Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/ROAD/7806/2014
|
8B/UCP/06/16/2016/FC
|
Construction of Deman to desau Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
5.868
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2014
|
Stage-I Approval on
|
:
|
25 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2017
|
|
|
|
18 Sep 2017
|
2
|
Uttarakhand
|
FP/UK/ROAD/18757/2016
|
8B/UCP/06/59/2017/FC
|
Fatgali-Damoli-Malujhal-Ukhalso motor road in District Bageshwar (CM Ghosna-804/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
4.103
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2016
|
Stage-I Approval on
|
:
|
27 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
|
3
|
Uttarakhand
|
FP/UK/ROAD/11421/2015
|
8B/UCP/06/152/2016/FC
|
Construction of Motor Road from Thirpak Kandai Motor Road Km 02 to Choprakot.
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.367
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2015
|
Stage-I Approval on
|
:
|
20 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2022
|
|
|
|
30 Mar 2022
|
4
|
Uttarakhand
|
FP/UK/ROAD/11424/2015
|
1(553)/2015
|
Construction of Bhandarigaon Garhsera motor road from km 14 of Dehalchauri Pauri Motor Road under CM village road connectivity in District Pauri
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.485
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2015
|
Stage-I Approval on
|
:
|
07 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
13 Oct 2017
|
|
|
|
09 Jan 2019
|
5
|
Uttarakhand
|
FP/UK/ROAD/41397/2019
|
8B/UCP/06/113/2020/FC
|
Hindolakhal Ghandiyaldhar (Mayali) to Junior High School Danda Motor road
|
Road
|
PWD
|
1.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jul 2019
|
Stage-I Approval on
|
:
|
26 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2022
|
|
|
|
06 Oct 2022
|
6
|
Uttarakhand
|
FP/UK/ROAD/27520/2017
|
8B/UCP/06/11/2018/FC
|
Construction of chakrata lakhamandal to rangau motor road
|
Road
|
EXECUTIVE ENGINEER
|
1.736
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jul 2017
|
Stage-I Approval on
|
:
|
16 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jul 2018
|
|
|
|
27 Sep 2018
|
7
|
Uttarakhand
|
FP/UK/Others/151759/2022
|
8B/UCP/09/40/2022/FC
|
Construction of Dovelepment Centre.
|
Others
|
ZILA SAINIK KALYAN EVAM PUNARVAS HALDWANI, NAINITAL.
|
0.063
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2022
|
Stage-I Approval on
|
:
|
05 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Aug 2024
|
|
|
|
11 Sep 2024
|
8
|
Uttarakhand
|
FP/UK/ROAD/38667/2019
|
8B/UCP/06/36/2020/FC
|
Construction of Sumari Virangaon Jakhal Motor road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.775
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2019
|
Stage-I Approval on
|
:
|
29 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2022
|
|
|
|
14 Jul 2022
|
9
|
Uttarakhand
|
FP/UK/ROAD/23820/2017
|
8B/UCP/06/32/2018/FC
|
construction of soughar pantgoun chmarkhan motor road single line to der line
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.612
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2017
|
Stage-I Approval on
|
:
|
27 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Sep 2024
|
|
|
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/9767/2015
|
8B/UCP/06/71/2015-FC
|
kimi band to rashtari billa biruntha kandau mr
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2015
|
Stage-I Approval on
|
:
|
15 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
16 Sep 2016
|
|
|
|
28 Aug 2017
|
11
|
Uttarakhand
|
FP/UK/ROAD/9783/2015
|
8B/UCP/06/119/2016/FC
|
Construction of Koti Band to Ghathora Motor Road and 2 R.C.C. Bridge in district Chamoli
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.099
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2015
|
Stage-I Approval on
|
:
|
07 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2024
|
|
|
|
|
12
|
Uttarakhand
|
FP/UK/ROAD/9582/2015
|
8B/UCP/06/60/2015
|
Construction of Meeng Gadera to Dangtoli Motor Road under PMGSY in Phase-XIII
|
Road
|
RES PMGSY KARANPERAYAG
|
3.919
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2015
|
Stage-I Approval on
|
:
|
14 Aug 2015
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2018
|
|
|
|
19 Jul 2018
|
13
|
Uttarakhand
|
FP/UK/ROAD/150430/2021
|
8B/UCP/06/56/2022/FC
|
