Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/TRANS/25855/2017
|
G.O.Rt.No.127
|
132KV DC/SC line from 132/33KV SS Vengalayapalem to 25KV RTSS, Nallapadu
|
Transmission Line
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR
|
0.51
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2017
|
Stage-I Approval on
|
:
|
22 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2019
|
|
|
|
|
2
|
Bihar
|
FP/BR/ROAD/21381/2016
|
FP/BR/ROAD/21381/2016
|
Baysi-Bahadurganj-Dighalbank section of SH-99
|
Road
|
BIHAR STATE ROAD DEVELOPMENT CORPORATION
|
69.178
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Sep 2016
|
Stage-I Approval on
|
:
|
04 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2023
|
|
|
|
|
3
|
Bihar
|
FP/BR/TRANS/122227/2021
|
FP/BR/TRANS/122227/2021
|
LILO OF KISHANGANJ DARBHANGA 400KV D/C (QUAD) LINE OF POWERGRID AT SAHARSA (NEW) SUBSTATION
|
Transmission Line
|
POWERGRID MITHILANCHAL TRANSMISSION LIMITED SAHARSA
|
2.191
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2021
|
Stage-I Approval on
|
:
|
24 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2022
|
|
|
|
|
4
|
Bihar
|
FP/BR/ROAD/146205/2021
|
FP/BR/ROAD/146205/2021
|
Construction of Four lane Inter corridor package-I from Amas (Ch. Km – 0+000) to Shivrampur (Ch. Km-55+002) in the state of Bihar under Bharatmala Pariyojna (Lot-5, Pkg-7) - NH-119D
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA, PROJECT IMPLEMENTATION UNIT - GAYA
|
2.064
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
Stage-I Approval on
|
:
|
27 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Sep 2024
|
|
|
|
|
5
|
Chhattisgarh
|
FP/CG/SubStation/145951/2021
|
FC-II/IROCH-17/2023
|
220/132/33 KV SUBSTATION DHARAMJAIGARH AT VILLAGE HATI, AREA 6.823 HECTARE
|
Sub Station
|
CSPTCL
|
6.823
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2021
|
Stage-I Approval on
|
:
|
04 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jan 2025
|
|
|
|
|
6
|
Goa
|
FP/GA/ROAD/42943/2019
|
No.4-GOB/1216-2019-BAN
|
Four Laning of existing NH-17(new NH-66) from Km 475.000 to Km 502.500 in the state of Goa under NHDP-III (Patradevi to Karaswada Section on NH-17)
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.06
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2019
|
Stage-I Approval on
|
:
|
09 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
30 Sep 2024
|
|
|
|
|
7
|
Gujarat
|
FP/GJ/ROAD/14898/2015
|
6-GJB05/2016-BHO
|
R.O.B. on Pansora-BhalejAnand Roa r and Bhalej-Ahima Road
|
Road
|
EXECUTIVE ENGINEER
|
0.99375
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2015
|
Stage-I Approval on
|
:
|
18 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
|
8
|
Gujarat
|
FP/GJ/ROAD/17511/2016
|
6-GJB012/2016-BHO
|
Tuwa-Mehlol-Vejalpur Road Km. 16/100 to 16/450 and 17/150 to 17/500 (L.C. No. 41 Railway Crossing)
|
Road
|
EX. ENGINEER, R & B, DIV. GODHARA
|
0.42
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2016
|
Stage-I Approval on
|
:
|
31 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2023
|
|
|
|
|
9
|
Gujarat
|
FP/GJ/ROAD/23626/2017
|
6-GJC29/2018-BHO
|
2/4 laning of Bhuj – Khavda – Dharmshala section NH-341 from km 65+475 to km 162+185 in the State of Gujarat - Package II
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
122.4077
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jan 2017
|
Stage-I Approval on
|
:
|
26 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2020
|
|
|
|
|
10
|
Gujarat
|
FP/GJ/TRANS/37923/2018
|
6-GJC042/2021-BHO
|
Erection of 66kV Tower line for 66kV Kalibel substation LILO from exist 66kV Waghai-Ahwa line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
6.642
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2018
|
Stage-I Approval on
|
:
|
25 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
11
|
Gujarat
|
FP/GJ/ROAD/38381/2019
|
6-GJC059/2019-BHO
|
Proposal for diversion of protected forest land for the project of Four laning of Pragatipath section Suigam - Limbuni - Masali - Madhpura - Boru - Dudhosan road Ch. 0/00 to 20/750
|
Road
|
EXECUTIVE ENGINEER, BANASKANTHA
|
22.44375
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2019
|
Stage-I Approval on
|
:
|
30 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Feb 2024
|
|
|
|
|
12
|
Gujarat
|
FP/GJ/IRRIG/40453/2019
|
FC-6/GJC-62/2022-GNR
|
Diversion of 10.19 ha. R.F. Land for construction of Barrage and approach road on Sabarmati River in Village: Hirpura, Dist. Mehsana.
