Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/OFC/42713/2019
|
3106/Sec.II/2022/1939297
|
Laying of Under Ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.26
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2019
|
Stage-I Approval on
|
:
|
10 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/ROAD/37340/2018
|
G.O.Ms.No.8
|
Lolangipadu to Pedapolam
|
Road
|
Executive Engineer PR Paderu
|
1.79
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2018
|
Stage-I Approval on
|
:
|
18 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
3
|
Andhra Pradesh
|
FP/AP/ROAD/37337/2018
|
G.O.Ms.No.15
|
Magathapalem to Vedurupalli
|
Road
|
Executive Engineer PR Paderu
|
1.6
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2018
|
Stage-I Approval on
|
:
|
16 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
4
|
Andhra Pradesh
|
FP/AP/ROAD/29874/2017
|
4-APC129/2021-VIJ
|
Upgradation of NH-167B from Km 99/103 to 191/050 i.e from CS puram to Singarayakonda (Old NH 16 ) to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
9.33
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2017
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2024
|
|
|
|
|
5
|
Andhra Pradesh
|
FP/AP/ROAD/37312/2018
|
G.O.Ms.No.9
|
Solabham to Ambalmamidi
|
Road
|
Executive Engineer PR Paderu
|
1.82
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2018
|
Stage-I Approval on
|
:
|
19 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
6
|
Andhra Pradesh
|
FP/AP/ROAD/34401/2018
|
G.O.Ms.No.119
|
Vantlamamidi PV R&B road to Vanjparthi
|
Road
|
Executive Engineer PR Paderu
|
3.11
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2018
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
7
|
Andhra Pradesh
|
FP/AP/ROAD/23801/2017
|
G.O.Rt.No.68
|
Diversion of Forest land for formation and BT to the road including construction of culverts from ZPP road to Sirasaguda
|
Road
|
Executive Engineer PR Paderu
|
3.3854
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2017
|
Stage-I Approval on
|
:
|
22 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
8
|
Andhra Pradesh
|
FP/AP/ROAD/23794/2017
|
G.O.Rt.No.69
|
Formation & BT to the road including construction of Culverts from ZPP road to Dhanasanivalasa
|
Road
|
Executive Engineer PR Paderu
|
4.7637
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2017
|
Stage-I Approval on
|
:
|
24 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
9
|
Andhra Pradesh
|
FP/AP/ROAD/44671/2020
|
4-APB108/2021-VIJ
|
Dabbagunta to Pallapudungada
|
Road
|
EXICUTIVE ENGINEER
|
4.36
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2020
|
Stage-I Approval on
|
:
|
05 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jan 2024
|
|
|
|
|
10
|
Andhra Pradesh
|
FP/AP/OFC/62261/2020
|
4-APB188/2022-VIJ
|
Laying of Under Ground Optical Fiber Cable (OFC) between Udayagiri-Duttalur
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.19
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Nov 2020
|
Stage-I Approval on
|
:
|
26 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
11
|
Andhra Pradesh
|
FP/AP/OFC/35350/2018
|
G.O.Ms.No.10
|
Laying of Under ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
4.64
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2018
|
Stage-I Approval on
|
:
|
31 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
12
|
Andhra Pradesh
|
FP/AP/ROAD/36017/2018
|
G.O.Ms.No.16
|
Providing BT to the Road from ZP road at Kothapalli to Nelakota via. Vemularai
|
Road
|
EEPIUKKD
|
3.2802
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2018
|
Stage-I Approval on
|
:
|
14 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2023
|
|
|
|
|
13
|
Andhra Pradesh
|
FP/AP/OFC/148408/2021
|
1769/Section-II/2023
|
Laying of Optical Fibre Cable (OFC) along existing Right of Way of the Roads passing through Forests under Proddatur WL Division
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.36
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2021
|
Stage-I Approval on
|
:
|
23 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2024
|
|
|
|
|
14
|
Andhra Pradesh
|
FP/AP/ROAD/7882/2014
|
10984/2014,FCA3
|
Providing BT surface to the road from Sapparla to Galikonda in G.K.Veedhi Mandal
|
Road
|
Executive Engineer PR Paderu
|
4.027
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2014
|
Stage-I Approval on
|
:
|
05 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2023
|
|
|
|
|
15
|
Andhra Pradesh
|
FP/AP/ROAD/141402/2021
|
4-APB170/2022-VIJ
|