Diversion of 2.183 ha of forest land for construction of Rudrapur Ring Road in the state of Uttrakhand under FCA 1980
|
Road
|
NHAI, PIU-RUDRAPUR
|
2.183
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2021
|
Stage-I Approval on
|
:
|
26 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2024
|
|
|
|
02 May 2024
|
14
|
Uttarakhand
|
FP/UK/ROAD/43650/2019
|
8B/UCP/06/80/2020/FC
|
Construction of Saur to Osala motor road
|
Road
|
PMGSYID PUROLA
|
22.2165
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2019
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
15 Dec 2022
|
|
|
|
10 Feb 2023
|
15
|
Uttarakhand
|
FP/UK/ROAD/29011/2017
|
8B/UCP/06/37/2019/FC
|
Construction of Didihat Aadichaura Motor Road to Hunera Motor Road Under PMGSY Didihat
|
Road
|
P.M.G.S.Y Didihat
|
8.21
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2018
|
Stage-I Approval on
|
:
|
13 Sep 2019
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2022
|
|
|
|
31 Aug 2022
|
16
|
Uttarakhand
|
FP/UK/ROAD/9004/2014
|
8B/UCP/06/144/2015-FC
|
Construction of Chamadkhan Kanoli Selapani Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
0.398
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2014
|
Stage-I Approval on
|
:
|
08 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
05 Mar 2016
|
|
|
|
04 Jan 2017
|
17
|
Uttarakhand
|
FP/UK/ROAD/7833/2014
|
1(412)/2015
|
Construction of Gangolihat to Rankot Upreti Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.5375
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2014
|
Stage-I Approval on
|
:
|
13 Aug 2015
|
Compliance Report Submitted by User Agency on
|
:
|
23 Oct 2018
|
|
|
|
14 Sep 2020
|
18
|
Uttarakhand
|
FP/UK/ROAD/8985/2014
|
8B/UCP/06/12/2015
|
Didihat (Devichona) to Jamtari motor road
|
Road
|
PUBLIC WORK DEPARTMENT
|
8.1123
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2014
|
Stage-I Approval on
|
:
|
31 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jul 2023
|
|
|
|
23 Aug 2023
|
19
|
Uttarakhand
|
FP/UK/ROAD/8970/2014
|
1(59)/15
|
Construction of Barikot-Khureri (Kotiyag) Motor Road
|
Road
|
PMGSY
|
0.991
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2014
|
Stage-I Approval on
|
:
|
01 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2017
|
|
|
|
04 May 2018
|
20
|
Uttarakhand
|
FP/UK/ROAD/7789/2014
|
8B/UCP/06/31/2015
|
Salla-Sail To Rautgarha Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
6.79
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2014
|
Stage-I Approval on
|
:
|
23 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2023
|
|
|
|
31 Jul 2023
|
21
|
Uttarakhand
|
FP/UK/ROAD/8961/2014
|
8B/UCP/06/122/2015/FC
|
Padair Gaon to Pairi Motor Road
|
Road
|
PMGSY
|
10.71
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2014
|
Stage-I Approval on
|
:
|
27 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2020
|
|
|
|
29 Sep 2020
|
22
|
Uttarakhand
|
FP/UK/ROAD/146609/2021
|
8B/UCP/06/14/2023/FC
|
Improvement and up-gradation of NH-74 (New NH-30) stretch from Bareilly to Sitarganj under Bharatmala Pariyojana Lot-4/Package-2 in the state of Uttar Pradesh and Uttarakhand
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY
|
0.7905
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
28 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2024
|
|
|
|
17 Jun 2024
|
23
|
Uttarakhand
|
FP/UK/ROAD/35451/2018
|
8B/UCP/06/68/2019/FC
|
Madmanley Dobans KM10 to Dhaulkanda
|
Road
|
PUBLIC WORK DEPARTMENT
|
6.23
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2018
|
Stage-I Approval on
|
:
|
28 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2023
|
|
|
|
22 Mar 2023
|
24
|
Uttarakhand
|
FP/UK/TRANS/35527/2018
|
8B/UCP/07/147/2018/FC
|
Construction of 220 kV D/C Jauljibi Pithoragarh transmission line
|
Transmission Line
|
POWERGRID FATEHGARH TRANSMISSION LIMITED
|
58.449
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2018
|
Stage-I Approval on
|
:
|
31 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 Oct 2021
|
|
|
|
29 Nov 2021
|
25
|
Uttarakhand
|
FP/UK/ROAD/147686/2021
|
8B/UCP/06/47/2022/FC
|
Diversion of forest land for the development of 6-lane (greenfield) access-controlled spur to Haridwar UP/Uttarakhand Boarder near Manakpur Adampur village (Ch:19+070) to Manoharpur village (Ch: 50+090) in Haridwar district of Uttarakhand State.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDAI PIU ROORKEE