|
Irrigation
|
DHAROI CANAL DIVISION NO.3, VISNAGAR
|
10.19
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
Stage-I Approval on
|
:
|
21 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2023
|
|
|
|
|
13
|
Gujarat
|
FP/GJ/TRANS/41280/2019
|
6-GJC040/2021-BHO
|
Submission of 21.6360 Hac. Forest land proposal for Diversion for Forest Land proposal for forest clearance for 66KV LILO line for 66kv Jirval sub-station - 2.1690 Hec, & 66KV LILO line for 66KV Nandg
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
21.636
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jul 2019
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
14
|
Gujarat
|
FP/GJ/ROAD/44056/2020
|
6-GJB093/2021-BHO
|
Bilimora Chikhli Vansda Waghai Road Km. 53/400 to 56/600 ( Only For Left Side Of The Road ) & Km. 56/600 to 59/600 ( For Both Side Of The Road )
|
Road
|
NAVSARI RNB DIVISION
|
3.76
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2020
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jan 2022
|
|
|
|
|
15
|
Gujarat
|
FP/GJ/TRANS/44390/2020
|
FCA-1020/3-18/20/SF-224/F
|
66KV D/c Rabarika - Umrali (M/S Powerica Wind Power Generation) line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.02
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2020
|
Stage-I Approval on
|
:
|
01 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2024
|
|
|
|
|
16
|
Gujarat
|
FP/GJ/OFC/46707/2020
|
6-GJB103/2021-BHO
|
NOFN (Lakhpat)
|
Optical Fibre Cable
|
RailTel Corporation of India limited
|
0.769995
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2020
|
Stage-I Approval on
|
:
|
03 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jul 2024
|
|
|
|
|
17
|
Gujarat
|
FP/GJ/ROAD/47661/2020
|
6-GJC039/2020-BHO
|
Construction of ambaji bypass road ( k.m. 0/00 to 2/950 ) on himmatanagar-kheroj-ambaji-aburoad Road S.H.-9
|
Road
|
PUBLIC WORK DEPARTMENT
|
13.275
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2020
|
Stage-I Approval on
|
:
|
30 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jul 2022
|
|
|
|
|
18
|
Gujarat
|
FP/GJ/ROAD/47665/2020
|
8-108/1993-FC Vol.
|
Construction of Ambaji Bypass Road ( k.m. 2/950 to 5/150 ) on himmatnagar-Kheroj-Ambaji-Aburoad Road S.H.-9
|
Road
|
PUBLIC WORK DEPARTMENT
|
9.9
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2020
|
Stage-I Approval on
|
:
|
21 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Dec 2022
|
|
|
|
|
19
|
Gujarat
|
FP/GJ/OFC/48577/2020
|
6-GJB031/2021-BHO
|
Proposal for Diversion of 1.9 ha. Reserved forest land (ESZ) for the grant permission for laying GFGNL Optical Fiber Cable line along the Shoolpaneshwar sanctuary area in Ta. Dediyapada and Nandod, Dist. Narmada
|
Optical Fibre Cable
|
GFGNL
|
1.9
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2020
|
Stage-I Approval on
|
:
|
22 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
|
20
|
Gujarat
|
FP/GJ/ROAD/48671/2020
|
6-GJC043/2021-BHO
|
Diversion of 10.80 Ha. Protected Forest Land of Road Side For Construction of Pagdandi on Ahmedabad-Viramgam-Mandal-Dasada-Panchasar-Shankheshwar road, District: Patan in Gujarat State.
