| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Gujarat
|
FP/GJ/VELEC/150525/2021
|
FED/FLP/e-file/6/2023/2338/F
|
laying 66 KV S/C Underground Power Cable (7.747 rkm) (3+1) 630 Sq mm of S/C from Existing 220 KV Nanikhakhar S/S to 66 KV Koday SS.
|
Village Electricity
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.5423
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Dec 2021
|
|
Stage-I Approval on
|
:
|
23 Sep 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Nov 2025
|
|
|
|
08 Dec 2025
|
|
2
|
Gujarat
|
FP/GJ/IND/29375/2017
|
FC-6/GJC-72/2023-GNR
|
Hazira Capacity Expansion Project (HCEP)
|
Industry
|
Shell Energy India Private Limited
|
12
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2019
|
|
Stage-I Approval on
|
:
|
05 Nov 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
12 Sep 2025
|
|
3
|
Gujarat
|
FP/GJ/OFC/148825/2021
|
FC-6/GJB-27/2023-GNR
|
Proposal for laying OFC for Jio Digital Fibre Private Limited 4G Dang South District
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.3073
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Oct 2021
|
|
Stage-I Approval on
|
:
|
08 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Mar 2025
|
|
|
|
06 Jun 2025
|
|
4
|
Gujarat
|
FP/GJ/Pipeline/154937/2022
|
FED/FLP/e-file/6/2024/0853/F
|
8” Dia Steel Gas Pipeline Connectivity For Bilasiya Bus Stand To Kanubhai Rabari CNG Station, Daskroi Ta:Daskroi, Dist: Ahmedabad
|
Pipeline
|
SABARMATI GAS LTD
|
0.11108
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Apr 2022
|
|
Stage-I Approval on
|
:
|
27 May 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
20 May 2025
|
|
5
|
Gujarat
|
FP/GJ/Pipeline/154937/2022
|
FED/FLP/e-file/6/2024/0853/F
|
8” Dia Steel Gas Pipeline Connectivity For Bilasiya Bus Stand To Kanubhai Rabari CNG Station, Daskroi Ta:Daskroi, Dist: Ahmedabad
|
Pipeline
|
SABARMATI GAS LTD
|
0.11108
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Apr 2022
|
|
Stage-I Approval on
|
:
|
27 May 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
20 May 2025
|
|
6
|
Gujarat
|
FP/GJ/ROAD/41444/2019
|
6-GJB005/2021-BHO
|
New RCC/Black tarred Road
|
Road
|
RUCHIL AGRO FOOD PRODUCTS
|
0.459
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2019
|
|
Stage-I Approval on
|
:
|
29 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
13 May 2025
|
|
7
|
Gujarat
|
FP/GJ/Pipeline/155124/2022
|
FED/FLP/e-file/6/2024/1510/F
|
90mm Dia MDPE Gas Pipeline Crossing & Parallel Connectivity For Vagoshna To Boru Ta:Mansa, Dist:Gandhinagar.
|
Pipeline
|
SABARMATI GAS LIMITED
|
0.12372
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 May 2022
|
|
Stage-I Approval on
|
:
|
09 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2025
|
|
|
|
13 May 2025
|
|
8
|
Gujarat
|
FP/GJ/ROAD/27051/2017
|
FC-6/GJC-78/2023-GNR
|
Consultancy Services for Project Management Phase- I including Preparation of Detailed Project Report for Upgradation of Junction with NH-47-Limbdi-Surendranagar-Dhrangadhra of NH-51 in the State of Gujarat to Two Lane with Paved Shoulder Configuration (Package No: NH/IAHE/15).
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
39.37
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2017
|
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
24 Apr 2025
|
|
9
|
Gujarat
|
FP/GJ/Pipeline/148928/2021
|
FED/FLP/e-file/6/2024/1900/F
|
8" Dia Steel Gas Pipeline Connectivity For Kishorpura SGL DRS To Rojad Swaminarayan CNG Station, Dist: Sabarkantha & Aravali
|
Pipeline
|
SABARMTI GAS LIMITED GANDHINAGAR
|
0.58352
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Nov 2021
|
|
Stage-I Approval on
|
:
|
10 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
21 Mar 2025
|
|
10
|
Gujarat
|
FP/GJ/Pipeline/148928/2021
|
FED/FLP/e-file/6/2024/1900/F
|
8" Dia Steel Gas Pipeline Connectivity For Kishorpura SGL DRS To Rojad Swaminarayan CNG Station, Dist: Sabarkantha & Aravali
|
Pipeline
|
SABARMTI GAS LIMITED GANDHINAGAR
|
0.58352
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Nov 2021
|
|
Stage-I Approval on
|
:
|
10 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2025
|
|
|
|
21 Mar 2025
|
|
11
|
Gujarat
|
FP/GJ/ROAD/149516/2021
|
FC-6/GJC-3/2023-GNR
|
Widening and strengthening of existing carriageway from km. 265/200 to km. 266/200 and from km 273/002 to km 287/905 of NH-56 under NH division Vadodara in the state of Gujarat.
