Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/ROAD/12568/2015 G.O.Ms.No.2 Karakavalasa Road to Marika Road EXICUTIVE ENGINEER 4.38 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Sep 2015
Stage-I Approval on : 02 Jan 2019
Compliance Report Submitted by User Agency on : 23 Aug 2023
2 Andhra Pradesh FP/AP/ROAD/33878/2018 G.O.Ms No.133 Diversion of 1.79 Ha in Giddalur Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 1.79 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 May 2018
Stage-I Approval on : 30 Nov 2018
Compliance Report Submitted by User Agency on : 25 Oct 2023
3 Andhra Pradesh FP/AP/ROAD/36092/2018 G.O.Ms.No.03 Formation and Providing BT to the road from Vinayakapuram to Irkampeta of Chinturu mandal Road EEPIUKKD 1.54 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Sep 2018
Stage-I Approval on : 25 Feb 2020
Compliance Report Submitted by User Agency on : 08 Nov 2023
4 Andhra Pradesh FP/AP/IRRIG/36514/2018 G.O.Ms.No.134 Providing drinking water and irrigation facilities to 68 tanks in the upland areas of Kurnool District from left side of HNSS main canal phase-i in Kurnool District Irrigation WATER RESOURCES DEPARTMENT 4.73 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Oct 2018
Stage-I Approval on : 05 Dec 2018
Compliance Report Submitted by User Agency on : 12 Aug 2021
5 Andhra Pradesh FP/AP/ROAD/37747/2018 G.O.Ms.No.34 Road from Vanjari to Korrapadu Road Executive Engineer PR Paderu 1.88 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Dec 2018
Stage-I Approval on : 03 Oct 2019
Compliance Report Submitted by User Agency on : 09 Nov 2023
6 Andhra Pradesh FP/AP/QRY/155444/2022 4-APB189/2022-VIJ Proposal for diversion of 4.84 ha of forest land in compartment no.102, Janapadu RF, Guntur Division for quarry lease for limestone (Minor) filed by Sri G. Pavan Kumar Reddy. Quarrying PAVAN KUMAR REDDY GOTTIMUKKALA 4.84 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 May 2022
Stage-I Approval on : 07 Apr 2023
Compliance Report Submitted by User Agency on : 18 Mar 2024
7 Arunachal Pradesh FP/AR/MIN/23213/2016 3 AN B 053/2018-SHI Diversion of 3.60 ha of forestland for OIL’s drilling location DML-3/1 in Namsang USF, Deomali in Tirap District of Arunachal Pradesh Mining OIL INDIA LIMITED NEF PROJECT 3.6 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Jul 2017
Stage-I Approval on : 31 Aug 2020
Compliance Report Submitted by User Agency on : 10 Sep 2021
8 Assam FP/AS/TRANS/9060/2015 3-AS B 034/2016-SHI 132KV S/C Transmission Line from 220KV Salakati Grid S/S to 132KV/33KV Kokrajhar S/S Transmission Line ASSAM ELECTRICITY GRID CORPORATION LINITED 1.82 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jan 2015
Stage-I Approval on : 25 Jan 2019
Compliance Report Submitted by User Agency on : 24 Feb 2022
9 Assam FP/AS/Pipeline/49586/2020 F. NO 3 AS C 089/2022/GHY Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar. Pipeline INDRADHANUSH GAS GRID LIMITED 9.2755 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Sep 2020
Stage-I Approval on : 24 May 2022
Compliance Report Submitted by User Agency on : 25 Jul 2022
10 Assam FP/AS/Pipeline/55045/2020 3-AS-C-054/2021-GHY Kumchai EPS to Kusijan FGGS Pipeline Pipeline OIL INDIA LIMITED 27.43 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Nov 2020
Stage-I Approval on : 30 Mar 2022
Compliance Report Submitted by User Agency on : 16 Jul 2022
11 Assam FP/AS/Pipeline/119243/2021 3-AN-C-040/2021-GHY Laying of underground Oil & Gas Pipelines along Upper Dehing Reserve Forest portion of Duliajan- Digboi Road, Assam Pipeline OIL INDIA LIMITED 13.43 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Jan 2021
