Ministry of Environment,Forest and Climate Change
Government of India
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/OFC/42713/2019 3106/Sec.II/2022/1939297 Laying of Under Ground Optical Fiber Cable (OFC) Optical Fibre Cable JIO DIGITAL FIBRE PRIVATE LIMITED 0.26 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 31 Oct 2019
Stage-I Approval on : 10 Jan 2023
Compliance Report Submitted by User Agency on : 31 Oct 2023
2 Andhra Pradesh FP/AP/ROAD/37340/2018 G.O.Ms.No.8 Lolangipadu to Pedapolam Road Executive Engineer PR Paderu 1.79 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 29 Nov 2018
Stage-I Approval on : 18 May 2020
Compliance Report Submitted by User Agency on : 19 Dec 2023
3 Andhra Pradesh FP/AP/ROAD/37337/2018 G.O.Ms.No.15 Magathapalem to Vedurupalli Road Executive Engineer PR Paderu 1.6 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 28 Nov 2018
Stage-I Approval on : 16 Jun 2020
Compliance Report Submitted by User Agency on : 19 Dec 2023
4 Andhra Pradesh FP/AP/ROAD/29874/2017 4-APC129/2021-VIJ Upgradation of NH-167B from Km 99/103 to 191/050 i.e from CS puram to Singarayakonda (Old NH 16 ) to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 9.33 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 28 Nov 2017
Stage-I Approval on : 30 Mar 2022
Compliance Report Submitted by User Agency on : 09 May 2024
5 Andhra Pradesh FP/AP/ROAD/37312/2018 G.O.Ms.No.9 Solabham to Ambalmamidi Road Executive Engineer PR Paderu 1.82 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Nov 2018
Stage-I Approval on : 19 May 2020
Compliance Report Submitted by User Agency on : 19 Dec 2023
6 Andhra Pradesh FP/AP/ROAD/34401/2018 G.O.Ms.No.119 Vantlamamidi PV R&B road to Vanjparthi Road Executive Engineer PR Paderu 3.11 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Jun 2018
Stage-I Approval on : 29 Oct 2018
Compliance Report Submitted by User Agency on : 19 Dec 2023
7 Andhra Pradesh FP/AP/ROAD/23801/2017 G.O.Rt.No.68 Diversion of Forest land for formation and BT to the road including construction of culverts from ZPP road to Sirasaguda Road Executive Engineer PR Paderu 3.3854 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Jan 2017
Stage-I Approval on : 22 May 2018
Compliance Report Submitted by User Agency on : 09 Nov 2023
8 Andhra Pradesh FP/AP/ROAD/23794/2017 G.O.Rt.No.69 Formation & BT to the road including construction of Culverts from ZPP road to Dhanasanivalasa Road Executive Engineer PR Paderu 4.7637 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Jan 2017
Stage-I Approval on : 24 May 2018
Compliance Report Submitted by User Agency on : 09 Nov 2023
9 Andhra Pradesh FP/AP/OFC/35350/2018 G.O.Ms.No.10 Laying of Under ground Optical Fiber Cable (OFC) Optical Fibre Cable Jio Digital Fibre Private Limited 4.64 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Aug 2018
Stage-I Approval on : 31 Jan 2019
Compliance Report Submitted by User Agency on : 31 Oct 2023
10 Andhra Pradesh FP/AP/ROAD/36017/2018 G.O.Ms.No.16 Providing BT to the Road from ZP road at Kothapalli to Nelakota via. Vemularai Road EEPIUKKD 3.2802 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 21 Sep 2018
Stage-I Approval on : 14 Feb 2019
Compliance Report Submitted by User Agency on : 08 Nov 2023
11 Andhra Pradesh FP/AP/ROAD/7882/2014 10984/2014,FCA3 Providing BT surface to the road from Sapparla to Galikonda in G.K.Veedhi Mandal Road Executive Engineer PR Paderu 4.027 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 21 Nov 2014