|
1.6535
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2021
|
Stage-I Approval on
|
:
|
25 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Nov 2023
|
|
|
|
21 Nov 2023
|
26
|
Uttarakhand
|
FP/UK/ROAD/15752/2015
|
1(347)/2016
|
Construction of Tanakpur-Tawaghat M/R to Silaad M/R under PMGSY Champawat
|
Road
|
PMGSY
|
0.81
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2015
|
Stage-I Approval on
|
:
|
05 Dec 2016
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2020
|
|
|
|
14 Sep 2020
|
27
|
Uttarakhand
|
FP/UK/IRRIG/29972/2017
|
8B/UCP/02/45/2018/FC
|
Construction of Suryadhar Lake
|
Irrigation
|
IRRIGATION DEPARTMENT UTTARAKHAND
|
3.69
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2017
|
Stage-I Approval on
|
:
|
24 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2019
|
|
|
|
07 Aug 2019
|
28
|
Uttarakhand
|
FP/UK/ROAD/16302/2015
|
8B/UCP/06/256/2016/FC
|
CHAUMASI TO NIVATTAR MOTAR ROAD
|
Road
|
EECDPWDUKM
|
0.755
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2015
|
Stage-I Approval on
|
:
|
16 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/16309/2015
|
8B/UCP/06/60/2016/FC
|
Santi Bazar-Mathkhal-Talla Doba motor road in District-Bageshwar (CM Ghosna-663/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.993
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2015
|
Stage-I Approval on
|
:
|
13 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2024
|
|
|
|
|
30
|
Uttarakhand
|
FP/UK/ROAD/8123/2014
|
8B/UCP/06/48/2015/FC
|
Construction of Naugoan Bukundi Motor Road Km 15.00 to 21.00
|
Road
|
EXECUTIVE ENGINEER
|
4.86
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2014
|
Stage-I Approval on
|
:
|
26 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2022
|
|
|
|
11 Jan 2023
|
31
|
Uttarakhand
|
FP/UK/ROAD/11378/2015
|
8B/UCP/06/255/2015/FC
|
Jainti-Banzdhar - Malli Binola to Talli Binola Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
0.45
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2015
|
Stage-I Approval on
|
:
|
06 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2021
|
|
|
|
30 Jun 2021
|
32
|
Uttarakhand
|
FP/UK/ROAD/11075/2015
|
1(395)/2015
|
Lostu Ghandiyal hoandu to ringoli motor road
|
Road
|
PWD
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2015
|
Stage-I Approval on
|
:
|
06 Aug 2015
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2016
|
|
|
|
20 Jun 2016
|
33
|
Uttarakhand
|
FP/UK/ROAD/26823/2017
|
8B/UCP/06/54/2017/FC
|
Construction of Tunnel at Silkyara bend from Km. 24.300 to Km.51.900 on NH-134(Dharasu-Yamunotri road) of district Uttarkashi in the state of Uttarakhand (Chardham Rajmarg Vikas Priyojna)
|
Road
|
MORTH (NHIDCL)
|
25.825
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2017
|
Stage-I Approval on
|
:
|
23 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2017
|
|
|
|
21 Jul 2020
|
34
|
Uttarakhand
|
FP/UK/Others/48097/2020
|
8B/UCP/09/111/2020/FC
|
Renovation of George Everest Heritage Park at Mussoorie, District Dehradun Uttarakhand
|
Others
|
UTTARAKHAND TOURISM DEVELOPMENT BOARD
|
0.8886
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
Stage-I Approval on
|
:
|
22 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jan 2021
|
|
|
|
29 Jan 2021
|
35
|
Uttarakhand
|
FP/UK/ROAD/41387/2019
|
8B/UCP/06/187/2019/FC
|
RAMA TO SYALUKA
|
Road
|
PMGSYID PUROLA
|
4.536
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2019
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
|
36
|
Uttarakhand
|
FP/UK/ROAD/14233/2015
|
1(598)/2015
|
construction of Bariely Almora motor road to Sirsa under PMGSY
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.9212
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2015
|
Stage-I Approval on
|
:
|
07 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 Feb 2017
|
|
|
|
16 Aug 2017
|
37
|
Uttarakhand
|
FP/UK/ROAD/13608/2015
|
8B/UCP/06/220/2015/908
|
Construction of Mulakot Kande Bhueya Motor Road in district Champawat
|
Road
|
PUBLIC WORKS DEPARTMENT
|
3.15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2015
|
Stage-I Approval on
|
:
|
05 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
10 Mar 2017
|
|
|
|
29 Mar 2017
|
38
|
Uttarakhand
|
FP/UK/WATER/38629/2019
|
2(52)/2019
|
Construction of Rishikesh Dehat Water Supply Scheme (Peri Urban) Funded by World Bank