Stage-I Approval on : 30 Mar 2022
Compliance Report Submitted by User Agency on : 25 May 2022
12 Assam FP/AS/TRANS/142618/2021 3-AS-C-093/2022/GHY DIVERSION PROPOSAL OF PROPOSED 18.028 HA AREA OF FOREST LAND FOR CONSTRUCTION AND COMMISSIONING OF 132 KV TRANSMISSION LINE FROM AGIA GSS TO GOALPARA TSS AT RAKHAYASHINI PRF UNDER GOALPARA FOREST DIVISION Transmission Line O/O THE CHIEF PROJECT DIRECTOR, CENTRAL ORGANIZATION FOR RAILWAY ELECTRIFICATION, GUWAHATI 18.028 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 May 2021
Stage-I Approval on : 01 Sep 2022
Compliance Report Submitted by User Agency on : 07 Jun 2024
13 Bihar FP/BR/Others/32115/2018 FP/BR/Others/32115/2018 Establishment of retail out-let (Petrol Pump) dealership of HPCL Others SMT SULEKHA KUMARI 0.012 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Feb 2018
Stage-I Approval on : 30 May 2019
Compliance Report Submitted by User Agency on : 22 Sep 2020
14 Bihar FP/BR/Others/43758/2020 FP/BR/Others/43758/2020 Diversion of 0.0195 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-56 Road in Darbhanga district of Bihar. Others AJAY KUMAR PASWAN 0.0195 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jan 2020
Stage-I Approval on : 29 Jun 2020
Compliance Report Submitted by User Agency on : 17 Sep 2021
15 Bihar FP/BR/Others/46309/2020 FP/BR/Others/46309/2020 Diversion of 0.010725 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of SH-49 in Vaishali district of Bihar. Others SAURABH KUMAR 0.01073 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jun 2020
Stage-I Approval on : 14 Oct 2020
Compliance Report Submitted by User Agency on : 12 Aug 2021
16 Chhattisgarh FP/CG/ROAD/37444/2018 FC-I/IROCH-09/2021 National Highway Authority of India (NHAI) , proposed Up-gradation of Champa-Korba-Chhuri-Katghora Section of NH-149B in the state of Chhattisgarh to two/ four lane with paved shoulder configuration, Package-I (0+00 to 38+150). Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR 4.493 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Feb 2019
Stage-I Approval on : 03 Jan 2022
Compliance Report Submitted by User Agency on : 23 Dec 2024
17 Chhattisgarh FP/CG/OFC/43124/2019 F 5-54/2023/10-2 BharatNet Phase-II Bhoramdeo Sanctuary Kawardha_Division Optical Fibre Cable CHIPS 3.579 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Dec 2019
Stage-I Approval on : 19 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
18 Chhattisgarh FP/CG/OFC/43274/2019 F 5-37/2023/10-2 BharatNet Phase-II Elephant Reserve Ambikapur Optical Fibre Cable CHIPS 1.462 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jan 2020
Stage-I Approval on : 19 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
19 Chhattisgarh FP/CG/OFC/43975/2020 F 5-04/2022/10-2 Bharatnet Phase-II Barnawapara Sanctuary Optical Fibre Cable CHIPS 1.137 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Jan 2020
Stage-I Approval on : 27 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
20 Chhattisgarh FP/CG/OFC/45471/2020 F 5-55/2023/10-2 BharatNet Project Phase-II Indrawati Tiger Reserve Bijapur Optical Fibre Cable CHIPS 5.88 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Aug 2020
Stage-I Approval on : 27 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
21 Chhattisgarh FP/CG/OFC/45530/2020 F 5-27/2023/10-2 BharatNet Project Phase-II Udanti Sitanadi Tiger Reserve, Gariyaband Optical Fibre Cable CHIPS 8.965 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Aug 2020
