Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
Regional Office
|
EDS
|
State secretary
|
13/12/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
2
|
State secretary
|
EDS
|
Nodal Officer
|
16/12/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
3
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
16/12/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
4
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
17/12/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
5
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
19/12/2019
|
state govt. may attend the following shortcomings as per the attachment here
|
|
6
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
23/01/2020
|
The correction have been made as per the instruction received
|
|
7
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
28/01/2020
|
plz send point wise ans. as per letter
|
|
8
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
10/02/2020
|
The correction have been made as per the instruction received
|
|
9
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
13/02/2020
|
The correction has been made as per the instruction received.
|
|
10
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
17/02/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 16-12-2019 has been clarified by Dfo Pithoragarh letter no 2948/12-1 dated 13-02-2020.
|
|
11
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
22/02/2020
|
find the letter attached
|
|
12
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
25/02/2020
|
find the letter attached
|
|
13
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
26/02/2020
|
remove obj. as per letter
|
|
14
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
04/03/2020
|
The correction have been made as per the instruction received
|
|
15
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
04/03/2020
|
The correction has been done as per letter
|
|
16
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
04/03/2020
|
The correction has been done as per letter
|
|
17
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
04/03/2020
|
The correction has been done as per letter
|
|
18
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
04/03/2020
|
The correction has been done as per letter
|
|
19
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
05/03/2020
|
The correction has been done as per letter
|
|
20
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
17/03/2020
|
find the letter attached
|
|
21
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
19/03/2020
|
find the letter attached
|
|
22
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
20/03/2020
|
find the letter attached
|
|
23
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
23/03/2020
|
The correction have been made as per the instruction received
|
|
24
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
06/05/2020
|
find the letter attached
|
|
25
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
29/06/2020
|
The correction have been made as per the instruction received
|
|
26
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
30/06/2020
|
Objection has been removed as per letter.
|
|
27
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
02/07/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 17-03-2020 has been clarified by Dfo Pithoragarh letter no 4347/12-1 dated 30-06-2020.
|
|
28
|
Nodal Officer
|
REPLY
|
State secretary
|
20/07/2020
|
The correction has been done as per letter
|
|
29
|
State secretary
|
REPLY
|
Regional Office
|
20/07/2020
|
The correction has been done as per letter
|
|
30
|
Regional Office
|
EDS
|
State secretary
|
30/07/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
31
|
State secretary
|
EDS
|
Nodal Officer
|
30/07/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
32
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
30/07/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
33
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
31/07/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
34
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
04/08/2020
|
Remove obj. as per letter.
|
|
35
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
14/08/2020
|
The correction have been made as per the instruction received
|
|
36
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
17/08/2020
|
Objection has been removed as per letter.
|
|
37
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
18/08/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 30-07-2020 has been clarified by Dfo Pithoragarh letter no 595/12-1 dated 17-08-2020.
|
|
38
|
Nodal Officer
|
REPLY
|
State secretary
|
18/08/2020
|
The correction have been made as per the instruction received
|
|
39
|
State secretary
|
REPLY
|
Regional Office
|
18/08/2020
|
The correction have been made as per the instruction received
|
|
40
|
Regional Office
|
EDS
|
State secretary
|
31/08/2020
|
The proposal was discussed in the REC meeting held on 26.08.2020. State Government may made corrections as per REC decisions. The minutes of the meeting attached herewith.
|
|
41
|
State secretary
|
EDS
|
Nodal Officer
|
31/08/2020
|
The proposal was discussed in the REC meeting held on 26.08.2020. State Government may made corrections as per REC decisions. The minutes of the meeting attached herewith.
|
|
42
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
31/08/2020
|
The proposal was discussed in the REC meeting held on 26.08.2020. State Government may made corrections as per REC decisions. The minutes of the meeting attached herewith.
|
|
43
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
07/09/2020
|
The proposal was discussed in the REC meeting held on 26.08.2020. State Government may made corrections as per REC decisions. The minutes of the meeting attached herewith.
|
|
44
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
19/09/2020
|
The proposal was discussed in the REC meeting held on 26.08.2020. State Government may made corrections as per REC decisions. The minutes of the meeting attached herewith.