|
Road
|
NH DIVISION, VADODARA
|
7.283
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2021
|
|
Stage-I Approval on
|
:
|
06 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Apr 2023
|
|
|
|
17 Mar 2025
|
|
12
|
Gujarat
|
FP/GJ/OFC/146346/2021
|
328-33
|
Proposal for Diversion of 0.084 ha. Forest land for the grant permission for laying GFGNL Optical Fiber Cable line in Dang District Gujarat state.
|
Optical Fibre Cable
|
GFGNL
|
0.084
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2021
|
|
Stage-I Approval on
|
:
|
01 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2024
|
|
|
|
20 Feb 2025
|
|
13
|
Gujarat
|
FP/GJ/Pipeline/155390/2022
|
FC-6/GJB-30/2023-GNR
|
Vanthevad to Rajpipla Pipeline Section under the Rajpipla Pipeline Project
|
Pipeline
|
GUJARAT STATE PETRONET LTD
|
0.616
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2022
|
|
Stage-I Approval on
|
:
|
13 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Sep 2024
|
|
|
|
05 Feb 2025
|
|
14
|
Gujarat
|
FP/GJ/Pipeline/155402/2022
|
FED/FLP/e-file/6/2023/1888/F
|
4” Dia Steel Gas Pipeline Connectivity For Sabar Dairy, Ta:Himatnagar, Dist: Sabarkhantha
|
Pipeline
|
SABARMATI GAS LTD
|
0.0034
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2022
|
|
Stage-I Approval on
|
:
|
10 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2024
|
|
|
|
05 Feb 2025
|
|
15
|
Gujarat
|
FP/GJ/Others/34353/2018
|
6-GJB045/2019-BHO
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Banaskantha District
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
0.4117
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2018
|
|
Stage-I Approval on
|
:
|
06 Dec 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2023
|
|
|
|
16 Jan 2025
|
|
16
|
Gujarat
|
FP/GJ/ROAD/50207/2020
|
FC-6/GJC-38/2022-GNR
|
Development of Trumpet Interchange for Hirasar International Airport intersection with NH-27
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
8.5033
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2020
|
|
Stage-I Approval on
|
:
|
03 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jun 2022
|
|
|
|
18 Nov 2024
|
|
17
|
Gujarat
|
FP/GJ/TRANS/82015/2020
|
6-GJB071/2021-BHO
|
220 kV TL from Adani Green Energy Limited PSS-II to Bhuj-II PGCIL SS
|
Transmission Line
|
ADANI GREEN ENERGY LIMITED
|
0.2498
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2020
|
|
Stage-I Approval on
|
:
|
06 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2024
|
|
|
|
05 Nov 2024
|
|
18
|
Gujarat
|
FP/GJ/ROAD/123541/2021
|
6-GJB090/2021-BHO
|
Widening and Strengthening of Arek Sisodra Puni Sarbhon road - km 0/0 to 7/4, Ta-Bardoli, Dist-Surat
|
Road
|
EXECUTIVE ENGINEER
|
1.11
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Feb 2021
|
|
Stage-I Approval on
|
:
|
06 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Oct 2024
|
|
|
|
30 Oct 2024
|
|
19
|
Gujarat
|
FP/GJ/Pipeline/149030/2021
|
FCA-1022-150-F
|
90/125 mm Dia MDPE Gas Pipeline Connectivity For Somany Plastrelle Pvt. Ltd, Village Dhanot Ta Kalol Dist:Gandhinagar
|
Pipeline
|
SABARMTI GAS LIMITED GANDHINAGAR
|
0.0002
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Nov 2021
|
|
Stage-I Approval on
|
:
|
11 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Oct 2024
|
|
|
|
17 Oct 2024
|
|
20
|
Gujarat
|
FP/GJ/TRANS/155272/2022
|
FCA-1022-179-F
|
Grant permission of 0.2550 ha Protected Forest land for 66 KV Poly Aluminium XLPE U/G cable having route 66 KV Mehsana Kherva S/S Transmission Line (3400 Mtr) (1C X 630Sq.mm [(3+1)], Ta.Mehsana, District:-Mehsana in Gujarat State.
