| Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter | 
				| 1 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 28/12/2018 | Please find attachment. |   | 
				| 2 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 02/02/2019 | The correction have been made as per the instruction received |   | 
				| 3 | DFO (Ramgarh) | EDS | User Agency (sbhardwaj@powergridindia.com) | 05/02/2019 | Ltr No 354 dt- 05.02.19 |   | 
				| 4 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ramgarh) | 06/02/2019 | The correction have been made as per the instruction received |   | 
				| 5 | DFO (Ramgarh) | EDS | User Agency (sbhardwaj@powergridindia.com) | 07/02/2019 | Ltr No. 354 dt-05.02.19 |   | 
				| 6 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ramgarh) | 15/02/2019 | The correction have been made as per the instruction received |   | 
				| 7 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 16/02/2019 | Please follow the instruction and submit the report |   | 
				| 8 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 20/02/2019 | The correction have been made as per the instruction received |   | 
				| 9 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 21/02/2019 | Please submit required document as soon as possible |   | 
				| 10 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 26/02/2019 | The correction have been made as per the instruction received |   | 
				| 11 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 27/02/2019 | Report after compliance. |   | 
				| 12 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 28/02/2019 | The correction have been made as per the instruction received |   | 
				| 13 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 01/03/2019 | Report after compliance. |   | 
				| 14 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 09/03/2019 | Please follow the instruction and submit the report |   | 
				| 15 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 29/05/2019 | The correction have been made as per the instruction received |   | 
				| 16 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 29/05/2019 | The correction have been made as per the instruction received |   | 
				| 17 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 30/05/2019 | It is requested to submit the documents sought in attached letter and submit compliance. |   | 
				| 18 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 06/06/2019 | The correction have been made as per the instruction received |   | 
				| 19 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 07/06/2019 | Site inspection date 11.06.2019 and 12.06.2019 |   | 
				| 20 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 10/06/2019 | The correction have been made as per the instruction received |   | 
				| 21 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 11/06/2019 | Submit proposal after site inspection. |   | 
				| 22 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 15/06/2019 | The correction have been made as per the instruction received |   | 
				| 23 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 16/06/2019 | In the list of villages shown in Part-I of the proposal the name of village Jalta is missing. It is requested to rectify the Part-I of the proposal and submit the proposal accordingly. |   | 
				| 24 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 17/06/2019 | The correction have been made as per the instruction received |   | 
				| 25 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 20/06/2019 | Please follow the instruction and submit the report |   | 
				| 26 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 12/07/2019 | The correction have been made as per the instruction received |   | 
				| 27 | CF (Ranchi) | EDS | DFO (Ranchi) | 15/07/2019 | As requested by Assistant clerk Arbaz, this project is being send back for further updation by the Ranchi Div. |   | 
				| 28 | DFO (Ranchi) | REPLY | CF (Ranchi) | 15/07/2019 | Correction has been made |   | 
				| 29 | CF (Ranchi) | EDS | DFO (Ranchi) | 31/07/2019 | Returned back again to Ranchi div as requested by the div staff |   | 
				| 30 | DFO (Ranchi) | REPLY | CF (Ranchi) | 01/08/2019 | Compliance has been made. |   | 
				| 31 | CF (Ranchi) | EDS | DFO (Ranchi) | 14/08/2019 | Proposal is being sent for compliance of the points raised by CF Ranchi |   | 
				| 32 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 28/08/2019 | Proposal is being sent for compliance of the points raised by CF Ranchi |   | 
				| 33 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 26/02/2020 | The correction have been made as per the instruction received |   | 
				| 34 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 26/02/2020 | Revised Land Schedule of Village-Belgara and Nindra has uploaded |   | 
				| 35 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 26/02/2020 | The correction have been made as per the instruction received |   | 
				| 36 | DFO (Ranchi) | REPLY | CF (Ranchi) | 26/02/2020 | correction has been made.revised Land Schedule of village Belgara and Nindra has been attached |   | 
				| 37 | CF (Ranchi) | EDS | DFO (Ranchi) | 02/03/2020 | Hard copy of proposal has not been sent. 
