Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
22/06/2015
|
As per letter no 4055/12-1-2 dated 22-06-2015
|
|
2
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
25/07/2015
|
Objection Removed.
|
|
3
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
12/08/2015
|
please find attachment
|
|
4
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
26/08/2015
|
II Alignment tree list Attached
|
|
5
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
16/09/2015
|
1.Please review entry in serial no. 5,12of Form A Part II 2. Please give compartment wise area details of Reserved Forests.
|
|
6
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
19/09/2015
|
As per latter no 1153/12-1 dated 18-09-2015
|
|
7
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
19/09/2015
|
please find enclosed and do provide patch wise details of proposed CA land of concerned proposal along KML map. serial number 12 in the enclosed letter seeking out above mentioned information.
|
|
8
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
12/10/2015
|
objection removed
|
|
9
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
14/10/2015
|
please find enclosed
|
|
10
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
14/10/2015
|
plz attached correct proposal latter
|
|
11
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
15/10/2015
|
please find the attached file
|
|
12
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/10/2015
|
The On line objections raised by Nodal officer/Reg. Officer on date 16.09.2015 has been clarified by DFO Bageshwar latter no 1302/12-1 dated 14-10-2015
|
|
13
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
02/11/2015
|
The area of Van Panchayat entered in serial no. 2 of Part II is different from that mentioned in recommendation file
|
|
14
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
06/11/2015
|
As per latter no. 1747/12-1 date 02/11/2015
|
|
15
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
16/11/2015
|
please find enclosed
|
|
16
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
17/11/2015
|
The On line objections raised by Nodal officer/Reg. Officer on date 02.11.2015 has been clarified by DFO Bageshwar latter no 1639/12-1 dated 07-11-2015
|
|
17
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
17/11/2015
|
1.225 plus 0.804 is not equal to 2.03. Kindly correct the entries of legal status of forests entered by DFO.
|
|
18
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
19/11/2015
|
As per letter no 1952/12-1 dated 19-11-2015
|
|
19
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
19/11/2015
|
please find enclosed
|
|
20
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
21/11/2015
|
The On line objections raised by Nodal officer/Reg. Officer on date 17.11.2015 has been clarified by DFO Bageshwar latter no 1639/12-1 dated 07-11-2015
|
|
21
|
Regional Office
|
EDS
|
State secretary
|
04/12/2015
|
The online proposal is returned back since hard copy has not been submitted to this office simultaneously. State Govt. may resubmit the proposal online after hard copy has been provided in Regional Office. As a proof scanned copy of the receipt of hard copy from the Regional Office may also be uploaded along with online proposal. Attached Letter No. Misc./II/ROC/COP/1/2013/1846 Dated 06.11.2015 may also be referred in this regard.
|
|
22
|
State secretary
|
EDS
|
Nodal Officer
|
07/12/2015
|
Plz reply to obj of RO-The online proposal is returned back since hard copy has not been submitted to this office simultaneously. State Govt. may resubmit the proposal online after hard copy has been provided in Regional Office. As a proof scanned copy of the receipt of hard copy from the Regional Office may also be uploaded along with online proposal. Attached Letter No. Misc./II/ROC/COP/1/2013/1846 Dated 06.11.2015 may also be referred in this regard.
|
|
23
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
13/12/2015
|
Plz reply to obj of RO-The online proposal is returned back since hard copy has not been submitted to this office simultaneously. State Govt. may resubmit the proposal online after hard copy has been provided in Regional Office. As a proof scanned copy of the receipt of hard copy from the Regional Office may also be uploaded along with online proposal. Attached Letter No. Misc./II/ROC/COP/1/2013/1846 Dated 06.11.2015 may also be referred in this regard.
|
|
24
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
14/12/2015
|
As per latter no. 2256/12-1 date 14/12/2015
|
|
25
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
15/12/2015
|
please find enclosed
|
|
26
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
10/02/2016
|
Hard Copy of Proposal is being sand Latter No 171/2E.F.L., Dt. 01.02.2016
|
|
27
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
15/02/2016
|
please provide additional hard copy of the proposal not the hard copy of dfo,s, you submitted in our office.
|
|
28
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
24/02/2016
|
additional hard copy already received by Nodal Office Deharadun on Dt. 03.02.2016 Vide Latter No 171/2E.F.L., Dt. 01.02.2016
|
|
29
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
27/02/2016
|
please find enclosed
|
|
30
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
27/02/2016
|
The On line objections raised by Nodal officer/Reg. Officer on date 13.12.2015 has been clarified by DFO bageshwar latter no 2469/12-1 dated 25-02-2016.