Stage-I Approval on : 05 Nov 2015
Compliance Report Submitted by User Agency on : 17 Nov 2023
12 Andhra Pradesh FP/AP/ROAD/141402/2021 4-APB170/2022-VIJ Road from Vetaganivalasa to Thangalam in Pachipenta Mandal of Vizianagaram District Road EXICUTIVE ENGINEER 3.37 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 20 Apr 2021
Stage-I Approval on : 07 Jun 2022
Compliance Report Submitted by User Agency on : 06 Feb 2024
13 Andhra Pradesh FP/AP/ROAD/33184/2018 G.O.Rt.No.84 P.Kodapalli to PL Road via Urugonda Road Executive Engineer PR Paderu 4.46 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 20 Apr 2018
Stage-I Approval on : 25 Jun 2018
Compliance Report Submitted by User Agency on : 19 Dec 2023
14 Andhra Pradesh FP/AP/ROAD/9196/2015 G.O.Rt.No.4, Dt:05.01.2017 Road from Pedakota(Jalada) to Velamamidi of Ananthagiri Mandal Visakhapatnam Road Executive Engineer PR Paderu 2.0828 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 19 Jan 2015
Stage-I Approval on : 05 Jan 2017
Compliance Report Submitted by User Agency on : 09 Nov 2023
15 Andhra Pradesh FP/AP/ROAD/9197/2015 G.O.Rt.No.5, Dt:05.01.2017 Road from Mamidipadu(Medaparthi) to Venukonda(Mettavalasa) of Ananthagiri mandal Visakhapatnam Road Executive Engineer PR Paderu 1.3747 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 19 Jan 2015
Stage-I Approval on : 05 Jan 2017
Compliance Report Submitted by User Agency on : 09 Nov 2023
16 Andhra Pradesh FP/AP/ROAD/37757/2018 G.O.Ms.No.38 Road from Pachnapalli to Gemmeli Road Executive Engineer PR Paderu 3.18 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 19 Dec 2018
Stage-I Approval on : 03 Dec 2019
Compliance Report Submitted by User Agency on : 09 Nov 2023
17 Andhra Pradesh FP/AP/ROAD/28781/2017 4-APC045/2017-CHN Chennai - Chittoor - Bangalore Road NH-4 road is included in NHDP-IV to upgrading to 4-lane from TN/AP Boarder to AP/KA Boarder Km 133/600 to 216/975 in Chittoor District, AP Road PROJECT DIRECTOR NHAI PIU TIRUPATI 23.23 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 19 Aug 2017
Stage-I Approval on : 05 Oct 2017
Compliance Report Submitted by User Agency on : 19 Mar 2022
18 Andhra Pradesh FP/AP/MIN/10972/2015 4-APB029-2017-CHN Quarry lease of black granite over an extent of 4.79 Ha in favour of BKR Granites. Mining BKR GRANITES 4.79 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 Mar 2015
Stage-I Approval on : 28 Aug 2017
Compliance Report Submitted by User Agency on : 30 Jun 2019
19 Andhra Pradesh FP/AP/ROAD/17576/2016 2382/Section-II/2016 Upgradation of NH-565 from Km.425/400 to 509/400 i.e from Penchalakona to Yerpedu Section Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 0.9916 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 17 Jan 2016
Stage-I Approval on : 20 Aug 2016
Compliance Report Submitted by User Agency on : 19 Dec 2020
20 Andhra Pradesh FP/AP/ROAD/141314/2021 4-APB175/2022-VIJ Road from Vetaganivalasa to Thangalam Road at 3/0 Km to Mutukudu via Boddapadu in Pachipenta Mandal of Vizianagaram District Road EXICUTIVE ENGINEER 2.75 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 16 Apr 2021
Stage-I Approval on : 07 Jun 2022
Compliance Report Submitted by User Agency on : 06 Feb 2024
21 Andhra Pradesh FP/AP/ROAD/31955/2018 G.O.Rt.No.78 Bangarumetta to Chinthagunnela Road Executive Engineer PR Paderu 2 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Feb 2018
Stage-I Approval on : 13 Jun 2018
Compliance Report Submitted by User Agency on : 09 Nov 2023