|
Drinking Water
|
JAL BHAWAN UTTARAKHAND JAL SANSTHAN
|
0.372
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2019
|
Stage-I Approval on
|
:
|
10 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2019
|
|
|
|
26 Dec 2019
|
39
|
Uttarakhand
|
FP/UK/ROAD/9770/2015
|
8B/UCP/06/23/2016/FC
|
Extention of Silogi-Ghansali Motor Road
|
Road
|
PWD LANSDOWNE
|
1.53
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2015
|
Stage-I Approval on
|
:
|
26 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
28 Aug 2019
|
|
|
|
04 Jun 2020
|
40
|
Uttarakhand
|
FP/UK/ROAD/9662/2015
|
1(14)/2016
|
construction of kud kotla motor road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.0415
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2015
|
Stage-I Approval on
|
:
|
29 Feb 2016
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2016
|
|
|
|
10 Jan 2017
|
41
|
Uttarakhand
|
FP/UK/ROAD/9709/2015
|
8B/UCP/06/167/2016/FC
|
kharadi to syalna bhansari M/R
|
Road
|
PMGSYID PUROLA
|
3.64
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2015
|
Stage-I Approval on
|
:
|
11 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
23 Sep 2018
|
|
|
|
27 Nov 2018
|
42
|
Uttarakhand
|
FP/UK/ROAD/9773/2015
|
1(29/2015
|
Construction of Almora-Baijnath-Gwaldam-Karanprayag Road, km-100 (Guram State) to Vijaypur Motor Road under PMGSY in Phase-XIII
|
Road
|
RES PMGSY KARANPERAYAG
|
3.71
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2015
|
Stage-I Approval on
|
:
|
20 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
19 Aug 2017
|
|
|
|
02 May 2018
|
43
|
Uttarakhand
|
FP/UK/ROAD/9756/2015
|
1(224)/2015
|
Construction of Kiranu Dhuniyara Thurindadhar Motor Road in Block Mori District Uttarkashi, Under CM Ghosna 246/2013
|
Road
|
PWD
|
3.532995
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2015
|
Stage-I Approval on
|
:
|
01 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
02 Mar 2016
|
|
|
|
04 Apr 2016
|
44
|
Uttarakhand
|
FP/UK/VELEC/31089/2017
|
8B/UCP/09/29/2018
|
Electrification of village Salra of block-Mori in district-Uttarkashi under DDUGJY.
|
Village Electricity
|
UPCL
|
4.25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2017
|
Stage-I Approval on
|
:
|
29 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
15 Oct 2018
|
|
|
|
10 Dec 2018
|
45
|
Uttarakhand
|
FP/UK/ROAD/22245/2016
|
8B/UCP/06/72/2017/FC
|
Aamani to Garakot Motor road
|
Road
|
PWD
|
1.629
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2016
|
Stage-I Approval on
|
:
|
26 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2019
|
|
|
|
18 Feb 2019
|
46
|
Uttarakhand
|
FP/UK/ROAD/17292/2015
|
8B/UCP/06/111/2016
|
construction of road from tartik (Jakholi) to Toli Talli Motor Road.
|
Road
|
PMGSY
|
6.4046
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2015
|
Stage-I Approval on
|
:
|
26 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2018
|
|
|
|
06 Jul 2018
|
47
|
Uttarakhand
|
FP/UK/ROAD/8979/2014
|
1(224)/2016
|
C/O Nainital Kaladhungi Motor Road km 20 to Nalni
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.495
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2014
|
Stage-I Approval on
|
:
|
02 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
21 May 2022
|
|
|
|
14 Feb 2020
|
48
|
Uttarakhand
|
FP/UK/ROAD/8986/2014
|
8B/UCP/06/118/2015-FC/934
|
Extension of Kunnigard Hiruli Bazar Motor Road Upto Rampur Chaukhutiya
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.35
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2014
|
Stage-I Approval on
|
:
|
09 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2024
|
|
|
|
|
49
|
Uttarakhand
|
FP/UK/ROAD/12309/2015
|
8B/UCP/06/224/2015/FC
|
DHANKRI KHAL TOK TWO CHOKI KHAL VIA KASANA VICHALA M/R
|
Road
|
PWD
|
1.08
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
Stage-I Approval on
|
:
|
21 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2024
|
|
|
|
|
50
|
Uttarakhand
|
FP/UK/ROAD/12314/2015
|
8B/UCP/06/55/2015/FC
|
Construction of Bhagwati to Timta Motor Road under PMGSY, length 15.90 km. in Dist. Almora, Legislative assembly area Dwarahat.
|
Road
|
PMGSY
|
9.153
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
Stage-I Approval on
|
:
|
28 Sep 2018
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2019
|
|
|
|
29 Mar 2019
|
|