Ministry of Environment,Forest and Climate Change
Government of India
Assam
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Assam FP/AS/MIN/113899/2020 3-AS-B-083/2022-GHY ONGC, Drilling of Exploratory Location ELAI Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.771 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2021
Stage-I Approval on : 07 Sep 2022
Compliance Report Submitted by User Agency on : 02 Jun 2023
16 Oct 2023
2 Assam FP/AS/MIN/139446/2021 3-ASB/116/2022/GHY ONGC Drilling of Exploratory location SUAD Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.8212483 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2021
Stage-I Approval on : 09 Feb 2024
Compliance Report Submitted by User Agency on : 18 Feb 2025
25 Jul 2025
3 Assam FP/AS/MIN/140108/2021 3-ASB/121/2022/GHY ONGC Drilling of Exploratory Location TLAA Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.76783 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2021
Stage-I Approval on : 09 Feb 2024
Compliance Report Submitted by User Agency on : 18 Feb 2025
25 Jul 2025
4 Assam FP/AS/Pipeline/48074/2020 F.No.3- AS B 07 6 /2021-GHy Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar. Pipeline INDRADHANUSH GAS GRID LIMITED 4.7289 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 30 Jul 2020
Stage-I Approval on : 09 Mar 2022
Compliance Report Submitted by User Agency on : 22 Aug 2022
5 Assam FP/AS/MIN/113884/2020 3-ASB/122/2022/GHY ONGC, Drilling of Exploratory Location TLAB Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.781 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2020
Stage-I Approval on : 09 Feb 2024
Compliance Report Submitted by User Agency on : 18 Feb 2025
25 Jul 2025
6 Assam FP/AS/MIN/87902/2020 3-AS B/124/2022/GHY ONGC, Drilling of Exploratory Location SPAA Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.731 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2020
Stage-I Approval on : 09 Feb 2024
Compliance Report Submitted by User Agency on : 18 Feb 2025
25 Jul 2025
7 Assam FP/AS/MIN/23331/2016 F. no. 3-AS B 037/2019-SHI Drilling Location MKE Mining OIL INDIA LIMITED 2.253 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Dec 2016
Stage-I Approval on : 18 Mar 2021
Compliance Report Submitted by User Agency on : 24 May 2022
19 Jul 2022
8 Assam FP/AS/TRANS/44809/2020 3-AS-C-074/2021/GHY Shifting of 132KV S/C Gohpur-Nirjuli Transmission Line from location no 42 to location no 64 due to upcoming Greenfield Airport at Hollongi, Arunachal Pradesh Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 19.791 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Feb 2020
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 27 Jul 2022
05 Mar 2024
9 Assam FP/AS/MIN/23089/2016 F. no. 3-AN B 036/2019-SHI Drilling Location MKD Mining OIL INDIA LIMITED 3.545 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2016
Stage-I Approval on : 18 Mar 2021
Compliance Report Submitted by User Agency on : 24 May 2022
18 Aug 2022
10 Assam FP/AS/HYD/8294/2014 8-53/2018-FC Lower Kopili Hydro Electric Project (120 MW) Hydel APGCL 523.046 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2014
Stage-I Approval on : 05 Feb 2019
Compliance Report Submitted by User Agency on : 28 Aug 2020
04 Dec 2020
11 Assam FP/AS/TRANS/40419/2019 3-AS-C-028/2021/GHY CONSTRUCTION OF 400 KV D/C HVAC TRANSMISSION LINE (LINE-II) FROM NHPC'S 2000 MW LOWER SUBANSIRI HYDRO ELECTRIC PROJECT AT GERUKAMUKH TO BISWANATH CHARIALI IN ASSAM Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 34.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 May 2019