Stage-I Approval on : 19 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
22 Chhattisgarh FP/CG/OFC/118817/2021 F 5-28/2023/10-2 BharatNet Project Phase-II, Kanger Ghati National Park, Jagdalpur Optical Fibre Cable CHIPS 1.005 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jan 2021
Stage-I Approval on : 19 Dec 2023
Compliance Report Submitted by User Agency on : 02 May 2024
23 Chhattisgarh FP/CG/SCH/153248/2022 FC-II/IROCH-12/2022 TRIBAL DEVELOPMENT KANKER, Establishment of Eklavya Modern Residential School, At Village Surhi, Tehsil-Narharpur, District- North Bastar, Kanker (C.G.) School TRIBAL DEVELOPMENT KANKER 6.5 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Mar 2022
Stage-I Approval on : 04 Oct 2022
Compliance Report Submitted by User Agency on : 23 Dec 2024
24 Chhattisgarh FP/CG/Approach/156074/2022 FC-8/22/2023/IRO-Raipur ALTERNATIVE ROAD FOR TRANSPORTATION OF IRON ORE AT CHHOTEDONGAR IRON ORE MINE Approach Access JAYASWAL NECO INDUSTRIES LIMITED 2.025 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jun 2022
Stage-I Approval on : 29 Feb 2024
Compliance Report Submitted by User Agency on : 24 Jul 2024
25 Dadar & Nagar Haveli FP/DN/IND/28625/2017 6-DNB049/2017-BHO Laying of 11 KV Underground Electricity Line Industry UNOVEL INDUSTRIES PRIVATE LIMITED 0.61 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Aug 2017
Stage-I Approval on : 19 Jan 2018
Compliance Report Submitted by User Agency on : 23 Jul 2024
26 Dadar & Nagar Haveli FP/DN/Others/32569/2018 6-DNB029/2018-BHO M/s. Shri Khatu Shyam Pvt. Ltd. power line connectivity Others DATT INDUSTRIAL SERVICES 0.425547 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Mar 2018
Stage-I Approval on : 01 Jun 2018
Compliance Report Submitted by User Agency on : 09 Dec 2024
27 Delhi FP/DL/RAIL/49562/2020 8B/DLI006/2022-JPR Construction of underground station at Krishna Park and Elevated corridor between Keshopur to Mukarba Chowk for Janakpuri to RK Ashram Corridor of MRTS phase-IV Railway DMRC CPM2 OFFICE 5.2187 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Oct 2020
Stage-I Approval on : 22 Feb 2022
Compliance Report Submitted by User Agency on : 06 May 2022
28 Gujarat FP/GJ/Others/25303/2017 6-GJB021/2018-BHO Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Gir West Distriect Others RELIANCE JIO INFOCOMM LTD 1.6143 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Mar 2017
Stage-I Approval on : 25 May 2018
Compliance Report Submitted by User Agency on : 27 Sep 2023
29 Gujarat FP/GJ/ROAD/27051/2017 FC-6/GJC-78/2023-GNR Consultancy Services for Project Management Phase- I including Preparation of Detailed Project Report for Upgradation of Junction with NH-47-Limbdi-Surendranagar-Dhrangadhra of NH-51 in the State of Gujarat to Two Lane with Paved Shoulder Configuration (Package No: NH/IAHE/15). Road EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION 39.37 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Oct 2017
Stage-I Approval on : 31 Oct 2023
Compliance Report Submitted by User Agency on : 27 Dec 2024
30 Gujarat FP/GJ/Others/33231/2018 6-GJB08/2019-BHO Proposal for grant of permission for laying of 300 mm Ø DI RAW Water Supply Pipeline from Intake Well at Variav to Adani Wilmar Limited at Sunvali in Dist. Surat Others ADANI WILMAR LIMITED 0.8357 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Apr 2018
Stage-I Approval on : 24 May 2019
Compliance Report Submitted by User Agency on : 16 Jul 2019
