FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/WATER/154215/2022   (ii). Name of Project for which Forest Land is required : Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi (Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi(Rajasthan) Total Diversion Area= 4.9975 ha.   (iv). State : Rajasthan   (v). Category of the Proposal : Drinking Water   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 97384   (viii). Area of forest land proposed for diversion(in ha.): 4.9975   (ix). Non-forest land required for this project(in ha.): 43.8452   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PUBLIC HEALTH ENGINEERING DEPARMENT RAJASTHAN   (ii). Address1 : EXECUTIVE ENGINEER PROJECT DIVISION, BUNDI,RAJASTHAN   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Bundi   (vi). Pin : 323001   (vii). Landmark : NIL   (viii). Email address : eeproj.bun.phed@rajasthan.gov.in   (ix). Landline Telephone No. : 0--   (x). Fax No. : 0-   (xi). Mobile No. : 9928355995   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Ram   (ii). Middle Name: Ratan   (iii). Last Name: Doie   (iv). Gender: NIL   (v). Designation: Executive Engineer   (vi). Address 1: EXECUTIVE ENGINEER PROJECT DIVISION, BUNDI,RAJASTHAN   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Bundi   (x). Tehsil: NIL   (xi). Pin: 323001   (xii). Landmark: NIL   (xiii). Email Address: rrdoie123@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9928355995   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bhilwara Territorial0.86765.2482
2.Ramgarh Vishdhari Tiger Reserve (Core), Bundi0.57062.8961
3.Bundi Territorial3.559335.7009
Total4.997543.8452
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bhilwara1.175.2482
1.Bundi3.827538.597
Total4.997543.8452
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Aroli00.315
2Jhareli00.2655
3Kesarpura00.297
4Salavatiya00.324
5Berisal00.3555
6Kalyanpura00.3075
7Nayagaov00.3735
8Kesharganj00.3117
9Bijoliya00.462
10Undarvo ka Khera00.192
11Bhawani Singh ka Khera00.3135
12Mal Ka Khera00.3294
13Saipipla00.249
14Gampura00.258
15Ralayta00.246
16Mangatala00.2775
17Jakholi Khurd00.4725
18Mardaya00.5247
19Owan00.537
20Khejra0.15510.4485
21Basoli0.72150.432
22Baliyagurd00.4515
23Ruppan00.477
24Nehgarh00.522
25Khinya00.4995
26Mahampura00.4935
27Datunda0.22650.8055
28Badi Ka khera0.26730.4125
29Narayanpura0.06120.423
30Gudha0.13620.4005
31Madhopura00.789
32Goverdhanpura00.3165
33Bada Nayagaov00.348
34Bhojgarh0.24250.223
35kherkata0.02260.38
36Amarpura00.267
37Gujarniya0.0910.359
38Barda00.335
39Kundla00.317
40Mangli kalan00.344
41Rughnathpura00.322
42Thana0.09510.289
43Salvaliya0.00190.296
44Bhisanpura00.281
45Babaji ka Barda00.308
46Hindoli0.02290.382
47Kharkheri00.264
48Bikaran00.275
49Tonkara0.03030.377
50Paich ki Bavri00.283
51Deva ka Khera00.367
52Kalmandi00.308
53Roshana00.232
54Kishanganj0.06670.298
55Pangra0.06880.282
56Maliyo ka Jhonpa0.10660.362
57Balola0.44350.3505
58Parera00.3906
59Ganeshganj0.08760.375
60Mandi0.00880.368
61Sukhpura0.01850.329
62Ramalwas00.268
63Baradiya00.325
64Danta00.332
65Thikharda00.305
66Ramchandraji ka Khera00.377
67Sayana00.369
68Borda00.392
69Naya Gonv00.302
70Kalabhata00.243
71Alod00.331
72Chetan ka Jhonpra00.344
73Ananganj00.318
74Dablana00.3675
75Bhawanipura00.3415
76Ran00.3565
77Sarsod00.2835
78Kumariya00.393
79Dhardari00.3652
80Roneeja0.03870.3728
81Bundi ka Gothra00.352
82Bal00.3175
83Ranipura00.3484
84Rishanada00.3516
85Khera00.334
86Takla00.318
87Soran00.345
88Raghunatpura00.369
89Kodi00.386
90Pandula00.229
91Sanwatgarh0.01240.3525
92Bansi0.08020.3754
93Sareda0.0870.3235
94Kalanala0.18120.358
95Bharmar00.3574
96Dungri00.3278
97Anv ka Khera0.04630.3442
98Manpura0.0740.3505
99Nenwa -II0.04560.3845
100Nenwa -I0.1230.363
101Khanpura0.02120.391
102Diyali00.3835
103Korma00.3275
104Bachhola00.2891
105Jajawar0.05110.395
106Khori0.01390.3753
107Hanuwantpura00.288
108Suwaniya00.2958
109Suntha00.3345
110Rajlota00.342
111Fuleta00.3456
112Bari priyap00.3685
113Banjari Bavri00.304
114Bambuli00.339
115Bhajaneri0.0470.223
116Dokun00.278
117Nainganv00.261
118Dei0.13130.3666
119Delpura00.256
120Dev ji ka Gudha00.263
121Kholkhera00.214
122Malera00.25
123Bansoli00.209
124Murdiya00.365
125Modsa00.198
126Dhandoon00.344
127Kesubilas0.93780.1341
128Dhanwara0.23220.237
Total 4.9975 43.8452
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1100mm to 600mm Pipe line2.259730.2438
2600 up to 800 mm Pipe Line2.737798513.6014
Total 4.9974985 43.8452
C. Maps of forest land proposed to be diverted
