Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Haryana
|
FP/HR/Approach/51883/2020
|
9-HRB139-2022-CHA
|
Construction of Prposed Path for Proposed MS/HSD Retail Outlet.
|
Approach Access
|
INDIAN OIL CORPORATION LIMITED, PANIPAT DIVISIONAL OFFICE, PANIPAT MARKETING COMPLEX, VILLAGE BAHOLI, P.O. PANIPAT REFINERY, DISTRICT PANIPAT (HARYANA)
|
0.0072
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
Stage-I Approval on
|
:
|
04 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2024
|
|
|
|
25 Apr 2025
|
2
|
Haryana
|
FP/HR/TRANS/142899/2021
|
9-HRB042-2022-CHA
|
Construction of 132 KV S/C Transmission Line from 220 KV Sub Station Deroli Ahir to Seka under Forest division and district Mahendergarh Hayrana.
|
Transmission Line
|
HVPNL REWARI
|
0.5352
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jul 2021
|
Stage-I Approval on
|
:
|
26 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
07 Apr 2025
|
3
|
Haryana
|
FP/HR/TRANS/140597/2021
|
9-HRB093-2021-CHA
|
Construction of 220 KV DC line from Existing 400/220 KV Sub Station Dhanonda to Proposed 220 KV Sub Station Deroli Ahir in district Mahendergarh Haryana.
|
Transmission Line
|
HVPNL REWARI
|
0.8085
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2021
|
Stage-I Approval on
|
:
|
29 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
07 Apr 2025
|
4
|
Haryana
|
FP/HR/Approach/41473/2019
|
9-HRB036-2022-CHA
|
Access Permission (Entry & Exist) for Affordable Residential Plotted Colony (Under Deen Dayal Jan Awas Yojana (DDJAY-2016)
|
Approach Access
|
REGIONAL CONSTRUCTION PVT. LTD.
|
0.014
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2019
|
Stage-I Approval on
|
:
|
13 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jan 2025
|
|
|
|
27 Mar 2025
|
5
|
Haryana
|
FP/HR/Approach/141354/2021
|
9-HRB068-2022-CHA
|
M/s Damaira Pharmaceuticals Pvt. Ltd.
|
Approach Access
|
M/S DAMAIRA PHARMACEUTICALS PRIVATE LTD
|
0.0144
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2021
|
Stage-I Approval on
|
:
|
26 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2025
|
|
|
|
27 Mar 2025
|
6
|
Haryana
|
FP/HR/ROAD/149539/2021
|
9-HRB037-2023-CHA
|
Construction of 6 lane Greenfield connectivity from DND-Faridabad-Ballabhgarh bypass (from km 32+600) to Jewar International Airport under Bharatmala Pariyojna (Lot-4/Pkg-1) in the State of Haryana un
|
Road
|
CMU, MATHURA, NHAI
|
0.8886
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2021
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2023
|
|
|
|
25 Mar 2025
|
7
|
Haryana
|
FP/HR/Approach/154967/2022
|
9-HRB123-2023-CHA
|
M/s Guru Amar Industry Ltd.
|
Approach Access
|
GURU AMAR INDUSTRY LIMITED
|
0.00998
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2022
|
Stage-I Approval on
|
:
|
15 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2023
|
|
|
|
21 Feb 2025
|
8
|
Haryana
|
FP/HR/Others/9304/2015
|
9-HRB074-2016-CHA
|
M/S SANDHU MARRIAGE PALACE
|
Others
|
SANDHU MARRIAGE PALACE
|
0.0032
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2015
|
Stage-I Approval on
|
:
|
07 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2020
|
|
|
|
20 Feb 2025
|
9
|
Haryana
|
FP/HR/ROAD/40712/2019
|
9-HRB090-2019-CHA
|
Diversion of 0.90 ha of forest land for Wdg. & Stg. of Meerut Sonipat Gohana Assand Kaithal Patiala road (Assand Kaithal Cheeka Patiala road ) S. H. No. 11 Km. Km. 231.44 to 234.21 & RD 234.41 to 234.