Stage-I Approval on : 22 Feb 2022
Compliance Report Submitted by User Agency on : 05 Aug 2022
29 Jul 2024
12 Assam FP/AS/MIN/21919/2016 3-AS B 038/2018-SHI ONGC drilling location KHDD Mining OIL AND NATURAL GAS CORPORATION LIMITED 2.24 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Dec 2016
Stage-I Approval on : 03 Jan 2018
Compliance Report Submitted by User Agency on : 11 Jan 2022
05 Apr 2022
13 Assam FP/AS/TRANS/142618/2021 3-AS-C-093/2022/GHY DIVERSION PROPOSAL OF PROPOSED 18.028 HA AREA OF FOREST LAND FOR CONSTRUCTION AND COMMISSIONING OF 132 KV TRANSMISSION LINE FROM AGIA GSS TO GOALPARA TSS AT RAKHAYASHINI PRF UNDER GOALPARA FOREST DIVISION Transmission Line O/O THE CHIEF PROJECT DIRECTOR, CENTRAL ORGANIZATION FOR RAILWAY ELECTRIFICATION, GUWAHATI 18.028 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 May 2021
Stage-I Approval on : 01 Sep 2022
Compliance Report Submitted by User Agency on : 07 Jun 2024
25 Sep 2025
14 Assam FP/AS/MIN/139701/2021 3-AS-B-095/2022-GHY ONGC, Exploratory Drilling Location KHBK Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.779 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Mar 2021
Stage-I Approval on : 27 Oct 2022
Compliance Report Submitted by User Agency on : 28 Jun 2023
16 Oct 2023
15 Assam FP/AS/Others/21128/2016 F. No. 3 AS B 083/2020-GHY GELEKI DEVELOPMENT PROJECT Others ONGC 4.43 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Aug 2016
Stage-I Approval on : 29 Nov 2021
Compliance Report Submitted by User Agency on : 07 Feb 2022
02 Nov 2023
16 Assam FP/AS/MIN/126230/2021 3-AS-B-085/2022/GHY ONGC Exploratory Drilling Location MJAA Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.763 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Mar 2021
Stage-I Approval on : 07 Sep 2022
Compliance Report Submitted by User Agency on : 28 May 2023
16 Oct 2023
17 Assam FP/AS/MIN/139315/2021 3-ASB/126/2022/GHY ONGC Drilling of Exploratory location ELAJ Mining OIL AND NATURAL GAS CORPORATION LIMITED 2.2091 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Mar 2021
Stage-I Approval on : 12 Feb 2024
Compliance Report Submitted by User Agency on : 18 Feb 2025
25 Jul 2025
18 Assam FP/AS/OFC/116541/2020 FRS.2/2022 Digboi-Duliajan NLD Optical Fiber Route Project Optical Fibre Cable RELIANCE JIO INFOCOM LTD 0.915 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Dec 2020
Stage-I Approval on : 18 Jan 2022
Compliance Report Submitted by User Agency on : 14 Jun 2024
16 Dec 2023
19 Assam FP/AS/MIN/51724/2020 3-AS-C-115/2022-GHY Forest diversion proposal for oil & gas well drilling at Loc. KA-2 located in Dhansiri Reserve Forest in NELP Block AA-ONN-2010/2 in Karbi Anglong District, Karbi Anglong Autonomous Council of Assam Mining OIL INDIA LIMITED 5.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Oct 2020
Stage-I Approval on : 07 Jul 2023
Compliance Report Submitted by User Agency on : 30 Dec 2023
30 Jan 2024
20 Assam FP/AS/REHAB/120428/2021 8-01/2021-FC RELOCATION OF FOREST VILLAGE LAIKA Rehabilitation TINSUKIA WILDLIFE DIVISION 238 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2021
Stage-I Approval on : 29 Mar 2021
Compliance Report Submitted by User Agency on : 21 Jun 2023
07 Aug 2023
21 Assam FP/AS/OFC/155167/2022 ECF No.278364 Laying of Optical Fibre Cable at Sonowal Mariani Assam Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.96 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jun 2022