Division 1. : Bhilwara Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.8676   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.0894    View File
2.0.0174    View File
3.0.7608    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Bundi Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 3.5593   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.3.5593    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Ramgarh Vishdhari Tiger Reserve (Core), Bundi
  (i). Area of forest land proposed to be diverted(in ha.) : 0.5706   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.3024    View File
2.0.2682    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Laying Pipe Line Existing Road Row
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 7   (iii). Temporary Employment(Number of person-days): 532900
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Bundi
  (a). Village: Kota Khurd   (b). Area(in ha.): 4.9975   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 1346   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Authorization Letter
2ADMINISTRATIVE AND FINANCIAL SANCTION
3TECHNICAL SANCTION
4Government of India Ministry of Jal Shakti Letter
5Project Report
6Jamabandi Kesuvilas Bhilwara Division
7Jamabandi part-1
8Jamabandi part-2
9Jamabandi part-3
10EDS Reply to DCF Bhilwara-14-02-2023
11AREA CALCULATION SHEET - RAMGARH VISHDHARI TIGER RESERVE (CORE) BUNDI
12AREA CALCULATION SHEET (BHILWARA TERRITORIAL DIVISION)
13AREA CALCULATION SHEET (BUNDI TERRITORIAL DIVISION)
14CERTIFICATE FOR MINIMUM USE OF FOREST LAND
15JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
16UNDERTAKING FOR ALL TYPE FOREST INCLUDED
17UNDERTAKING FOR CA LAND (Non-Forest Land)
18UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING
19UNDERTAKING FOR MUCK DISPOSAL DURING LAYING
20UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND
21UNDERTAKING FOR NO TREE CUTTING DURING LAYING PIPE LINE
22UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
23UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
24UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
25UNDERTAKING FOR PIPE LINE LAYING WORK WILL BE EXECUTE
26UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED
27UNDERTAKING FOR USE OF FOREST LAND
28UNDERTAKING FOR WASTE MANAGEMENT DURING LAYING PIPE LINE ACTIVITY
29UNDERTAKING OF FRA CERTIFICATE
30UNDERTAKING OF Muck Restoration Plan
31Details of Permanent Employment to be Generated
32SEGMENT WISE AREA CALCULATION SHEET
33MAP SHOWING FOR GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH PROSPOED WATER PIPE LINE ROUTE ALIGNMENT SOI TOPOSHEET SCALE 1 : 50000 (Bhilwara Division) Part-1
34MAP SHOWING FOR GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH PROSPOED WATER PIPE LINE ROUTE ALIGNMENT SOI TOPOSHEET SCALE 1 : 50000 (Bundi Territorial Division) Part-2
35MAP SHOWING FOR GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH PROSPOED WATER PIPE LINE ROUTE ALIGNMENT SOI TOPOSHEET SCALE 1 : 50000 (RVTR and Bundi Territorial Division) Part-3
36GEO-REFERENCED DGPS MAP SHOWING FOR REQUIRED LAND COORDINATE WITH PROSPOED WATER PIPE LINE ROUTE ALIGNMENT SOI TOPOSHEET DGPS MAP (Bhilwara -Division and RVTR ) Part-1
37GEO-REFERENCED DGPS MAP SHOWING FOR REQUIRED LAND COORDINATE WITH PROSPOED WATER PIPE LINE ROUTE ALIGNMENT SOI TOPOSHEET DGPS MAP Bundi -Division and RVTR ) Part-2
38GEO-REFERENCED DGPS MAP SHOWING FOR REQUIRED LAND COORDINATE WITH PROSPOED WATER PIPE LINE ROUTE ALIGNMENT SOI TOPOSHEET DGPS MAP Bundi -Division and RVTR ) Part-3
39Combined Digital Map
40Combined Toposheet Map
41Village Wise Area Calculation Sheet
42Khasra Wise Area Calculation Sheet (Bhilwara Division)
43Khasra Wise Area Calculation Sheet (Bundi Territorial Division)
44Khasra Wise Area Calculation Sheet (RVTR Bundi Division)
45Khasra Map Super Imposed (Bhilwara Divsion) Scale 1-4000
46Khasra Map Super Imposed (RVTR Core Bundi Division) Scale 1-4000
47Khasra Map Super Imposed (Bundi Division) Part- I Scale 1-4000
48Khasra Map Super Imposed (Bundi Division) Part- II Scale 1-4000
49EDS Reply-23-02-2023
50EDS Reply- TO DCF BUNDI -29-03-2023
51EDS Reply-to RVTR DCF Bundi 29-03-2023
52Allotment Letter NFL by District Collector Bundi
53JAMABANDI FOR CA NFL
54KHASRA MAP FOR CA NFL LAND SCALE 1: 4000
55GEO-REFERENCED DGPS MAP FOR CA LAND
56GEO-REFERENCED TOPOSHEET WITH PROPOSED FOR Compensatory Afforestation SCALE 1 : 50000
57District Collector Bundi TO PHED
58EDS Reply-15-05-2023
59Cross Section pipeline
60Area Calculation Sheet WLS and Territorial Forest
61Detail of Area Calculation sheet