|
Road
|
EXECUTIVE ENGINEER ROAD AND BUILDING DIVISION (STATE) PATAN
|
10.8
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2020
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jun 2024
|
|
|
|
|
21
|
Gujarat
|
FP/GJ/OFC/49234/2020
|
6-GJB045/2021-BHO
|
Grant permission for optical fiber cable along the route mention here (Purna wildlife sanctuary Area)
|
Optical Fibre Cable
|
GFGNL
|
0.6895
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2020
|
Stage-I Approval on
|
:
|
30 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
|
22
|
Gujarat
|
FP/GJ/OFC/49946/2020
|
6-GJB101/2021-BHO
|
GFGNL (BBNL Phase-II) Project Dhrangadhra Gudhkhar forest area
|
Optical Fibre Cable
|
GUJARAT FIBER GRID NETWORK LTD
|
0.0333
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2020
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2023
|
|
|
|
|
23
|
Gujarat
|
FP/GJ/TRANS/54160/2020
|
6-GJB060/2021-BHO
|
Bhaniya village 24 *7 hour 3-ph JGY power supply (Bhaniya – khishari ag electric link line (0.0595 Ha)) ta. Khambha dist. Amreli in Gujarat State
|
Transmission Line
|
PGVCL KHAMBHA SDN
|
0.0595
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Nov 2020
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
31 May 2022
|
|
|
|
|
24
|
Gujarat
|
FP/GJ/RAIL/65579/2020
|
6-GJB057/2021-BHO
|
WDFC (ROB 12-PCL)
|
Railway
|
DFCCIL AHMEDABAD
|
2.35
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
04 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2021
|
|
|
|
|
25
|
Gujarat
|
FP/GJ/WATER/82029/2020
|
6-GJB051/2021-BHO
|
Diversion of 0.098 Ha. Forest land for laying Two 6" (inch) dia PVC pipeline for irrigation and drinking water
|
Drinking Water
|
KHUNTI RANMALBHAI
|
0.098
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2020
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2022
|
|
|
|
|
26
|
Gujarat
|
FP/GJ/ROAD/123854/2021
|
6-GJC041/2021-BHO
|
Widening & Strengthening of Naswadi - Bhakha - Kawant Road Km. 0/0 to 38/400
|
Road
|
DISTRICT R & B SUB DIVISION
|
10.7445
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2021
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
|
27
|
Gujarat
|
FP/GJ/ROAD/140444/2021
|
FC-6/GJB-33/2022-GNR
|
Reconstruction of Sukhpur Dalkhaniya Road
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
0.98
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Apr 2021
|
Stage-I Approval on
|
:
|
01 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2023
|
|
|
|
|
28
|
Gujarat
|
FP/GJ/ROAD/140541/2021
|
FCA-1022/7-32/21/SF-42/F
|
Construction of Amabaradi Safari Park to Gadadhara Mandir Road (Village Road)
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
0.48
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2021
|
Stage-I Approval on
|
:
|
22 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2022
|
|
|
|
|
29
|
Gujarat
|
FP/GJ/TRANS/140743/2021
|
6-GJB096/2021-BHO
|
66KV S/C Kangashiyali (220KV) (GETCO) - Siddheshwar underground cable line with 1C x 630 sq mm (3+1 spare) XLPE power cable line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.427
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Apr 2021
|
Stage-I Approval on
|
:
|
03 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jan 2022
|
|
|
|
|
30
|
Gujarat
|
FP/GJ/TRANS/143615/2021
|
FC-6/GJB-47/2022-GNR
|
Construction of 33 kV transmission line from Ratadiya PSS to WTG locations of Adani Wind Energy Kutchh Five Limited
|
Transmission Line
|
ADANI WIND ENERGY KUTCH FIVE LIMITED
|
0.0346
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2021
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2022
|
|
|
|
|
31
|
Gujarat
|
FP/GJ/Pipeline/144112/2021
|
6-GJB006/2022-FC
|
Diversion of 4.97 ha of Reserve Forest Land of Laying Irrigation Underground Water pipeline under Tapi- Karanj link pipeline Lift Irrigation Project.
|
Pipeline
|
NWRWS KALPSAR DEPARTMENT VER II PROJECT DIVISION VYARA
|
4.97
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2021
|
Stage-I Approval on
|
:
|
28 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 May 2022
|
|
|
|
|
32
|
Gujarat
|
FP/GJ/TRANS/145120/2021
|
FCA-1021/3-20/21/SF-188/F
|
66KV S/C (3+1) 630 Sq. mm, UG Cable from 66KV Ghanghali – 3 S/S (GETCO S/S) to M/s.Prabodh steel Pvt. Ltd. village-Ghanghali,Ta. Sihor,Dist.Bhavnagar.
