Ministry of Environment,Forest and Climate Change
Government of India
Rajasthan
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Rajasthan FP/RJ/OFC/153375/2022 1(31)Forest/2023 Permission for laying underground OFC in ROW of existing PWD road from Nathdwara to Iswal from Lat/ Long 24°53' 51.08" N/ 73°42' 33.72" E to 24°53' 34.36" N/ 73°41' 55.73" E in Rajsamand District. Total length & area in Forest is 1.365 KM & 0.06143 ha in Rajsamand District, Rajasthan. Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.06143 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Mar 2022
Stage-I Approval on : 23 May 2023
Compliance Report Submitted by User Agency on : 06 Nov 2024
29 Nov 2024
2 Rajasthan FP/RJ/OFC/44109/2020 1(13)forest/2022 Laying of underground OFC within ROW of existing PWD road from Vijaipura-Ratangarh form Lat/long point 24.808472/75.718965° to 24.688055/75.605895° for length & area in forest is 23.222 KM & 1.045 ha and length & area in non-forest is 0.156 Km & 0.007 ha. Total length and area in forest is 23.222 KM & 1.045 ha and in non-forest is 0.156 Km & 0.007 Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 1.045 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jan 2020
Stage-I Approval on : 22 Feb 2022
Compliance Report Submitted by User Agency on : 26 Nov 2024
28 Nov 2024
3 Rajasthan FP/RJ/OFC/44367/2020 1(101)forest/2021 laying underground OFC in ROW of existing road from Vijaipur - Ratangarh (MP Border) from Lat/long point 24.705416/75.519275 to 24.735003/75.339779 for total length of 21.252 KM and total area 0.956 ha. (Length and area in Forest are 8.844 KM & 0.398 ha & Length & area in Non -Forest are 12.408 KM & 0.558 ha) along PWD roads in Chittorgarh District Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.398 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Feb 2020
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 26 Nov 2024
28 Nov 2024
4 Rajasthan FP/RJ/OFC/144983/2021 1(15)Forest/2023 Permission for laying underground OFC in Forest area along road from Vijaipur - Rooppura from Lat/Long 24.791558/75.718341 to 24.765172/75.740787 for total length of 4.063 KM and total area 0.1828 ha in Chittorgarh District, Rajasthan Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.1828 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jul 2021
Stage-I Approval on : 28 Jun 2023
Compliance Report Submitted by User Agency on : 08 Nov 2024
28 Nov 2024
5 Rajasthan FP/RJ/OFC/43686/2020 1(134)forest/2020 Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 58.285 = 58.285 km (Gogunda - Kirat Road) District - Udaipur (Rajasthan) Optical Fibre Cable DINESH ENGINEERS LTD. 0.3648 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Jan 2020
Stage-I Approval on : 09 Mar 2021
Compliance Report Submitted by User Agency on : 06 Nov 2024
27 Nov 2024
6 Rajasthan FP/RJ/OFC/150331/2021 1(60)Forest/2023 Permission for laying underground OFC in ROW of existing PWD road from Gerhi to Peeplekoot from Lat/ Long 23.845817/74.323689 (village Mundela) to 3.855166/74.448102 (Gangji Ka Khera) in Banswara District. Total length & area in Forest and non-Forest are 6.636 KM & 0.2986 ha and 13.407 & 0.6033 ha respectively in Banswara District, Rajasthan Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.2986 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Dec 2021
Stage-I Approval on : 22 Aug 2023
Compliance Report Submitted by User Agency on : 06 Nov 2024
27 Nov 2024
