| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Assam
|
FP/AS/MIN/113899/2020
|
3-AS-B-083/2022-GHY
|
ONGC, Drilling of Exploratory Location ELAI
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.771
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2021
|
|
Stage-I Approval on
|
:
|
07 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jun 2023
|
|
|
|
16 Oct 2023
|
|
2
|
Assam
|
FP/AS/MIN/139446/2021
|
3-ASB/116/2022/GHY
|
ONGC Drilling of Exploratory location SUAD
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.8212483
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2021
|
|
Stage-I Approval on
|
:
|
09 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
25 Jul 2025
|
|
3
|
Assam
|
FP/AS/MIN/140108/2021
|
3-ASB/121/2022/GHY
|
ONGC Drilling of Exploratory Location TLAA
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.76783
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2021
|
|
Stage-I Approval on
|
:
|
09 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
25 Jul 2025
|
|
4
|
Assam
|
FP/AS/Pipeline/48074/2020
|
F.No.3- AS B 07 6 /2021-GHy
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
4.7289
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
|
Stage-I Approval on
|
:
|
09 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2022
|
|
|
|
|
|
5
|
Assam
|
FP/AS/MIN/113884/2020
|
3-ASB/122/2022/GHY
|
ONGC, Drilling of Exploratory Location TLAB
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.781
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2020
|
|
Stage-I Approval on
|
:
|
09 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
25 Jul 2025
|
|
6
|
Assam
|
FP/AS/MIN/87902/2020
|
3-AS B/124/2022/GHY
|
ONGC, Drilling of Exploratory Location SPAA
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.731
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2020
|
|
Stage-I Approval on
|
:
|
09 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
25 Jul 2025
|
|
7
|
Assam
|
FP/AS/MIN/23331/2016
|
F. no. 3-AS B 037/2019-SHI
|
Drilling Location MKE
|
Mining
|
OIL INDIA LIMITED
|
2.253
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2016
|
|
Stage-I Approval on
|
:
|
18 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2022
|
|
|
|
19 Jul 2022
|
|
8
|
Assam
|
FP/AS/TRANS/44809/2020
|
3-AS-C-074/2021/GHY
|
Shifting of 132KV S/C Gohpur-Nirjuli Transmission Line from location no 42 to location no 64 due to upcoming Greenfield Airport at Hollongi, Arunachal Pradesh
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
19.791
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2020
|
|
Stage-I Approval on
|
:
|
28 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jul 2022
|
|
|
|
05 Mar 2024
|
|
9
|
Assam
|
FP/AS/MIN/23089/2016
|
F. no. 3-AN B 036/2019-SHI
|
Drilling Location MKD
|
Mining
|
OIL INDIA LIMITED
|
3.545
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2016
|
|
Stage-I Approval on
|
:
|
18 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2022
|
|
|
|
18 Aug 2022
|
|
10
|
Assam
|
FP/AS/HYD/8294/2014
|
8-53/2018-FC
|
Lower Kopili Hydro Electric Project (120 MW)
|
Hydel
|
APGCL
|
523.046
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2014
|
|
Stage-I Approval on
|
:
|
05 Feb 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
28 Aug 2020
|
|
|
|
04 Dec 2020
|
|
11
|
Assam
|
FP/AS/TRANS/40419/2019
|
3-AS-C-028/2021/GHY
|
CONSTRUCTION OF 400 KV D/C HVAC TRANSMISSION LINE (LINE-II) FROM NHPC'S 2000 MW LOWER SUBANSIRI HYDRO ELECTRIC PROJECT AT GERUKAMUKH TO BISWANATH CHARIALI IN ASSAM
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
34.32
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 May 2019
|
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2022