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
|
0.255
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2022
|
|
Stage-I Approval on
|
:
|
20 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2024
|
|
|
|
17 Oct 2024
|
|
21
|
Gujarat
|
FP/GJ/WATER/45275/2020
|
6-GJB073/2020-BHO
|
Prachi Group Water Supply Scheme
|
Drinking Water
|
EE PHWDN VERAVAL
|
2.0074
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2020
|
|
Stage-I Approval on
|
:
|
21 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2023
|
|
|
|
15 Oct 2024
|
|
22
|
Gujarat
|
FP/GJ/ROAD/34035/2018
|
6-GJC046/2019-BHO
|
Widening of Adwan – Raval – Kalyanpur - BhatiaRoad (SH 94
|
Road
|
DY EXECUTIVE ENGINEER DWARKA
|
36.54
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2018
|
|
Stage-I Approval on
|
:
|
13 Feb 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Aug 2024
|
|
|
|
14 Oct 2024
|
|
23
|
Gujarat
|
FP/GJ/Others/51131/2020
|
FC-6/GJB-45/2022-GNR
|
Proposed Under Pass at Sector 22/23, 22/21, for Smooth traffic flow in Gandhinagar City.
|
Others
|
GANDHINAGAR SMART CITY DEVELOPMENT LIMITED
|
0.6
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Oct 2020
|
|
Stage-I Approval on
|
:
|
25 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 May 2024
|
|
|
|
14 Oct 2024
|
|
24
|
Gujarat
|
FP/GJ/RAIL/142369/2021
|
FC-6/GJB-28/2022-GNR
|
Mumbai-Ahmedabad High Speed Railway Project
|
Railway
|
NATIONAL HIGH SPEED RAIL CORPORATION LTD
|
0.0562
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 May 2021
|
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Sep 2024
|
|
|
|
14 Oct 2024
|
|
25
|
Gujarat
|
FP/GJ/ROAD/157656/2022
|
FED/FLP/e-file/6/2024/0625/F
|
Construction of Kukvav-Bhonyni Road km 0/00 to 3/300 in Taluka of Detroj-Rampura District of Ahmedabad
|
Road
|
MADHUBHAI BHOYA
|
0.675
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2022
|
|
Stage-I Approval on
|
:
|
21 May 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2024
|
|
|
|
14 Oct 2024
|
|
26
|
Gujarat
|
FP/GJ/WATER/152269/2022
|
FC-6/GJB-22/2023-GNR
|
Diversion of 0.9391 ha. (0.80 Ha) Reserved Forest land for the Construction of New Filter Plant, R.C.C. U/G Sump, Pump House and U/G Water Pipeline for drinking water supply facility in 20 Villages of Godhra Taluka. Village: Gollav & Achhala, Taluka: Godhra, District: Panchmahal in Gujarat State.
|
Drinking Water
|
GWSSB GANDHINAGAR
|
0.8
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Feb 2022
|
|
Stage-I Approval on
|
:
|
23 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Sep 2024
|
|
|
|
10 Oct 2024
|
|
27
|
Gujarat
|
FP/GJ/ROAD/32356/2018
|
6-GJB011/2019-BHO
|
Road
|
Road
|
MARUTI INDUSTRIES
|
0.21
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Mar 2018
|
|
Stage-I Approval on
|
:
|
25 Nov 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2020
|
|
|
|
07 Oct 2024
|
|
28
|
Gujarat
|
FP/GJ/ROAD/46724/2020
|
FC-6/GJC-26/2023-GNR
|
Design and construction of Smart Road by widening of Road No.6,Road No.7 and G Road in Gandhinagar city.
|
Road
|
GANDHINAGAR SMART CITY DEVELOPMENT LIMITED
|
20.41
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jun 2020
|
|
Stage-I Approval on
|
:
|
21 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 May 2024
|
|
|
|
07 Oct 2024
|
|
29
|
Gujarat
|
FP/GJ/ROAD/46724/2020
|
FC-6/GJC-26/2023-GNR
|
Design and construction of Smart Road by widening of Road No.6,Road No.7 and G Road in Gandhinagar city.