Please send the proposal in seven copies at earliest. |   | 
				| 38 | DFO (Ranchi) | REPLY | CF (Ranchi) | 04/03/2020 | Hard copy ofProposal has been sent |   | 
				| 39 | CF (Ranchi) | EDS | DFO (Ranchi) | 04/03/2020 | On request the proposal is send back for correction |   | 
				| 40 | DFO (Ranchi) | REPLY | CF (Ranchi) | 04/03/2020 | correction made |   | 
				| 41 | State secretary | EDS | Nodal Officer | 10/06/2020 | replay of query raised by  GoJ on 10 pts has been sought. |   | 
				| 42 | Nodal Officer | EDS | CF (Bokaro) | 17/12/2020 | Please take note on EDS by Nodal Officer |   | 
				| 43 | CF (Bokaro) | EDS | DFO (Ramgarh) | 26/12/2020 | Please Kindly resolve the issue at the earliest so that the aforesaid proposal can be processed further. |   | 
				| 44 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 05/01/2021 | Raised query is not related with this division. |   | 
				| 45 | CF (Bokaro) | REPLY | Nodal Officer | 07/01/2021 | Raised query is not related to this circle. |   | 
				| 46 | Nodal Officer | EDS | CF (Ranchi) | 07/01/2021 | Please take note on EDS |   | 
				| 47 | CF (Ranchi) | EDS | DFO (Ranchi) | 07/01/2021 | Please take required action. |   | 
				| 48 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 08/01/2021 | Please update village wise land details/schedule and submit Form A in the Divisional Office |   | 
				| 49 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 28/01/2021 | The correction have been made as per the instruction received |   | 
				| 50 | DFO (Ranchi) | REPLY | CF (Ranchi) | 18/02/2021 | correction has been made |   | 
				| 51 | CF (Ranchi) | REPLY | Nodal Officer | 03/03/2021 | Queries answered by the DFO is being forwarded |   | 
				| 52 | Nodal Officer | REPLY | State secretary | 01/04/2021 | EDS Reply |   | 
				| 53 | State secretary | EDS | Nodal Officer | 15/06/2021 | Comment of CWLW and signed copy of Part-III has been sought. |   | 
				| 54 | Nodal Officer | EDS | CF (Ranchi) | 22/06/2021 | Please take note on EDS by GOJ |   | 
				| 55 | CF (Ranchi) | REPLY | Nodal Officer | 22/06/2021 | Revised Part III of the project submitted by the DFO, Ranchi is being submitted herewith. |   | 
				| 56 | Nodal Officer | EDS | CF (Bokaro) | 25/06/2021 | Online signed copy of Part I, and part II is also to be uploaded as PDF file on the part of user agency and DFO concerned, as additional information. Part I and Part II Form is attached as PDF file. |   | 
				| 57 | Nodal Officer | EDS | CF (Daltonganj) | 25/06/2021 | Online signed copy of Part I, and part II is also to be uploaded as PDF file on the part of user agency and DFO concerned, as additional information. Part I and Part II Form is attached as PDF file. |   | 
				| 58 | Nodal Officer | EDS | CF (Ranchi) | 25/06/2021 | Online signed copy of Part I, and part II is also to be uploaded as PDF file on the part of user agency and DFO concerned, as additional information. Part I and Part II Form is attached as PDF file. |   | 
				| 59 | CF (Bokaro) | EDS | DFO (Ramgarh) | 29/06/2021 | Online signed copy of Part I, and part II is also to be uploaded as PDF file on the part of user agency and DFO concerned, as additional information. Part I and Part II Form is attached as PDF file. |   | 
				| 60 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 09/07/2021 | Raised query is not related with this division. |   | 
				| 61 | CF (Ranchi) | EDS | DFO (Ranchi) | 09/07/2021 | Queries to be answered by the division |   | 
				| 62 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 09/07/2021 | Please upload form A |   | 
				| 63 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 09/07/2021 | The correction have been made as per the instruction received |   | 
				| 64 | DFO (Ranchi) | REPLY | CF (Ranchi) | 09/07/2021 | Part 2 and form A upload |   | 
				| 65 | CF (Ranchi) | EDS | DFO (Ranchi) | 09/07/2021 | Part I & Part II form is being sent to be filled up by the concerned authority. |   | 
				| 66 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 10/07/2021 | Please upload part 1 |   | 
				| 67 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 29/07/2021 | The correction have been made as per the instruction received |   | 
				| 68 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 04/08/2021 | Please update part 1 in division wise area |   | 
				| 69 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 05/08/2021 | The correction have been made as per the instruction received |   | 
				| 70 | DFO (Ranchi) | REPLY | CF (Ranchi) | 11/08/2021 | Compliance has been made and attached as additional document |   | 