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.15
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jul 2021
|
Stage-I Approval on
|
:
|
06 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
33
|
Gujarat
|
FP/GJ/TRANS/146196/2021
|
FCA-1021/3-30/21/SF-246/F
|
66KV S/C (3+1) 630Sq.mm, underground cable from 220KV Otha Sub-station to 66KV Mahuva (Neswad) Sub-station.
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.43252
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
Stage-I Approval on
|
:
|
06 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
34
|
Gujarat
|
FP/GJ/ROAD/156679/2022
|
FC-6/GJA-74/2023-GNR
|
Div of 78.1014 Ha Protected Forest land for four laning of existing section of Dudhrej-Vana-Malvan Road on SH-19 in Surendranagar district. (4/00 Km to 43/00 Km)
|
Road
|
DEPUTY EXECUTIVE ENGINEER
|
78.1014
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2022
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2024
|
|
|
|
|
35
|
Gujarat
|
FP/GJ/ROAD/157025/2022
|
FC-6/GJA-81/2023-GNR
|
Div of 68.0884 Ha Protected Forest land for four laning of existing section of Malvan Patdi Zainabad Dasada Road on SH-19 in Surendranagar district. (43/00 Km to 77/00 Km)
|
Road
|
DEPUTY EXECUTIVE ENGINEER
|
68.0884
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2022
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
|
36
|
Haryana
|
FP/HR/ROAD/27251/2017
|
9-HRB062-2018-CHA
|
construction of Ring road from Tauru road to Alwar road via Engineering College, Medical College and Navodaya School Bai in Nuh Distt. (C.M. Announcement 15242)
|
Road
|
PWD BANDR MEWAT
|
1.8239232
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Aug 2017
|
Stage-I Approval on
|
:
|
20 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
|
37
|
Haryana
|
FP/HR/WATER/37285/2018
|
9045
|
DRINKING WATER PIPELINE FROM JANAULI TO ASAOTI
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DIVISION PALWAL
|
0.702
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2018
|
Stage-I Approval on
|
:
|
16 Nov 2019
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2024
|
|
|
|
|
38
|
Haryana
|
FP/HR/Approach/41473/2019
|
9-HRB036-2022-CHA
|
Access Permission (Entry & Exist) for Affordable Residential Plotted Colony (Under Deen Dayal Jan Awas Yojana (DDJAY-2016)
|
Approach Access
|
REGIONAL CONSTRUCTION PVT. LTD.
|
0.014
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2019
|
Stage-I Approval on
|
:
|
13 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jan 2025
|
|
|
|
|
39
|
Haryana
|
FP/HR/ROAD/48568/2020
|
9-HRB076-2021-CHA
|
Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Pkg-I)
|
Road
|
CMU, MATHURA, NHAI
|
3.9
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
Stage-I Approval on
|
:
|
22 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
|
40
|
Haryana
|
FP/HR/Approach/51883/2020
|
9-HRB139-2022-CHA
|
Construction of Prposed Path for Proposed MS/HSD Retail Outlet.
|
Approach Access
|
INDIAN OIL CORPORATION LIMITED, PANIPAT DIVISIONAL OFFICE, PANIPAT MARKETING COMPLEX, VILLAGE BAHOLI, P.O. PANIPAT REFINERY, DISTRICT PANIPAT (HARYANA)
|
0.0072
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
Stage-I Approval on
|
:
|
04 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2024
|
|
|
|
|
41
|
Haryana
|
FP/HR/ROAD/143744/2021
|
9-HRC141-2021-CHA
|
Rehabilitation and upgradation to four laning of Jind-Gohana-Sonipat road km 0 to 78.837)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI)
|
16.904
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jun 2021
|
Stage-I Approval on
|
:
|
01 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Oct 2024
|
|
|
|
|
42
|
Haryana
|
FP/HR/ROAD/145587/2021
|
10152
|
Widening and strengthening of road from Narwana to Tohana MDR-111 district Jind Haryana.