|
Road
|
GANDHINAGAR SMART CITY DEVELOPMENT LIMITED
|
20.41
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jun 2020
|
|
Stage-I Approval on
|
:
|
21 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 May 2024
|
|
|
|
07 Oct 2024
|
|
30
|
Gujarat
|
FP/GJ/Others/47974/2020
|
6-GJB003/2021-BHO
|
Proposal for laying OFC for GFGNL Project for Bharat Net Phase II in Dahod District Hac. 0.27369 (Wild Life Vadadoara FCA)
|
Others
|
GFGNL
|
0.27369
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jul 2020
|
|
Stage-I Approval on
|
:
|
14 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2022
|
|
|
|
25 Sep 2024
|
|
31
|
Gujarat
|
FP/GJ/TRANS/49319/2020
|
FC-6/GJC-2/2023-GNR
|
765 kV D/C Khavda-Bhuj PSS1 Transmission Line for Adani Green Energy Thirty Limited
|
Transmission Line
|
ADANI GREEN ENERGY THIRTY LIMITED
|
226.3223
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2020
|
|
Stage-I Approval on
|
:
|
06 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2024
|
|
|
|
25 Sep 2024
|
|
32
|
Gujarat
|
FP/GJ/Approach/140861/2021
|
6-GJB098/2021-BHO
|
KPIG Energia Private Limited
|
Approach Access
|
KPIG ENERGIA PVT LTD.
|
0.0076
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2021
|
|
Stage-I Approval on
|
:
|
29 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
25 Sep 2024
|
|
33
|
Gujarat
|
FP/GJ/TRANS/120934/2021
|
6-GJB073/2021-BHO
|
33 kV S/C Transmission Line from AWEK1L PSS to Wind Turbine Areas.
|
Transmission Line
|
ADANI WIND ENERGY KUTCHH ONE LIMITED
|
0.0675
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2021
|
|
Stage-I Approval on
|
:
|
06 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2024
|
|
|
|
19 Sep 2024
|
|
34
|
Gujarat
|
FP/GJ/Pipeline/141520/2021
|
FCA-1021/5-25/21/SF-128/F
|
Proposed 4” Dia. Steel & 125 mm Dia. MDPE Gas Pipeline from Una Tower Chowk to Diu Check post to develop city Gas Distribution network in Una & Diu city of Taluka Una, District - Gir Somnath
|
Pipeline
|
IRM ENERGY PRIVATE LIMITED
|
0.4434
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Apr 2021
|
|
Stage-I Approval on
|
:
|
31 Aug 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2024
|
|
|
|
17 Sep 2024
|
|
35
|
Gujarat
|
FP/GJ/TRANS/155251/2022
|
FCA-1022-144-F
|
66KV LILO Veraval III SS line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.03
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 May 2022
|
|
Stage-I Approval on
|
:
|
09 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 May 2024
|
|
|
|
17 Sep 2024
|
|
36
|
Gujarat
|
FP/GJ/Others/18458/2016
|
C/FCA/T-6/2146-53/15-16
|
proposal for laying optical fibre cable Bhavanagar district
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
4.374
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2016
|
|
Stage-I Approval on
|
:
|
27 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2024
|
|
|
|
09 Sep 2024
|
|
37
|
Gujarat
|
FP/GJ/ROAD/147435/2021
|
FC-6/GJC-21/2022-GNR
|
Diversion of Protected forest land for the project of four lanning of BHaruch-shuklatirth road(Zadeshwar chokdi to tavara village) km 7/000 to 10/700
|
Road
|
BAUDA BHARUCH
|
5.2725
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Sep 2021
|
|
Stage-I Approval on
|
:
|
20 Apr 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
09 Sep 2024
|
|
38
|
Gujarat
|
FP/GJ/ROAD/152353/2022
|
FC-6/GJC-42/2022-GNR
|
Widening & Strengthening of Sutrapada Fatak-Dhamlej MDR Road
|
Road
|
EXECUTIVE ENGINEER ROAD AND BUILDING DIVISION GIRSOMNATH
|
5.5125
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Feb 2022
|
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2024
|
|
|
|
30 Aug 2024
|
|
39
|
Gujarat
|
FP/GJ/Pipeline/155401/2022
|
FED/FLP/e-file/6/2023/1155/F
|
90mm Dia MDPE Gas Pipeline Connectivity For Oracle Industries Ta. Himmatnagar Dist.: Sabarkantha
|
Pipeline
|
SABARMATI GAS LIMITED
|
0.036
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2022
|
|
Stage-I Approval on
|
:
|
15 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2024
|
|
|
|
14 Aug 2024
|
|
40
|
Gujarat
|
FP/GJ/Pipeline/145415/2021
|
FCA-1022/5-94/21/SF-25/F
|
4” Dia Steel Gas Pipeline Connectivity of Kanubhai Rabari SGL CNG Station, Dehgam Ta:Dehgam, Dist: Gandhinagar.