				| 71 | CF (Ranchi) | REPLY | Nodal Officer | 11/08/2021 | Compliance made by DFO Ranchi is being forwarded to ED Nodal |   | 
				| 72 | CF (Daltonganj) | EDS | DFO (Latehar) | 16/08/2021 | Online signed copy of Part I, and part II is also to be uploaded as PDF file on the part of user agency and DFO concerned, as additional information. Part I and Part II Form is attached as PDF file. |   | 
				| 73 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 16/08/2021 | Please find attached letter no. 1101 dated 02.08.2021 |   | 
				| 74 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 17/08/2021 | The correction have been made as per the instruction received |   | 
				| 75 | DFO (Latehar) | EDS | User Agency (sbhardwaj@powergridindia.com) | 18/08/2021 | On the request of User Agency vide letter no. 92 dated 18/08/2021 the proposal is being sent back to User Agency for uploading all relevant documents. |   | 
				| 76 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Latehar) | 19/08/2021 | The correction have been made as per the instruction received |   | 
				| 77 | DFO (Latehar) | REPLY | CF (Daltonganj) | 19/08/2021 | Correction have been made as per the instruction received. |   | 
				| 78 | CF (Bokaro) | REPLY | Nodal Officer | 26/08/2021 | I agree with D.F.O., Ramgarh. The raised issue is not related to Bokaro Circle. |   | 
				| 79 | CF (Daltonganj) | REPLY | Nodal Officer | 26/08/2021 | sir, 
    Please see the attachment letter no.1165 dated 26.08.2021 |   | 
				| 80 | Nodal Officer | EDS | CF (Bokaro) | 06/09/2021 | Online duly signed copy of part II with mentioning Name, Designation of the signing authority and date of signature is not uploaded as PDF file on the part of DFO Ramgarh as additional information. Part II form is attached as PDF file. |   | 
				| 81 | CF (Bokaro) | EDS | DFO (Ramgarh) | 06/09/2021 | Please send immediate the compliance of query raised by the ED Nodal Officer. |   | 
				| 82 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 06/09/2021 | Part-II is submitted. |   | 
				| 83 | CF (Bokaro) | EDS | DFO (Ramgarh) | 06/09/2021 | Please submit a compliance properly. |   | 
				| 84 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 06/09/2021 | Part -II is submitted |   | 
				| 85 | CF (Bokaro) | REPLY | Nodal Officer | 06/09/2021 | Online copy of part II duly signed by Shri V.P.Kamboj, DFO, Ramgarh with Designation  and date of signature as additional Information has been uploaded as PDF file. |   | 
				| 86 | Nodal Officer | REPLY | State secretary | 07/09/2021 | EDS Reply |   | 
				| 87 | Regional Office | EDS | State secretary | 30/06/2022 | some query raised |   | 
				| 88 | State secretary | EDS | Nodal Officer | 01/08/2022 | Reply of query raised by GoI letter dated 29.06.2022 has been sought. |   | 
				| 89 | Nodal Officer | EDS | CF (Bokaro) | 02/08/2022 | Please take note on EDS by RO, Ranchi. |   | 
				| 90 | Nodal Officer | EDS | CF (Daltonganj) | 02/08/2022 | Please take note on EDS by RO, Ranchi. |   | 
				| 91 | Nodal Officer | EDS | CF (Ranchi) | 02/08/2022 | Please take note on EDS by RO, Ranchi. |   | 
				| 92 | CF (Ranchi) | EDS | DFO (Ranchi) | 03/08/2022 | EDS raised by IRO, Ranchi to be answered |   | 
				| 93 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 04/08/2022 | Please compliance soon |   | 
				| 94 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 23/08/2022 | The correction have been made as per the instruction received |   | 
				| 95 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 23/08/2022 | Please upload correct area of 51.937 Kml file |   | 
				| 96 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 26/08/2022 | The correction have been made as per the instruction received |   | 
				| 97 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 22/09/2022 | Please upload revised kml of forest land as well as non forest land |   | 
				| 98 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 29/09/2022 | The correction have been made as per the instruction received |   | 
				| 99 | DFO (Ranchi) | REPLY | CF (Ranchi) | 17/11/2022 | Correction have been made as per instrution received |   | 
				| 100 | CF (Ranchi) | REPLY | Nodal Officer | 23/11/2022 | Raised Queries answerd by DFO Ranchi is being forwarded. |   | 
				| 101 | CF (Bokaro) | EDS | DFO (Ramgarh) | 12/12/2022 | Please sent compliance of letter no. 610 dated 07.07.2022 of ED-cum-PCCF, WLDB,Jharkhand, Ranchi. |   | 
				| 102 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 14/12/2022 | Compliance is being submitted. |   | 
