Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
29/12/2017
|
The case the proposal folder are still awaited.
|
|
2
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
08/02/2018
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
16/02/2018
|
The GPS co-ordinates of land bank for raising of CA has been conveyed to user agency.
|
|
4
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
27/02/2018
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
30/05/2018
|
The returned to user agency with some observation vide this office letter No.1658 dated 30.05.2018
|
|
6
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
27/06/2018
|
The correction have been made as per the instruction received
|
|
7
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
14/08/2018
|
The returned to user agency with some observation vide letter No. 4528 dated 14.08.2018.
|
|
8
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
29/08/2018
|
The correction have been made as per the instruction received
|
|
9
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
06/02/2019
|
Please complete the proposal as per copy of EDS is attached.
|
|
10
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
08/02/2019
|
Please complete the proposal as per copy of EDS is attached.
|
|
11
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
08/02/2019
|
Please complete the proposal as per copy of EDS is attached.
|
|
12
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
18/02/2019
|
The returned to user agency with some observation vide this Endst.No 11407 dated 12.02.2019
|
|
13
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
31/05/2019
|
The correction have been made as per the instruction received
|
|
14
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
02/06/2019
|
The point No. 6 of EDS dated 6.2.2019 is still unattended
|
|
15
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
04/06/2019
|
The correction have been made as per the instruction received
|
|
16
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
14/06/2019
|
observations as raised by CF Bilaspur has been attended to vide this office letter No. 2964 dated 12.06.2019
|
|
17
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
14/06/2019
|
observations as raised by CF Bilaspur has been attended to vide this office letter No. 2964 dated 12.06.2019
|
|
18
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
18/06/2019
|
EDS attended to.
|
|
19
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
29/06/2019
|
Please complete the proposal as per copy of shortcomings is attached.
|
|
20
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
01/07/2019
|
Please complete the proposal as per copy of shortcomings is attached.
|
|
21
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
04/07/2019
|
EDS
|
|
22
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
27/07/2019
|
The correction have been made as per the instruction received
|
|
23
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
01/08/2019
|
Please uploaded and send hard copy of undertaking for payment of Penal NPV.
|
|
24
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
03/08/2019
|
The correction have been made as per the instruction received
|
|
25
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
08/08/2019
|
observations as raised by CF Bilaspur has been attended to vide this office letter No.4812 dated 08.08.2019
|
|
26
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
13/08/2019
|
EDS attended to.
|
|
27
|
Regional Office
|
EDS
|
State secretary
|
28/01/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
28
|
State secretary
|
EDS
|
Nodal Officer
|
04/02/2020
|
EDS
|
|
29
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
04/02/2020
|
EDS
|
|
30
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
06/02/2020
|
EDS
|
|
31
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
15/02/2020
|
EDS
|
|
32
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
06/06/2020
|
The correction have been made as per the instruction received
|
|
33
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
10/06/2020
|
EDS
|
|
34
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
03/07/2020
|
The correction have been made as per the instruction received
|
|
35
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
08/07/2020
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.2945 dated 04.07.2020
|
|
36
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
08/07/2020
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.2945 dated 04.07.2020
|
|
37
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
17/07/2020
|
EDS
|
|
38
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
03/08/2020
|
The proposed road, existing road, location of beneficiary villages and dumping sites may be marked in distinct colors in KML & digital map. The beneficiary villages population may be marked in circle and distance of beneficiary villages from already existing road may also be intimated as per discussion held with you in meeting dated 29.07.2020
|
|
39
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
04/09/2020
|
The correction have been made as per the instruction received
|
|
40
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
03/10/2020
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.7446 dated 01.10.2020
|
|
41
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
06/10/2020
|
EDS
|
|
42
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
27/10/2020
|
Reply
|
|
43
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
27/10/2020
|
The correction have been made as per the instruction received
|
|
44
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
30/10/2020
|
The correction have been made as per the instruction received
|
|
45
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
02/11/2020
|
EDS Attended to.
|
|
46
|
Nodal Officer
|
REPLY
|
State secretary
|
24/11/2020
|
Complete reply is submitted.
|
|
47
|
State secretary
|
REPLY
|
Regional Office
|
24/11/2020
|
Complete reply is submitted.
|
|
48
|
Regional Office
|
EDS
|
State secretary
|
09/12/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
49
|
State secretary
|
EDS
|
Nodal Officer
|
11/12/2020
|
EDS
|
|
50
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
11/12/2020
|
EDS
|
|
51
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
16/12/2020
|
EDS
|
|
52
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
21/12/2020
|
EDS
|
|
53
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
11/02/2021
|
The correction have been made as per the instruction received
|
|
54
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
23/02/2021
|
KML file is not open properly.