Road from Vetaganivalasa to Thangalam in Pachipenta Mandal of Vizianagaram District
|
Road
|
EXICUTIVE ENGINEER
|
3.37
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2021
|
Stage-I Approval on
|
:
|
07 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2024
|
|
|
|
|
16
|
Andhra Pradesh
|
FP/AP/ROAD/33184/2018
|
G.O.Rt.No.84
|
P.Kodapalli to PL Road via Urugonda
|
Road
|
Executive Engineer PR Paderu
|
4.46
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2018
|
Stage-I Approval on
|
:
|
25 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
17
|
Andhra Pradesh
|
FP/AP/ROAD/9196/2015
|
G.O.Rt.No.4, Dt:05.01.2017
|
Road from Pedakota(Jalada) to Velamamidi of Ananthagiri Mandal Visakhapatnam
|
Road
|
Executive Engineer PR Paderu
|
2.0828
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2015
|
Stage-I Approval on
|
:
|
05 Jan 2017
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
18
|
Andhra Pradesh
|
FP/AP/ROAD/9197/2015
|
G.O.Rt.No.5, Dt:05.01.2017
|
Road from Mamidipadu(Medaparthi) to Venukonda(Mettavalasa) of Ananthagiri mandal Visakhapatnam
|
Road
|
Executive Engineer PR Paderu
|
1.3747
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2015
|
Stage-I Approval on
|
:
|
05 Jan 2017
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
19
|
Andhra Pradesh
|
FP/AP/ROAD/37757/2018
|
G.O.Ms.No.38
|
Road from Pachnapalli to Gemmeli
|
Road
|
Executive Engineer PR Paderu
|
3.18
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2018
|
Stage-I Approval on
|
:
|
03 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
20
|
Andhra Pradesh
|
FP/AP/ROAD/28781/2017
|
4-APC045/2017-CHN
|
Chennai - Chittoor - Bangalore Road NH-4 road is included in NHDP-IV to upgrading to 4-lane from TN/AP Boarder to AP/KA Boarder Km 133/600 to 216/975 in Chittoor District, AP
|
Road
|
PROJECT DIRECTOR NHAI PIU TIRUPATI
|
23.23
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2017
|
Stage-I Approval on
|
:
|
05 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2022
|
|
|
|
|
21
|
Andhra Pradesh
|
FP/AP/MIN/10972/2015
|
4-APB029-2017-CHN
|
Quarry lease of black granite over an extent of 4.79 Ha in favour of BKR Granites.
|
Mining
|
BKR GRANITES
|
4.79
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2015
|
Stage-I Approval on
|
:
|
28 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jun 2019
|
|
|
|
|
22
|
Andhra Pradesh
|
FP/AP/ROAD/17576/2016
|
2382/Section-II/2016
|
Upgradation of NH-565 from Km.425/400 to 509/400 i.e from Penchalakona to Yerpedu Section
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
0.9916
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2016
|
Stage-I Approval on
|
:
|
20 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2020
|
|
|
|
|
23
|
Andhra Pradesh
|
FP/AP/ROAD/141314/2021
|
4-APB175/2022-VIJ
|
Road from Vetaganivalasa to Thangalam Road at 3/0 Km to Mutukudu via Boddapadu in Pachipenta Mandal of Vizianagaram District
|
Road
|
EXICUTIVE ENGINEER
|
2.75
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Apr 2021
|
Stage-I Approval on
|
:
|
07 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2024
|
|
|
|
|
24
|
Andhra Pradesh
|
FP/AP/ROAD/31955/2018
|
G.O.Rt.No.78
|
Bangarumetta to Chinthagunnela
|
Road
|
Executive Engineer PR Paderu
|
2
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2018
|
Stage-I Approval on
|
:
|
13 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
25
|
Andhra Pradesh
|
FP/AP/ROAD/31951/2018
|
G.O.Rt.No.76
|
Solabham to Chilakamamidi
|
Road
|
Executive Engineer PR Paderu
|
4.37
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2018
|
Stage-I Approval on
|
:
|
11 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
26
|
Andhra Pradesh
|
FP/AP/Others/144722/2021
|
4-APB212/2023-VIJ
|
Krishnapatnam Hyderabad Pipeline project
|
Others
|
BHARAT PETROLEUM CORP LTD
|
2.72
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jul 2021
|
Stage-I Approval on
|
:
|
16 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2023
|
|
|
|
|
27
|
Andhra Pradesh
|
FP/AP/Pipeline/143395/2021
|
4-APB128/2021-VIJ
|
Proposal for re-diversion of forest land to an extent of 0.33 ha.in Kurmanipalle R.F, Compt.no.333, Nadimuru Beat, Kuppam Range of Chittoor West Division.
|
Pipeline
|
HPCL KUPPAM
|
0.33
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jun 2021
|
Stage-I Approval on
|
:
|
30 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2021
|
|
|
|
|
28
|
Andhra Pradesh
|
FP/AP/OFC/128499/2021
|
4-APB140/2021-VIJ
|
Execution of optical Fiber Network (IPI.) Project Nellore District, Andhra Pradesh State.
