DISP/64500/2020
|
8B/RAJ/09/14/2021/FC
|
Constriction of Primary Health Centre at Village Paada , Tehsil Rajgarh , District -Alwar
|
Dispensary/Hospital
|
MEDICAL, HEALTH AND FAMILY WELFARE DEPARTMENT RAJASTHAN
|
0.16
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2020
|
Stage-I Approval on
|
:
|
02 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2023
|
|
|
|
28 Aug 2023
|
47
|
Rajasthan
|
FP/RJ/TRANS/150002/2021
|
8B/RAJ053/2022-JPR
|
“Construction 400 KV D/C Khetri-Bhiwadi Transmission line(Twin HTLS)”
|
Transmission Line
|
BIKANER-II BHIWADI TRANSCO LIMITED (100% SUBSIDIARY OF POWERGRID)
|
1.6238
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2021
|
Stage-I Approval on
|
:
|
14 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2023
|
|
|
|
16 Aug 2023
|
48
|
Rajasthan
|
FP/RJ/Others/52281/2020
|
8B/RAJ054/2022-JPR
|
“Construction of Passenger Ropeway From Mehndipur Balaji Main road Bhairva Baba Temple At Village- Meena Seemla, Tehsil- Sikrai ,District -Dausa (Rajasthan)
|
Others
|
SHIVAMPRIME INFRA PROJECT PVT LTD.
|
0.7882
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2020
|
Stage-I Approval on
|
:
|
13 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2023
|
|
|
|
12 Jul 2023
|
49
|
Rajasthan
|
FP/RJ/Approach/146317/2021
|
8B-RAJ010/2022-JPR
|
Construction of Approach Road for Proposed Nayara Energy Limited (Formerly Essar Oil Ltd.) Retail Outlet on Harsore - Parbatsar Road (SH-21A) between KM Stone No. 13-14 (Chainage 13+089.00 - 13+125.68) RHS in the Part of Khasra No. 580/576, At Village - Neniya, Tehsil - Parbatsar, District - Nagaur, Raj.
|
Approach Access
|
NAYARA ENERGY LIMITED FORMERLY ESSAR OIL LIMITED
|
0.1305
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Aug 2021
|
Stage-I Approval on
|
:
|
22 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2023
|
|
|
|
07 Jul 2023
|
50
|
Rajasthan
|
FP/RJ/TRANS/36238/2018
|
8B/Raj/04/26/2020
|
Uprating Work of “132 KV D/C Line from 220 KV GSS Sikar to 132 KV GSS Sanwali Road Water works (with dismantling of existing 132 KV Line)”.
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD SIKAR
|
5.5401
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2018
|
Stage-I Approval on
|
:
|
08 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
09 Mar 2023
|
|
|
|
30 Jun 2023
|
|