22 Andhra Pradesh FP/AP/ROAD/31951/2018 G.O.Rt.No.76 Solabham to Chilakamamidi Road Executive Engineer PR Paderu 4.37 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Feb 2018
Stage-I Approval on : 11 Jun 2018
Compliance Report Submitted by User Agency on : 09 Nov 2023
23 Andhra Pradesh FP/AP/Pipeline/143395/2021 4-APB128/2021-VIJ Proposal for re-diversion of forest land to an extent of 0.33 ha.in Kurmanipalle R.F, Compt.no.333, Nadimuru Beat, Kuppam Range of Chittoor West Division. Pipeline HPCL KUPPAM 0.33 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 12 Jun 2021
Stage-I Approval on : 30 Jul 2021
Compliance Report Submitted by User Agency on : 08 Dec 2021
24 Andhra Pradesh FP/AP/ROAD/36458/2018 G.O.Ms.No.138 Nurmathi R&B Road to Pedajageeru of G.Madugula Mandal Road Executive Engineer PR Paderu 2.48 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 10 Oct 2018
Stage-I Approval on : 18 Dec 2018
Compliance Report Submitted by User Agency on : 17 Nov 2023
25 Andhra Pradesh FP/AP/ROAD/22943/2016 G.O.Rt.No.63 Upgradation of NH-67 from Km.641/000 to Km.695/000 i.e from Dornla T Junction to Atmakur Section in SPSR Nellore District Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 0.933 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 Dec 2016
Stage-I Approval on : 16 Mar 2017
Compliance Report Submitted by User Agency on : 19 Dec 2020
26 Andhra Pradesh FP/AP/ROAD/34595/2018 G.O.Ms.No.110 ZPP Road to Reddipalem Road Executive Engineer PR Paderu 1.42 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 Jul 2018
Stage-I Approval on : 29 Oct 2018
Compliance Report Submitted by User Agency on : 19 Dec 2023
27 Andhra Pradesh FP/AP/ROAD/38077/2019 G.O.Ms.No.18 Providing BT to the road from Goipaka to Ijjakai via Pallam Tulesu(orissa),Kithalamba and Vadajangi of GL Puram mandal Road EXICUTIVE ENGINEER 3.32 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 06 Jan 2019
Stage-I Approval on : 12 Aug 2020
Compliance Report Submitted by User Agency on : 21 Aug 2023
28 Andhra Pradesh FP/AP/ROAD/6911/2014 22917/2013-FCA3 Formation of BT road from Duppulawada to Gorrilova Village Road Executive Engineer PR Paderu 2.66 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 05 Sep 2014
Stage-I Approval on : 05 Nov 2015
Compliance Report Submitted by User Agency on : 17 Nov 2023
29 Assam FP/AS/Pipeline/48074/2020 F.No.3- AS B 07 6 /2021-GHy Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar. Pipeline INDRADHANUSH GAS GRID LIMITED 4.7289 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 30 Jul 2020
Stage-I Approval on : 09 Mar 2022
Compliance Report Submitted by User Agency on : 22 Aug 2022
30 Assam FP/AS/TRANS/119559/2021 3-AS-C-096/2022/GHY Diversion of Forest Land for 11 nos. of Tower Location (123 to 136A) against “Diversion work of 132KV S/C Haflong-Jiribam transmission line of POWERGRID in the section between tower location no. 104 to location no. 164 for facilitating the construction of NH-54 (E) under Borail Wildlife Sanctuary under Cachar Dist. of Assam State Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 9.23 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Jan 2021
Stage-I Approval on : 09 Feb 2023
Compliance Report Submitted by User Agency on : 11 Apr 2023
31 Assam FP/AS/ROAD/44439/2020 3-AS-C-100/2022/GHY Up gradation of Bilasipura-Chapar-Tulungia-Jogighopa-Gendera-Paikan-Dudhnoi-Guwahati Road (Length 225.000 km) for Goalpara district, in the State of Assam Road NHIDCL BO TEZPUR 27.054 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 06 Feb 2020