|
Optical Fibre Cable
|
M/S VINDHYA TELELINKS LTD
|
0.12
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Mar 2021
|
Stage-I Approval on
|
:
|
22 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2024
|
|
|
|
|
29
|
Andhra Pradesh
|
FP/AP/ROAD/36458/2018
|
G.O.Ms.No.138
|
Nurmathi R&B Road to Pedajageeru of G.Madugula Mandal
|
Road
|
Executive Engineer PR Paderu
|
2.48
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Oct 2018
|
Stage-I Approval on
|
:
|
18 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2023
|
|
|
|
|
30
|
Andhra Pradesh
|
FP/AP/ROAD/22943/2016
|
G.O.Rt.No.63
|
Upgradation of NH-67 from Km.641/000 to Km.695/000 i.e from Dornla T Junction to Atmakur Section in SPSR Nellore District
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
0.933
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2016
|
Stage-I Approval on
|
:
|
16 Mar 2017
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2020
|
|
|
|
|
31
|
Andhra Pradesh
|
FP/AP/ROAD/34595/2018
|
G.O.Ms.No.110
|
ZPP Road to Reddipalem
|
Road
|
Executive Engineer PR Paderu
|
1.42
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2018
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
|
32
|
Andhra Pradesh
|
FP/AP/ROAD/38077/2019
|
G.O.Ms.No.18
|
Providing BT to the road from Goipaka to Ijjakai via Pallam Tulesu(orissa),Kithalamba and Vadajangi of GL Puram mandal
|
Road
|
EXICUTIVE ENGINEER
|
3.32
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2019
|
Stage-I Approval on
|
:
|
12 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2023
|
|
|
|
|
33
|
Andhra Pradesh
|
FP/AP/ROAD/6911/2014
|
22917/2013-FCA3
|
Formation of BT road from Duppulawada to Gorrilova Village
|
Road
|
Executive Engineer PR Paderu
|
2.66
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2014
|
Stage-I Approval on
|
:
|
05 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2023
|
|
|
|
|
34
|
Andhra Pradesh
|
FP/AP/OFC/39298/2019
|
C No.1382/Sec-ii/2023
|
Laying of Under Ground Optical Fiber Cable
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
0.15
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2019
|
Stage-I Approval on
|
:
|
10 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jan 2025
|
|
|
|
|
35
|
Andhra Pradesh
|
FP/AP/OFC/41711/2019
|
4-APB122/202-VIJ
|
BSNL OPTICAL FIBRE CABLE LAYING
|
Optical Fibre Cable
|
DET OFP BSNL VIJAYAWADA
|
0.21
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Sep 2019
|
Stage-I Approval on
|
:
|
24 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2021
|
|
|
|
|
36
|
Assam
|
FP/AS/Pipeline/48074/2020
|
F.No.3- AS B 07 6 /2021-GHy
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
4.7289
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
Stage-I Approval on
|
:
|
09 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2022
|
|
|
|
|
37
|
Assam
|
FP/AS/TRANS/119559/2021
|
3-AS-C-096/2022/GHY
|
Diversion of Forest Land for 11 nos. of Tower Location (123 to 136A) against “Diversion work of 132KV S/C Haflong-Jiribam transmission line of POWERGRID in the section between tower location no. 104 to location no. 164 for facilitating the construction of NH-54 (E) under Borail Wildlife Sanctuary under Cachar Dist. of Assam State
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
9.23
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jan 2021
|
Stage-I Approval on
|
:
|
09 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2023
|
|
|
|
|
38
|
Assam
|
FP/AS/ROAD/44439/2020
|
3-AS-C-100/2022/GHY
|
Up gradation of Bilasipura-Chapar-Tulungia-Jogighopa-Gendera-Paikan-Dudhnoi-Guwahati Road (Length 225.000 km) for Goalpara district, in the State of Assam
|
Road
|
NHIDCL BO TEZPUR
|
27.054
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2020
|
Stage-I Approval on
|
:
|
16 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2024
|
|
|
|
|
39
|
Bihar
|
FP/BR/ROAD/157210/2022
|
FP/BR/ROAD/157210/2022
|
Improvement to two lane with paved shoulder of National Highway No. 327AD from km. 0.000 to km. 10.672 Saraigarh starting from its junctions with NH 327A Lalganj Ganpatganj terminating at its junction
|
Road
|
PUBLIC WORK DEPARTMENT (NATIONAL HIGHWAY)PATNA BIHAR
|
0.1799
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2022
|
Stage-I Approval on
|
:
|
22 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2024
|
|
|
|
|
40
|
Bihar
|
FP/BR/RAIL/153523/2022
|
FP/BR/RAIL/153523/2022
|
Araria Galgalia New BG Railway Line
|
Railway
|
CHIEF ENGINEER CONSTRUCTION III, N.F RAILWAY MALIGAON
|
8.243
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2023
|
|
|
|
|
41
|
Dadar & Nagar Haveli
|
FP/DN/Pipeline/117117/2020
|
No 7-5/3-FD/640
|
Gas Distribution Network in Dadra & Nagar Haveli Area (M.S Vedanta Industry Connectivity)
|
Pipeline
|
GUJARAT GAS LIMITED
|
0.1253
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2020
|
Stage-I Approval on
|
:
|
21 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2025
|
|
|
|
|
42
|
Delhi
|
FP/DL/ROAD/142233/2021
|
8B/DLI029/2022-JPR
|
Development of Six- lane access controlled in Delhi portion of Delhi Saharanpur Highway from Akshardham NH-9 junction to Delhi/UP Border in the state of Delhi.