|
|
31
|
Nodal Officer
|
REPLY
|
State secretary
|
09/03/2016
|
Required documents uploaded for your further necessary action.
|
|
32
|
State secretary
|
REPLY
|
Regional Office
|
10/03/2016
|
Required documents uploaded for your further necessary action.
|
|
33
|
Regional Office
|
EDS
|
State secretary
|
22/03/2016
|
find the letter attached.
|
|
34
|
State secretary
|
EDS
|
Nodal Officer
|
29/03/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
35
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
31/03/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
36
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
01/04/2016
|
as per letter no-3630/12-1 dated-01-04-2016.
|
|
37
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
04/04/2016
|
please find enclosed
|
|
38
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
18/04/2016
|
The correction have been made as per the instruction received
|
|
39
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
25/04/2016
|
please find enclosed
|
|
40
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
26/04/2016
|
DFO may provide consolidated point wise reply to all the objections along with numbered annexures. The present reply does not address all the points
|
|
41
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
26/04/2016
|
please forward this letter for further proceeding, as all question raised by nodal office are not concerned to this proposal....
|
|
42
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
27/04/2016
|
DFO may provide consolidated point wise reply to all the objections along with numbered annexures
|
|
43
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
27/04/2016
|
please find enclosed
|
|
44
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
30/04/2016
|
DFO may provide consolidated point wise reply to all the objections along with numbered annexures. The present reply does not address all the points.
|
|
45
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
02/05/2016
|
please find enclosed
|
|
46
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
02/05/2016
|
DFO may provide consolidated point wise reply to all the objections along with numbered annexures. The present reply does not address all the points dated 31-3-2016
|
|
47
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
03/05/2016
|
please find enclosed
|
|
48
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
05/05/2016
|
DFO may provide consolidated point wise reply to all the objections along with numbered annexures. The present reply does not address all the points as per letter no-3630/12-1 dated-01-04-2016.
|
|
49
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
07/05/2016
|
please view letter no 3630/12-1 dated 01.04.2016 ...all questions raised by nodal office do not correspond with this proposal's hectare and affected figures of trees....
|
|
50
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
16/05/2016
|
DFO may provide consolidated point wise reply to all the objections along with numbered annexures. The present reply does not address all the points as per letter no-3630/12-1 dated-01-04-2016.
|
|
51
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
16/05/2016
|
please find enclosed
|
|
52
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
31/05/2016
|
The correction have been made as per the instruction received
|
|
53
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
01/06/2016
|
please find enclosed
|
|
54
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
18/06/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
55
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
18/06/2016
|
please find enclosed
|
|
56
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
25/11/2016
|
The correction have been made as per the instruction received
|
|
57
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
25/11/2016
|
please enclose all enclosures to the point no 6,7,and 9.
|
|
58
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
26/11/2016
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
26/11/2016
|
plz ensure enclosure of component wise break up and signed copy of part I,II,III,IV,V.
|
|
60
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
26/11/2016
|
The correction have been made as per the instruction received
|
|
61
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
20/12/2016
|
please find enclosed
|
|
62
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
23/12/2016
|
As per letter no 1864/12-1 dated 23-10-2016
|
|
63
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
29/12/2016
|
please forward this proposal as the hard copy of all enclosures have been sent to you and also mailed..
|
|
64
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
09/01/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 31-03-2016 has been clarified by DFO Bageshwar letter no 1422/12-1 dated 14-12-2016
|
|
65
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
28/01/2017
|
find the letter attached
|
|
66
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
31/01/2017
|
find the letter attached
|
|
67
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
02/02/2017
|
please find enclosed
|
|
68
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
20/02/2017
|
The correction have been made as per the instruction received
|
|
69
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
06/03/2017
|
please find enclosed
|
|
70
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
06/03/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 28-01-2017 has been clarified by DFO Bageshwar letter no 2185/12-1 dated 03-03-2017
|
|
71
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
20/03/2017
|
CF may kindly provide consolidated point wise reply to objections raised by regional office. The present reply does not correspond to the points raised by regional office. objection received from regional office is being attached herewith again
|
|
72
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
21/03/2017
|
DFO may kindly provide consolidated point wise reply to objections raised by regional office. The present reply does not correspond to the points raised by regional office. objection received from regional office is being attached herewith again
|
|
73
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
27/03/2017
|
please find enclosed
|
|
74
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
27/04/2017
|
The correction have been made as per the instruction received
|
|
75
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
03/05/2017
|
please enclose acknowledgement letter received from Nodal office...