Stage-I Approval on : 16 Dec 2022
Compliance Report Submitted by User Agency on : 08 Aug 2024
32 Assam FP/AS/MIN/32798/2018 3-AS-B-138/2022/GHY Proposed Development Drilling Wells and Testing of Hydrocarbons in Dipling Block-AA/ONDSF/DIPLING/2016 in Sivasagar (Charaideo) and Dibrugarh District,Assam Mining RAMAYANA ISPAT PVT LTD 3.06 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 04 Apr 2018
Stage-I Approval on : 11 Apr 2023
Compliance Report Submitted by User Agency on : 10 Feb 2025
33 Bihar FP/BR/ROAD/157210/2022 FP/BR/ROAD/157210/2022 Improvement to two lane with paved shoulder of National Highway No. 327AD from km. 0.000 to km. 10.672 Saraigarh starting from its junctions with NH 327A Lalganj Ganpatganj terminating at its junction Road PUBLIC WORK DEPARTMENT (NATIONAL HIGHWAY)PATNA BIHAR 0.1799 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Jun 2022
Stage-I Approval on : 22 Aug 2023
Compliance Report Submitted by User Agency on : 20 Nov 2024
34 Bihar FP/BR/RAIL/153523/2022 FP/BR/RAIL/153523/2022 Araria Galgalia New BG Railway Line Railway CHIEF ENGINEER CONSTRUCTION III, N.F RAILWAY MALIGAON 8.243 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 22 Mar 2022
Stage-I Approval on : 10 Apr 2023
Compliance Report Submitted by User Agency on : 14 Aug 2023
35 Bihar FP/BR/Others/141318/2021 FP/BR/Others/141318/2021 Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of HPCL on Mashrakh-Gauda Bazar SH-90 Road in Saran district of Bihar. Others ABHIMANYU KUMAR 0.01275 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Apr 2021
Stage-I Approval on : 21 Aug 2025
Compliance Report Submitted by User Agency on : 06 Oct 2025
36 Delhi FP/DL/ROAD/142233/2021 8B/DLI029/2022-JPR Development of Six- lane access controlled in Delhi portion of Delhi Saharanpur Highway from Akshardham NH-9 junction to Delhi/UP Border in the state of Delhi. Road NHAI 9.58 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 12 May 2021
Stage-I Approval on : 13 Jun 2022
Compliance Report Submitted by User Agency on : 01 Mar 2024
37 Gujarat FP/GJ/ROAD/8847/2014 6-GJB018/2015-BHO Bharuch-Ankleshwar-sixline Road NH 8 Km 190/08 to 192/040 Road EXICUTIVE ENGINEER 0.992 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 23 Dec 2014
Stage-I Approval on : 27 Feb 2015
Compliance Report Submitted by User Agency on : 06 Oct 2025
38 Gujarat FP/GJ/WATER/150429/2021 FCA-1022/4-03/22/SF-90/F Diversion of 0.05 ha. Reserved Forest land for the Construction of New Sump and Pump House for drinking water supply facility under Gothib group water supply scheme in Moralnaka and other 11 villages. Drinking Water GWSSB GANDHINAGAR 0.05 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 22 Dec 2021
Stage-I Approval on : 04 Jun 2022
Compliance Report Submitted by User Agency on : 08 Oct 2025
39 Gujarat FP/GJ/ROAD/47757/2020 6-GJB088/2021-BHO CONSTRUCTION OF R.O.B APPROACHES ON L.C NO. 71 MALAV - VANKAS ROAD IN VALSAD DISTRICT Road ROAD AND BUILDING DIVISION VALSAD 0.936 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 21 Jul 2020
Stage-I Approval on : 28 Sep 2022
Compliance Report Submitted by User Agency on : 11 Sep 2024
40 Gujarat FP/GJ/ROAD/119742/2021 FC-6/GJB-29/2022-GNR The Project of Widening 7.00 meter to 10.00 meter of S.H.No.172 Vyara – Bheskatri - Kalibel – Pimpari road K.m 00/000 to 06/800 Road (R&B) SUB DIVISION, WAGHAI 0.057 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 16 Jan 2021