|
Road
|
NHAI
|
9.58
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2021
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2024
|
|
|
|
|
43
|
Gujarat
|
FP/GJ/Others/32241/2018
|
FCA-1018/5-42/18/SF-163/F
|
To connect various domestic, commercial and industrial customers in surrounding areas of Palanpur city in Palanpur & Vadgam Taluka in Banaskantha District of Banaskantha GA.
|
Others
|
IRM ENERGY PRIVATE LIMITED
|
0.2409
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2018
|
Stage-I Approval on
|
:
|
26 Jun 2019
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
|
44
|
Gujarat
|
FP/GJ/ROAD/25121/2017
|
FCA-1019/7-05/19/SF-100/F
|
Proposal for diversion of 0.6750 ha. Reserved forest land for the project of Widening and Strengthening Construction of Kubada-Shivad Road (Village Road) K.M. 0/00 to 3/500 (Working Section 1/000 to 1/900) Village : Kubda Dist. Amreli in Gujarat State.
|
Road
|
R N B PANCHAYAT DIVISION AMRELI
|
0.675
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2017
|
Stage-I Approval on
|
:
|
07 Sep 2019
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
45
|
Gujarat
|
FP/GJ/ROAD/47757/2020
|
6-GJB088/2021-BHO
|
CONSTRUCTION OF R.O.B APPROACHES ON L.C NO. 71 MALAV - VANKAS ROAD IN VALSAD DISTRICT
|
Road
|
ROAD AND BUILDING DIVISION VALSAD
|
0.936
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2020
|
Stage-I Approval on
|
:
|
28 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
11 Sep 2024
|
|
|
|
|
46
|
Gujarat
|
FP/GJ/ROAD/119742/2021
|
FC-6/GJB-29/2022-GNR
|
The Project of Widening 7.00 meter to 10.00 meter of S.H.No.172 Vyara – Bheskatri - Kalibel – Pimpari road K.m 00/000 to 06/800
|
Road
|
(R&B) SUB DIVISION, WAGHAI
|
0.057
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2021
|
Stage-I Approval on
|
:
|
26 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Feb 2024
|
|
|
|
|
47
|
Gujarat
|
FP/GJ/Others/29672/2017
|
6-GJB039/2020-BHO
|
PROPOSAL FOR GRANT FOREST LAND FOR THE PROJECT
|
Others
|
HASTIMAL VACHHRAJJI BROTHERS
|
0.0225
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Oct 2017
|
Stage-I Approval on
|
:
|
05 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2021
|
|
|
|
|
48
|
Gujarat
|
FP/GJ/ROAD/45736/2020
|
FC-6/GJB-68/2022-GNR
|
WIDENING AND STRENGTHENING OF KHAMBHALA-KOTDAPITHA-THORKHAN ROAD (MDR) KM. 0/0 TO 29/6, DIST. AMRELI
|
Road
|
EXECUTIVE ENGINEER R&B DIVISION AMRELI
|
2.34
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
Stage-I Approval on
|
:
|
08 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2024
|
|
|
|
|
49
|
Gujarat
|
FP/GJ/WATER/154238/2022
|
FCA-1022-200-F
|
laying of drinking water pipeline from makanpar H.W to connect it to existing pipeline at palara village
|
Drinking Water
|
GUJRAT WATER SUPPLY & SEWERAGE BOARD, P. H. S. SUB DN NO.1
|
0.077
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2022
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Sep 2024
|
|
|
|
|
50
|
Gujarat
|
FP/GJ/ROAD/152123/2022
|
6-GJA003/2024-GNR
|
Project of Widening and Strengthening of Tithal-Valsad-Dharampur road K.M. 0/0 to 31/4 (W/S 8/0 to 31/4) Ta. Dist. Valsad.
|
Road
|
ROAD AND BUILDING SUB DIVISION, VALSAD
|
40.365
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Mar 2022
|
Stage-I Approval on
|
:
|
05 Nov 2024
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2025
|
|
|
|
|
|