7 Rajasthan FP/RJ/TRANS/23277/2016 8B/RAJ025/2023-JPR “Construction of 11 kv Transmission Line Projects of Rajeev Gandhi Gram Vidyutikaran Yojana(RGGVY) in XII Plan for Between Shivshakti Stone Crusher Jinjhari to Village-Bhawan,Tehsil-Sojat,District Pali (Raj)” Transmission Line JODHPUR VIDHYUT VITRAN NIGAM LTD 1.764 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Dec 2016
Stage-I Approval on : 22 Jun 2023
Compliance Report Submitted by User Agency on : 23 Aug 2024
13 Nov 2024
8 Rajasthan FP/RJ/TRANS/147919/2021 8B-RAJ022/2022-JPR Construction for 132 KV S/C Setrawa-Sekhala Line , Tehsil -Balesar , District -Jodhpur (Rajasthan) Transmission Line RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED 0.1404 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Oct 2021
Stage-I Approval on : 09 May 2022
Compliance Report Submitted by User Agency on : 22 Aug 2024
13 Nov 2024
9 Rajasthan FP/RJ/Approach/154227/2022 1(149)forest2022 “Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on Shiv-Nimbla Road NH-68 (Old NH-15) LHS on Chainage 114+570.00 to 114+605.00 on Khasra No 822/506 At Village-Nimbla, Tehsil -Shiv & District – Barmer(Rajasthan)” Approach Access HINDUSTAN PETROLEUM CORPORATION LIMITED 0.1801 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Apr 2022
Stage-I Approval on : 09 Jan 2023
Compliance Report Submitted by User Agency on : 21 Oct 2024
06 Nov 2024
10 Rajasthan FP/RJ/ROAD/6956/2014 8B/RJ/06/13/2015 Road from Nehroopur to Jhhiri Road PUBLIC WORKS DEPARTMENT 3.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2014
Stage-I Approval on : 04 Aug 2016
Compliance Report Submitted by User Agency on : 04 Jul 2024
05 Nov 2024
11 Rajasthan FP/RJ/ROAD/6999/2014 8B/RJ/06/5/2015 Road from Dhikoniya to Talawara Road PUBLIC WORKS DEPARTMENT 7.5 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2014
Stage-I Approval on : 04 Aug 2016
Compliance Report Submitted by User Agency on : 04 Jul 2024
05 Nov 2024
12 Rajasthan FP/RJ/ROAD/144538/2021 8B-RAJ040/2022-JPR Construction of Missing Link Road from NH 148 to Moroli via Peepli Patalwas Koliwada Dob Paplaj Mata Sar Dhaun (MDR-145) km 9.00 to 15.00, in the State of Rajasthan (Total Length 4.530 km) Road PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR 3.0207 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Jul 2021
Stage-I Approval on : 20 Jul 2022
Compliance Report Submitted by User Agency on : 14 Sep 2024
05 Nov 2024
13 Rajasthan FP/RJ/Others/150590/2021 8-05/2022-FC Diversion of 466.592 ha. Forest land for Construction of New Green Field Airport Kota, District- Bundi in the State of Rajasthan Others AIRPORT AUTHORITY OF INDIA KOTA 466.592 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2021
Stage-I Approval on : 27 Jan 2023
Compliance Report Submitted by User Agency on : 17 Oct 2024
01 Nov 2024
14 Rajasthan FP/RJ/WATER/145797/2021 8B/RAJ016/2023-JPR Construction of Intake Well with Pump House, MCC Room, Raising Main Pipeline, Approach Road and HT Transmission Line in Area of Baisasing Dam District-Sirohi, Rajasthan Drinking Water PUBLIC HEALTH ENGINEERING DEPARTMENT 3.6975 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Aug 2021
Stage-I Approval on : 11 Jul 2023
Compliance Report Submitted by User Agency on : 30 Apr 2024
07 Oct 2024
15 Rajasthan FP/RJ/TRANS/143945/2021 8B/RAJ034/2022-JPR Construction of Sikar-II_Neemrana 400 KV D/C Transmission Line(Twin HTLS*)in Rajasthan Transmission Line SIKAR NEW TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED) 13.0134 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2021
Stage-I Approval on : 22 Dec 2022
Compliance Report Submitted by User Agency on : 19 Sep 2024
30 Sep 2024
