List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/TRANS/25855/2017 G.O.Rt.No.127 132KV DC/SC line from 132/33KV SS Vengalayapalem to 25KV RTSS, Nallapadu Transmission Line EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR 0.51 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Apr 2017
Stage-I Approval on : 22 Jun 2017
Compliance Report Submitted by User Agency on : 20 Nov 2019
2 Bihar FP/BR/ROAD/21381/2016 FP/BR/ROAD/21381/2016 Baysi-Bahadurganj-Dighalbank section of SH-99 Road BIHAR STATE ROAD DEVELOPMENT CORPORATION 69.178 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Sep 2016
Stage-I Approval on : 04 Oct 2023
Compliance Report Submitted by User Agency on : 14 Nov 2023
3 Bihar FP/BR/TRANS/122227/2021 FP/BR/TRANS/122227/2021 LILO OF KISHANGANJ DARBHANGA 400KV D/C (QUAD) LINE OF POWERGRID AT SAHARSA (NEW) SUBSTATION Transmission Line POWERGRID MITHILANCHAL TRANSMISSION LIMITED SAHARSA 2.191 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Feb 2021
Stage-I Approval on : 24 Mar 2022
Compliance Report Submitted by User Agency on : 30 Nov 2022
4 Bihar FP/BR/ROAD/146205/2021 FP/BR/ROAD/146205/2021 Construction of Four lane Inter corridor package-I from Amas (Ch. Km – 0+000) to Shivrampur (Ch. Km-55+002) in the state of Bihar under Bharatmala Pariyojna (Lot-5, Pkg-7) - NH-119D Road NATIONAL HIGHWAYS AUTHORITY OF INDIA, PROJECT IMPLEMENTATION UNIT - GAYA 2.064 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Aug 2021
Stage-I Approval on : 27 Oct 2022
Compliance Report Submitted by User Agency on : 04 Sep 2024
5 Chhattisgarh FP/CG/SubStation/145951/2021 FC-II/IROCH-17/2023 220/132/33 KV SUBSTATION DHARAMJAIGARH AT VILLAGE HATI, AREA 6.823 HECTARE Sub Station CSPTCL 6.823 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Aug 2021
Stage-I Approval on : 04 Jul 2023
Compliance Report Submitted by User Agency on : 02 Jan 2025
6 Goa FP/GA/ROAD/42943/2019 No.4-GOB/1216-2019-BAN Four Laning of existing NH-17(new NH-66) from Km 475.000 to Km 502.500 in the state of Goa under NHDP-III (Patradevi to Karaswada Section on NH-17) Road PUBLIC WORKS DEPARTMENT 0.06 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Nov 2019
Stage-I Approval on : 09 Dec 2019
Compliance Report Submitted by User Agency on : 30 Sep 2024
7 Gujarat FP/GJ/ROAD/14898/2015 6-GJB05/2016-BHO R.O.B. on Pansora-BhalejAnand Roa r and Bhalej-Ahima Road Road EXECUTIVE ENGINEER 0.99375 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Aug 2015
Stage-I Approval on : 18 Mar 2016
Compliance Report Submitted by User Agency on : 07 Aug 2023
8 Gujarat FP/GJ/ROAD/17511/2016 6-GJB012/2016-BHO Tuwa-Mehlol-Vejalpur Road Km. 16/100 to 16/450 and 17/150 to 17/500 (L.C. No. 41 Railway Crossing) Road EX. ENGINEER, R & B, DIV. GODHARA 0.42 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Jan 2016
Stage-I Approval on : 31 Mar 2016
Compliance Report Submitted by User Agency on : 18 Dec 2023
9 Gujarat FP/GJ/ROAD/23626/2017 6-GJC29/2018-BHO 2/4 laning of Bhuj – Khavda – Dharmshala section NH-341 from km 65+475 to km 162+185 in the State of Gujarat - Package II Road MINISTRY OF ROAD TRANSPORT & HIGHWAYS 122.4077 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jan 2017
Stage-I Approval on : 26 Apr 2020
Compliance Report Submitted by User Agency on : 20 Jul 2020
10 Gujarat FP/GJ/TRANS/37923/2018 6-GJC042/2021-BHO Erection of 66kV Tower line for 66kV Kalibel substation LILO from exist 66kV Waghai-Ahwa line Transmission Line GUJARAT ENERGY TRANSMISSION CORP LTD 6.642 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Dec 2018
Stage-I Approval on : 25 Jan 2022
Compliance Report Submitted by User Agency on : 26 Sep 2024