|
Road
|
EXECUTIVE ENGINEER
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2019
|
Stage-I Approval on
|
:
|
22 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2020
|
|
|
|
29 Jan 2025
|
10
|
Haryana
|
FP/HR/Approach/155085/2022
|
9-HRB168-2023-CHA
|
Diversion of forest land for access to the Retail Outlet of Bharat Petroleum Corporation Ltd. at Kawartan on Kaithal to Kawartan Road at RDKM 10.930 (RHS) Tehsil and, Distt. Kaithal, Haryana bearing
|
Approach Access
|
BPCL AMBALA
|
0.0544
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jul 2022
|
Stage-I Approval on
|
:
|
17 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Sep 2024
|
|
|
|
08 Jan 2025
|
11
|
Haryana
|
FP/HR/ROAD/43866/2020
|
9-HRB026-2020-CHA
|
WIDENING AND STRENGTHENING OF LINK ROAD FROM CHHACHHRAUI-BILASPUR TO PANCHMUKHI HANUMAN MANDIR (ID 717) (0.00 TO 0.54 IN DISTRICT YAMUNA NAGAR
|
Road
|
PWD B AND R HARYANA
|
0.108
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jan 2020
|
Stage-I Approval on
|
:
|
01 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Feb 2024
|
|
|
|
03 Jan 2025
|
12
|
Haryana
|
FP/HR/Approach/145097/2021
|
9-HRB024-2022-CHA
|
Establishment of Kalyani Hari Charitable Trust Building
|
Approach Access
|
KALYANI HARI CHARITABLE TRUST
|
0.0119
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jul 2021
|
Stage-I Approval on
|
:
|
21 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2024
|
|
|
|
27 Dec 2024
|
13
|
Haryana
|
FP/HR/Approach/148593/2021
|
9-HRB013-2022-CHA
|
Pratithi Organic Foods Private Limited
|
Approach Access
|
PRATITHI ORGANIC FOODS PRIVATE LIMITED
|
0.0053
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2021
|
Stage-I Approval on
|
:
|
02 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Nov 2024
|
|
|
|
27 Dec 2024
|
14
|
Haryana
|
FP/HR/Approach/30895/2017
|
9-HRB042-2018-CHA
|
Shri Bala Ji Rice Mill Village Jagmalwali
|
Approach Access
|
MS SHRI BALAJI RICE MILL
|
0.015652
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2017
|
Stage-I Approval on
|
:
|
28 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
05 Dec 2024
|
15
|
Haryana
|
FP/HR/Canal/152229/2022
|
9-HRC135-2022-CHA
|
Diversion of 33.71 Ha of Forest Land for construction of channel for supply 180 Cs water to Nuclear Power Plant at Gorakhpur, Tehsil & District Fatehabad through old abandoned Sirsa Branch from RD 388
|
Canal
|
EXECUTIVE ENGINEER ADAMPUR WATER SERVICES DIVISION HISAR
|
33.71
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2022
|
Stage-I Approval on
|
:
|
13 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Nov 2024
|
|
|
|
04 Dec 2024
|
16
|
Haryana
|
FP/HR/Approach/150340/2021
|
9-HRB150-2023-CHA
|
Construction of approach access for retail outlet of BPCL on Ballabhgarh to Sohna road, at village Nimaut tehsil Sohna district Guruguram Haryana.
|
Approach Access
|
BHARAT PETROLEUM CORPORATION LIMITED REWARI
|
0.0132
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2021
|
Stage-I Approval on
|
:
|
06 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2024
|
|
|
|
04 Dec 2024
|
17
|
Haryana
|
FP/HR/Approach/33604/2018
|
9-HRB170-2018-CHA
|
M/s Bhagat Rice Mill
|
Approach Access
|
M/S BHAGAT RICE MILL
|
0.0104
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2018
|
Stage-I Approval on
|
:
|
27 Sep 2018
|
Compliance Report Submitted by User Agency on
|
:
|
08 Mar 2019
|
|
|
|
04 Dec 2024
|
18
|
Haryana
|
FP/HR/Approach/36230/2018
|
9-HRB058-2021-CHA
|
Aloft Industries Pvt. Ltd.