16 Rajasthan FP/RJ/ROAD/49638/2020 1(103)forest/2021 Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Jaipur - Bikaner Road (NH-11) between KM Stone No. 450-451 (Chainage: 450.394 - 450.439) LHS in Khasra No. 486, At Village - Rajaldesar, Tehsil - Ratangarh, District - Churu, Raj Road Indian Oil Corporation Limited 0.0712 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Sep 2020
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 11 Jul 2024
12 Sep 2024
17 Rajasthan FP/RJ/ROAD/21362/2016 8B/RAJ026/2023-JPR Development of Arain-Sarwad Highway, Section of SH-7E, from existing km 44.300 to km 0.000, in the state of Rajasthan Road PWD JAIPUR 1.2401 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Sep 2016
Stage-I Approval on : 13 Sep 2023
Compliance Report Submitted by User Agency on : 24 Jul 2024
10 Sep 2024
18 Rajasthan FP/RJ/TRANS/144853/2021 8B/RAJ018/2023-JPR Construction of 765 KV D/C Sikar-II -Aligarh Transmission line, District- Sikar, Jaipur & Alwar (Rajasthan)” in Rajasthan Portion Ap-01 to Ap-180 Common Point Rajasthan State Boundary. Total Route Length 180.946 km Transmission Line SIKAR -II ALIGARH TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED) 15.8321 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jul 2021
Stage-I Approval on : 10 Aug 2023
Compliance Report Submitted by User Agency on : 21 Jun 2024
30 Aug 2024
19 Rajasthan FP/RJ/ROAD/38150/2019 1(30)forest/2020 Construction of Approach road jhalra patan railway station Road PUBLIC WORKS DEPARTMENT JHALAWAR 0.9 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jan 2019
Stage-I Approval on : 04 Oct 2021
Compliance Report Submitted by User Agency on : 03 May 2023
23 Aug 2024
20 Rajasthan FP/RJ/ROAD/38372/2019 1(73)forest/2022 Construction of sawantkhera to kadagpura road Road PUBLIC WORKS DEPARTMENT JHALAWAR 0.52 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jan 2019
Stage-I Approval on : 21 Jul 2022
Compliance Report Submitted by User Agency on : 28 Apr 2024
23 Aug 2024
21 Rajasthan FP/RJ/ROAD/35096/2018 8B/RAJ030/2023-BHO Construction of Road Widening & Strengthening of Manoharpur to Itwa Bhopji Via Nawalpura Charanwas (MDR-187) Road PUBLIC WORK DEPARTMENT 1.4445 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Sep 2018
Stage-I Approval on : 28 Aug 2023
Compliance Report Submitted by User Agency on : 02 Jul 2024
12 Jul 2024
22 Rajasthan FP/RJ/ROAD/29601/2017 8B/UP/06/06/2018/FC PROPOSED DIVERSION OF FOREST LAND FOR RENEWAL,WIDENING & STRENGTHENING OF SIKAR-HARSH ROAD (ODR-04)KM 8/750 TO 15/100 IN HARSHNATH PF VILLAGE- ANTRI TEHSIL-DHOD,DISTT.- SIKAR (RAJ.) Road PUBLIC WORKS DEPATMENT SIKAR 6.35 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Oct 2017
Stage-I Approval on : 28 Mar 2018
Compliance Report Submitted by User Agency on : 28 Mar 2023
08 Jul 2024
23 Rajasthan FP/RJ/ROAD/21211/2016 8B/RAJ/06/22/2017/FC Development of Tarnau-Deedwana-Laxmangarh-Mukundgarh, Section of SH-60, SH-20, SH-83, SH-82A & SH-8 from design chainage km 39.668 to km 205.300 of SH-60, in the state of Rajasthan Road PWD JAIPUR 84.248 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Sep 2016
Stage-I Approval on : 06 Nov 2017
Compliance Report Submitted by User Agency on : 02 Dec 2022
10 Jun 2024
24 Rajasthan FP/RJ/ROAD/31293/2018 8B/Raj/06/09/2020 Padisal –Jagta Basai- Ratta Khurd- Balan Basai-Shyamka-Ismailpur- Ganj- Kishangarhbas road. Road PUBLIC WORKS DEPARTMENT NCRPB DIVISION ALWAR 5.9 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Feb 2018
Stage-I Approval on : 07 Dec 2020
Compliance Report Submitted by User Agency on : 29 Nov 2022