31 Gujarat FP/GJ/Others/39408/2019 FC-6/GJB-2/2022-GNR Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Kutch District Others RELIANCE JIO INFOCOMM LTD 0.2138 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Mar 2019
Stage-I Approval on : 25 Jan 2022
Compliance Report Submitted by User Agency on : 12 Sep 2023
32 Gujarat FP/GJ/Others/42615/2019 6-GJB020/2020-BHO Laying of underground power cable for electrification of ropeway project on girnar hill Others PGVCL JUNAGADH 2 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Nov 2019
Stage-I Approval on : 30 Jun 2020
Compliance Report Submitted by User Agency on : 05 Aug 2023
33 Gujarat FP/GJ/Others/50281/2020 FC-6/GJB-40/2022-GNR Proposal for laying OFC for Jio Digital Fibre Pvt. Ltd. Patan District Others JIO DIGITAL FIBER PRIVATE LIMITED 0.2934 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 05 Sep 2022
Compliance Report Submitted by User Agency on : 26 Apr 2024
34 Gujarat FP/GJ/OFC/146346/2021 328-33 Proposal for Diversion of 0.084 ha. Forest land for the grant permission for laying GFGNL Optical Fiber Cable line in Dang District Gujarat state. Optical Fibre Cable GFGNL 0.084 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Aug 2021
Stage-I Approval on : 01 Oct 2024
Compliance Report Submitted by User Agency on : 10 Oct 2024
35 Gujarat FP/GJ/ROAD/148923/2021 FC-6/GJC-58/2022-GNR Widening & Strengthening of Junagadh-Bhesan-Parab Vavdi Road Road DEPUTY EXECUTIVE ENGINEER-R&B CITY SUB DIVISION-JUNAGADH 17.24625 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Oct 2021
Stage-I Approval on : 30 Oct 2022
Compliance Report Submitted by User Agency on : 04 Jul 2024
36 Gujarat FP/GJ/ROAD/149516/2021 FC-6/GJC-3/2023-GNR Widening and strengthening of existing carriageway from km. 265/200 to km. 266/200 and from km 273/002 to km 287/905 of NH-56 under NH division Vadodara in the state of Gujarat. Road NH DIVISION, VADODARA 7.283 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Nov 2021
Stage-I Approval on : 06 Feb 2023
Compliance Report Submitted by User Agency on : 15 Apr 2023
37 Gujarat FP/GJ/ROAD/152422/2022 FC-6/GJC-39/2022-GNR Widening & Strengthening of Talala to Ankolvadi road SH-98 between km. 69/000 to 53/000 Road EXECUTIVE ENGINEER ROAD AND BUILDING DIVISION GIRSOMNATH 8.4 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Feb 2022
Stage-I Approval on : 04 Jul 2022
Compliance Report Submitted by User Agency on : 02 Jul 2024
38 Gujarat FP/GJ/Pipeline/154945/2022 FCA-1022/5-17/22/SF-133/F 125 mm Dia MDPE Gas Pipeline Connectivity For Scoda Tubes ltd. Kadi Dist:Mehsana Pipeline SABARMATI GAS LIMITED 0.068 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Apr 2022
Stage-I Approval on : 27 Jul 2022
Compliance Report Submitted by User Agency on : 24 Sep 2024
39 Gujarat FP/GJ/Pipeline/155402/2022 FED/FLP/e-file/6/2023/1888/F 4” Dia Steel Gas Pipeline Connectivity For Sabar Dairy, Ta:Himatnagar, Dist: Sabarkhantha Pipeline SABARMATI GAS LTD 0.0034 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 May 2022
Stage-I Approval on : 10 Aug 2023
Compliance Report Submitted by User Agency on : 16 Jul 2024
40 Haryana FP/HR/Approach/36575/2018 10043 Diversion of forest land of 0.0086Ha. for access to HPCL retail outlet on yamunanagar-Jathlana road at village- Shadipur, dist.- yamunanagar. Approach Access HINDUSTAN PETROLEUM CORPORATION LIMITED 0.0086 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Oct 2018
Stage-I Approval on : 06 Oct 2021
Compliance Report Submitted by User Agency on : 05 Feb 2024