|
Approach Access
|
ALOFT INDUSTRIES PRIVATE LIMITED
|
0.0057
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Oct 2018
|
Stage-I Approval on
|
:
|
22 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Sep 2024
|
|
|
|
03 Dec 2024
|
19
|
Haryana
|
FP/HR/TRANS/155970/2022
|
9-HRB189-2023-CHA
|
Diversion of 0.474 Ha. of Forest Land For 132 KV DC Jagadhri TSS to Tapri TSS Transmission Line in District Yamuna Nagar
|
Transmission Line
|
DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED
|
0.474
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2022
|
Stage-I Approval on
|
:
|
12 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 Sep 2024
|
|
|
|
03 Dec 2024
|
20
|
Haryana
|
FP/HR/IRRIG/152751/2022
|
9-HRB129-2023-CHA
|
Remodeling of Badola Minor from RD 0-24600 having chronic tails to feed
|
Irrigation
|
EXECUTIVE ENGINEER SIWANI WATER SERVICES DIVISION BHIWANI
|
0.892
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2022
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Nov 2024
|
|
|
|
03 Dec 2024
|
21
|
Haryana
|
FP/HR/ROAD/17701/2016
|
9-HRC107-2016-CHA
|
WIDENING OF ROAD
|
Road
|
PHED
|
7.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2016
|
Stage-I Approval on
|
:
|
30 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2024
|
|
|
|
25 Nov 2024
|
22
|
Haryana
|
FP/HR/ROAD/125491/2021
|
9-HRB026-2022-CHA
|
Diversion of 3.4912 hectare forest land for special repair for improvement by way of 4 lanning Faridabad Tigaon road from Km 0.00 to 1.18 & km 3.02 to 10.50 In Faridabad District CM Announcement code 12421 dated 17.04.2016
|
Road
|
XEN PWD FBD
|
3.4912
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2021
|
Stage-I Approval on
|
:
|
07 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2024
|
|
|
|
21 Nov 2024
|
23
|
Haryana
|
FP/HR/ROAD/32141/2018
|
9-HRB087-2018-CHA
|
Construction of 2 Lane ROB at LC No. 100
|
Road
|
EXECUTIVE ENGINEER HISAR
|
1.965
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2018
|
Stage-I Approval on
|
:
|
13 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
19 Nov 2024
|
24
|
Haryana
|
FP/HR/Approach/150815/2022
|
9-HRB146-2023-CHA
|
The Next Generation Trust on Khasra No. 111 // 10/2, 11, 9/2/2/2 on Madanheri to Jind-Bhiwani
|
Approach Access
|
NEXT GENERATION TRUST HISAR
|
0.003
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jan 2022
|
Stage-I Approval on
|
:
|
18 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Sep 2024
|
|
|
|
12 Nov 2024
|
25
|
Haryana
|
FP/HR/Approach/150701/2021
|
9-HRB153-2023-CHA
|
Diversion of 0.0035 Ha. of Forest Land for access to approach road to the Proposed Site plan for M/s Modern Steels Industry at Village - Sarakpur Teh. - Raipur Rani, Distt. - Panchkula (HARYANA)
|
Approach Access
|
MODERN STEEL INDUSTRIES
|
0.0035
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2021
|
Stage-I Approval on
|
:
|
03 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Sep 2024
|
|
|
|
12 Nov 2024
|
26
|
Haryana
|
FP/HR/Others/23935/2017
|
9-HRB050-2017-CHA
|
BADHWAR BHARAT GAS CONSTRUCTION OF PATH FOR LPG GODOWN
|
Others
|
BADHWAR BHARAT GAS
|
0.0011137392
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2017
|
Stage-I Approval on
|
:
|
15 Nov 2017
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2024
|
|
|
|
22 Oct 2024
|
27
|
Haryana
|
FP/HR/ROAD/48699/2020
|
9-HRB196-2021-CHA
|
Diversion of 0.44 hectare forest land for strengthening of service path by constructing a road from Ballabgarh Sector 56 to village Madalpur & Fatehpur km 0.00 to 3.85 on bank of Gurgaon canal in Fari
|
Road
|
XEN PWD FBD
|
0.44
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2020
|
Stage-I Approval on
|
:
|
09 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2024
|
|
|
|
01 Oct 2024
|
28
|
Haryana
|
FP/HR/Approach/39653/2019
|
9-HRB006-2023-CHA
|
CNG PUMP
|
Approach Access
|
INDRAPRASTHA GAS LTD
|
0.01377
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2019
|
Stage-I Approval on
|
:
|
14 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2024
|
|
|
|
25 Sep 2024
|
29
|
Haryana
|
FP/HR/ROAD/34109/2018
|
9-HRB148-2018-CHA
|
for Improvement of road Dikadla to Atta road at RD 0 to 2660 in Distt. Panipat (Haryana).
|
Road
|
PWD (B&R) PANIPAT (HARYANA)
|
0.399
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jun 2018
|
Stage-I Approval on
|
:
|
12 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
13 May 2024
|
|
|
|
20 Sep 2024
|
30
|
Haryana
|
FP/HR/Approach/157037/2022
|
9-HRB152-2023-CHA
|
Gupta Resorts
|
Approach Access
|
GOBIND PAL
|
0.0059
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2022
|
Stage-I Approval on
|
:
|
25 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2024
|
|
|
|
03 Sep 2024
|
31
|
Haryana
|
FP/HR/Approach/148940/2021
|
9-HRB094-2023-CHA
|
proposed restail outlet for bpcl village harnaul tehsil and dis. yamunanagar haryana on topara Saharanpur byepass road.