|
|
55
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
02/03/2021
|
The correction have been made as per the instruction received
|
|
56
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
22/03/2021
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.17574 dated 22.03.2021
|
|
57
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
24/03/2021
|
EDS Attended to.
|
|
58
|
Nodal Officer
|
REPLY
|
State secretary
|
07/04/2021
|
Complete reply is submitted.
|
|
59
|
State secretary
|
REPLY
|
Regional Office
|
07/04/2021
|
Complete reply is submitted.
|
|
60
|
Regional Office
|
EDS
|
State secretary
|
16/04/2021
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
61
|
State secretary
|
EDS
|
Nodal Officer
|
17/04/2021
|
EDS
|
|
62
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
17/04/2021
|
EDS
|
|
63
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
20/04/2021
|
EDS
|
|
64
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
22/04/2021
|
EDS
|
|
65
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
22/04/2021
|
The correction have been made as per the instruction received
|
|
66
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
28/04/2021
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.1139 dated 28.04.2021
|
|
67
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
30/04/2021
|
EDS attended.
|
|
68
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
23/06/2021
|
The issue was discussed in REC. Please submit the complete reply based on the decision of REC meeting.
|
|
69
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
23/06/2021
|
The issue was discussed in REC. Please submit the complete reply based on the decision of REC meeting.
|
|
70
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
25/06/2021
|
The issue was discussed in REC. Please submit the complete reply based on the decision of REC meeting. As already conveyed vide Endst No 2492 dated 17.6.2021
|
|
71
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
03/08/2021
|
The correction have been made as per the instruction received
|
|
72
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
09/08/2021
|
EDS
|
|
73
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
29/09/2021
|
The correction have been made as per the instruction received
|
|
74
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
11/10/2021
|
EDS
|
|
75
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
19/10/2021
|
The correction have been made as per the instruction received
|
|
76
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
26/10/2021
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.7713 dated 26.10.2021
|
|
77
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
30/10/2021
|
EDS attended
|
|
78
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
17/11/2021
|
EDS
|
|
79
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
22/11/2021
|
EDS
|
|
80
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
25/11/2021
|
EDS
|
|
81
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
30/11/2021
|
The correction have been made as per the instruction received
|
|
82
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
08/12/2021
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.9323 dated 06.12.2021
|
|
83
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
08/12/2021
|
EDS attended.
|
|
84
|
Nodal Officer
|
REPLY
|
State secretary
|
27/12/2021
|
Complete reply is submitted.
|
|
85
|
State secretary
|
REPLY
|
Regional Office
|
28/12/2021
|
Complete reply is submitted.
|
|
86
|
Regional Office
|
EDS
|
State secretary
|
11/02/2022
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
87
|
State secretary
|
EDS
|
Nodal Officer
|
17/02/2022
|
EDS
|
|
88
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
17/02/2022
|
EDS
|
|
89
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
19/02/2022
|
EDS
|
|
90
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
03/03/2022
|
EDS
|
|
91
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
10/03/2022
|
The correction have been made as per the instruction received
|
|
92
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
26/03/2022
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.17299 dated 25.03.2022
|
|
93
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
06/04/2022
|
EDS attended.
|
|
94
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
20/04/2022
|
Point No. 6 the enumeration list of trees of dumping site has not been authenticated by DFO concerned and point No. 7 area calculation of muck management plan is not correct.
|
|
95
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
22/04/2022
|
Point No. 6 the enumeration list of trees of dumping site has not been authenticated by DFO concerned and point No. 7 area calculation of muck management plan is not correct.
|
|
96
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
23/04/2022
|
point No. 7 area calculation of muck management plan is not correct.
|
|
97
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
29/04/2022
|
The correction have been made as per the instruction received
|
|
98
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
06/05/2022
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.2233 dated 06.05.2022
|
|
99
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
09/05/2022
|
EDS attended.
|
|
100
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
17/05/2022
|
Correct the area in part I against the column C i & C b 1
|
|
101
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
18/05/2022
|
Correct the area in part I against the column C i & C b 1
|
|
102
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
21/05/2022
|
Correct the area in part I against the column C i & C b 1
|
|
103
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
21/05/2022
|
The correction have been made as per the instruction received
|
|
104
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
23/05/2022
|
The correction have been made as per the instruction received
|
|
105
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
23/05/2022
|
The correction have been made as per the instruction received
|
|
106
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
25/05/2022
|
kindly attend the observation
|
|
107
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
25/05/2022
|
kindly attend the observation
|
|
108
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
25/05/2022
|
necessary corrections has been made
|
|
109
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
25/05/2022
|
necessary correction has been made
|
|
110
|
Nodal Officer
|
REPLY
|
State secretary
|
27/05/2022
|
Complete reply is submitted
|
|
111
|
State secretary
|
REPLY
|
Regional Office
|
27/05/2022
|
Complete reply is submitted
|
|
112
|
Regional Office
|
EDS
|
State secretary
|
05/07/2022
|
State Govt. may attend the shortcomings attached herewith.
