| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Andhra Pradesh
|
FP/AP/OFC/42713/2019
|
3106/Sec.II/2022/1939297
|
Laying of Under Ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.26
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2019
|
|
Stage-I Approval on
|
:
|
10 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/ROAD/37340/2018
|
G.O.Ms.No.8
|
Lolangipadu to Pedapolam
|
Road
|
Executive Engineer PR Paderu
|
1.79
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2018
|
|
Stage-I Approval on
|
:
|
18 May 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
|
3
|
Andhra Pradesh
|
FP/AP/ROAD/37337/2018
|
G.O.Ms.No.15
|
Magathapalem to Vedurupalli
|
Road
|
Executive Engineer PR Paderu
|
1.6
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2018
|
|
Stage-I Approval on
|
:
|
16 Jun 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
|
4
|
Andhra Pradesh
|
FP/AP/ROAD/29874/2017
|
4-APC129/2021-VIJ
|
Upgradation of NH-167B from Km 99/103 to 191/050 i.e from CS puram to Singarayakonda (Old NH 16 ) to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
9.33
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2017
|
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2024
|
|
|
|
|
|
5
|
Andhra Pradesh
|
FP/AP/ROAD/37312/2018
|
G.O.Ms.No.9
|
Solabham to Ambalmamidi
|
Road
|
Executive Engineer PR Paderu
|
1.82
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2018
|
|
Stage-I Approval on
|
:
|
19 May 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
|
6
|
Andhra Pradesh
|
FP/AP/ROAD/34401/2018
|
G.O.Ms.No.119
|
Vantlamamidi PV R&B road to Vanjparthi
|
Road
|
Executive Engineer PR Paderu
|
3.11
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2018
|
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
|
7
|
Andhra Pradesh
|
FP/AP/ROAD/23801/2017
|
G.O.Rt.No.68
|
Diversion of Forest land for formation and BT to the road including construction of culverts from ZPP road to Sirasaguda
|
Road
|
Executive Engineer PR Paderu
|
3.3854
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2017
|
|
Stage-I Approval on
|
:
|
22 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
8
|
Andhra Pradesh
|
FP/AP/ROAD/23794/2017
|
G.O.Rt.No.69
|
Formation & BT to the road including construction of Culverts from ZPP road to Dhanasanivalasa
|
Road
|
Executive Engineer PR Paderu
|
4.7637
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2017
|
|
Stage-I Approval on
|
:
|
24 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
9
|
Andhra Pradesh
|
FP/AP/OFC/35350/2018
|
G.O.Ms.No.10
|
Laying of Under ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
4.64
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2018
|
|
Stage-I Approval on
|
:
|
31 Jan 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
|
10
|
Andhra Pradesh
|
FP/AP/ROAD/36017/2018
|
G.O.Ms.No.16
|
Providing BT to the Road from ZP road at Kothapalli to Nelakota via. Vemularai
|
Road
|
EEPIUKKD
|
3.2802
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2018
|
|
Stage-I Approval on
|
:
|
14 Feb 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2023
|
|
|
|
|
|
11
|
Andhra Pradesh
|
FP/AP/ROAD/7882/2014
|
10984/2014,FCA3
|
Providing BT surface to the road from Sapparla to Galikonda in G.K.Veedhi Mandal
|
Road
|
Executive Engineer PR Paderu
|
4.027
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2014
|
|
Stage-I Approval on
|
:
|
05 Nov 2015
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2023
|
|
|
|
|
|
12
|
Andhra Pradesh
|
FP/AP/ROAD/141402/2021
|
4-APB170/2022-VIJ
|
Road from Vetaganivalasa to Thangalam in Pachipenta Mandal of Vizianagaram District
|
Road
|
EXICUTIVE ENGINEER
|
3.37
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2021
|
|
Stage-I Approval on
|
:
|
07 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2024
|
|
|
|
|
|
13
|
Andhra Pradesh
|
FP/AP/ROAD/33184/2018
|
G.O.Rt.No.84
|
P.Kodapalli to PL Road via Urugonda
|
Road
|
Executive Engineer PR Paderu
|
4.46
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2018
|
|
Stage-I Approval on
|
:
|
25 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
|
14
|
Andhra Pradesh
|
FP/AP/ROAD/9196/2015
|
G.O.Rt.No.4, Dt:05.01.2017
|
Road from Pedakota(Jalada) to Velamamidi of Ananthagiri Mandal Visakhapatnam
|
Road
|
Executive Engineer PR Paderu
|
2.0828
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2015
|
|
Stage-I Approval on
|
:
|
05 Jan 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
15
|
Andhra Pradesh
|
FP/AP/ROAD/9197/2015
|
G.O.Rt.No.5, Dt:05.01.2017
|
Road from Mamidipadu(Medaparthi) to Venukonda(Mettavalasa) of Ananthagiri mandal Visakhapatnam
|
Road
|
Executive Engineer PR Paderu
|
1.3747
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2015
|
|
Stage-I Approval on
|
:
|
05 Jan 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
16
|
Andhra Pradesh
|
FP/AP/ROAD/37757/2018
|
G.O.Ms.No.38
|
Road from Pachnapalli to Gemmeli
|
Road
|
Executive Engineer PR Paderu
|
3.18
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2018
|
|
Stage-I Approval on
|
:
|
03 Dec 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
17
|
Andhra Pradesh
|
FP/AP/ROAD/28781/2017
|
4-APC045/2017-CHN
|
Chennai - Chittoor - Bangalore Road NH-4 road is included in NHDP-IV to upgrading to 4-lane from TN/AP Boarder to AP/KA Boarder Km 133/600 to 216/975 in Chittoor District, AP
|
Road
|
PROJECT DIRECTOR NHAI PIU TIRUPATI
|
23.23
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2017
|
|
Stage-I Approval on
|
:
|
05 Oct 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2022
|
|
|
|
|
|
18
|
Andhra Pradesh
|
FP/AP/MIN/10972/2015
|
4-APB029-2017-CHN
|
Quarry lease of black granite over an extent of 4.79 Ha in favour of BKR Granites.