11 Gujarat FP/GJ/ROAD/38381/2019 6-GJC059/2019-BHO Proposal for diversion of protected forest land for the project of Four laning of Pragatipath section Suigam - Limbuni - Masali - Madhpura - Boru - Dudhosan road Ch. 0/00 to 20/750 Road EXECUTIVE ENGINEER, BANASKANTHA 22.44375 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jan 2019
Stage-I Approval on : 30 Oct 2020
Compliance Report Submitted by User Agency on : 16 Feb 2024
12 Gujarat FP/GJ/IRRIG/40453/2019 FC-6/GJC-62/2022-GNR Diversion of 10.19 ha. R.F. Land for construction of Barrage and approach road on Sabarmati River in Village: Hirpura, Dist. Mehsana. Irrigation DHAROI CANAL DIVISION NO.3, VISNAGAR 10.19 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 May 2019
Stage-I Approval on : 21 Apr 2023
Compliance Report Submitted by User Agency on : 08 Aug 2023
13 Gujarat FP/GJ/TRANS/41280/2019 6-GJC040/2021-BHO Submission of 21.6360 Hac. Forest land proposal for Diversion for Forest Land proposal for forest clearance for 66KV LILO line for 66kv Jirval sub-station - 2.1690 Hec, & 66KV LILO line for 66KV Nandg Transmission Line GUJARAT ENERGY TRANSMISSION CORP LTD 21.636 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Jul 2019
Stage-I Approval on : 24 Jan 2022
Compliance Report Submitted by User Agency on : 26 Sep 2024
14 Gujarat FP/GJ/ROAD/44056/2020 6-GJB093/2021-BHO Bilimora Chikhli Vansda Waghai Road Km. 53/400 to 56/600 ( Only For Left Side Of The Road ) & Km. 56/600 to 59/600 ( For Both Side Of The Road ) Road NAVSARI RNB DIVISION 3.76 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Jan 2020
Stage-I Approval on : 30 Dec 2021
Compliance Report Submitted by User Agency on : 28 Jan 2022
15 Gujarat FP/GJ/TRANS/44390/2020 FCA-1020/3-18/20/SF-224/F 66KV D/c Rabarika - Umrali (M/S Powerica Wind Power Generation) line Transmission Line GUJARAT ENERGY TRANSMISSION CORP LTD 0.02 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Feb 2020
Stage-I Approval on : 01 Jan 2021
Compliance Report Submitted by User Agency on : 21 Aug 2024
16 Gujarat FP/GJ/OFC/46707/2020 6-GJB103/2021-BHO NOFN (Lakhpat) Optical Fibre Cable RailTel Corporation of India limited 0.769995 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Jun 2020
Stage-I Approval on : 03 Jan 2022
Compliance Report Submitted by User Agency on : 26 Jul 2024
17 Gujarat FP/GJ/ROAD/47661/2020 6-GJC039/2020-BHO Construction of ambaji bypass road ( k.m. 0/00 to 2/950 ) on himmatanagar-kheroj-ambaji-aburoad Road S.H.-9 Road PUBLIC WORK DEPARTMENT 13.275 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Jul 2020
Stage-I Approval on : 30 Dec 2020
Compliance Report Submitted by User Agency on : 21 Jul 2022
18 Gujarat FP/GJ/ROAD/47665/2020 8-108/1993-FC Vol. Construction of Ambaji Bypass Road ( k.m. 2/950 to 5/150 ) on himmatnagar-Kheroj-Ambaji-Aburoad Road S.H.-9 Road PUBLIC WORK DEPARTMENT 9.9 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Jul 2020
Stage-I Approval on : 21 Apr 2022
Compliance Report Submitted by User Agency on : 14 Dec 2022
19 Gujarat FP/GJ/OFC/48577/2020 6-GJB031/2021-BHO Proposal for Diversion of 1.9 ha. Reserved forest land (ESZ) for the grant permission for laying GFGNL Optical Fiber Cable line along the Shoolpaneshwar sanctuary area in Ta. Dediyapada and Nandod, Dist. Narmada Optical Fibre Cable GFGNL 1.9 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Aug 2020
Stage-I Approval on : 22 Apr 2021
Compliance Report Submitted by User Agency on : 19 Jun 2024
20 Gujarat FP/GJ/ROAD/48671/2020 6-GJC043/2021-BHO Diversion of 10.80 Ha. Protected Forest Land of Road Side For Construction of Pagdandi on Ahmedabad-Viramgam-Mandal-Dasada-Panchasar-Shankheshwar road, District: Patan in Gujarat State. Road EXECUTIVE ENGINEER ROAD AND BUILDING DIVISION (STATE) PATAN 10.8 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Aug 2020
Stage-I Approval on : 24 Jan 2022
Compliance Report Submitted by User Agency on : 01 Jun 2024