|
|
113
|
State secretary
|
EDS
|
Nodal Officer
|
05/07/2022
|
EDS
|
|
114
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
06/07/2022
|
EDS
|
|
115
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
07/07/2022
|
EDS
|
|
116
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
19/07/2022
|
EDS
|
|
117
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
25/07/2022
|
The correction have been made as per the instruction received
|
|
118
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
01/08/2022
|
EDS
|
|
119
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
27/08/2022
|
The correction have been made as per the instruction received
|
|
120
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
02/09/2022
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.7476 dated 01.09.2022.
|
|
121
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
06/09/2022
|
EDS
|
|
122
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
21/09/2022
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.8069 dated 20.09.2022.
|
|
123
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
04/10/2022
|
EDS
|
|
124
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
12/10/2022
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No.9112 dated 03.10.2022.
|
|
125
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
12/10/2022
|
EDS attended.
|
|
126
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
04/11/2022
|
EDS
|
|
127
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
04/11/2022
|
EDS
|
|
128
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
10/11/2022
|
EDS
|
|
129
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
22/11/2022
|
The correction have been made as per the instruction received
|
|
130
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
25/11/2022
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No. 11239 dated 24.11.2022.
|
|
131
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
26/11/2022
|
EDS attended.
|
|
132
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
17/12/2022
|
EDS
|
|
133
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
20/12/2022
|
EDS
|
|
134
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
28/12/2022
|
EDS
|
|
135
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
24/01/2023
|
The correction have been made as per the instruction received
|
|
136
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
15/02/2023
|
The reply of incomplete.
|
|
137
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
21/02/2023
|
The correction have been made as per the instruction received
|
|
138
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
16/03/2023
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No. 19073 dated 14.03.2023.
|
|
139
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
17/03/2023
|
EDS attended.
|
|
140
|
Nodal Officer
|
REPLY
|
State secretary
|
20/04/2023
|
Complete reply is submitted
|
|
141
|
State secretary
|
REPLY
|
Regional Office
|
20/04/2023
|
Complete reply is submitted
|
|
142
|
Regional Office
|
EDS
|
State secretary
|
28/04/2023
|
Letter addressed to CCF Bilaspur has been uploaded. Therefore, correct letter may be uploaded.
|
|
143
|
State secretary
|
EDS
|
Nodal Officer
|
29/04/2023
|
EDS
|
|
144
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
29/04/2023
|
EDS
|
|
145
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
01/05/2023
|
EDS
|
|
146
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
04/05/2023
|
EDS
|
|
147
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
09/05/2023
|
The correction have been made as per the instruction received
|
|
148
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
11/05/2023
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No. 1383 dated 16.05.2023.
|
|
149
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
30/05/2023
|
EDS attended.
|
|
150
|
Nodal Officer
|
REPLY
|
State secretary
|
03/06/2023
|
Complete reply is submitted
|
|
151
|
State secretary
|
REPLY
|
Regional Office
|
03/06/2023
|
Complete reply is submitted
|
|
152
|
Regional Office
|
EDS
|
State secretary
|
04/10/2023
|
RNA
|
|
153
|
State secretary
|
EDS
|
Nodal Officer
|
04/10/2023
|
eds
|
|
154
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
04/10/2023
|
eds
|
|
155
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
05/10/2023
|
EDS
|
|
156
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
06/10/2023
|
EDS
|
|
157
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
16/10/2023
|
The correction have been made as per the instruction received
|
|
158
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
27/10/2023
|
EDS
|
|
159
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
27/10/2023
|
The correction have been made as per the instruction received
|
|
160
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
30/10/2023
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No. 7628 dated 27.10.2023.
|
|
161
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
06/11/2023
|
EDS attended.
|
|
162
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
09/11/2023
|
In reply to point No. the copy of notification and de-notification are required to be uploaded as it can not be accepted that such notification is not in existence. Further, the comments of DFO/ CF regarding measures to be taken to minimize the impact on WL may be given in more detail.
|
|
163
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
10/11/2023
|
In reply to point No. the copy of notification and de-notification are required to be uploaded as it can not be accepted that such notification is not in existence. Further, the comments of DFO/ CF regarding measures to be taken to minimize the impact on WL may be given in more detail.
|
|
164
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
17/11/2023
|
The GoHP has declared Govind Sagar as Wild Life Sanctuary vide Notification No. FFE-B-F(6)-18/99 dated 23.10.1999. There after above Wild Life Sanctuary has been de-notified by GoHP vide Notification No. FFE-B-F(6)-11/2005-II/Gobind Sagar dated 7.6.2013. Now the notification dated 23.10.1999 is not in existence. Both the notification have been uploaded online against additional information.