|
|
|
|
29 Jul 2024
|
|
12
|
Assam
|
FP/AS/MIN/21919/2016
|
3-AS B 038/2018-SHI
|
ONGC drilling location KHDD
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
2.24
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Dec 2016
|
|
Stage-I Approval on
|
:
|
03 Jan 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jan 2022
|
|
|
|
05 Apr 2022
|
|
13
|
Assam
|
FP/AS/TRANS/142618/2021
|
3-AS-C-093/2022/GHY
|
DIVERSION PROPOSAL OF PROPOSED 18.028 HA AREA OF FOREST LAND FOR CONSTRUCTION AND COMMISSIONING OF 132 KV TRANSMISSION LINE FROM AGIA GSS TO GOALPARA TSS AT RAKHAYASHINI PRF UNDER GOALPARA FOREST DIVISION
|
Transmission Line
|
O/O THE CHIEF PROJECT DIRECTOR, CENTRAL ORGANIZATION FOR RAILWAY ELECTRIFICATION, GUWAHATI
|
18.028
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2021
|
|
Stage-I Approval on
|
:
|
01 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jun 2024
|
|
|
|
25 Sep 2025
|
|
14
|
Assam
|
FP/AS/MIN/139701/2021
|
3-AS-B-095/2022-GHY
|
ONGC, Exploratory Drilling Location KHBK
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.779
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2021
|
|
Stage-I Approval on
|
:
|
27 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2023
|
|
|
|
16 Oct 2023
|
|
15
|
Assam
|
FP/AS/Others/21128/2016
|
F. No. 3 AS B 083/2020-GHY
|
GELEKI DEVELOPMENT PROJECT
|
Others
|
ONGC
|
4.43
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Aug 2016
|
|
Stage-I Approval on
|
:
|
29 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2022
|
|
|
|
02 Nov 2023
|
|
16
|
Assam
|
FP/AS/MIN/126230/2021
|
3-AS-B-085/2022/GHY
|
ONGC Exploratory Drilling Location MJAA
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.763
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2021
|
|
Stage-I Approval on
|
:
|
07 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
28 May 2023
|
|
|
|
16 Oct 2023
|
|
17
|
Assam
|
FP/AS/MIN/139315/2021
|
3-ASB/126/2022/GHY
|
ONGC Drilling of Exploratory location ELAJ
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
2.2091
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2021
|
|
Stage-I Approval on
|
:
|
12 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
25 Jul 2025
|
|
18
|
Assam
|
FP/AS/OFC/116541/2020
|
FRS.2/2022
|
Digboi-Duliajan NLD Optical Fiber Route Project
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOM LTD
|
0.915
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2020
|
|
Stage-I Approval on
|
:
|
18 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jun 2024
|
|
|
|
16 Dec 2023
|
|
19
|
Assam
|
FP/AS/MIN/51724/2020
|
3-AS-C-115/2022-GHY
|
Forest diversion proposal for oil & gas well drilling at Loc. KA-2 located in Dhansiri Reserve Forest in NELP Block AA-ONN-2010/2 in Karbi Anglong District, Karbi Anglong Autonomous Council of Assam
|
Mining
|
OIL INDIA LIMITED
|
5.6
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
|
Stage-I Approval on
|
:
|
07 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2023
|
|
|
|
30 Jan 2024
|
|
20
|
Assam
|
FP/AS/REHAB/120428/2021
|
8-01/2021-FC
|
RELOCATION OF FOREST VILLAGE LAIKA
|
Rehabilitation
|
TINSUKIA WILDLIFE DIVISION
|
238
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2021
|
|
Stage-I Approval on
|
:
|
29 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2023
|
|
|
|
07 Aug 2023
|
|
21
|
Assam
|
FP/AS/OFC/155167/2022
|
ECF No.278364
|
Laying of Optical Fibre Cable at Sonowal Mariani Assam
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.96
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2022
|
|
Stage-I Approval on
|
:
|
06 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2024
|
|
|
|
20 Mar 2024
|
|
22
|
Assam
|
FP/AS/ROAD/152364/2022
|
FRS.100/2022
|
