Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
25/10/2016
|
As per letter no 1297/12-1 dated 25-10-2016
|
|
2
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
27/10/2016
|
please find enclosed
|
|
3
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
02/11/2016
|
The correction have been made as per the instruction received
|
|
4
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
25/11/2016
|
please send hard copy to this office of all enclosures and colored Map regarding queries raised by State govt.
|
|
5
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
25/11/2016
|
The correction have been made as per the instruction received
|
|
6
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
26/11/2016
|
please send hard copy to this office of all enclosures and colored Map regarding queries raised by State govt.
|
|
7
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
26/12/2016
|
The correction have been made as per the instruction received
|
|
8
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
31/12/2016
|
please find enclosed
|
|
9
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
19/01/2017
|
As per letter no 2160/12-1 dated 19-01-2017
|
|
10
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
20/01/2017
|
please mfind enclosed
|
|
11
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
20/01/2017
|
The correction have been made as per the instruction received
|
|
12
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
27/01/2017
|
please find enclosed
|
|
13
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
27/01/2017
|
please find enclosed
|
|
14
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
23/02/2017
|
plz clearlify abjection
|
|
15
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
27/02/2017
|
please find enclosed
|
|
16
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
27/02/2017
|
The correction have been made as per the instruction received
|
|
17
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
02/03/2017
|
do not forward proposal to dfo level unless corrections have been done..
|
|
18
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
08/03/2017
|
The correction have been made as per the instruction received
|
|
19
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
31/03/2017
|
please submit original hard copy to the R.O. office..along with filled Part I to part V..instruction received from Nodal office
|
|
20
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
02/04/2017
|
The correction have been made as per the instruction received
|
|
21
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
05/04/2017
|
please find enclosed
|
|
22
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
17/04/2017
|
Plz send original Hard Copy of reply
|
|
23
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
19/04/2017
|
please send original hard copy containing all original documents...to the R.O. office DEHRADUN. than forward this proposal for further processing...as per instruction received by NODAL OFFICE.
|
|
24
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
20/04/2017
|
The correction have been made as per the instruction received
|
|
25
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
20/04/2017
|
please find enclosed and hard copy has been sent to the Nodal office..
|
|
26
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
21/04/2017
|
Plz send original Hard Copy Cf Office then send this proposal
|
|
27
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
28/04/2017
|
Plz send original Hard Copy Cf Office then send this proposal
|
|
28
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
04/05/2017
|
The correction have been made as per the instruction received
|
|
29
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
23/05/2017
|
please find enclosed
|
|
30
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
31/05/2017
|
as per letter no 3529/12-1 dated 31-05-2017
|
|
31
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
21/06/2017
|
plz find enclosed
|
|
32
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
29/06/2017
|
The correction have been made as per the instruction received
|
|
33
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
23/08/2017
|
please provide point wise answers and ensure each attachment of the points resolved by your office.
|
|
34
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
24/08/2017
|
The correction have been made as per the instruction received
|
|
35
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
12/10/2017
|
please check the email id and file not attchment this id.
|
|
36
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
12/10/2017
|
The correction have been made as per the instruction received
|
|
37
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
23/11/2017
|
please find enclosed
|
|
38
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
01/12/2017
|
Plz Submit original Hard Copy Cf Office then send this proposal
|
|
39
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
01/12/2017
|
please find enclosed
|
|
40
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
02/12/2017
|
The correction have been made as per the instruction received
|
|
41
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
09/12/2017
|
pleased find enclosed
|
|
42
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
18/12/2017
|
The hard copy of the proposal containing original documents is not yet received in this office. The user agency may provide original hard copy of the proposal to this office including authenticated copy of Part I to Part iii as in online web portal.
|
|
43
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
20/12/2017
|
The hard copy of the proposal containing original documents is not yet received in this office. The user agency may provide original hard copy of the proposal to this office including authenticated copy of Part I to Part iii as in online web portal.
|
|
44
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
20/12/2017
|
The hard copy of the proposal containing original documents is not yet received in this office. The user agency may provide original hard copy of the proposal to this office including authenticated copy of Part I to Part iii as in online web portal.