Stage-I Approval on : 26 Jul 2022
Compliance Report Submitted by User Agency on : 28 Feb 2024
41 Gujarat FP/GJ/Others/29672/2017 6-GJB039/2020-BHO PROPOSAL FOR GRANT FOREST LAND FOR THE PROJECT Others HASTIMAL VACHHRAJJI BROTHERS 0.0225 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 10 Oct 2017
Stage-I Approval on : 05 May 2021
Compliance Report Submitted by User Agency on : 07 Oct 2021
42 Gujarat FP/GJ/WATER/154238/2022 FCA-1022-200-F laying of drinking water pipeline from makanpar H.W to connect it to existing pipeline at palara village Drinking Water GUJRAT WATER SUPPLY & SEWERAGE BOARD, P. H. S. SUB DN NO.1 0.077 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 Apr 2022
Stage-I Approval on : 30 Jan 2023
Compliance Report Submitted by User Agency on : 02 Sep 2024
43 Gujarat FP/GJ/ROAD/152123/2022 6-GJA003/2024-GNR Project of Widening and Strengthening of Tithal-Valsad-Dharampur road K.M. 0/0 to 31/4 (W/S 8/0 to 31/4) Ta. Dist. Valsad. Road ROAD AND BUILDING SUB DIVISION, VALSAD 40.365 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 04 Mar 2022
Stage-I Approval on : 05 Nov 2024
Compliance Report Submitted by User Agency on : 31 Jan 2025
44 Haryana FP/HR/ROAD/35035/2018 9560 Providing Side Drain on Hodel-Nuh-Pataudi-Patauda Road(MDR-132) in km. 70.70 to 71.10 and km. 71.80 to 72.35(LHS) in Gurgaon Distict.(Road ID 8660) Road PMGSY 0.4081 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 30 Jul 2018
Stage-I Approval on : 28 Jun 2021
Compliance Report Submitted by User Agency on : 29 Jun 2022
45 Haryana FP/HR/Approach/32303/2018 9-HRB008-2019-CHA Access to M/s Lovely Agro Products at Kalanwali Approach Access LOVELY AGRO PRODUCTS 0.0069 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Feb 2018
Stage-I Approval on : 24 Jan 2019
Compliance Report Submitted by User Agency on : 25 Sep 2025
46 Haryana FP/HR/Approach/49044/2020 9-HRB014-2021-CHA Motel belonging to Sh. Varun Verma S/o Sh. Virender Approach Access MOTEL BELONGING TO SH. VIRENDER S/O SHIV RAM, SH. VIJAY S/O SH. VIRENDER AND SH. VARUN VERMA S/O SH. VIRENDER 0.017 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 25 Aug 2020
Stage-I Approval on : 09 Feb 2021
Compliance Report Submitted by User Agency on : 24 Jun 2025
47 Haryana FP/HR/Approach/147272/2021 9-HRB001-2022-CHA Shri Nath Ji Educational Society Approach Access SHRI NATH JI EDUCATIONAL SOCIETY 0.0162 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Sep 2021
Stage-I Approval on : 06 Jan 2022
Compliance Report Submitted by User Agency on : 01 Aug 2024
48 Haryana FP/HR/Approach/46697/2020 9-HRB045-2021-CHA VIRASAT HERITAGE VILLAGE TRUST Approach Access VIRASAT HERITAGE VILLAGE 0.0119 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Jun 2020
Stage-I Approval on : 31 Mar 2021
Compliance Report Submitted by User Agency on : 19 Jun 2024
49 Haryana FP/HR/Approach/61917/2020 9-HRB022-2021-CHA WAREHOUSE OF "M/S IWARE SUPPLYCHAIN SERVICES PRIVATE LIMITED " Approach Access IWARE SUPPLYCHAIN 0.02526 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 23 Nov 2020
Stage-I Approval on : 26 Feb 2021
Compliance Report Submitted by User Agency on : 09 Mar 2021
50 Haryana FP/HR/Pipeline/148416/2021 9-HRB112-2022-CHA Laying of RCC NP2 Pipeline Pipeline EXECUTIVE ENGINEER, PUNDRI W/S DIVISION, IRRIGATION & WATER RESOURCES, KAITHAL, HARYANA. 0.5853 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 21 Oct 2021
Stage-I Approval on : 25 May 2023
Compliance Report Submitted by User Agency on : 15 Oct 2024
12345