FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/RJ/TRANS/150764/2022
(ii). Name of Project for which Forest Land is required :
Avaada Energy Pvt Ltd. Solar Power Plant in Kolayat Tehsil , Bikaner - Bhadla -II PS 220 KV S/C Transmission Line
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Avaada Energy Pvt Ltd. Solar Power Plant in Kolayat Tehsil , Bikaner - Bhadla -II PS 220 KV S/C Transmission Line (Total route length 22.730km)
(iv). State :
Rajasthan
(v). Category of the Proposal :
Transmission Line
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
2073.306
(viii). Area of forest land proposed for diversion(in ha.):
0.9625
(ix). Non-forest land required for this project(in ha.):
76.8775
(x). Total period for which the forest land is proposed to be diverted(in years):
50
A-2.
Details of User Agency
(i). Name :
AVAADA ENERGY PRIVATE LIMITED
(ii). Address1 :
406,Hubtown Solares, N.S Phadke Marg, Andheri(E)Mumbai
(iii). Address2 :
NIL
(iv). State :
Maharashtra
(v). District :
Mumbai City
(vi). Pin :
400069
(vii). Landmark :
NIL
(viii). Email address :
92sharma@gmail.com
(ix). Landline Telephone No. :
22-61408000
(x). Fax No. :
22-
(xi). Mobile No. :
9906274399
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Rahul
(ii). Middle Name:
NIL
(iii). Last Name:
Sharma
(iv). Gender:
Male
(v). Designation:
Engineer
(vi). Address 1:
Avaada Energy Private Limited, Solar Power Plant At Village-Nokhra, Tehsil-Kolayat , District Bikaner Rajasthan
(vii). Address 2:
NIL
(viii). State:
Rajasthan
(ix). District:
Bikaner
(x). Tehsil:
Kolayat
(xi). Pin:
334303
(xii). Landmark:
NIL
(xiii). Email Address:
92sharmar@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9906274399
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Jodhpur Territorial
0.9625
76.8775
Total
0.9625
76.8775
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Jodhpur
0.9625
59.8325
1.
Bikaner
0
17.045
Total
0.9625
76.8775
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Nokhra
0
8.645
2
Modiya
0
8.4
3
Khidrat
0.7875
20.335
4
Ajad Nagar
0
13.615
5
Kan Singh ki Sir
0.175
25.8825
Total
0.9625
76.8775
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Tower Foundation
0
1.0512
2
Stringing Area
0.33
25.3068
3
Remaining ROW Area
0.6325
50.5195
Total
0.9625
76.8775
C.
Maps of forest land proposed to be diverted
Division 1. : Jodhpur Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
0.9625
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Four
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.175
View File
2.
0.399
View File
3.
0.2135
View File
4.
0.175
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
5
(iii). Temporary Employment(Number of person-days):
7869
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Approval Section 68_ 320 MW Solar Project
2
Authoritarian letter of Rahul Sharma
3
BAR CHART
4
CERTIFICATE FOR MINIMUM USE OF FOREST LAND
5
CERTIFICATE TOWARD MUCK DISPOSAL AND MANAGMENT PLAN
6
Comparative Statement of Alternative
7
COMPLETE ALIGNMENT TOWER COORDINATES
8
Component Wise Area Calculation Sheet
9
Details of Permanent Employment to be Generated
10
Jamabandi Kansingh ki sir
11
Jamabandi Khidart
12
JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
13
Segment Wise Area Calculation Sheet
14
STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
15
STATEMENT SHOWING DETAILS OF NON FOREST AREA INVOLVED IN THE PROPOSAL
16
UNDERTAKING FOR All TYPE FOREST LAND INCLUDED
17
UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING CONSTRUCTION OF TRANSMISSION LINE
18
UNDERTAKING FOR IRRIGATION DEPARTMENT NOC
19
UNDERTAKING FOR MEDICIANAL PLANTS
20
UNDERTAKING FOR MUCK DISPOSAL
21
UNDERTAKING FOR NATIONAL HIGHWAY AUTHORITY OF INDIA NOC
22
UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND
23
UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE
24
UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
25
UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
26
UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
27
UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
28
UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
29
UNDERTAKING FOR USE OF FOREST LAND
30
UNDERTAKING OF FRA CERTIFICATE
31
Village Wise Area calculation Sheet Forest and Non-Forest Land
32
Geo-Referenced Survey of India Toposheet with Proposed 220 kv S/c Transmission Line Full Toposheet No-45A/06 and 45A/11 Scale 1 : 50000
33
Geo-Referenced Digital Map Total Route Alignment Scale 1 : 50000
34
Geo-Referenced DGPS Map Required Land Coordinate With 220 kv S/c Transmission Line Segment-1
35
Geo-Referenced DGPS Map Required Land Coordinate With 220 kv S/c Transmission Line Segment-2
36
Geo-Referenced DGPS Map Required Land Coordinate With 220 kv S/c Transmission Line Segment-3
37
Geo-Referenced DGPS Map Required Land Coordinate With 220 kv S/c Transmission Line Segment-4
38
Khasra Map Super Imposed Village-Khidart and Kan Singh ji ki Sir
39
Geo-Referenced Alternative Route SOI Toposheet Map Scale 1:50000
40
Geo-Referenced Alternative Digital Map Scale 1:50000