|
|
45
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
06/10/2020
|
The correction have been made as per the instruction received
|
|
46
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
09/10/2020
|
e proposal was discussed in the REC meeting held on 26.08.2020. State Government may made corrections as per REC decisions. The minutes of the meeting attached herewith.
|
|
47
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
13/10/2020
|
The correction have been made as per the instruction received
|
|
48
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
13/10/2020
|
Objection has been removed as per letter.
|
|
49
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
17/10/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 31-08-2020 has been clarified by Dfo Pithoragarh letter no 1457/12-1 dated 13-10-2020.
|
|
50
|
Nodal Officer
|
REPLY
|
State secretary
|
22/10/2020
|
The correction have been made as per the instruction received
|
|
51
|
State secretary
|
REPLY
|
Regional Office
|
22/10/2020
|
The correction have been made as per the instruction received
|
|
52
|
RO/HQ
|
EDS
|
( RODEHR )
|
01/01/2021
|
EDS raised on 31.12.2020
|
|
53
|
Regional Office
|
EDS
|
State secretary
|
01/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
54
|
State secretary
|
EDS
|
Nodal Officer
|
01/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
55
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
04/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
56
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
08/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
57
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
11/01/2021
|
please resolve all objections sought by RO
|
|
58
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
14/01/2021
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
24/02/2021
|
The correction have been made as per the instruction received
|
|
60
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
25/02/2021
|
The On line objections raised by Reg. Office /Nodal officer on date 04-01-2021 has been clarified by Dfo Pithoragarh letter no 3153/12-1 dated 24-02-2021.
|
|
61
|
Nodal Officer
|
REPLY
|
State secretary
|
27/02/2021
|
The correction have been made as per the instruction received
|
|
62
|
State secretary
|
REPLY
|
Regional Office
|
27/02/2021
|
The correction have been made as per the instruction received
|
|
63
|
Regional Office
|
EDS
|
State secretary
|
17/03/2021
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
64
|
State secretary
|
EDS
|
Nodal Officer
|
17/03/2021
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
65
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
17/03/2021
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
66
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
18/03/2021
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
67
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
19/03/2021
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
68
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
03/05/2021
|
The correction have been made as per the instruction received
|
|
69
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
11/05/2021
|
objections have been removed as per instruction received
|
|
70
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
13/05/2021
|
The On line objections raised by Reg. Office /Nodal officer on date 17-03-2021 has been clarified by DFO Pithoragarh letter no 4649/12-1 dated 11-05-2021.
|
|
71
|
Nodal Officer
|
REPLY
|
State secretary
|
25/05/2021
|
The correction have been made as per the instruction received
|
|
72
|
State secretary
|
REPLY
|
Regional Office
|
25/05/2021
|
The correction have been made as per the instruction received
|
|
73
|
Regional Office
|
EDS
|
State secretary
|
23/06/2021
|
state govt. may attend the following shortcomings as per the attachment here
|
|
74
|
State secretary
|
EDS
|
Nodal Officer
|
24/06/2021
|
state govt. may attend the following shortcomings as per the attachment here
|
|
75
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
24/06/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
76
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
28/06/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
77
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
29/06/2021
|
please find enclosed and do necessary corrections as asked by R.O office
|
|
78
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
09/07/2021
|
The correction have been made as per the instruction received
|
|
79
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
14/07/2021
|
Send appropriate answer.
|
|
80
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
15/07/2021
|
The correction have been made as per the instruction received
|
|
81
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
15/07/2021
|
plz find enclosed objections have been removed as per instruction received.
|
|
82
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
27/07/2021
|
As per letter no /12-01 dated 26-07-2021
|
|
83
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
28/07/2021
|
• please submit hard copy of the compliance for EDS raised by reginal office on dated 23-6-21 to nodal office for perusing proposal to RO office.
|
|
84
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
31/07/2021
|
please submit hard copy of the compliance for EDS raised by reginal office on dated 23-6-21 to nodal office for perusing proposal to RO office.