21 Gujarat FP/GJ/OFC/49234/2020 6-GJB045/2021-BHO Grant permission for optical fiber cable along the route mention here (Purna wildlife sanctuary Area) Optical Fibre Cable GFGNL 0.6895 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Aug 2020
Stage-I Approval on : 30 Aug 2021
Compliance Report Submitted by User Agency on : 13 Aug 2024
22 Gujarat FP/GJ/OFC/49946/2020 6-GJB101/2021-BHO GFGNL (BBNL Phase-II) Project Dhrangadhra Gudhkhar forest area Optical Fibre Cable GUJARAT FIBER GRID NETWORK LTD 0.0333 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Sep 2020
Stage-I Approval on : 24 Jan 2022
Compliance Report Submitted by User Agency on : 21 Feb 2023
23 Gujarat FP/GJ/TRANS/54160/2020 6-GJB060/2021-BHO Bhaniya village 24 *7 hour 3-ph JGY power supply (Bhaniya – khishari ag electric link line (0.0595 Ha)) ta. Khambha dist. Amreli in Gujarat State Transmission Line PGVCL KHAMBHA SDN 0.0595 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Nov 2020
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 31 May 2022
24 Gujarat FP/GJ/RAIL/65579/2020 6-GJB057/2021-BHO WDFC (ROB 12-PCL) Railway DFCCIL AHMEDABAD 2.35 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Nov 2020
Stage-I Approval on : 04 Jun 2021
Compliance Report Submitted by User Agency on : 19 Jul 2021
25 Gujarat FP/GJ/WATER/82029/2020 6-GJB051/2021-BHO Diversion of 0.098 Ha. Forest land for laying Two 6" (inch) dia PVC pipeline for irrigation and drinking water Drinking Water KHUNTI RANMALBHAI 0.098 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Dec 2020
Stage-I Approval on : 13 May 2021
Compliance Report Submitted by User Agency on : 15 Jul 2022
26 Gujarat FP/GJ/ROAD/123854/2021 6-GJC041/2021-BHO Widening & Strengthening of Naswadi - Bhakha - Kawant Road Km. 0/0 to 38/400 Road DISTRICT R & B SUB DIVISION 10.7445 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Feb 2021
Stage-I Approval on : 24 Jan 2022
Compliance Report Submitted by User Agency on : 25 Jul 2024
27 Gujarat FP/GJ/ROAD/140444/2021 FC-6/GJB-33/2022-GNR Reconstruction of Sukhpur Dalkhaniya Road Road R AND B PANCHAYAT DIVISION AMRELI 0.98 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Apr 2021
Stage-I Approval on : 01 Jun 2022
Compliance Report Submitted by User Agency on : 24 Jan 2023
28 Gujarat FP/GJ/ROAD/140541/2021 FCA-1022/7-32/21/SF-42/F Construction of Amabaradi Safari Park to Gadadhara Mandir Road (Village Road) Road R AND B PANCHAYAT DIVISION AMRELI 0.48 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jul 2021
Stage-I Approval on : 22 Mar 2022
Compliance Report Submitted by User Agency on : 05 Jul 2022
29 Gujarat FP/GJ/TRANS/140743/2021 6-GJB096/2021-BHO 66KV S/C Kangashiyali (220KV) (GETCO) - Siddheshwar underground cable line with 1C x 630 sq mm (3+1 spare) XLPE power cable line Transmission Line GUJARAT ENERGY TRANSMISSION CORP LTD 0.427 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Apr 2021
Stage-I Approval on : 03 Jan 2022
Compliance Report Submitted by User Agency on : 25 Jan 2022
30 Gujarat FP/GJ/TRANS/143615/2021 FC-6/GJB-47/2022-GNR Construction of 33 kV transmission line from Ratadiya PSS to WTG locations of Adani Wind Energy Kutchh Five Limited Transmission Line ADANI WIND ENERGY KUTCH FIVE LIMITED 0.0346 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jun 2021
Stage-I Approval on : 21 Jul 2022
Compliance Report Submitted by User Agency on : 17 Dec 2022
31 Gujarat FP/GJ/Pipeline/144112/2021 6-GJB006/2022-FC Diversion of 4.97 ha of Reserve Forest Land of Laying Irrigation Underground Water pipeline under Tapi- Karanj link pipeline Lift Irrigation Project. Pipeline NWRWS KALPSAR DEPARTMENT VER II PROJECT DIVISION VYARA 4.97 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Jun 2021
Stage-I Approval on : 28 Feb 2022