Development and Improvement of Jagun Namchik Mioa Road (Assam Portion) including Bridge No. 9/1 over River Namchik in Tinsukia District
|
Road
|
DIGBOI AND MARGHERITA TERRITORIAL ROAD DIVISION
|
0.09563
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2022
|
|
Stage-I Approval on
|
:
|
11 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Apr 2023
|
|
|
|
12 Jul 2023
|
|
23
|
Assam
|
FP/AS/TRANS/145939/2021
|
3-AS-B-107/2022/GHY
|
Construction of 132kV D/C Roing-Chapakhowa Transmission Line under NERSS-X
|
Transmission Line
|
POWERGRID
|
0.675
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Aug 2021
|
|
Stage-I Approval on
|
:
|
02 Dec 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Apr 2023
|
|
|
|
19 Jun 2025
|
|
24
|
Assam
|
FP/AS/Others/18536/2016
|
3-AS C 021/2018-SHI
|
6 TRUNK PIPELIE REPLACEMENT PROJECT
|
Others
|
ONGC
|
20.72
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2016
|
|
Stage-I Approval on
|
:
|
27 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Oct 2021
|
|
|
|
29 Apr 2022
|
|
25
|
Assam
|
FP/AS/TRANS/19330/2016
|
3-AS C 023/2017-SHI
|
Proposal for diversion of 208.807 Hectare forest land for construction of 400 kV D/C (Quad) Jigmelling-Alipurduar Transmission Line in the State of Assam
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
208.807
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2016
|
|
Stage-I Approval on
|
:
|
18 Oct 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jan 2021
|
|
|
|
15 Feb 2021
|
|
26
|
Assam
|
FP/AS/MIN/17426/2016
|
8-11/2019-FC
|
New Umrangshu Limestone Mine
|
Mining
|
CALCOM CEMENT INDIA LTD
|
425.5
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2016
|
|
Stage-I Approval on
|
:
|
23 Aug 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jun 2020
|
|
|
|
25 Nov 2020
|
|
27
|
Assam
|
FP/AS/TRANS/119559/2021
|
3-AS-C-096/2022/GHY
|
Diversion of Forest Land for 11 nos. of Tower Location (123 to 136A) against “Diversion work of 132KV S/C Haflong-Jiribam transmission line of POWERGRID in the section between tower location no. 104 to location no. 164 for facilitating the construction of NH-54 (E) under Borail Wildlife Sanctuary under Cachar Dist. of Assam State
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
9.23
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jan 2021
|
|
Stage-I Approval on
|
:
|
09 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2025
|
|
|
|
|
|
28
|
Assam
|
FP/AS/Others/120624/2021
|
FNO-3 ASA 075/2021/GHY
|
Dergaon - Dimapur Natural Gas Pipeline Project
|
Others
|
INDRADHANUSH GAS GRID LIMITED
|
79.5284
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2021
|
|
Stage-I Approval on
|
:
|
09 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2022
|
|
|
|
22 May 2023
|
|
29
|
Assam
|
FP/AS/MIN/36318/2018
|
3-AS-B-072/2021-GHY
|
ONGC Exploratory Drilling Location KSAH
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.75
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Nov 2018
|
|
Stage-I Approval on
|
:
|
07 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jun 2023
|
|
|
|
04 Apr 2024
|
|
30
|
Assam
|
FP/AS/MIN/44360/2020
|
3-AS-B-102/2022-GHY
|
Forest diversion proposal for oil and gas exploration, development and production in Block AA-ONHP/2017/1 in Assam- Well pad No 28.
|
Mining
|
M/s Vedanta Limited(Division Cairn Oil & Gas)
|
2.43
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Feb 2020
|
|
Stage-I Approval on
|
:
|
27 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 May 2024
|
|
|
|
20 Jun 2024
|
|
31
|
Assam
|
FP/AS/MIN/44361/2020
|
3-AS-B-106/2022/GHY
|
Forest diversion proposal for oil and gas exploration, development and production in Block AA-ONHP/2017/1 in Assam- Well pad No 29.
