Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
31/10/2015
|
find the attachment.
|
|
2
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
22/12/2015
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
14/01/2016
|
please find the attachment.
|
|
4
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
26/01/2016
|
Query Related File is attached. Please find attachment.
|
|
5
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
27/01/2016
|
Please give right information of trees
|
|
6
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
27/01/2016
|
Sir right information of trees now attached in part II.
|
|
7
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
02/02/2016
|
Please give site inspection date on oak trees with conservator
|
|
8
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
02/02/2016
|
please remove the objection.
|
|
9
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
10/02/2016
|
The correction have been made as per the instruction received
|
|
10
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
10/02/2016
|
Please give the reply with proper answar.
|
|
11
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
16/02/2016
|
The correction have been made as per the instruction received
|
|
12
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
18/02/2016
|
Sir please find the attachment.
|
|
13
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
25/02/2016
|
Please give site inspection date on oak trees with conservator
|
|
14
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
04/03/2016
|
Sir please find the attachments.
|
|
15
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
01/04/2016
|
The Site inspection for oak trees decide on 07-04-2016
|
|
16
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
04/04/2016
|
Sir after site inspection Baanj varaksh parman patra upload in part I after sign CF sir.
|
|
17
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
13/04/2016
|
The correction have been made as per the instruction received
|
|
18
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
13/04/2016
|
Sir please find the proposals.
|
|
19
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
13/05/2016
|
Plz reply to obj of RO-As per this office letter Misc/II/ROC/COP/I/2013/1846 dated 6-11-2015 the hard copy is not received through proper channel. The state Govt may advise to assure the receiving of hard copy in regional office before perusing proposal online to this office.
|
|
20
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
16/05/2016
|
Please remove the objections
|
|
21
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
18/05/2016
|
please remove the objection.
|
|
22
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
19/05/2016
|
The correction have been made as per the instruction received
|
|
23
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
29/05/2016
|
Sir please find the attachments.
|
|
24
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
30/05/2016
|
Sir, Please receive information of the proposal.
|
|
25
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
07/06/2016
|
the hard copy of the proposal is not submitted yet
|
|
26
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
08/06/2016
|
the hard copy of the proposal is not submitted yet
|
|
27
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
08/06/2016
|
The hard copy of proposals not submitted yet in the Nodal office dehradun please submitt the hard copy of proposals.
|
|
28
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
13/06/2016
|
The correction have been made as per the instruction received
|
|
29
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
13/06/2016
|
Sir
hard copy receiving letter attached herewith.
|
|
30
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
14/06/2016
|
Sir, Please receive information of the proaposal.
|
|
31
|
Regional Office
|
EDS
|
State secretary
|
23/06/2016
|
find the letter attached.
|
|
32
|
State secretary
|
EDS
|
Nodal Officer
|
24/06/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
33
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
24/06/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
34
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
25/06/2016
|
Please remove the objections.
|
|
35
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
29/06/2016
|
Please remove the objections.
|
|
36
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
14/07/2016
|
The correction have been made as per the instruction received
|
|
37
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
14/07/2016
|
Sir,
Please find attachment
|
|
38
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
18/07/2016
|
Sir, Please receive information of the proposal.
|
|
39
|
Nodal Officer
|
REPLY
|
State secretary
|
19/07/2016
|
Required documents uploaded for your further necessary action.
|
|
40
|
State secretary
|
REPLY
|
Regional Office
|
21/07/2016
|
Required documents uploaded for your further necessary action.
|
|
41
|
Regional Office
|
EDS
|
State secretary
|
03/08/2016
|
In the reply of the State Govt uploaded dated 21-07-2016 the following shortcomings are still remained.