Compliance Report Submitted by User Agency on : 05 May 2022
32 Gujarat FP/GJ/TRANS/145120/2021 FCA-1021/3-20/21/SF-188/F 66KV S/C (3+1) 630 Sq. mm, UG Cable from 66KV Ghanghali – 3 S/S (GETCO S/S) to M/s.Prabodh steel Pvt. Ltd. village-Ghanghali,Ta. Sihor,Dist.Bhavnagar. Transmission Line GUJARAT ENERGY TRANSMISSION CORP LTD 0.15 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Jul 2021
Stage-I Approval on : 06 Jan 2022
Compliance Report Submitted by User Agency on : 26 Sep 2024
33 Gujarat FP/GJ/TRANS/146196/2021 FCA-1021/3-30/21/SF-246/F 66KV S/C (3+1) 630Sq.mm, underground cable from 220KV Otha Sub-station to 66KV Mahuva (Neswad) Sub-station. Transmission Line GUJARAT ENERGY TRANSMISSION CORP LTD 0.43252 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Aug 2021
Stage-I Approval on : 06 Jan 2022
Compliance Report Submitted by User Agency on : 26 Sep 2024
34 Gujarat FP/GJ/ROAD/156679/2022 FC-6/GJA-74/2023-GNR Div of 78.1014 Ha Protected Forest land for four laning of existing section of Dudhrej-Vana-Malvan Road on SH-19 in Surendranagar district. (4/00 Km to 43/00 Km) Road DEPUTY EXECUTIVE ENGINEER 78.1014 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jun 2022
Stage-I Approval on : 31 Oct 2023
Compliance Report Submitted by User Agency on : 28 Jun 2024
35 Gujarat FP/GJ/ROAD/157025/2022 FC-6/GJA-81/2023-GNR Div of 68.0884 Ha Protected Forest land for four laning of existing section of Malvan Patdi Zainabad Dasada Road on SH-19 in Surendranagar district. (43/00 Km to 77/00 Km) Road DEPUTY EXECUTIVE ENGINEER 68.0884 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Jun 2022
Stage-I Approval on : 21 Dec 2023
Compliance Report Submitted by User Agency on : 27 Jun 2024
36 Haryana FP/HR/ROAD/27251/2017 9-HRB062-2018-CHA construction of Ring road from Tauru road to Alwar road via Engineering College, Medical College and Navodaya School Bai in Nuh Distt. (C.M. Announcement 15242) Road PWD BANDR MEWAT 1.8239232 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Aug 2017
Stage-I Approval on : 20 Aug 2018
Compliance Report Submitted by User Agency on : 23 Jan 2025
37 Haryana FP/HR/WATER/37285/2018 9045 DRINKING WATER PIPELINE FROM JANAULI TO ASAOTI Drinking Water PUBLIC HEALTH ENGINEERING DIVISION PALWAL 0.702 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Dec 2018
Stage-I Approval on : 16 Nov 2019
Compliance Report Submitted by User Agency on : 27 May 2024
38 Haryana FP/HR/Approach/41473/2019 9-HRB036-2022-CHA Access Permission (Entry & Exist) for Affordable Residential Plotted Colony (Under Deen Dayal Jan Awas Yojana (DDJAY-2016) Approach Access REGIONAL CONSTRUCTION PVT. LTD. 0.014 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Aug 2019
Stage-I Approval on : 13 Jul 2022
Compliance Report Submitted by User Agency on : 28 Jan 2025
39 Haryana FP/HR/ROAD/48568/2020 9-HRB076-2021-CHA Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Pkg-I) Road CMU, MATHURA, NHAI 3.9 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Aug 2020
Stage-I Approval on : 22 Jun 2021
Compliance Report Submitted by User Agency on : 15 Jan 2025
40 Haryana FP/HR/Approach/51883/2020 9-HRB139-2022-CHA Construction of Prposed Path for Proposed MS/HSD Retail Outlet. Approach Access INDIAN OIL CORPORATION LIMITED, PANIPAT DIVISIONAL OFFICE, PANIPAT MARKETING COMPLEX, VILLAGE BAHOLI, P.O. PANIPAT REFINERY, DISTRICT PANIPAT (HARYANA) 0.0072 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Oct 2020
Stage-I Approval on : 04 Jul 2023
Compliance Report Submitted by User Agency on : 06 Aug 2024
41 Haryana FP/HR/ROAD/143744/2021 9-HRC141-2021-CHA Rehabilitation and upgradation to four laning of Jind-Gohana-Sonipat road km 0 to 78.837) Road NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI) 16.904 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Jun 2021