10 Jun 2024
25 Rajasthan FP/RJ/ROAD/118453/2021 8B/RAJ031/2022-JPR Construction of Road from Jalore City to Jalore Fort (Design Chainage 0+000 km to 5+176 km) Village, Tehsil and District- Jalore in State of Rajasthan Road MUNICIPAL COUNCIL JALORE 4.0144 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Feb 2021
Stage-I Approval on : 20 Jun 2022
Compliance Report Submitted by User Agency on : 29 Jul 2023
10 Jun 2024
26 Rajasthan FP/RJ/ROAD/140782/2021 8B/RAJ007/2022-JPR Construction of Proposed Road from Ghoda Gati to Meharangarh Fort, District-Jodhpur in State of Rajasthan (Total Length 2300 meters) Road JODHPUR DEVELOPMENT AUTHORITY, JODHPUR 3.579 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Apr 2021
Stage-I Approval on : 08 Feb 2022
Compliance Report Submitted by User Agency on : 10 May 2023
10 Jun 2024
27 Rajasthan FP/RJ/TRANS/142545/2021 1(106)FOREST/2023 Construction of 765 KV D/C Bhadla-II to Sikar-II Transmission line ,District- Jodhpur, Bikaner, Nagaur, Churu & Sikar (Rajasthan) Transmission Line SIKAR NEW TRANSMISSION LIMITED 0.5428 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Jun 2021
Stage-I Approval on : 06 Dec 2023
Compliance Report Submitted by User Agency on : 24 Jan 2024
20 May 2024
28 Rajasthan FP/RJ/Others/22621/2016 8-10/2022-FC Mahi Banswara Rajasthan Atomic Power Project (MBRAPP)-1 to 4 Others NPCIL 100.05 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Dec 2016
Stage-I Approval on : 12 May 2023
Compliance Report Submitted by User Agency on : 28 Aug 2023
06 May 2024
29 Rajasthan FP/RJ/Approach/149575/2021 1(65)forest/2022 “Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on NH -11 (New-NH-21) LHS on Khasra No 476, Chainage 75/776 to 75/824, At Village – Sewla, Tehsil -Nadabai, Approach Access HINDUSTAN PETROLIUM CORPORATION LIMITED 0.1409 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jan 2022
Stage-I Approval on : 09 Jun 2022
Compliance Report Submitted by User Agency on : 20 Mar 2024
30 Apr 2024
30 Rajasthan FP/RJ/OFC/150256/2021 1(67)forest/2022 Loying of OFC CABLE BLOWING WORK FOR TELESONIC CONNECTIVITY in Samoli, Near Sei Nadi,Tin Sara, Kagwas, Subra Subri, Sawan ka kyara to near Guda and Mamer to Bhoori Dheber Gujrat Border in Udaipur Nort Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.606 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Dec 2021
Stage-I Approval on : 24 Jun 2022
Compliance Report Submitted by User Agency on : 21 Mar 2024
25 Apr 2024
31 Rajasthan FP/RJ/ROAD/18883/2016 8B/Raj/06/19/2020/FC Widening and Curve Improvement on Existing Road Alignment . Road PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR 4.47 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Apr 2016
Stage-I Approval on : 30 Nov 2021
Compliance Report Submitted by User Agency on : 27 Dec 2022
22 Apr 2024
32 Rajasthan FP/RJ/OFC/44409/2020 1(83)forest/2020 Loying of OFC CABLE BLOWING WORK FOR TELESONIC CONNECTIVITY From Near Shastri Nagar, Vishveshwar Mahadev, Lohagal Road To Lohagal Panchsheel Road, Nr. Kabir Nagar, Ajmer of total length 1500 mtr. Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.0585 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Feb 2020
Stage-I Approval on : 06 Jan 2021
Compliance Report Submitted by User Agency on : 11 Mar 2024
26 Mar 2024
33 Rajasthan FP/RJ/TRANS/43798/2020 8B/RAJ019/2023-JPR Construction of 11 kv Transmission Line for Rural Electrification of Bera Sukh Sagar to Village Sand Mangra, Khejdi Ka Bala,Lakha ka Khet, Tehsil-Sojat,District Pali (Raj) Transmission Line JODHPUR VIDHYUT VITRAN NIGAM LTD 0.8491 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Jan 2020