|
|
76
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
29/06/2017
|
The correction have been made as per the instruction received
|
|
77
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
18/08/2017
|
please find enclosed
|
|
78
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
19/08/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 20-03-2017 has been clarified by DFO Bageshwar letter no 404/12-1 dated 18-08-2017
|
|
79
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
26/08/2017
|
find the letter attached
|
|
80
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
01/09/2017
|
find the letter attached
|
|
81
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
01/09/2017
|
please find enclosed
|
|
82
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
02/01/2018
|
The correction have been made as per the instruction received
|
|
83
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
08/01/2018
|
please find enclosed
|
|
84
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
20/02/2018
|
The correction have been made as per the instruction received
|
|
85
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
19/03/2018
|
please find enclosed
|
|
86
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/03/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 26-08-2017 has been clarified by DFO Bageshwar letter no 2212/12-1 dated 17-03-2018
|
|
87
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
31/03/2018
|
find the letter attached
|
|
88
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
02/04/2018
|
find the letter attached
|
|
89
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
02/04/2018
|
please find enclosed
|
|
90
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
28/05/2018
|
The correction have been made as per the instruction received
|
|
91
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
25/06/2018
|
plz find enclosed
|
|
92
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
26/06/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 31-03-2018 has been clarified by DFO Bageshwar letter no 3043/12-1 dated 22-06-2018
|
|
93
|
Nodal Officer
|
REPLY
|
State secretary
|
02/07/2018
|
Required documents uploaded for your further necessary action.
|
|
94
|
State secretary
|
REPLY
|
Regional Office
|
09/07/2018
|
the asked queries have been corrected and attach herewith in Eds Letter column.
|
|
95
|
Regional Office
|
EDS
|
State secretary
|
23/07/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
96
|
State secretary
|
EDS
|
Nodal Officer
|
25/07/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
97
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
25/07/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
98
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
26/07/2018
|
The State Govt. may attend the shortcomings as per attachment here.
|
|
99
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
30/07/2018
|
plz find enclosed
|
|
100
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
14/09/2018
|
The correction have been made as per the instruction received
|
|
101
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
27/09/2018
|
plz find enclosed.
|
|
102
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
28/09/2018
|
The On line objections raised by Reg. Office/Nodal officer on date 25-07-2018. has been clarified by DFO Bageshwar letter no 863/12-1 dated 26-09-2018.
|
|
103
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
11/10/2018
|
find the letter attached
|
|
104
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
16/10/2018
|
find the letter attached
|
|
105
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
18/10/2018
|
plz find enclosed
|
|
106
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
14/11/2018
|
The correction have been made as per the instruction received
|
|
107
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
10/12/2018
|
plz find enclosed
|
|
108
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
11/12/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 11-10-2018 has been clarified by DFO Bageshwar letter no 1445/12-1 dated 07-12-2018
|
|
109
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
14/12/2018
|
find the letter attached
|
|
110
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
15/12/2018
|
find the letter attached
|
|
111
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
15/12/2018
|
plz find enclosed
|
|
112
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
26/12/2018
|
The correction have been made as per the instruction received
|
|
113
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
23/01/2019
|
plz find enclosed
|
|
114
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
24/01/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 14-12.2018 has been clarified by DFO Bageshwar letter no 1822/12- 1 Date 23-01-2019
|
|
115
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
14/02/2019
|
find the letter attached
|
|
116
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
15/02/2019
|
find the letter attached
|
|
117
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
15/02/2019
|
find the letter attached
|
|
118
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
29/04/2019
|
The correction have been made as per the instruction received
|
|
119
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
28/05/2019
|
plz find enclosed
|
|
120
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
03/06/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 14-02-2019 has been clarified by DFO Bageshwar letter no 3135/12-1 dated 27-05-2019.
|
|
121
|
Nodal Officer
|
REPLY
|
State secretary
|
19/06/2019
|
Required documents uploaded for your further necessary action.
|
|
122
|
State secretary
|
REPLY
|
Regional Office
|
21/06/2019
|
Required documents uploaded for your further necessary action.
|
|
123
|
Regional Office
|
EDS
|
State secretary
|
19/07/2019
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
124
|
State secretary
|
EDS
|
Nodal Officer
|
26/07/2019
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
125
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
26/07/2019
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
126
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
29/07/2019
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
127
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
29/07/2019
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
128
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
25/07/2020
|
The correction have been made as per the instruction received
|
|
129
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
18/08/2020
|
plz find enclosed
|
|
130
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
26/08/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 26-07-2020 has been clarified by Dfo Bagehwar letter no 487/12-1 dated 18-08-2020
|
|
131
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
29/08/2020
|
find the letter attached
|
|
132
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
08/09/2020
|
find the letter attached
|
|
133
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
19/09/2020
|
find the letter attached
|
|
134
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
27/05/2021
|
The correction have been made as per the instruction received
|
|
135
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
31/05/2021
|
plz find enclosed.