Stage-I Approval on : 01 Oct 2021
Compliance Report Submitted by User Agency on : 03 Oct 2024
42 Haryana FP/HR/ROAD/145587/2021 10152 Widening and strengthening of road from Narwana to Tohana MDR-111 district Jind Haryana. Road SDE PWD B&R NARWANA 0.85 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Aug 2021
Stage-I Approval on : 15 Dec 2021
Compliance Report Submitted by User Agency on : 12 May 2024
43 Haryana FP/HR/ROAD/149539/2021 9-HRB037-2023-CHA Construction of 6 lane Greenfield connectivity from DND-Faridabad-Ballabhgarh bypass (from km 32+600) to Jewar International Airport under Bharatmala Pariyojna (Lot-4/Pkg-1) in the State of Haryana un Road CMU, MATHURA, NHAI 0.8886 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Nov 2021
Stage-I Approval on : 10 Apr 2023
Compliance Report Submitted by User Agency on : 08 Sep 2023
44 Haryana FP/HR/ROAD/151320/2022 D-III-10324 Diversion of 0.7934 hac. of Forest Land for construction of 2 Lane ROB on LC No. – 114 on Mandi Adampur to Daroli Road at Adampur in Distt. - Hisar (HR). Road PROVINCIAL DIVISION PWD B&R BR., HISAR 0.7934 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Jan 2022
Stage-I Approval on : 06 Jul 2022
Compliance Report Submitted by User Agency on : 16 Jan 2025
45 Haryana FP/HR/ROAD/153617/2022 9-HRB023-2023-CHA Diversion of forest land for construction of road from Nuh Palwal road (Mannaki) to Jogipur Hathin road (Tain) in Nuh Distt. (CMA No.22706) (Section Tain Hussainpur to Jogipur Hathin road) Road PWD BANDR MEWAT 0.1525 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Mar 2022
Stage-I Approval on : 15 May 2023
Compliance Report Submitted by User Agency on : 23 Jan 2025
46 Jharkhand FP/JH/TRANS/18253/2016 FP/JH/TRANS/18253/2016 132 kV D/C Simdega-Manoharpur Transmission Line Transmission Line JHARKHAND URJA SANCHARAN NIGAM LIMITED 26.814 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 01 Mar 2016
Stage-I Approval on : 08 May 2017
Compliance Report Submitted by User Agency on : 29 Jan 2025
47 Jharkhand FP/JH/MIN/38798/2019 8-56/2009-FC Vol. Pakri Barwadih North-West Quarry (PB-A) Coal Block of M/s NTPC Ltd Mining NTPC - PAKRI BARWADIH COAL MINING PROJECT 331.198 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Feb 2019
Stage-I Approval on : 26 May 2023
Compliance Report Submitted by User Agency on : 30 Nov 2024
48 Karnataka FP/KA/TRANS/115396/2020 F.No.4-KRC1378/2022-BAN Construction of 400 KV Quad D/C Transmission Line in forest lands of Kallumundkuru, Thenkamijaru Villages in Karkal Taluk of Udupi District, Ulipadi Village in Mangalore Taluk, Virakhamba, Vitlamudnuru Villages in Bantwal Taluk of Dakshina Kannada District for a length of 6.756 Km in favour of Udupi Kasargode Transmission Limited, New Delhi Transmission Line UDUPI KASARGODE TRANSMISSION LIMITED 31.079 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Dec 2020
Stage-I Approval on : 27 Oct 2022
Compliance Report Submitted by User Agency on : 18 Jul 2024
49 Kerala FP/KL/ROAD/148616/2021 4-KLC1368/2022-BAN Construction of Twin Tunnel (2+2 lane) with Four Lane Approaches (from existing roads) for providing direct connectivity between Aanakampoyil­ Kalladi-Meppadi in Kozhikode and Wayanad Districts of Ker Road EXECUTIVE ENGINEER KERALA PUBLIC WORKS DEPARTMENT ROADS DIVISION, KOZHIKODE 17.263 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Oct 2021
Stage-I Approval on : 31 Mar 2023
Compliance Report Submitted by User Agency on : 02 Jul 2024
50 Orissa FP/OR/Others/147445/2021 5-ORC548/2023-BHU Srikakulam - Angul Pipeline (SAPL)Project_Mainline Others GAIL INDIA LIMITED 6.1487 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Sep 2021
Stage-I Approval on : 17 Feb 2023
Compliance Report Submitted by User Agency on : 03 Feb 2025