				| 103 | CF (Daltonganj) | REPLY | Nodal Officer | 21/12/2022 | N. A. |   | 
				| 104 | CF (Bokaro) | REPLY | Nodal Officer | 22/12/2022 | KML File is uploaded in parivesh portal. |   | 
				| 105 | Nodal Officer | EDS | CF (Bokaro) | 05/01/2023 | Please take note on EDS by Nodal Office. |   | 
				| 106 | Nodal Officer | EDS | CF (Daltonganj) | 05/01/2023 | Please take note on EDS by Nodal Office. |   | 
				| 107 | Nodal Officer | EDS | CF (Ranchi) | 05/01/2023 | Please take note on EDS by Nodal Office. |   | 
				| 108 | CF (Bokaro) | EDS | DFO (Ramgarh) | 06/01/2023 | Please send compliance as soon as possible.. |   | 
				| 109 | CF (Ranchi) | EDS | DFO (Ranchi) | 11/01/2023 | EDS by Nodal to be answered by DFO, Ranchi |   | 
				| 110 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 11/01/2023 | Please upload correct area in kml as per letter attached |   | 
				| 111 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 20/02/2023 | The correction have been made as per the instruction received |   | 
				| 112 | DFO (Ranchi) | EDS | User Agency (sbhardwaj@powergridindia.com) | 11/03/2023 | Please compliance as per letter attached |   | 
				| 113 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ranchi) | 13/03/2023 | The correction have been made as per the instruction received |   | 
				| 114 | DFO (Ramgarh) | EDS | User Agency (sbhardwaj@powergridindia.com) | 18/03/2023 | Letter is being enclosed. |   | 
				| 115 | User Agency (sbhardwaj@powergridindia.com) | REPLY | DFO (Ramgarh) | 13/04/2023 | The correction have been made as per the instruction received |   | 
				| 116 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 19/04/2023 | Reply of the query is being submitted. |   | 
				| 117 | DFO (Ranchi) | REPLY | CF (Ranchi) | 29/04/2023 | The correction have been made as per the instruction received |   | 
				| 118 | CF (Bokaro) | REPLY | Nodal Officer | 10/05/2023 | Compliance has been done. |   | 
				| 119 | CF (Ranchi) | REPLY | Nodal Officer | 12/05/2023 | EDS complied by DFO Ranchi is being forwarded. |   | 
				| 120 | CF (Daltonganj) | REPLY | Nodal Officer | 17/05/2023 | Query made regarding the mismatch of area reported and the area calculated from the kml file uploaded for the CA land has been rectified by the User Agency and the same is uploaded. |   | 
				| 121 | Nodal Officer | REPLY | State secretary | 29/05/2023 | EDS Reply |   | 
				| 122 | State secretary | EDS | Nodal Officer | 29/05/2023 | Please upload the issued letter. |   | 
				| 123 | Nodal Officer | REPLY | State secretary | 29/05/2023 | EDS Reply |   | 
				| 124 | State secretary | REPLY | Regional Office | 22/06/2023 | Reply of query raised by GoI letter dated 29.06.2022 is being submitted. |   | 
				| 125 | Regional Office | EDS | State secretary | 21/07/2023 | Some Quarry Raised |   | 
				| 126 | State secretary | EDS | Nodal Officer | 10/08/2023 | Reply of query raised by GoI letter dated 20.07.2023 has been sought. |   | 
				| 127 | Nodal Officer | EDS | CF (Bokaro) | 17/08/2023 | Please take note on EDS by IRO, Ranchi. |   | 
				| 128 | Nodal Officer | EDS | CF (Daltonganj) | 17/08/2023 | Please take note on EDS by IRO, Ranchi. |   | 
				| 129 | Nodal Officer | EDS | CF (Ranchi) | 17/08/2023 | Please take note on EDS by IRO, Ranchi. |   | 
				| 130 | CF (Bokaro) | EDS | DFO (Ramgarh) | 22/08/2023 | It is requested that it should be ensured to make available the report as soon as possible. |   | 
				| 131 | DFO (Ramgarh) | EDS | User Agency (pgcilljcptl@gmail.com) | 30/08/2023 | Letter is being enclosed |   | 
				| 132 | User Agency (pgcilljcptl@gmail.com) | REPLY | DFO (Ramgarh) | 28/11/2023 | The correction have been made as per the instruction received |   | 
				| 133 | DFO (Ramgarh) | EDS | User Agency (pgcilljcptl@gmail.com) | 30/05/2024 | Letter is being attached. |   | 
				| 134 | User Agency (pgcilljcptl@gmail.com) | REPLY | DFO (Ramgarh) | 16/05/2025 | The correction have been made as per the instruction received |   | 
				| 135 | CF (Ranchi) | EDS | DFO (Ranchi) | 06/06/2025 | As per your request regarding change in Area, returning the proposal back to Ranchi division. |   | 
				| 136 | DFO (Ranchi) | EDS | User Agency (pgcilljcptl@gmail.com) | 06/06/2025 | With reference to your letter no. 85 dated 29-05-2025, it is understood that the diversion proposal needs to be altered/amended at your end. This is because the land schedule has changed and hence the mandatory documents like revised and countersigned land schedule, tree enumeration lists, NOC for JJ land, etc has to be re-done at your end.