|
Mining
|
M/s Vedanta Limited(Division Cairn Oil & Gas)
|
4.125
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Feb 2020
|
|
Stage-I Approval on
|
:
|
07 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 May 2024
|
|
|
|
20 Jun 2024
|
|
32
|
Assam
|
FP/AS/TRANS/36517/2018
|
3-AS-C-030/2021/GHY
|
Construction of 400 KV D/C HVAC Transmission Line ( Line - I) from NHPC’s 2000 MW Lower Subansiri Hydro Electric Project at Gerukamukh to Biswanath Chariali in Assam.
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
32.78
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Oct 2018
|
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2022
|
|
|
|
29 Jul 2024
|
|
33
|
Assam
|
FP/AS/ROAD/154980/2022
|
3-AS-B-108-2022 - GHY
|
Construction of Trumpet Interchange at Gauripur Junction North Guwahati
|
Road
|
PUBLIC WORKS (ROADS) DEPARTMENT
|
2.66
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 May 2022
|
|
Stage-I Approval on
|
:
|
18 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2023
|
|
|
|
19 Dec 2024
|
|
34
|
Assam
|
FP/AS/MIN/154403/2022
|
3-AS-B-114/2022/GHY
|
Proposed Development Drilling wells and Testing of Hydrocarbons in Duarmara Block in Margherita, District - Tinsukia, Assam
|
Mining
|
OILMAX ENERGY PRIVATE LIMITED
|
3.92
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Apr 2022
|
|
Stage-I Approval on
|
:
|
29 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jan 2024
|
|
|
|
24 Dec 2024
|
|
35
|
Assam
|
FP/AS/ROAD/22913/2016
|
3-AS C 014/2017-SHI
|
Four laning of Balachera to Harangajao section from Km 244.000 to Km 275.000 under East-West Corridor of NH-54(E) in the state of Assam [Contract package no. EW-II AS-14]
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU SILCHAR
|
10.583
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Dec 2016
|
|
Stage-I Approval on
|
:
|
18 Sep 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2022
|
|
|
|
28 Jun 2022
|
|
36
|
Assam
|
FP/AS/TRANS/36480/2018
|
3-AS B 052/2019-SHI
|
Construction of 400 kV D/C Silchar to Misa Transmission line- a part near Misa sub-station
|
Transmission Line
|
NER II TRANSMISSION LIMITED
|
1.483
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Oct 2018
|
|
Stage-I Approval on
|
:
|
06 Jun 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Mar 2021
|
|
|
|
28 Oct 2021
|
|
37
|
Assam
|
FP/AS/Others/27091/2017
|
3-AS B 032/2017-SHI
|
Jagiroad Stone Mahal No. F (1)
|
Others
|
HILLS TRADE AGENCIES
|
1
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jul 2017
|
|
Stage-I Approval on
|
:
|
09 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Apr 2022
|
|
|
|
23 Jan 2023
|
|
38
|
Assam
|
FP/AS/Pipeline/119243/2021
|
3-AN-C-040/2021-GHY
|
Laying of underground Oil & Gas Pipelines along Upper Dehing Reserve Forest portion of Duliajan- Digboi Road, Assam
|
Pipeline
|
OIL INDIA LIMITED
|
13.43
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2021
|
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2022
|
|
|
|
28 Mar 2025
|
|
39
|
Assam
|
FP/AS/Others/150085/2021
|
3-AS-B-091/2022-GHY
|
Construction of Holongi Airport
|
Others
|
AIRPORTS AUTHORITY OF INDIA
|
2.604
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Dec 2021
|
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2022
|
|
|
|
04 May 2022
|
|
40
|
Assam
|
FP/AS/Pipeline/49586/2020
|
F. NO 3 AS C 089/2022/GHY
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
9.2755
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2020
|
|
Stage-I Approval on
|
:
|
24 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2022