|
Mining
|
BKR GRANITES
|
4.79
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2015
|
|
Stage-I Approval on
|
:
|
28 Aug 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jun 2019
|
|
|
|
|
|
19
|
Andhra Pradesh
|
FP/AP/ROAD/17576/2016
|
2382/Section-II/2016
|
Upgradation of NH-565 from Km.425/400 to 509/400 i.e from Penchalakona to Yerpedu Section
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
0.9916
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2016
|
|
Stage-I Approval on
|
:
|
20 Aug 2016
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2020
|
|
|
|
|
|
20
|
Andhra Pradesh
|
FP/AP/ROAD/141314/2021
|
4-APB175/2022-VIJ
|
Road from Vetaganivalasa to Thangalam Road at 3/0 Km to Mutukudu via Boddapadu in Pachipenta Mandal of Vizianagaram District
|
Road
|
EXICUTIVE ENGINEER
|
2.75
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Apr 2021
|
|
Stage-I Approval on
|
:
|
07 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2024
|
|
|
|
|
|
21
|
Andhra Pradesh
|
FP/AP/ROAD/31955/2018
|
G.O.Rt.No.78
|
Bangarumetta to Chinthagunnela
|
Road
|
Executive Engineer PR Paderu
|
2
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2018
|
|
Stage-I Approval on
|
:
|
13 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
22
|
Andhra Pradesh
|
FP/AP/ROAD/31951/2018
|
G.O.Rt.No.76
|
Solabham to Chilakamamidi
|
Road
|
Executive Engineer PR Paderu
|
4.37
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2018
|
|
Stage-I Approval on
|
:
|
11 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
23
|
Andhra Pradesh
|
FP/AP/Pipeline/143395/2021
|
4-APB128/2021-VIJ
|
Proposal for re-diversion of forest land to an extent of 0.33 ha.in Kurmanipalle R.F, Compt.no.333, Nadimuru Beat, Kuppam Range of Chittoor West Division.
|
Pipeline
|
HPCL KUPPAM
|
0.33
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jun 2021
|
|
Stage-I Approval on
|
:
|
30 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2021
|
|
|
|
|
|
24
|
Andhra Pradesh
|
FP/AP/ROAD/36458/2018
|
G.O.Ms.No.138
|
Nurmathi R&B Road to Pedajageeru of G.Madugula Mandal
|
Road
|
Executive Engineer PR Paderu
|
2.48
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Oct 2018
|
|
Stage-I Approval on
|
:
|
18 Dec 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2023
|
|
|
|
|
|
25
|
Andhra Pradesh
|
FP/AP/ROAD/22943/2016
|
G.O.Rt.No.63
|
Upgradation of NH-67 from Km.641/000 to Km.695/000 i.e from Dornla T Junction to Atmakur Section in SPSR Nellore District
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
0.933
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2016
|
|
Stage-I Approval on
|
:
|
16 Mar 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2020
|
|
|
|
|
|
26
|
Andhra Pradesh
|
FP/AP/ROAD/34595/2018
|
G.O.Ms.No.110
|
ZPP Road to Reddipalem
|
Road
|
Executive Engineer PR Paderu
|
1.42
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2018
|
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
|
27
|
Andhra Pradesh
|
FP/AP/ROAD/38077/2019
|
G.O.Ms.No.18
|
Providing BT to the road from Goipaka to Ijjakai via Pallam Tulesu(orissa),Kithalamba and Vadajangi of GL Puram mandal
|
Road
|
EXICUTIVE ENGINEER
|
3.32
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2019
|
|
Stage-I Approval on
|
:
|
12 Aug 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2023
|
|
|
|
|
|
28
|
Andhra Pradesh
|
FP/AP/QRY/152052/2022
|
4-APB211/2023-VIJ
|
Rama Minerals
|
Quarrying
|
BIKKALA RAMADEVI
|
2.03
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2022
|
|
Stage-I Approval on
|
:
|
28 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Mar 2026
|
|
|
|
|
|
29
|
Andhra Pradesh
|
FP/AP/ROAD/6911/2014
|
22917/2013-FCA3
|
Formation of BT road from Duppulawada to Gorrilova Village
|
Road
|
Executive Engineer PR Paderu
|
2.66
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2014
|
|
Stage-I Approval on
|
:
|
05 Nov 2015