Stage-I Approval on : 30 May 2023
Compliance Report Submitted by User Agency on : 09 Feb 2024
20 Mar 2024
34 Rajasthan FP/RJ/TRANS/152039/2022 8B/RAJ036/2022-JPR “Construction of 33 KV Transmission Line Overhead/ Underground 33 KV XLPE 300 Sq. mm Cable From 400 KV GSS Bhadla to HPCL Rajasthan Refinery Ltd Nachana District -Jaisalmer” Transmission Line JODHPUR VIDYUT VITRAN NIGAM LIMITED , JAISALMER 1.5206 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Feb 2022
Stage-I Approval on : 26 Jun 2023
Compliance Report Submitted by User Agency on : 18 Jan 2024
20 Mar 2024
35 Rajasthan FP/RJ/ROAD/35614/2018 1(19)forest/2020 Renewal of Road from Chouth ka Barwara to Nayagaon (0/0 to 4/750 km), District- Sawai Madhopur, Raj. Road PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR 0.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Sep 2018
Stage-I Approval on : 03 Jun 2020
Compliance Report Submitted by User Agency on : 08 Sep 2023
19 Mar 2024
36 Rajasthan FP/RJ/TRANS/148899/2021 8B/RAJ043/2022-JPR Construction of 132 KV S/C Transmission Line for Power Evacuation from 150 MW Chhattargarh Solar Project of NTPC Renewable Energy Limited (A wholly owned subsidiary of NTPC Limited) to 220 KV Chhattargarh Grid Sub Station District-Bikaner in the State of Rajasthan Transmission Line NTPC RENEWABLE ENERGY LIMITED 3.9007 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2021
Stage-I Approval on : 18 Aug 2022
Compliance Report Submitted by User Agency on : 07 Feb 2024
04 Mar 2024
37 Rajasthan FP/RJ/IRRIG/30576/2017 8B/Raj/02/15/2021/FC Construction of canal (LMC& RMC) for gararda medium irrigation project distt. bundi Irrigation EXECUTIVE ENGINEER WR PROJECT DIV BUNDI 18.567 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2018
Stage-I Approval on : 06 Jun 2022
Compliance Report Submitted by User Agency on : 26 Apr 2023
14 Feb 2024
38 Rajasthan FP/RJ/Pipeline/147451/2021 8-B-Raj009/2022-JPR “Laying of Under ground of 8”/12” Dia Carbon Steel Gas Pipeline Along the NH-8 Road Within the Existing Row from Tapping Point NH-8 Jaipur -Ajmer- Bypass Tiraha at Gagwana to Mangliyawas Tapping Point (Length 35.00 Km)in District-Ajmer(Rajasthan) by Indraprastha Gas Limited.” Pipeline INDRAPRASTHA GAS LIMITED 3.5 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Sep 2021
Stage-I Approval on : 07 Mar 2022
Compliance Report Submitted by User Agency on : 25 Jan 2024
14 Feb 2024
39 Rajasthan FP/RJ/Pipeline/147495/2021 8-B-Raj008/2022-JPR “Laying of Under ground of 8”/12” Dia Carbon Steel Gas Pipeline Along the NH-8 Road Within the Existing Row from Tapping Point NH-8 Jaipur -Ajmer- Bypass Tiraha via Kishangarh to Bandar Sindari (Length 38.800 Km) in District-Ajmer(Rajasthan) by Indraprastha Gas Limited. Pipeline INDRAPRASTHA GAS LIMITED 3.88 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Sep 2021
Stage-I Approval on : 07 Mar 2022
Compliance Report Submitted by User Agency on : 25 Jan 2024
14 Feb 2024
40 Rajasthan FP/RJ/ROAD/20390/2016 8B/Raj/06/36/2019/FC BT ROAD FROM NAL TO DUNGRA ,RISHABHDEV,UDAIPUR Road PWD RISBHABHDEV II 1.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jul 2017
Stage-I Approval on : 27 Dec 2019
Compliance Report Submitted by User Agency on : 02 Jan 2023
12 Feb 2024
41 Rajasthan FP/RJ/ROAD/35275/2018 8B/RAJ023/2022-JPR Construction of Road from Silpur Road to Palanpur ,District-Karauli (Rajasthan) Road PUBLIC DEPARTMENT WORK KARAULI 1.179 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2018