|
Road
|
SDE PWD B&R NARWANA
|
0.85
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Aug 2021
|
Stage-I Approval on
|
:
|
15 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 May 2024
|
|
|
|
|
43
|
Haryana
|
FP/HR/ROAD/149539/2021
|
9-HRB037-2023-CHA
|
Construction of 6 lane Greenfield connectivity from DND-Faridabad-Ballabhgarh bypass (from km 32+600) to Jewar International Airport under Bharatmala Pariyojna (Lot-4/Pkg-1) in the State of Haryana un
|
Road
|
CMU, MATHURA, NHAI
|
0.8886
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2021
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2023
|
|
|
|
|
44
|
Haryana
|
FP/HR/ROAD/151320/2022
|
D-III-10324
|
Diversion of 0.7934 hac. of Forest Land for construction of 2 Lane ROB on LC No. – 114 on Mandi Adampur to Daroli Road at Adampur in Distt. - Hisar (HR).
|
Road
|
PROVINCIAL DIVISION PWD B&R BR., HISAR
|
0.7934
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2022
|
Stage-I Approval on
|
:
|
06 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jan 2025
|
|
|
|
|
45
|
Haryana
|
FP/HR/ROAD/153617/2022
|
9-HRB023-2023-CHA
|
Diversion of forest land for construction of road from Nuh Palwal road (Mannaki) to Jogipur Hathin road (Tain) in Nuh Distt. (CMA No.22706) (Section Tain Hussainpur to Jogipur Hathin road)
|
Road
|
PWD BANDR MEWAT
|
0.1525
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
Stage-I Approval on
|
:
|
15 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
|
46
|
Jharkhand
|
FP/JH/TRANS/18253/2016
|
FP/JH/TRANS/18253/2016
|
132 kV D/C Simdega-Manoharpur Transmission Line
|
Transmission Line
|
JHARKHAND URJA SANCHARAN NIGAM LIMITED
|
26.814
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Mar 2016
|
Stage-I Approval on
|
:
|
08 May 2017
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
|
47
|
Jharkhand
|
FP/JH/MIN/38798/2019
|
8-56/2009-FC Vol.
|
Pakri Barwadih North-West Quarry (PB-A) Coal Block of M/s NTPC Ltd
|
Mining
|
NTPC - PAKRI BARWADIH COAL MINING PROJECT
|
331.198
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2019
|
Stage-I Approval on
|
:
|
26 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2024
|
|
|
|
|
48
|
Karnataka
|
FP/KA/TRANS/115396/2020
|
F.No.4-KRC1378/2022-BAN
|
Construction of 400 KV Quad D/C Transmission Line in forest lands of Kallumundkuru, Thenkamijaru Villages in Karkal Taluk of Udupi District, Ulipadi Village in Mangalore Taluk, Virakhamba, Vitlamudnuru Villages in Bantwal Taluk of Dakshina Kannada District for a length of 6.756 Km in favour of Udupi Kasargode Transmission Limited, New Delhi
|
Transmission Line
|
UDUPI KASARGODE TRANSMISSION LIMITED
|
31.079
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2020
|
Stage-I Approval on
|
:
|
27 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
|
49
|
Kerala
|
FP/KL/ROAD/148616/2021
|
4-KLC1368/2022-BAN
|
Construction of Twin Tunnel (2+2 lane) with Four Lane Approaches (from existing roads) for providing direct connectivity between Aanakampoyil Kalladi-Meppadi in Kozhikode and Wayanad Districts of Ker
|
Road
|
EXECUTIVE ENGINEER KERALA PUBLIC WORKS DEPARTMENT ROADS DIVISION, KOZHIKODE
|
17.263
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2021
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2024
|
|
|
|
|
50
|
Orissa
|
FP/OR/Others/147445/2021
|
5-ORC548/2023-BHU
|
Srikakulam - Angul Pipeline (SAPL)Project_Mainline
|
Others
|
GAIL INDIA LIMITED
|
6.1487
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2021
|
Stage-I Approval on
|
:
|
17 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2025
|
|
|
|
|
|