Stage-I Approval on : 06 Mar 2023
Compliance Report Submitted by User Agency on : 04 Mar 2024
20 Mar 2024
22 Assam FP/AS/ROAD/152364/2022 FRS.100/2022 Development and Improvement of Jagun Namchik Mioa Road (Assam Portion) including Bridge No. 9/1 over River Namchik in Tinsukia District Road DIGBOI AND MARGHERITA TERRITORIAL ROAD DIVISION 0.09563 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Apr 2022
Stage-I Approval on : 11 Jul 2022
Compliance Report Submitted by User Agency on : 27 Apr 2023
12 Jul 2023
23 Assam FP/AS/TRANS/145939/2021 3-AS-B-107/2022/GHY Construction of 132kV D/C Roing-Chapakhowa Transmission Line under NERSS-X Transmission Line POWERGRID 0.675 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Aug 2021
Stage-I Approval on : 02 Dec 2022
Compliance Report Submitted by User Agency on : 27 Apr 2023
19 Jun 2025
24 Assam FP/AS/Others/18536/2016 3-AS C 021/2018-SHI 6 TRUNK PIPELIE REPLACEMENT PROJECT Others ONGC 20.72 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Mar 2016
Stage-I Approval on : 27 Jan 2020
Compliance Report Submitted by User Agency on : 12 Oct 2021
29 Apr 2022
25 Assam FP/AS/TRANS/19330/2016 3-AS C 023/2017-SHI Proposal for diversion of 208.807 Hectare forest land for construction of 400 kV D/C (Quad) Jigmelling-Alipurduar Transmission Line in the State of Assam Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 208.807 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 May 2016
Stage-I Approval on : 18 Oct 2018
Compliance Report Submitted by User Agency on : 02 Jan 2021
15 Feb 2021
26 Assam FP/AS/MIN/17426/2016 8-11/2019-FC New Umrangshu Limestone Mine Mining CALCOM CEMENT INDIA LTD 425.5 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Mar 2016
Stage-I Approval on : 23 Aug 2019
Compliance Report Submitted by User Agency on : 04 Jun 2020
25 Nov 2020
27 Assam FP/AS/TRANS/119559/2021 3-AS-C-096/2022/GHY Diversion of Forest Land for 11 nos. of Tower Location (123 to 136A) against “Diversion work of 132KV S/C Haflong-Jiribam transmission line of POWERGRID in the section between tower location no. 104 to location no. 164 for facilitating the construction of NH-54 (E) under Borail Wildlife Sanctuary under Cachar Dist. of Assam State Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 9.23 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Jan 2021
Stage-I Approval on : 09 Feb 2023
Compliance Report Submitted by User Agency on : 16 Oct 2025
28 Assam FP/AS/Others/120624/2021 FNO-3 ASA 075/2021/GHY Dergaon - Dimapur Natural Gas Pipeline Project Others INDRADHANUSH GAS GRID LIMITED 79.5284 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Feb 2021
Stage-I Approval on : 09 May 2022
Compliance Report Submitted by User Agency on : 01 Jul 2022
22 May 2023
29 Assam FP/AS/MIN/36318/2018 3-AS-B-072/2021-GHY ONGC Exploratory Drilling Location KSAH Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.75 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Nov 2018
Stage-I Approval on : 07 Sep 2022
Compliance Report Submitted by User Agency on : 02 Jun 2023
04 Apr 2024
30 Assam FP/AS/MIN/44360/2020 3-AS-B-102/2022-GHY Forest diversion proposal for oil and gas exploration, development and production in Block AA-ONHP/2017/1 in Assam- Well pad No 28. Mining M/s Vedanta Limited(Division Cairn Oil & Gas) 2.43 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2020
Stage-I Approval on : 27 Oct 2022
Compliance Report Submitted by User Agency on : 22 May 2024