Stage-I Approval on : 06 Jan 2023
Compliance Report Submitted by User Agency on : 09 May 2023
12 Feb 2024
42 Rajasthan FP/RJ/OFC/45721/2020 1(85)forest/2021 Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 56.262 = 56.262 km (Badi Sadri - Tekan Road) District – Chittorgarh & Udaipur, Rajasthan Optical Fibre Cable DINESH ENGINEERS LTD. 0.1325 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jun 2020
Stage-I Approval on : 15 Nov 2021
Compliance Report Submitted by User Agency on : 12 Jan 2024
12 Feb 2024
43 Rajasthan FP/RJ/OFC/150733/2022 1(43)forest2022 Laying Underground Optical Fiber Cable along side road by Open Trench method within existing ROW from Rangama Talaab, Bichipur to Harnagar and Harnagar to Khoobnagar District Karouli Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.477 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jan 2022
Stage-I Approval on : 29 Nov 2022
Compliance Report Submitted by User Agency on : 07 Feb 2024
12 Feb 2024
44 Rajasthan FP/RJ/WATER/33714/2018 8B/Raj/08/20/2021/FC Fluoride Control Project for Remaining Villages of Tehsil Beawar Drinking Water PHED 7.0484 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 May 2018
Stage-I Approval on : 06 Jun 2022
Compliance Report Submitted by User Agency on : 30 Jan 2023
02 Feb 2024
45 Rajasthan FP/RJ/IND/153357/2022 8B/RAJ011/2023-JPR Laying of railway line for private siding for Cement plant. Industry WONDER CEMENT LIMITED 7.3792 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Mar 2022
Stage-I Approval on : 04 Aug 2023
Compliance Report Submitted by User Agency on : 11 Jan 2024
02 Feb 2024
46 Rajasthan FP/RJ/ROAD/43002/2019 1(107) Van/2020 Rehabilitation of jhalrapatan ,Gindor,Railway station Jhikriya, Kishanpura Durgpura Gagron (MDR-227) Road PUBLIC WORKS DEPARTMENT JHALAWAR 0.999 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Dec 2019
Stage-I Approval on : 22 Oct 2020
Compliance Report Submitted by User Agency on : 10 Oct 2023
15 Jan 2024
47 Rajasthan FP/RJ/ROAD/57309/2020 1(95)Forest/2021 Construction of Approach Road for Proposed Hindustan Petroleum Corp. Ltd. Retail Outlet on Nagaur - Bikaner Road NH-89 between KM Stone No. 180-181 (Chainage: 180/949 - 180/994) LHS in Khasra No. 525 Road HINDUSTAN PETROLEUM CORPORATION LTD JODHPUR 0.1845 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Dec 2020
Stage-I Approval on : 10 Apr 2023
Compliance Report Submitted by User Agency on : 28 Dec 2023
09 Jan 2024
48 Rajasthan FP/RJ/ROAD/150326/2021 1(28)Forest/2023 Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Package-4) - Paniyala-Alwar-Barodameo. Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SOHNA 0.76 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Feb 2022
Stage-I Approval on : 19 May 2023
Compliance Report Submitted by User Agency on : 18 Aug 2023
09 Jan 2024
49 Rajasthan FP/RJ/Others/146292/2021 8B/RAJ051/2022-JPR Construction and Renovation works at Machia Fort and Construction of Approach Road from Kaylana Main Road to Machia Fort at Jodhpur (Rajasthan) Others JODHPUR DEVELOPMENT AUTHORITY, JODHPUR 3.9133 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Mar 2022
Stage-I Approval on : 05 Sep 2022
Compliance Report Submitted by User Agency on : 31 Aug 2023
29 Nov 2023
50 Rajasthan FP/RJ/TRANS/145974/2021 8B/RAJ026/2022-JPR Construction of 220 kV Transmission Line Transmission Line SBE Renewables Ten Private Limited 0.175 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Aug 2021
Stage-I Approval on : 06 Jun 2022
Compliance Report Submitted by User Agency on : 25 Aug 2023
24 Nov 2023