A kachha road of 5960 mtr length & 2.50 mtr width already exists in the area. No case of human-wildlife conflict, apart from the ones involving Rhesus macaque (common monkey) has been reported in the area. However, measures such as box & pipe culverts canopy, bridges, fences, glider poles will be implemented. Funds have been sought from user agency to prepare a detailed wildlife management plan. The un
|
|
165
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
18/11/2023
|
The GoHP has declared Govind Sagar as Wild Life Sanctuary vide Notification No. FFE-B-F(6)-18/99 dated 23.10.1999. There after above Wild Life Sanctuary has been de-notified by GoHP vide Notification No. FFE-B-F(6)-11/2005-II/Gobind Sagar dated 7.6.2013. Now the notification dated 23.10.1999 is not in existence. Both the notification have been uploaded online against additional information. A kachha road of 5960 mtr length & 2.50 mtr width already exists in the area. No case of human-wildlife conflict, apart from the ones involving Rhesus macaque (common monkey) has been reported in the area. However, measures such as box & pipe culverts canopy, bridges, fences, glider poles will be implemented. Funds have been sought from user agency to prepare a detailed wildlife management plan.
|
|
166
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
18/11/2023
|
Please mention the Sr, No. against which is the copy of notification has been uploaded. As such no copies of the same has been found on the portal.
|
|
167
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
20/11/2023
|
Please mention the Sr, No. against which is the copy of notification has been uploaded. As such no copies of the same has been found on the portal.
|
|
168
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
20/11/2023
|
Both the notification have been uploaded online against additional information.
|
|
169
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
21/11/2023
|
Both the notification have been uploaded online against additional information.
|
|
170
|
Nodal Officer
|
REPLY
|
State secretary
|
25/11/2023
|
Complete reply is submitted
|
|
171
|
State secretary
|
REPLY
|
Regional Office
|
25/11/2023
|
Complete reply is submitted
|
|
172
|
Regional Office
|
EDS
|
State secretary
|
29/01/2024
|
REPLY NOT ACCEPTED
|
|
173
|
State secretary
|
EDS
|
Nodal Officer
|
31/01/2024
|
EDS
|
|
174
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
31/01/2024
|
EDS
|
|
175
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
03/02/2024
|
pls attend to the eds
|
|
176
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
08/02/2024
|
EDS
|
|
177
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
15/02/2024
|
The correction have been made as per the instruction received
|
|
178
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
21/02/2024
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No. 12012 dated 20.02.2024
|
|
179
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
21/02/2024
|
EDS attended.
|
|
180
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
01/03/2024
|
The enclosures as mentioned in reply are not found attached please upload the all requisite annexure.
|
|
181
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
01/03/2024
|
The enclosures as mentioned in reply already stands sent to your office by post on dated 23.02.2024.
|
|
182
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
02/03/2024
|
As you are well aware that proposal are being processed through online mode, hence requisite documents be uploaded on Parivesh Portal and hard copies are not required.
|
|
183
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
04/03/2024
|
The enclosures has been uploaded
|
|
184
|
Nodal Officer
|
REPLY
|
State secretary
|
14/03/2024
|
Complete reply is submitted
|
|
185
|
State secretary
|
REPLY
|
Regional Office
|
14/03/2024
|
Complete reply is submitted
|
|
186
|
Regional Office
|
EDS
|
State secretary
|
28/03/2024
|
State Govt. need to take necessary action as per letter attached
|
|
187
|
State secretary
|
EDS
|
Nodal Officer
|
05/04/2024
|
EDS
|
|
188
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
05/04/2024
|
EDS
|
|
189
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
06/04/2024
|
EDS
|
|
190
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
18/04/2024
|
EDS
|
|
191
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
30/04/2024
|
The correction have been made as per the instruction received
|
|
192
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
06/05/2024
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No. 765 dated 06.05.2024
|
|
193
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
13/05/2024
|
EDS attended
|
|
194
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
13/05/2024
|
EDS ATTENDED
|
|
195
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
13/05/2024
|
EDS ATTENDED
|
|
196
|
Nodal Officer
|
REPLY
|
State secretary
|
18/05/2024
|
Complete reply is submitted
|
|
197
|
State secretary
|
REPLY
|
Regional Office
|
06/06/2024
|
Complete reply is submitted
|
|
198
|
Regional Office
|
EDS
|
State secretary
|
19/11/2024
|
State Govt. may attend the shortcomings attached herewith.