The proposal is being reverted back through our official letter no. 415/12-1 Dated 28-07-2021 with the intent that it must be submitted back online to the office after complying with all the instructions given in the letter.
|
|
85
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
02/08/2021
|
please submit hard copy of the compliance for EDS raised by reginal office on dated 23-6-21 to nodal office for perusing proposal to RO office. The proposal is being reverted back through our official letter no. 415/12-1 Dated 28-07-2021 with the intent that it must be submitted back online to the office after complying with all the instructions given in the letter. quarry raised by CF office .
|
|
86
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
31/08/2021
|
The correction have been made as per the instruction received
|
|
87
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
02/09/2021
|
Objection has been removed as per letter attached.
|
|
88
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
14/09/2021
|
As per letter no 1020/12-1 dated 02-09-2021
|
|
89
|
Nodal Officer
|
REPLY
|
State secretary
|
14/09/2021
|
The correction have been made as per the instruction received
|
|
90
|
State secretary
|
REPLY
|
Regional Office
|
17/09/2021
|
The correction have been made as per the instruction received
|
|
91
|
Regional Office
|
EDS
|
State secretary
|
01/10/2021
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
92
|
State secretary
|
EDS
|
Nodal Officer
|
05/10/2021
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
93
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
05/10/2021
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
94
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
25/10/2021
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
95
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
26/10/2021
|
remove obj as per letter.
|
|
96
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
05/11/2021
|
The correction have been made as per the instruction received
|
|
97
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
18/11/2021
|
Objection removed as p[er letter.
|
|
98
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
18/11/2021
|
Send 4 more hard copies of the answer to the objection, so that the matter can be sent to the higher level & direct the user agency to collect the returning letter for the proposal with the recommendation of CF North Kumaon and submit the hard copy at the Nodal Office.
|
|
99
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
24/11/2021
|
hard copies already sent.
|
|
100
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
26/11/2021
|
Send 4 more hard copies of the answer to the objection, so that the matter can be sent to the higher level & direct the user agency to collect the returning letter for the proposal with the recommendation of CF North Kumaon and submit the hard copy at the Nodal Office.
|
|
101
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
09/12/2021
|
hard copies has been sent.
|
|
102
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
13/12/2021
|
As per letter no 2214/12-1 dated 10-12-2021
|
|
103
|
Nodal Officer
|
REPLY
|
State secretary
|
18/12/2021
|
The correction have been made as per the instruction received
|
|
104
|
State secretary
|
REPLY
|
Regional Office
|
18/12/2021
|
The correction have been made as per the instruction received
|
|
105
|
Regional Office
|
EDS
|
State secretary
|
04/01/2022
|
state govt. may attend the following shortcomings as per the REC minutes attached here
|
|
106
|
State secretary
|
EDS
|
Nodal Officer
|
06/01/2022
|
state govt. may attend the following shortcomings as per the REC minutes attached here
|
|
107
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
06/01/2022
|
state govt. may attend the following shortcomings as per the REC minutes attached here
|
|
108
|
CF (North Kumaun)
|
EDS
|
DFO (Pithoragarh)
|
12/01/2022
|
state govt. may attend the following shortcomings as per the REC minutes attached here
|
|
109
|
DFO (Pithoragarh)
|
EDS
|
User Agency (ucjoshi2@gmail.com)
|
17/01/2022
|
Remove objection.
|
|
110
|
User Agency (ucjoshi2@gmail.com)
|
REPLY
|
DFO (Pithoragarh)
|
02/02/2022
|
The correction have been made as per the instruction received
|
|
111
|
DFO (Pithoragarh)
|
REPLY
|
CF (North Kumaun)
|
09/02/2022
|
Objection has been removed as per letter attached.
|
|
112
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
24/02/2022
|
As per letter no 3936/12-1 dated 22-02-2022
|
|
113
|
Nodal Officer
|
REPLY
|
State secretary
|
03/03/2022
|
The correction have been made as per the instruction received
|
|
114
|
State secretary
|
REPLY
|
Regional Office
|
03/03/2022
|
The correction have been made as per the instruction received
|
|