PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : HR-049/2022
1. Location of the project/Scheme : Haryana
 (i) State / Union Territory : Haryana  (ii) District : Faridabad  (iii) Forest Division : Faridabad  (iv) Area of forest land proposed for diversion (in ha.) : 0.8886  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Faridabad0.8886Protected Forest
Total 0.8886
Division 1. : Faridabad
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Faridabad0.8886
Total0.8886
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.88860.6Eco 3
Total. 0.8886


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Cassia FistulaTootlas010000
2Morus LaevigataToot032220
3Melia AzadirachtaBaikan0168000
4Syzigium CuminiJamun001000
5Prasophis sinereriaJund002300
6Leucosceptrum Canum Sm.Subabul011000
7Acacia leucophloeaRonjh040000
8EucalyptusSafeda0000412
9Terminalia ArjunaArjun000011
10Misc. SpeciesKikar/muscut0891031
11Dalburgia SisooShisham231300
12Acacia Niloticakikar950100
13Eucalyptussafeda000439
14Misc. Speciesmisc.031226153
Total 11 7246 2928 26
Sub Total (No of Trees.) 212


5. Working plan prescription for the forest land proposed for diversion : protected forest
6. Brief note on vulnerability of the forest area to erosion : nil
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : no
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 33.39583
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
112.5protected forestBallabhgarhH43X3    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Tree marking List
2 Letter, part II and Check List 15
3 Railway noc
4 toposheet
5 Irrigation noc
6 Layout plan
7 Other
8 check list19
9 Yamuna river noc

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Faridabad2105007022.48328123264.3201/01/201744.500
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 South Circle GurgaonCFYesOne23/06/2022
FaridabadSouth Circle GurgaonDFOYesOne29/04/2022
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
FaridabadSouth Circle GurgaonDFO Recommendedas per rules
South Circle GurgaonCF RecommendedRecommended as per rulesYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
HaryanaState SecretaryRecommended21/02/2023Recommended for Stage I Approval Part V uploaded State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ChandigarhRegional Office9-HRB037-2023-CHA10/04/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/HR/ROAD/149539/2021ROAD14953920213963,339,583.433,339,583.432023-04-19928508Union Bank Of IndiaNEFT/RTGS (Challan)2023-04-112023-04-11
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 2.5   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)2.5
  Status of CA Land so identified : Forest Area   Site Name : Dhoj section 4 and 5   Location Details : Dhoj section 4 and 5 Ballabhgarh Forest Range   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Dhoj section 4 and 5PF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/HR/ROAD/149539/202106 Sep 2023No DataN/A
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/HR/ROAD/149539/202108 Sep 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/HR/ROAD/149539/2021Approved In-PrincipleNo Data