|
Approach Access
|
BPCL AMBALA
|
0.0649
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2021
|
Stage-I Approval on
|
:
|
20 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
03 Sep 2024
|
32
|
Haryana
|
FP/HR/Approach/150372/2021
|
9-HRB151-2023-CHA
|
Dhaba belonging to Balraj Singh S/o Sh. Ajaib Singh
|
Approach Access
|
BALRAJ SINGH S/O SH. AJAIB SINGH
|
0.0344
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2021
|
Stage-I Approval on
|
:
|
15 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2024
|
|
|
|
03 Sep 2024
|
33
|
Haryana
|
FP/HR/Others/34868/2018
|
9-HRB081-2022-CHA
|
Construction of Residential House in Forest land Closed under Section 4 & 5
|
Others
|
RAVINDER SINGH SON SH PHOOL SINGH
|
0.1897
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2018
|
Stage-I Approval on
|
:
|
15 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jun 2024
|
|
|
|
19 Jul 2024
|
34
|
Haryana
|
FP/HR/Approach/47625/2020
|
9-HRB034-2021-CHA
|
Warehouse for storage of tiles over an area measuring 25 kanal – 04 marla in Khasra no. – 82//10/2, 11, 83//6/3, 7,15 in the revenue estate of Village- Manak Tabra, Tehsil – Raipur Rani Distt.-Panchku
|
Approach Access
|
WAREHOUSE, RAIPUR RANI
|
0.021524
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jul 2020
|
Stage-I Approval on
|
:
|
24 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2024
|
|
|
|
19 Jul 2024
|
35
|
Haryana
|
FP/HR/Approach/39592/2019
|
9-HRB111-2021-CHA
|
M/s Ajit Industries Pvt. Ltd., Village Saidpur, Tehsil Kharkhoda, District Sonipat (Haryana).
|
Approach Access
|
AJIT INDUSTRIES PRIVATE LIMITED
|
0.008338
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2019
|
Stage-I Approval on
|
:
|
17 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2024
|
|
|
|
09 Jul 2024
|
36
|
Haryana
|
FP/HR/ROAD/15378/2015
|
9-HRB072-2017-CHA
|
Gyan Ganga Polytechnic, Salpani Khurd, Thanesar Jhansa Road, Kurukshetra
|
Road
|
PIU Karaikudi NHAI
|
0.0124
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Sep 2015
|
Stage-I Approval on
|
:
|
12 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2024
|
|
|
|
03 Jul 2024
|
37
|
Haryana
|
FP/HR/Others/41984/2019
|
9-HRB120-2023-CHA
|
Providing Sewerage System
|
Others
|
EXECUTIVE ENGINEER MUNICIPAL CORPORATION FARIDABAD HARYANA
|
3.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2019
|
Stage-I Approval on
|
:
|
16 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2024
|
|
|
|
02 Jul 2024
|
38
|
Haryana
|
FP/HR/Approach/32398/2018
|
9-HRB140-2018-CHA
|
SMR International School
|
Approach Access
|
RAGHUPATI EDUCATION SOCIETY
|
0.0099
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2018
|
Stage-I Approval on
|
:
|
09 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2024
|
|
|
|
18 Jun 2024
|
39
|
Haryana
|
FP/HR/ROAD/31377/2018
|
9-HRB068-2019-CHA
|
Widening & Strengthening of SH-12 (Village Seroi to Paban Hasanpur) Road
|
Road
|
PWD B AND R HARYANA
|
0.04
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2018
|
Stage-I Approval on
|
:
|
07 Aug 2019
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2019
|
|
|
|
17 Jun 2024
|
40
|
Haryana
|
FP/HR/Approach/144571/2021
|
9-HRB175-2023-CHA
|
Retail Outlet (Petrol Pump) at Village Sasouli
|
Approach Access
|
IOCL PANIPAT DIVISIONAL OFFICE
|
0.0074
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2021
|
Stage-I Approval on
|
:
|
29 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2024
|
|
|
|
13 Jun 2024
|
41
|
Haryana
|
FP/HR/Pipeline/60527/2020
|
9-HRB054-2022-CHA
|
HPCL Sonipat Jind Phase VI
|
Pipeline
|
HINDUSTAN PETROLEUM CORPORATION LTD, SONIPAT - JIND CGD
|
2.23
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2020
|
Stage-I Approval on
|
:
|
18 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 Apr 2024
|
|
|
|
13 Jun 2024
|
42
|
Haryana
|
FP/HR/ROAD/155991/2022
|
9-HRB166-2023-CHA
|
Consultancy services for preparation of Detail Project Reports of Ambala Ring road connecting NH-152 (at km 9.750, old chainage) to NH-72 (at village handesra) to NH-444A (at village khudda kalan) to NH-44 (at village mohra) and NH-65 (at village Balana) in in Haryana state
|
Road
|
NHAI PIU I AMBALA HARYANA
|
1.88
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2022
|
Stage-I Approval on
|
:
|
01 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2024
|
|
|
|
05 Jun 2024
|
43
|
Haryana
|
FP/HR/ROAD/150425/2021
|
9-HRC134-2022-CHA
|
Widening & Strengthening of road from Surewala Chowk to Uklana Bhuna Fatehabad Road Km 19.70 to 47.375 (SH-2) (Road ID 5367 & 5545) in Distt. – Fatehabad (HR).