41 Haryana FP/HR/IRRIG/40972/2019 9-HRC048-2020-CHA PARALLEL LINED CHANNEL (PLC) PROJECT FROM RD 0 (DADUPUR HEAD) TO 68220 (HAMIDA HEAD) FOR DIVERSION OF 21.67 HACTARE OF FOREST LAND Irrigation IRRIGATION WATER SERVICES DIVISION DADUPUR 22.94 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Jul 2019
Stage-I Approval on : 25 Feb 2021
Compliance Report Submitted by User Agency on : 28 Nov 2022
42 Haryana FP/HR/Approach/154967/2022 9-HRB123-2023-CHA M/s Guru Amar Industry Ltd. Approach Access GURU AMAR INDUSTRY LIMITED 0.00998 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Apr 2022
Stage-I Approval on : 15 Jun 2023
Compliance Report Submitted by User Agency on : 14 Aug 2023
43 Jharkhand FP/JH/Others/17529/2016 Van bhumi 26/2015 Institute of Hotel Management Catering Technology Others TOURISM DEPARTMENT 4.06 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Jan 2016
Stage-I Approval on : 21 Apr 2016
Compliance Report Submitted by User Agency on : 26 Dec 2024
44 Jharkhand FP/JH/TRANS/45211/2020 FP/JH/TRANS/45211/2020 132 KV barhi to Itkhori Transmission Line against NIT 306 Pkg Transmission Line JHARKHAND URJA SANCHARAN NIGAM LIMITED 28.9394 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Mar 2020
Stage-I Approval on : 04 Mar 2022
Compliance Report Submitted by User Agency on : 24 Sep 2024
45 Karnataka FP/KA/ROAD/7440/2014 8-02/1995-FC vol Approach Road to Ramgad Iron Ore mine (M.L.No.2547) Road ZEENATH TRANSPORT COMPANY 9.4 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Nov 2014
Stage-I Approval on : 19 Dec 2017
Compliance Report Submitted by User Agency on : 04 Dec 2024
46 Karnataka FP/KA/TRANS/8118/2014 No.4-KRB1127/2018-BAN Estimate for Establishing 1*5MVA,33/11KV substation at Subramanya inputtur Division ,Sullia Taluk Transmission Line ASSISTANT EXECUTIVE ENGINEER 0.918 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Dec 2014
Stage-I Approval on : 17 Oct 2019
Compliance Report Submitted by User Agency on : 27 Aug 2024
47 Karnataka FP/KA/WATER/15630/2015 FEE 87 FLL 2016 PROVIDING MULTI VILLAGE WATER SUPPLY TO KAROPADY & OTHER 79 HABITATIONS IN BANTWAL TALUK Drinking Water RURAL DRINKING WATER SUPPLY AND SANITATION DEPARTMENT 0.03 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Sep 2015
Stage-I Approval on : 04 Nov 2016
Compliance Report Submitted by User Agency on : 10 Jan 2024
48 Karnataka FP/KA/WATER/24468/2017 FEE 09 FLL 2018 providing drinking water supply pipeline extension at kalmale in bantwal taluk Drinking Water RURAL DRINKING WATER SUPPLY AND SANITATION DEPARTMENT 0.01255 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Feb 2017
Stage-I Approval on : 12 Feb 2018
Compliance Report Submitted by User Agency on : 10 Jan 2024
49 Karnataka FP/KA/Others/31165/2018 8-17/1994-FC Vol. SMIORE Downhill Conveyor System (DCS) from Kammathuru Iron Ore Mine to PMBR (BMM) Siding towards Mining Related Infrastructure development under Comprehensive Environment Plan for Mining Impact Zone (CEPMIZ) in Mining Lease No. 2678 (Old 2580/1179). Others THE SANDUR MANGANESE AND IRON ORES LIMITED 2.4313888 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Jan 2018
Stage-I Approval on : 15 Oct 2019
Compliance Report Submitted by User Agency on : 07 Dec 2024
50 Karnataka FP/KA/IRRIG/35763/2018 4-KRB1221/2020 Laying of pipeline to fill 60 tanks of Harpanahalli Taluk from Tungabhadra River Irrigation EXECUTIVE ENGINEER KNNL BHADRA CANAL DIVISION DAVANGERE 0.54 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Sep 2018
Stage-I Approval on : 29 Jan 2020
Compliance Report Submitted by User Agency on : 23 Nov 2021
1234
Please wait ...