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2023
|
|
|
|
|
|
30
|
Assam
|
FP/AS/Pipeline/48074/2020
|
F.No.3- AS B 07 6 /2021-GHy
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
4.7289
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
|
Stage-I Approval on
|
:
|
09 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2022
|
|
|
|
|
|
31
|
Bihar
|
FP/BR/ROAD/149739/2021
|
FP/BR/ROAD/149739/2021
|
Consultancy Services for Preparation of DPR for Two laning with paved shoulder of Ghazipur – Ballia - UP/Bihar Greenfield section from Km. 0.000 to 115.200 of NH-19 including Buxar Spur (Length:17.800
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU AZAMGARH
|
5.66
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2021
|
|
Stage-I Approval on
|
:
|
11 Jun 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2026
|
|
|
|
|
|
32
|
Gujarat
|
FP/GJ/ROAD/48099/2020
|
6-GJB079/2021-BHO
|
Road widening of Road No.5 and K road in Gandhinagar District
|
Road
|
CAPITAL PROJECT DIVISION NO 1
|
4.0788
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
|
Stage-I Approval on
|
:
|
27 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Dec 2025
|
|
|
|
|
|
33
|
Gujarat
|
FP/GJ/Others/20758/2016
|
FC-6/GJB-46/2022-GNR
|
Maruti Suzuki India Project At Hansalpur
|
Others
|
MARUTI SUZUKI INDIA LIMITED
|
0.0388
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2016
|
|
Stage-I Approval on
|
:
|
06 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2026
|
|
|
|
|
|
34
|
Gujarat
|
FP/GJ/IRRIG/44298/2020
|
8-06/2021-FC
|
methala bandhara
|
Irrigation
|
EX ENGINEER
|
598.2427
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2020
|
|
Stage-I Approval on
|
:
|
15 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2026
|
|
|
|
|
|
35
|
Gujarat
|
FP/GJ/WATER/150429/2021
|
FCA-1022/4-03/22/SF-90/F
|
Diversion of 0.05 ha. Reserved Forest land for the Construction of New Sump and Pump House for drinking water supply facility under Gothib group water supply scheme in Moralnaka and other 11 villages.
|
Drinking Water
|
GWSSB GANDHINAGAR
|
0.05
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2021
|
|
Stage-I Approval on
|
:
|
04 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
|
|
36
|
Gujarat
|
FP/GJ/ROAD/47757/2020
|
6-GJB088/2021-BHO
|
CONSTRUCTION OF R.O.B APPROACHES ON L.C NO. 71 MALAV - VANKAS ROAD IN VALSAD DISTRICT
|
Road
|
ROAD AND BUILDING DIVISION VALSAD
|
0.936
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2020
|
|
Stage-I Approval on
|
:
|
28 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Sep 2024
|
|
|
|
|
|
37
|
Gujarat
|
FP/GJ/ROAD/119742/2021
|
FC-6/GJB-29/2022-GNR
|
The Project of Widening 7.00 meter to 10.00 meter of S.H.No.172 Vyara – Bheskatri - Kalibel – Pimpari road K.m 00/000 to 06/800
|
Road
|
(R&B) SUB DIVISION, WAGHAI
|
0.057
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2021
|
|
Stage-I Approval on
|
:
|
26 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
28 Feb 2024
|
|
|
|
|
|
38
|
Gujarat
|
FP/GJ/Others/29672/2017
|
6-GJB039/2020-BHO
|
PROPOSAL FOR GRANT FOREST LAND FOR THE PROJECT
|
Others
|
HASTIMAL VACHHRAJJI BROTHERS
|
0.0225
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Oct 2017
|
|
Stage-I Approval on
|
:
|
05 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2021
|
|
|
|
|
|
39
|
Gujarat
|
FP/GJ/WATER/154238/2022
|
FCA-1022-200-F
|
laying of drinking water pipeline from makanpar H.W to connect it to existing pipeline at palara village
|
Drinking Water
|
GUJRAT WATER SUPPLY & SEWERAGE BOARD, P. H. S. SUB DN NO.1
|
0.077
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2022
|
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Sep 2024
|
|
|
|
|
|
40
|
Gujarat
|
FP/GJ/ROAD/152123/2022
|
6-GJA003/2024-GNR
|
Project of Widening and Strengthening of Tithal-Valsad-Dharampur road K.M. 0/0 to 31/4 (W/S 8/0 to 31/4) Ta. Dist. Valsad.