|
|
136
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
07/06/2021
|
The On line objections raised by Reg. Office /Nodal officer on date 29-08-2021 has been clarified by DFO Bageshwar letter no 4651/12-1 dated 29-05-2021.
|
|
137
|
Nodal Officer
|
REPLY
|
State secretary
|
16/06/2021
|
Required documents uploaded for your further necessary action.
|
|
138
|
State secretary
|
REPLY
|
Regional Office
|
17/06/2021
|
Required documents uploaded for your further necessary action.
|
|
139
|
Regional Office
|
EDS
|
State secretary
|
29/06/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
140
|
State secretary
|
EDS
|
Nodal Officer
|
01/07/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
141
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
01/07/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
142
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
02/07/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
143
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
02/07/2021
|
find the letter attached.
|
|
144
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
04/01/2022
|
The correction have been made as per the instruction received
|
|
145
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
04/03/2022
|
find the letter attached
|
|
146
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
29/03/2022
|
The correction have been made as per the instruction received
|
|
147
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
30/03/2022
|
plz find enclosed.
|
|
148
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
30/03/2022
|
The correction have been made as per the instruction received
|
|
149
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
30/03/2022
|
plz find enclosed.
|
|
150
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
31/03/2022
|
As per letter no 4409/12-1 dated 28-03-2022
|
|
151
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
12/04/2022
|
find the letter attached
|
|
152
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
22/04/2022
|
find the letter attached
|
|
153
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
02/05/2022
|
find the letter attached..
|
|
154
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
04/05/2022
|
The correction have been made as per the instruction received
|
|
155
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
27/05/2022
|
find the letter attached..
|
|
156
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
28/06/2022
|
The correction have been made as per the instruction received
|
|
157
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
29/06/2022
|
pzl find enclosed
|
|
158
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
02/07/2022
|
As per letter no 5831/12-1 dated 30-06-2022
|
|
159
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
07/07/2022
|
find the letter attached
|
|
160
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
14/07/2022
|
find the letter attached
|
|
161
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
14/07/2022
|
find the letter attached
|
|
162
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
25/11/2022
|
The correction have been made as per the instruction received
|
|
163
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
07/12/2022
|
plz find enclosed
|
|
164
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
09/12/2022
|
As per letter no. 4409/12-1 dated 28.03.2022
|
|
165
|
Nodal Officer
|
REPLY
|
State secretary
|
31/12/2022
|
Required documents uploaded for your further necessary action.
|
|
166
|
State secretary
|
REPLY
|
Regional Office
|
31/12/2022
|
The correction have been made as per the instruction received
|
|
167
|
Regional Office
|
EDS
|
State secretary
|
13/01/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
168
|
State secretary
|
EDS
|
Nodal Officer
|
13/01/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
169
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
13/01/2023
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
170
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
16/01/2023
|
Do needful action as per EDS
|
|
171
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
20/01/2023
|
Do needful action as per EDS
|
|
172
|
User Agency (pdpwdbgr@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
01/07/2023
|
The correction have been made as per the instruction received
|
|
173
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
19/10/2023
|
plz find enclosed.
|
|
174
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
18/11/2023
|
Send back
|
|
175
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
18/11/2023
|
plz find enclosed.
|
|
176
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/11/2023
|
As per letter no. 1155/12-1 dated 03.11.2023
|
|
177
|
Nodal Officer
|
REPLY
|
State secretary
|
28/12/2023
|
Required documents uploaded for your further necessary action.
|
|
178
|
State secretary
|
REPLY
|
Regional Office
|
28/12/2023
|
Required documents uploaded for your further necessary action.
|
|
179
|
Regional Office
|
EDS
|
State secretary
|
03/07/2024
|
State Government is requested to attend the shortcomings as per the letter attached.
|
|
180
|
State secretary
|
EDS
|
Nodal Officer
|
04/07/2024
|
Kindly do the necessary as per the letter attached.
|
|
181
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
09/07/2024
|
As per RO EDS Letter
|
|
182
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
09/07/2024
|
As per RO EDS Letter
|
|
183
|
DFO (Bageshwar)
|
EDS
|
User Agency (pdpwdbgr@gmail.com)
|
12/07/2024
|
As per RO EDS Letter
|
|