FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/OFC/43686/2020   (ii). Name of Project for which Forest Land is required : Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 58.285 = 58.285 km (Gogunda - Kirat Road) District - Udaipur (Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 58.285 = 58.285 km (Gogunda - Kirat Road) District - Udaipur (Rajasthan)   (iv). State : Rajasthan   (v). Category of the Proposal : Optical Fibre Cable   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 40.8   (viii). Area of forest land proposed for diversion(in ha.): 0.3648   (ix). Non-forest land required for this project(in ha.): 2.258   (x). Total period for which the forest land is proposed to be diverted(in years): 20
A-2. Details of User Agency
  (i). Name : DINESH ENGINEERS LTD.   (ii). Address1 : DEPL House, Neighbourhood Shopping Complex, Sector - 4   (iii). Address2 : Nerul - W, Navi Mumbai   (iv). State : Maharashtra   (v). District : Mumbai City   (vi). Pin : 400706   (vii). Landmark : NIL   (viii). Email address : dineshengineersltd@gmail.com   (ix). Landline Telephone No. : 22-27704600   (x). Fax No. : 22-   (xi). Mobile No. : 7976988838   (xii). Website (if any) : www.depl.co.in   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Devendra   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: RoW Supervisor   (vi). Address 1: DEPL House Neighbourhood Shopping Complex Sector - 4   (vii). Address 2: Nerul - W, Navi Mumbai   (viii). State: Maharashtra   (ix). District: Mumbai City   (x). Tehsil: NIL   (xi). Pin: 400706   (xii). Landmark: NIL   (xiii). Email Address: dineshengineersltd@gmail.com   (xiv). Landline Telephone No.: 22-27704600   (xv). Fax No.: NIL   (xvi). Mobile No.: 7976988838   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1Under Processing at State GovernmentFP/RJ/OFC/43491/20190.720
2Under Processing at State GovernmentFP/RJ/OFC/44190/20200.53130
Total 1.2513 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Udaipur (South) Territorial0.36482.258
Total0.36482.258
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Udaipur0.36482.258
Total0.36482.258
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Gogunda00.0146
2Kalji Ka Gurha00.0499
3Ranan00.0844
4Mokhi00.2208
5Jhank0.05170
6Sandar0.04420
7Pada Wali Kalan0.0410
8Chundawaton Ka Khera00.0442
9Madra00.0725
10Bilriya00.0562
11Vaas00.0476
12Veerpura00.0616
13Khambiya00.0613
14Sameeja00.1049
15Atariya00.0955
16Doongariyawas00.0789
17Ogna00.0901
18Dadmiya00.0879
19Undra00.1206
20Ranpur00.0312
21Kyariya00.0758
22Kapayabas0.01230.1186
23Kada0.02030.023
24Bhawariya0.0630.0122
25Upreta0.0720.079
26Heeroomala00.0317
27Benagiya00.0712
28Rohimala00.1037
29Odda0.0230.0234
30Luniyara0.00780.0261
31Kathor00.0119
32Ghati00.0351
33Jhada Pipla00.0522
34Biroti00.0475
35Dob00.0671
36Jeetawar00.0549
37Kirat0.02950.1024
Total 0.3648 2.258
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Laying of Optical Fiber Cable0.36482.258
Total 0.3648 2.258
C. Maps of forest land proposed to be diverted
Division 1. : Udaipur (South) Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.3648   (ii). Nature of the Project: Linear   (b). No. of Segments : Six
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.1369    View File
2.0.0123    View File
3.0.1553    View File
4.0.0095    View File
5.0.0213    View File
6.0.0295    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: OFC alignment is Proposed along the existing Road.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 4   (iii). Temporary Employment(Number of person-days): 300
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1IP Licence.
2Proposed OFC Cross Section.
3Reply Letter of 20.01.2020 EDS.
4CERTIFICATE FOR MINIMUM USE OF FOREST LAND.
5Details of Permanent Employment to be generated.
6Project Report.
7UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING LAYING OF OFC.
8Undertaking for Depth and Width.
9Undertaking for FRA Certificate.
10UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE AND DIVERSION OF MINIMUM Forest Land.
11UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION.
12UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION.
13UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA.
14Undertaking for Use of Any Material From Forest Land.
15Undertaking for Waste Management.
16Segment Wise Area Calculation Sheet.
17Village wise Area Calculation Sheet.
18Bar Chart Status.
19Geo Referenced Full Toposheet Map 45H6.
20Geo Referenced Full Toposheet Map 45H7.
21Geo Referenced Total OFC Alignment Toposheet map 50000 scale.
22Geo Referenced Total OFC Alignment Digital map 50000 scale.
23EDS Reply Letter Udaipur DFO Dated 02_09_2020.