1. In the DSS analysis the area calculated of revised shape file of area proposed for CA is comes 0.55 ha instead of 4.438 ha. The State Govt may provide revised KML file and GIS generated map of area 4.438 ha and upload the same in designated place in online Part II.
|
|
42
|
State secretary
|
EDS
|
Nodal Officer
|
05/08/2016
|
Plz reply to obj of RO-In the reply of the State Govt uploaded dated 21-07-2016 the following shortcomings are still remained. 1. In the DSS analysis the area calculated of revised shape file of area proposed for CA is comes 0.55 ha instead of 4.438 ha. The State Govt may provide revised KML file and GIS generated map of area 4.438 ha and upload the same in designated place in online Part II.
|
|
43
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
06/08/2016
|
Plz reply to obj of RO-In the reply of the State Govt uploaded dated 21-07-2016 the following shortcomings are still remained. 1. In the DSS analysis the area calculated of revised shape file of area proposed for CA is comes 0.55 ha instead of 4.438 ha. The State Govt may provide revised KML file and GIS generated map of area 4.438 ha and upload the same in designated place in online Part II.
|
|
44
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
07/08/2016
|
Plz reply to obj of RO-In the reply of the State Govt uploaded dated 21-07-2016 the following shortcomings are still remained. 1. In the DSS analysis the area calculated of revised shape file of area proposed for CA is comes 0.55 ha instead of 4.438 ha. The State Govt may provide revised KML file and GIS generated map of area 4.438 ha and upload the same in designated place in online Part II.
|
|
45
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
08/08/2016
|
Plz reply to obj of RO-In the reply of the State Govt uploaded dated 21-07-2016 the following shortcomings are still remained. 1. In the DSS analysis the area calculated of revised shape file of area proposed for CA is comes 0.55 ha instead of 4.438 ha. The State Govt may provide revised KML file and GIS generated map of area 4.438 ha and upload the same in designated place in online Part II.
|
|
46
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
03/09/2016
|
The correction have been made as per the instruction received
|
|
47
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
14/09/2016
|
Sir,Please find the attachment.
|
|
48
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
16/09/2016
|
Sir, Please receive information of the proposal.
|
|
49
|
Nodal Officer
|
REPLY
|
State secretary
|
21/09/2016
|
Required documents uploaded for your further necessary action.
|
|
50
|
State secretary
|
REPLY
|
Regional Office
|
27/09/2016
|
Required documents uploaded for your further necessary action.
|
|
51
|
Regional Office
|
EDS
|
State secretary
|
10/10/2016
|
State Govt. may attend to the shortcomings mentioned in the attached document.
|
|
52
|
State secretary
|
EDS
|
Nodal Officer
|
13/10/2016
|
State Govt. may attend to the shortcomings mentioned in the attached document.
|
|
53
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
21/10/2016
|
State Govt. may attend to the shortcomings mentioned in the attached document.
|
|
54
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
22/10/2016
|
Please remove the objetions
|
|
55
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
24/10/2016
|
please remove the objections.
|
|
56
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
11/11/2016
|
The correction have been made as per the instruction received
|
|
57
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
16/11/2016
|
Please your letter with enclosure attached online Part I additional information.
|
|
58
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
29/12/2016
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
31/12/2016
|
Sir, Please find the attachment.
|
|
60
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
04/01/2017
|
Sir, Please receive information of the proposal.
|
|
61
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
07/01/2017
|
find the letter attached
|
|
62
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
07/01/2017
|
Please remove the objections
|
|
63
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
09/01/2017
|
please remove objection.
|
|
64
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
09/01/2017
|
The correction have been made as per the instruction received
|
|
65
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
20/03/2017
|
your instruction received letter not satisfy. please give your answer attached part I additional information upload.
|
|
66
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
11/06/2017
|
The correction have been made as per the instruction received
|
|
67
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
12/06/2017
|
Please remove the objection. soft copy send your emailid.
|
|
68
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
14/06/2017
|
Letter No. 3655/12-1 Date 14.06.2017
|
|
69
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
30/06/2017
|
find the letter attached
|
|
70
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
30/06/2017
|
Please remove the objections
|
|
71
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
05/07/2017
|
please remove the objection.
|
|
72
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
06/07/2017
|
The correction have been made as per the instruction received
|
|
73
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
12/07/2017
|
sir,
correction have been user agency. send your soft copy email id.
|
|
74
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
13/07/2017
|
208/12-1 Date 13.07.2017
|
|
75
|
Nodal Officer
|
REPLY
|
State secretary
|
01/08/2017
|
the asked queries have been corrected and attach herewith in Eds Letter column.