|
Road
|
HARYANA PWD B&R BR., CHANDIGARH
|
11.5282
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2021
|
Stage-I Approval on
|
:
|
13 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2024
|
|
|
|
25 Apr 2024
|
44
|
Haryana
|
FP/HR/SubStation/44046/2020
|
9-HRB051-2022-CHA
|
Diversion of 0.94 hectare Forest Land for Construction of 66kV GIS S/Stn Surajkund Faridabad
|
Sub Station
|
HARYANA VIDYUT PARSARAN NIGAM LIMITED
|
0.94
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2020
|
Stage-I Approval on
|
:
|
11 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Feb 2024
|
|
|
|
16 Apr 2024
|
45
|
Haryana
|
FP/HR/Approach/141822/2021
|
9-HRB152-2022-CHA
|
Sawan Kirpal Ruhani Mission Ambala
|
Approach Access
|
SAWAN KIRPAL RUHANI MISSION AMBALA
|
0.023
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Aug 2021
|
Stage-I Approval on
|
:
|
13 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Feb 2024
|
|
|
|
16 Apr 2024
|
46
|
Haryana
|
FP/HR/Approach/148312/2021
|
9-HRB169-2022-CHA
|
Retail Outlet of Nexgen Energia Limited, at village Dhangar, Distt.- Fatehabad.
|
Approach Access
|
NEXGEN ENERGI LIMITED, NOIDA
|
0.022
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Oct 2021
|
Stage-I Approval on
|
:
|
19 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2024
|
|
|
|
16 Apr 2024
|
47
|
Haryana
|
FP/HR/TRANS/153329/2022
|
9-HRB156-2023-CHA
|
Diversion of 0.5845 Hectare of Forest Land for Construction of 220 KV D/C Mund-IOCL transmission Line in District Karnal, Haryana
|
Transmission Line
|
HARYANA VIDYUT PRASARAN NIGAM LIMITED
|
0.5845
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2022
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2024
|
|
|
|
16 Apr 2024
|
48
|
Haryana
|
FP/HR/Approach/138451/2021
|
9-HRB164-2021-CHA
|
Diversion of Forest Land for approach access by Haryana Trunk House Harbhajan Lal, Satish Kumar Ss/o. Sh. Harbans Lal Mutation no. 3126 Khasra No. 80//16, 25 at Fatehabad Bhuna road Km stone 6.90 L/si
|
Approach Access
|
HARYANA TRUNK HOUSE
|
0.0076
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2021
|
Stage-I Approval on
|
:
|
20 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Feb 2024
|
|
|
|
16 Apr 2024
|
49
|
Haryana
|
FP/HR/TRANS/148304/2021
|
9-HRB128-2022-CHA
|
Construction of 132 KV D/C Line Avaada Green HN Project Private Limited
|
Transmission Line
|
Avaada Green HN Project Private Limited
|
0.09558
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Oct 2021
|
Stage-I Approval on
|
:
|
13 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Feb 2024
|
|
|
|
14 Apr 2024
|
50
|
Haryana
|
FP/HR/Approach/150838/2022
|
9-HRB175-2022-CHA
|
Sankalp Infraline LLP
|
Approach Access
|
SANKALP INFRALINE LLP JIND
|
0.0829
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jan 2022
|
Stage-I Approval on
|
:
|
13 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Feb 2024
|
|
|
|
14 Apr 2024
|
|