|
|
|
|
|
|
41
|
Assam
|
FP/AS/TRANS/34360/2018
|
F.No.3 AS B 033/2020-SHI
|
132kV D/C Sonapur-Baghjap Transmission line(Jagiroad)
|
Transmission Line
|
ASSAM ELECTRICITY GRID CORPORATION LIMITED(AEGCL)
|
5.77
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2018
|
|
Stage-I Approval on
|
:
|
24 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2024
|
|
|
|
09 Jul 2024
|
|
42
|
Assam
|
FP/AS/Pipeline/55045/2020
|
3-AS-C-054/2021-GHY
|
Kumchai EPS to Kusijan FGGS Pipeline
|
Pipeline
|
OIL INDIA LIMITED
|
27.43
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Nov 2020
|
|
Stage-I Approval on
|
:
|
30 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2022
|
|
|
|
28 Mar 2025
|
|
43
|
Assam
|
FP/AS/MIN/23425/2017
|
3-AS-B-112-2020 - GHY
|
Drilling Location DHD
|
Mining
|
OIL INDIA LIMITED
|
2.696
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2017
|
|
Stage-I Approval on
|
:
|
28 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2024
|
|
|
|
|
|
44
|
Assam
|
FP/AS/TRANS/28563/2017
|
3-AS C 010/2019-SHI
|
Proposal for diversion of 19.976 Ha of Forest land for construction of 400 KV D/C (Twin) New Mariani – New Kohima Transmission Line (Assam Portion) in the state of Assam
|
Transmission Line
|
KOHIMA MARIANI TRANSMISSION LIMITED
|
19.976
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Aug 2017
|
|
Stage-I Approval on
|
:
|
24 Jan 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2021
|
|
|
|
19 Feb 2020
|
|
45
|
Assam
|
FP/AS/MIN/35222/2018
|
3-ASB/125/2022/GHY
|
ONGC exploratory Drilling Location KSAI
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
2.1
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2018
|
|
Stage-I Approval on
|
:
|
09 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
25 Jul 2025
|
|
46
|
Assam
|
FP/AS/OFC/73279/2020
|
FRS.121/2021
|
Kaliabor Tezpur OFC Route
|
Optical Fibre Cable
|
RELIANCE JIO INFOCOM LTD
|
0.092
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2020
|
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2022
|
|
|
|
11 Jul 2022
|
|
47
|
Assam
|
FP/AS/Others/38082/2019
|
F. no. 3-AS B 110/2020-SHI
|
KASOMARIGAON EPS
|
Others
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
3.63
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jan 2019
|
|
Stage-I Approval on
|
:
|
07 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Oct 2021
|
|
|
|
29 Aug 2023
|
|
48
|
Assam
|
FP/AS/TRANS/9060/2015
|
3-AS B 034/2016-SHI
|
132KV S/C Transmission Line from 220KV Salakati Grid S/S to 132KV/33KV Kokrajhar S/S
|
Transmission Line
|
ASSAM ELECTRICITY GRID CORPORATION LINITED
|
1.82
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2015
|
|
Stage-I Approval on
|
:
|
25 Jan 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2022
|
|
|
|
|
|
49
|
Assam
|
FP/AS/ROAD/44439/2020
|
3-AS-C-100/2022/GHY
|
Up gradation of Bilasipura-Chapar-Tulungia-Jogighopa-Gendera-Paikan-Dudhnoi-Guwahati Road (Length 225.000 km) for Goalpara district, in the State of Assam
|
Road
|
NHIDCL BO TEZPUR
|
27.054
|
IN-PRINCIPLE
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2020
|
|
Stage-I Approval on
|
:
|
16 Dec 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2024
|
|
|
|
|
|
50
|
Assam
|
FP/AS/MIN/20313/2016
|
3-AS B 043/2018-SHI
|
ONGC exploratory drilling location KSAD
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.89
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2017
|
|
Stage-I Approval on
|
:
|
28 Nov 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2022
|
|
|
|
24 May 2022
|
|