|
|
45
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
27/12/2017
|
The correction have been made as per the instruction received
|
|
46
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
30/12/2017
|
please find enclosed
|
|
47
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
03/01/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 18-12-2017 has been clarified by DFO Bageshwar letter no 1475/12-1 dated 29-12-2017
|
|
48
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
06/01/2018
|
find the letter attached
|
|
49
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
08/01/2018
|
find the letter attached
|
|
50
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
08/01/2018
|
please find enclosed
|
|
51
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
24/01/2018
|
The correction have been made as per the instruction received
|
|
52
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
17/03/2018
|
please find enclosed
|
|
53
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/03/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 06-01-2018 has been clarified by DFO Bageshwar letter no 2168/12-1 dated 17-03-2018
|
|
54
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
28/03/2018
|
find the letter attached
|
|
55
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
02/04/2018
|
find the letter attached
|
|
56
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
02/04/2018
|
please find enclosed
|
|
57
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
04/07/2018
|
The correction have been made as per the instruction received
|
|
58
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
20/07/2018
|
plz find enclosed
|
|
59
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
21/07/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 28-03-2018 has been clarified by DFO Bageshwar letter no 155/12-1 dated 19-07-2018
|
|
60
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
24/07/2018
|
find the letter attached
|
|
61
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
26/07/2018
|
find the letter attached
|
|
62
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
30/07/2018
|
find the letter attached
|
|
63
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
30/10/2018
|
The correction have been made as per the instruction received
|
|
64
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
15/12/2018
|
plz find enclosed
|
|
65
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
15/12/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 24-07-2018 has been clarified by DFO Bageshwar letter no 1517/12-1 Date 14-12-2018
|
|
66
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
22/12/2018
|
find the letter attached
|
|
67
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
16/01/2019
|
find the letter attached
|
|
68
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
16/01/2019
|
please find enclosed
|
|
69
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
24/01/2019
|
The correction have been made as per the instruction received
|
|
70
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
01/02/2019
|
plz find enclosed
|
|
71
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
02/02/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 22-12.2018 has been clarified by DFO Bageshwar letter no 1949/12-1 dated 29-01-2019
|
|
72
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
07/03/2019
|
State Govt. may attend the shortcoming as per attachment.
|
|
73
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
08/03/2019
|
State Govt. may attend the shortcoming as per attachment.
|
|
74
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
08/03/2019
|
may attend the shortcoming as per attachment.
|
|
75
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
21/06/2019
|
The correction have been made as per the instruction received
|
|
76
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
06/07/2019
|
plz find enclosed
|
|
77
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
09/07/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 07-03-2019 has been clarified by DFO Bageshwar letter no 105/12-1 dated 05-07-2019.
|
|
78
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
30/07/2019
|
find the letter attached
|
|
79
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
31/07/2019
|
find the letter attached
|
|
80
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
31/07/2019
|
find the letter attached
|
|
81
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
08/08/2019
|
The correction have been made as per the instruction received
|
|
82
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
29/08/2019
|
plz find enlosed
|
|
83
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
09/09/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 30-07-2019 has been clarified by DFO Bageshwar letter no 703/12-1 dated 29-08-2019
|
|
84
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
11/09/2019
|
find the letter attached
|
|
85
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
13/09/2019
|
find the letter attached
|
|
86
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
16/09/2019
|
find the letter attached
|
|
87
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
21/12/2019
|
The correction have been made as per the instruction received
|
|
88
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
23/12/2019
|
find the letter attached
|
|
89
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
01/01/2020
|
The correction have been made as per the instruction received
|
|
90
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
06/01/2020
|
find attached file.
|
|
91
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
11/11/2020
|
The correction have been made as per the instruction received
|
|
92
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
21/11/2020
|
plz find enclosed
|
|
93
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
25/11/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 11-09-2019 has been clarified by Dfo Bageshwar letter no 1571/12-1 dated 21-11-2020.
|
|
94
|
Regional Office
|
EDS
|
State secretary
|
31/12/2020
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
95
|
State secretary
|
EDS
|
Nodal Officer
|
01/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
96
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
02/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
97
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
04/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
98
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
08/01/2021
|
The state govt. may attend the following shortcomings as per the attachment here
|
|
99
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
28/01/2022
|
The correction have been made as per the instruction received
|
|
100
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
28/02/2022
|
plz find enclosed.
|
|
101
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
11/03/2022
|
As per letter no 4084/12-1 dated 28-02-2022
|
|
102
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
21/03/2022
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
103
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
22/03/2022
|
State Govt. may attend the following shortcomings as per the attachment here
|
|
104
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
24/03/2022
|
find the letter attached
|
|
105
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
11/04/2022
|
The correction have been made as per the instruction received
|
|
106
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
20/06/2022
|
plz find enclosed
|
|
107
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
05/07/2022
|
As per letter no 5625/12-1 dated 18-06-2022
|
|
108
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
19/07/2022
|
find the letter attached
|
|
109
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
27/07/2022
|
find the letter attached
|
|
110
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
29/07/2022
|
find the letter attached
|
|
111
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
03/06/2024
|
The correction have been made as per the instruction received
|
|
112
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
11/06/2024
|
Please ensure to send the hard copy of the reply to the objection raised by the Nodal Officer in the said proposal to the office of the undersigned.
|
|
113
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
12/06/2024
|
The correction have been made as per the instruction received
|
|
114
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
12/07/2024
|
dss report
|
|
115
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
18/07/2024
|
The correction have been made as per the instruction received
|
|
116
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
27/07/2024
|
dss report
|
|
117
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
12/12/2024
|
The correction have been made as per the instruction received
|
|
118
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
26/12/2024
|
Please ensure to send the hard copy of the reply to the objection raised by the Nodal Officer in the said proposal to the office of the undersigned.
|
|
119
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
27/12/2024
|
The correction have been made as per the instruction received
|
|
120
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
17/01/2025
|
plz find enclosed.
|
|
121
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
13/02/2025
|
As per letter no1913/12-1 dated 06-02-2025
|
|