|
|
76
|
State secretary
|
REPLY
|
Regional Office
|
02/08/2017
|
the asked queries have been corrected and attach herewith in Eds Letter column.
|
|
77
|
Regional Office
|
EDS
|
State secretary
|
04/09/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
78
|
State secretary
|
EDS
|
Nodal Officer
|
11/09/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
79
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
11/09/2017
|
State Government may attend to the shortcomings mentioned in the attached document.
|
|
80
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
12/09/2017
|
Please remove the objection.
|
|
81
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
12/09/2017
|
Please remove the obejction.
|
|
82
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
10/09/2018
|
The correction have been made as per the instruction received
|
|
83
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
24/09/2018
|
Sir eds objection reply.
|
|
84
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
05/10/2018
|
Sir, Please receive information of the proposal.
|
|
85
|
Nodal Officer
|
REPLY
|
State secretary
|
15/10/2018
|
the asked queries have been corrected and attach herewith in Eds Letter column.
|
|
86
|
State secretary
|
REPLY
|
Regional Office
|
15/10/2018
|
the asked queries have been corrected and attach herewith in Eds Letter column.
|
|
87
|
Regional Office
|
EDS
|
State secretary
|
31/10/2018
|
State Govt. may attend the shortcomings as per attachment.
|
|
88
|
State secretary
|
EDS
|
Nodal Officer
|
31/10/2018
|
State Govt. may attend the shortcomings as per attachment.
|
|
89
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
02/11/2018
|
State Govt. may attend the following shortcomings as per attachment.
|
|
90
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
05/11/2018
|
Please remove the objection.
|
|
91
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
12/11/2018
|
Please remove the objection.
|
|
92
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
16/03/2019
|
The correction have been made as per the instruction received
|
|
93
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
26/04/2019
|
Please remove the objection.
|
|
94
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
04/05/2019
|
The correction have been made as per the instruction received
|
|
95
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
09/05/2019
|
Sir
User agency remove the objection.
|
|
96
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
17/06/2019
|
Sir, Please receive information of the proposal.
|
|
97
|
Nodal Officer
|
REPLY
|
State secretary
|
01/07/2019
|
The correction have been made as per the instruction received
|
|
98
|
State secretary
|
REPLY
|
Regional Office
|
02/07/2019
|
The correction have been made as per the instruction received
|
|
99
|
Regional Office
|
EDS
|
State secretary
|
22/07/2019
|
State Govt may attend the short comings as per the attachments
|
|
100
|
State secretary
|
EDS
|
Nodal Officer
|
23/07/2019
|
State Govt may attend the short comings as per the attachments
|
|
101
|
Nodal Officer
|
EDS
|
CF (Garhwal)
|
23/07/2019
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
102
|
CF (Garhwal)
|
EDS
|
DFO (Badrinath,Gopeshwar)
|
24/07/2019
|
please remove the objection
|
|
103
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
25/07/2019
|
please remove the objection.
|
|
104
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
16/10/2019
|
The correction have been made as per the instruction received
|
|
105
|
DFO (Badrinath,Gopeshwar)
|
EDS
|
User Agency (eepdpwdkpg@gmail.com)
|
20/11/2019
|
please remove the objection.
|
|
106
|
User Agency (eepdpwdkpg@gmail.com)
|
REPLY
|
DFO (Badrinath,Gopeshwar)
|
15/02/2020
|
The correction have been made as per the instruction received
|
|
107
|
DFO (Badrinath,Gopeshwar)
|
REPLY
|
CF (Garhwal)
|
11/03/2020
|
Sir EDS objection has been removed.
|
|
108
|
CF (Garhwal)
|
REPLY
|
Nodal Officer
|
05/05/2020
|
Sir Please received the information this proposal
|
|
109
|
Nodal Officer
|
REPLY
|
State secretary
|
09/05/2020
|
The correction have been made as per the instruction received
|
|
110
|
State secretary
|
REPLY
|
Regional Office
|
09/05/2020
|
The correction have been made as per the instruction received
|
|