20 Jun 2024
31 Assam FP/AS/MIN/44361/2020 3-AS-B-106/2022/GHY Forest diversion proposal for oil and gas exploration, development and production in Block AA-ONHP/2017/1 in Assam- Well pad No 29. Mining M/s Vedanta Limited(Division Cairn Oil & Gas) 4.125 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2020
Stage-I Approval on : 07 Jul 2023
Compliance Report Submitted by User Agency on : 22 May 2024
20 Jun 2024
32 Assam FP/AS/TRANS/36517/2018 3-AS-C-030/2021/GHY Construction of 400 KV D/C HVAC Transmission Line ( Line - I) from NHPC’s 2000 MW Lower Subansiri Hydro Electric Project at Gerukamukh to Biswanath Chariali in Assam. Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 32.78 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Oct 2018
Stage-I Approval on : 22 Feb 2022
Compliance Report Submitted by User Agency on : 05 Aug 2022
29 Jul 2024
33 Assam FP/AS/ROAD/154980/2022 3-AS-B-108-2022 - GHY Construction of Trumpet Interchange at Gauripur Junction North Guwahati Road PUBLIC WORKS (ROADS) DEPARTMENT 2.66 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 May 2022
Stage-I Approval on : 18 Aug 2022
Compliance Report Submitted by User Agency on : 30 Nov 2023
19 Dec 2024
34 Assam FP/AS/MIN/154403/2022 3-AS-B-114/2022/GHY Proposed Development Drilling wells and Testing of Hydrocarbons in Duarmara Block in Margherita, District - Tinsukia, Assam Mining OILMAX ENERGY PRIVATE LIMITED 3.92 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Apr 2022
Stage-I Approval on : 29 Aug 2023
Compliance Report Submitted by User Agency on : 12 Jan 2024
24 Dec 2024
35 Assam FP/AS/ROAD/22913/2016 3-AS C 014/2017-SHI Four laning of Balachera to Harangajao section from Km 244.000 to Km 275.000 under East-West Corridor of NH-54(E) in the state of Assam [Contract package no. EW-II AS-14] Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU SILCHAR 10.583 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Dec 2016
Stage-I Approval on : 18 Sep 2017
Compliance Report Submitted by User Agency on : 03 Jun 2022
28 Jun 2022
36 Assam FP/AS/TRANS/36480/2018 3-AS B 052/2019-SHI Construction of 400 kV D/C Silchar to Misa Transmission line- a part near Misa sub-station Transmission Line NER II TRANSMISSION LIMITED 1.483 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Oct 2018
Stage-I Approval on : 06 Jun 2019
Compliance Report Submitted by User Agency on : 05 Mar 2021
28 Oct 2021
37 Assam FP/AS/Others/27091/2017 3-AS B 032/2017-SHI Jagiroad Stone Mahal No. F (1) Others HILLS TRADE AGENCIES 1 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jul 2017
Stage-I Approval on : 09 May 2018
Compliance Report Submitted by User Agency on : 08 Apr 2022
23 Jan 2023
38 Assam FP/AS/Pipeline/119243/2021 3-AN-C-040/2021-GHY Laying of underground Oil & Gas Pipelines along Upper Dehing Reserve Forest portion of Duliajan- Digboi Road, Assam Pipeline OIL INDIA LIMITED 13.43 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jan 2021
Stage-I Approval on : 30 Mar 2022
Compliance Report Submitted by User Agency on : 25 May 2022
28 Mar 2025
39 Assam FP/AS/Others/150085/2021 3-AS-B-091/2022-GHY Construction of Holongi Airport Others AIRPORTS AUTHORITY OF INDIA 2.604 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Dec 2021
Stage-I Approval on : 17 Mar 2022
Compliance Report Submitted by User Agency on : 26 Apr 2022
04 May 2022
40 Assam FP/AS/Pipeline/49586/2020 F. NO 3 AS C 089/2022/GHY Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar. Pipeline INDRADHANUSH GAS GRID LIMITED 9.2755 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Sep 2020