|
Road
|
ROAD AND BUILDING SUB DIVISION, VALSAD
|
40.365
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Mar 2022
|
|
Stage-I Approval on
|
:
|
05 Nov 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2025
|
|
|
|
|
|
41
|
Haryana
|
FP/HR/Approach/146575/2021
|
9-HRB129/2022-CHA
|
Access permission for transportation of Mining area at vill khanak
|
Approach Access
|
HSIIDC STONE MINES KHANAK
|
0.1785
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2021
|
|
Stage-I Approval on
|
:
|
21 Dec 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2026
|
|
|
|
|
|
42
|
Haryana
|
FP/HR/TRANS/15655/2015
|
5385
|
LILO 220kv cheeka-dhurala line out)
|
Transmission Line
|
HARYANA VIDYUT PRASARAN NIGAM LIMITED
|
0.084
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2015
|
|
Stage-I Approval on
|
:
|
14 Jul 2016
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Nov 2025
|
|
|
|
|
|
43
|
Haryana
|
FP/HR/Approach/138514/2021
|
9-HRB155-2022-CHA
|
Const. of approach access for retail outlet of IOCL on Rasulpur Hasanpur via Gulawad Jatoli road at village Gulawad district Palwal
|
Approach Access
|
INDIAN OIL CORPORATION LIMITED GURGAON BP
|
0.0586
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Mar 2021
|
|
Stage-I Approval on
|
:
|
24 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Apr 2026
|
|
|
|
|
|
44
|
Haryana
|
FP/HR/VELEC/148750/2021
|
10216
|
shifting of 33kV Tosham-Sangwan line passing over newly constructed Judicial Court complex Tosham within the jurisdiction of DHBVN
|
Village Electricity
|
DHBVN BHIWANI
|
0.48
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2021
|
|
Stage-I Approval on
|
:
|
15 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Dec 2025
|
|
|
|
|
|
45
|
Haryana
|
FP/HR/ROAD/45196/2020
|
9-HRC078-2021-CHA
|
Improvement of Palwla Hathin Uttawar road MDR 135 km 0.40 to 22.40 in Palwal Distt
|
Road
|
PWD BANDR PALWAL
|
6.387
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2020
|
|
Stage-I Approval on
|
:
|
25 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2026
|
|
|
|
|
|
46
|
Haryana
|
FP/HR/TRANS/36545/2018
|
8778
|
132 KV S/C Sonipat
|
Transmission Line
|
HVPNL PANIPAT
|
0.1296
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2018
|
|
Stage-I Approval on
|
:
|
02 Jul 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Nov 2025
|
|
|
|
|
|
47
|
Haryana
|
FP/HR/Others/37688/2018
|
0.081
|
Laying of Sewerage Line from Govt. Girls School to Range Forest Office Gate in Village & Tehsil Indri Distt. Karnal
|
Others
|
EXECUTIVE ENGINEER PUBLIC HEALTH ENGG DIVI NO ONE KARNAL
|
0.081
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Dec 2018
|
|
Stage-I Approval on
|
:
|
26 Sep 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2025
|
|
|
|
|
|
48
|
Haryana
|
FP/HR/Approach/147084/2021
|
10083
|
Construction of approach road for 66 kV Sub Station Taprian
|
Approach Access
|
EXECUTIVE ENGINEER HVPNL
|
0.01102
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2021
|
|
Stage-I Approval on
|
:
|
23 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Apr 2026
|
|
|
|
|
|
49
|
Haryana
|
FP/HR/WATER/36425/2018
|
6400
|
Augmentation water supply scheme for village Nangal Sirohi (based on canal filtration) district Mahendergarh Haryana
|
Drinking Water
|
SDE PHE MAHENDERGARH
|
0.23
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Oct 2018
|
|
Stage-I Approval on
|
:
|
08 Dec 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Oct 2021
|
|
|
|
|
|
50
|
Haryana
|
FP/HR/ROAD/40167/2019
|
9-HRB073-2019-CHA
|
Improvement of Prithla to Dhatir road (ID 3592) under NABARD RIDF-XXIV scheme for the year 2018-19 in Palwal Distt.
|
Road
|
PWD BANDR PALWAL
|
1.47
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 May 2019
|
|
Stage-I Approval on
|
:
|
28 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2026
|
|
|
|
|
|