|
Pipeline
|
SABARMTI GAS LIMITED GANDHINAGAR
|
0.04324
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jul 2021
|
|
Stage-I Approval on
|
:
|
09 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
01 Aug 2024
|
|
41
|
Gujarat
|
FP/GJ/ROAD/26245/2017
|
6-GJB043/2017-BHO
|
S. R. to Vadtal Zole Bakrol Road km. 0/0 to 9/6 (Widening of Road from 10.00 Mtr. to Four lane at km. 9/100 to 9/600)
|
Road
|
EXECUTIVE ENGINEER ANAND
|
0.5125
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 May 2017
|
|
Stage-I Approval on
|
:
|
16 Nov 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Apr 2022
|
|
|
|
31 Jul 2024
|
|
42
|
Gujarat
|
FP/GJ/ROAD/30429/2017
|
6-GJB050/2018-BHO
|
Segwa Sinor Malsar Road Km 14/600 to 17/250
|
Road
|
EXECUTIVE ENGINEER
|
0.86125
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Nov 2017
|
|
Stage-I Approval on
|
:
|
24 Sep 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Nov 2022
|
|
|
|
31 Jul 2024
|
|
43
|
Gujarat
|
FP/GJ/SubStation/49258/2020
|
6-GJB005/2022-FC
|
Diversion of 0.49 Ha. Reserved Forest Land for 66 KV Munpur Substation At. Munpur, Ta. : Kadana, Dist.: Mahisagar in Favor of Gujarat Energy Transmission Corporation Limited (GETCO) Jambuva (Vadodara)
|
Sub Station
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.49
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Sep 2020
|
|
Stage-I Approval on
|
:
|
11 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
31 Jul 2024
|
|
44
|
Gujarat
|
FP/GJ/TRANS/54477/2020
|
6-GJB072/2021-BHO
|
Diversion of 0.0324 Ha Protected forest land for construction of 33 KV D/C Overhead Transmission Line Nr Village Ratadiya, Block Nakhatrana, Dist Kutch.
|
Transmission Line
|
ADANI RENEWABLE ENERGY(TN) LIMITED
|
0.0324
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Nov 2020
|
|
Stage-I Approval on
|
:
|
06 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2024
|
|
|
|
31 Jul 2024
|
|
45
|
Gujarat
|
FP/GJ/Others/11221/2015
|
FCA-1016/3-05/15/SF-04/F
|
XLPE U/G cable frome Kerala - Kalyangadh line
|
Others
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.35
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2015
|
|
Stage-I Approval on
|
:
|
25 Sep 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
30 Jul 2024
|
|
46
|
Gujarat
|
FP/GJ/Others/120861/2021
|
K/FCA/13/7708-14/2020-21
|
Proposal for laying OFC for JIO DIGITAL FIBRE PRIVATE Limited 4G, 5G Sabarkantha District
|
Others
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
4.32
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2021
|
|
Stage-I Approval on
|
:
|
19 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jul 2024
|
|
|
|
30 Jul 2024
|
|
47
|
Gujarat
|
FP/GJ/Others/150410/2021
|
K/FCA/13/122-25/2022-23
|
Proposal for laying OFC 4G/5G for JIO DIGITAL FIBRE PRIVATE LIMITED Sabarkantha Dist. Himmatnagar (Himmatnagar-Idar)
|
Others
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.261
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2021
|
|
Stage-I Approval on
|
:
|
08 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jul 2024
|
|
|
|
30 Jul 2024
|
|
48
|
Gujarat
|
FP/GJ/Others/39642/2019
|
C/FCA/T-9/17-24/2019-20
|
OFC Network for sanchor-bhabhar
|
Others
|
VODAFONE IDEA LIMITED
|
3.7755
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2019
|
|
Stage-I Approval on
|
:
|
28 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
26 Jul 2024
|
|
49
|
Gujarat
|
FP/GJ/Others/40125/2019
|
C/Land/T.6/4522-25/2019-20
|
OFC Network for Bhavnagar - Talaja
|
Others
|
VODAFONE IDEA LIMITED
|
2.115
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 May 2019
|
|
Stage-I Approval on
|
:
|
27 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jul 2024
|
|
|
|
26 Jul 2024
|
|
50
|
Gujarat
|
FP/GJ/Others/40494/2019
|
B/Land/T-9/9596-99/2019-20
|
Proposal for grant of permission for laying Optical Fiber Cable in Vyara and Dolvan Taluka of Tapi Dist.
|
Others
|
GFGNL
|
2.26
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2019
|
|
Stage-I Approval on
|
:
|
15 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
26 Jul 2024
|
|