Stage-I Approval on : 24 May 2022
Compliance Report Submitted by User Agency on : 25 Jul 2022
41 Assam FP/AS/TRANS/34360/2018 F.No.3 AS B 033/2020-SHI 132kV D/C Sonapur-Baghjap Transmission line(Jagiroad) Transmission Line ASSAM ELECTRICITY GRID CORPORATION LIMITED(AEGCL) 5.77 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Sep 2018
Stage-I Approval on : 24 Sep 2021
Compliance Report Submitted by User Agency on : 16 Apr 2024
09 Jul 2024
42 Assam FP/AS/Pipeline/55045/2020 3-AS-C-054/2021-GHY Kumchai EPS to Kusijan FGGS Pipeline Pipeline OIL INDIA LIMITED 27.43 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Nov 2020
Stage-I Approval on : 30 Mar 2022
Compliance Report Submitted by User Agency on : 16 Jul 2022
28 Mar 2025
43 Assam FP/AS/MIN/23425/2017 3-AS-B-112-2020 - GHY Drilling Location DHD Mining OIL INDIA LIMITED 2.696 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Jan 2017
Stage-I Approval on : 28 Jul 2023
Compliance Report Submitted by User Agency on : 24 Aug 2024
44 Assam FP/AS/TRANS/28563/2017 3-AS C 010/2019-SHI Proposal for diversion of 19.976 Ha of Forest land for construction of 400 KV D/C (Twin) New Mariani – New Kohima Transmission Line (Assam Portion) in the state of Assam Transmission Line KOHIMA MARIANI TRANSMISSION LIMITED 19.976 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Aug 2017
Stage-I Approval on : 24 Jan 2019
Compliance Report Submitted by User Agency on : 29 Jan 2021
19 Feb 2020
45 Assam FP/AS/MIN/35222/2018 3-ASB/125/2022/GHY ONGC exploratory Drilling Location KSAI Mining OIL AND NATURAL GAS CORPORATION LIMITED 2.1 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2018
Stage-I Approval on : 09 Feb 2024
Compliance Report Submitted by User Agency on : 18 Feb 2025
25 Jul 2025
46 Assam FP/AS/OFC/73279/2020 FRS.121/2021 Kaliabor Tezpur OFC Route Optical Fibre Cable RELIANCE JIO INFOCOM LTD 0.092 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Dec 2020
Stage-I Approval on : 30 Dec 2021
Compliance Report Submitted by User Agency on : 30 Apr 2022
11 Jul 2022
47 Assam FP/AS/Others/38082/2019 F. no. 3-AS B 110/2020-SHI KASOMARIGAON EPS Others OIL AND NATURAL GAS CORPORATION LIMITED 3.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jan 2019
Stage-I Approval on : 07 Jul 2021
Compliance Report Submitted by User Agency on : 12 Oct 2021
29 Aug 2023
48 Assam FP/AS/TRANS/9060/2015 3-AS B 034/2016-SHI 132KV S/C Transmission Line from 220KV Salakati Grid S/S to 132KV/33KV Kokrajhar S/S Transmission Line ASSAM ELECTRICITY GRID CORPORATION LINITED 1.82 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jan 2015
Stage-I Approval on : 25 Jan 2019
Compliance Report Submitted by User Agency on : 24 Feb 2022
49 Assam FP/AS/ROAD/44439/2020 3-AS-C-100/2022/GHY Up gradation of Bilasipura-Chapar-Tulungia-Jogighopa-Gendera-Paikan-Dudhnoi-Guwahati Road (Length 225.000 km) for Goalpara district, in the State of Assam Road NHIDCL BO TEZPUR 27.054 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 06 Feb 2020
Stage-I Approval on : 16 Dec 2022
Compliance Report Submitted by User Agency on : 08 Aug 2024
50 Assam FP/AS/MIN/20313/2016 3-AS B 043/2018-SHI ONGC exploratory drilling location KSAD Mining OIL AND NATURAL GAS CORPORATION LIMITED 1.89 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Mar 2017
Stage-I Approval on : 28 Nov 2018
Compliance Report Submitted by User Agency on : 01 Feb 2022
24 May 2022
12