|
|
199
|
State secretary
|
EDS
|
Nodal Officer
|
20/11/2024
|
EDS
|
|
200
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
20/11/2024
|
EDS
|
|
201
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
21/11/2024
|
EDS
|
|
202
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
23/11/2024
|
EDS
|
|
203
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
26/11/2024
|
The correction have been made as per the instruction received
|
|
204
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
07/12/2024
|
observations as raised by CCF Bilaspur has been attended to vide this office letter No. 7967 dated 06.12.2024
|
|
205
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
11/12/2024
|
EDS attended.
|
|
206
|
Nodal Officer
|
REPLY
|
State secretary
|
18/12/2024
|
Complete reply is submitted
|
|
207
|
State secretary
|
REPLY
|
Regional Office
|
18/12/2024
|
Complete reply is submitted
|
|
208
|
Regional Office
|
EDS
|
State secretary
|
01/01/2025
|
The state Govt. may attend the shortcomings attached herewith.
|
|
209
|
State secretary
|
EDS
|
Nodal Officer
|
02/01/2025
|
eds
|
|
210
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
02/01/2025
|
eds
|
|
211
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
02/01/2025
|
EDS
|
|
212
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
06/01/2025
|
EDS
|
|
213
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
24/01/2025
|
The correction have been made as per the instruction received
|
|
214
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
25/02/2025
|
observations as raised by CF Bilaspur has been attended to vide this office letter No.12122 dated 25.02.2025
|
|
215
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
04/03/2025
|
EDS attended
|
|
216
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
18/03/2025
|
The complete Status of the approved, under process and remaining proposal under violation as reported to Honable Hight court may be furnished.
|
|
217
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
19/03/2025
|
the complete Status of the approved, under process and remaining proposal under violation as reported to Honable Hight court may be furnished.
|
|
218
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
26/03/2025
|
the complete Status of the approved, under process and remaining proposal under violation as reported to Hon'ble Hight court may be furnished.
|
|
219
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
03/04/2025
|
The correction have been made as per the instruction received
|
|
220
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
07/04/2025
|
observations as raised by CF Bilaspur has been attended to vide this office letter No.161 dated 05.04.2025
|
|
221
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
17/04/2025
|
EDS attended
|
|
222
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
23/04/2025
|
The reply submitted is incomplete, the complete status of 2183 roads are to be provided to GoI.
|
|
223
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
26/04/2025
|
The reply submitted is incomplete, the complete status of 2183 roads are to be provided to GoI.
|
|
224
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
26/04/2025
|
EDS
|
|
225
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
26/04/2025
|
The reply submitted is incomplete, the complete status of 2183 roads are to be provided to GoI.
|
|
226
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
28/04/2025
|
The reply submitted is incomplete, the complete status of 2183 roads are to be provided to GoI.
|
|
227
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
10/06/2025
|
The correction have been made as per the instruction received
|
|
228
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
13/06/2025
|
observations as raised by CF Bilaspur has been attended to vide this office letter No.1946 dated 12.06.2025
|
|
229
|
CF (Bilaspur)
|
REPLY
|
Nodal Officer
|
19/06/2025
|
EDS attended.
|
|
230
|
Nodal Officer
|
EDS
|
CF (Bilaspur)
|
21/06/2025
|
The complete Status of 2183 road approved, under process and remaining proposal under violation as reported to Honable Hight court may be furnished.
|
|
231
|
CF (Bilaspur)
|
EDS
|
DFO (Bilaspur)
|
25/06/2025
|
The complete Status of 2183 road approved, under process and remaining proposal under violation as reported to Honable Hight court may be furnished.
|
|
232
|
DFO (Bilaspur)
|
EDS
|
User Agency (ee-bil2-hp@nic.in)
|
01/07/2025
|
The complete Status of 2183 road approved, under process and remaining proposal under violation as reported to Hon'ble Hight court may be furnished.
|
|
233
|
User Agency (ee-bil2-hp@nic.in)
|
REPLY
|
DFO (Bilaspur)
|
04/07/2025
|
The correction have been made as per the instruction received
|
|
234
|
DFO (Bilaspur)
|
REPLY
|
CF (Bilaspur)
|
05/07/2025
|
The correction have been made as per the instruction received
|
|