      Hence, this proposal is being directed to you for the necessary corrections. |   | 
				| 137 | User Agency (pgcilljcptl@gmail.com) | REPLY | DFO (Ranchi) | 07/06/2025 | The correction have been made as per the instruction received |   | 
				| 138 | DFO (Ramgarh) | EDS | User Agency (pgcilljcptl@gmail.com) | 12/07/2025 | Letter is being attached. |   | 
				| 139 | User Agency (pgcilljcptl@gmail.com) | REPLY | DFO (Ramgarh) | 16/07/2025 | The correction have been made as per the instruction received |   | 
				| 140 | DFO (Ramgarh) | EDS | User Agency (pgcilljcptl@gmail.com) | 23/07/2025 | Please Change Justification and Topo sheet map and put in right place not in as additional document. |   | 
				| 141 | User Agency (pgcilljcptl@gmail.com) | REPLY | DFO (Ramgarh) | 25/07/2025 | The correction have been made as per the instruction received |   | 
				| 142 | CF (Daltonganj) | EDS | DFO (Latehar) | 23/08/2025 | Incomplete Form-A, Part-1 Please apply with complete details. |   | 
				| 143 | DFO (Latehar) | EDS | User Agency (pgcilljcptl@gmail.com) | 23/08/2025 | Please compliance letter no. 1906 dated 02.08.2025 |   | 
				| 144 | User Agency (pgcilljcptl@gmail.com) | REPLY | DFO (Latehar) | 29/08/2025 | The correction have been made as per the instruction received |   | 
				| 145 | DFO (Latehar) | REPLY | CF (Daltonganj) | 26/09/2025 | The correction have been made as per the instruction received. |   | 
				| 146 | CF (Daltonganj) | EDS | DFO (Latehar) | 03/10/2025 | Incomplete Form-A, Part-2 Please apply with complete details. |   | 
				| 147 | DFO (Latehar) | REPLY | CF (Daltonganj) | 03/10/2025 | The correction have been made as per the instruction received. |   | 
				| 148 | DFO (Ramgarh) | EDS | User Agency (pgcilljcptl@gmail.com) | 04/10/2025 | Please reply to EDS raised by Ministry via letter no-1291 dated 20.07.2023 and also as CA cost has increased, please modify the cost benefit analysis report if possible in part-I, otherwise attach it as additional document in EDS reply. |   | 
				| 149 | User Agency (pgcilljcptl@gmail.com) | REPLY | DFO (Ramgarh) | 04/10/2025 | The correction have been made as per the instruction received |   | 
				| 150 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 05/10/2025 | Point wise reply to EDS and corresponding changes in Part-I and  Part-II has been done. |   | 
				| 151 | DFO (Ranchi) | REPLY | CF (Ranchi) | 08/10/2025 | Revised part-2 has  been updated and resubmitted as per the new revised area. |   | 
				| 152 | CF (Daltonganj) | EDS | DFO (Latehar) | 13/10/2025 | The correction have been made as per the instruction received. |   | 
				| 153 | DFO (Latehar) | REPLY | CF (Daltonganj) | 13/10/2025 | Correction have been made. |   | 
				| 154 | CF (Daltonganj) | REPLY | Nodal Officer | 13/10/2025 | Correction have been made. |   | 
				| 155 | CF (Bokaro) | EDS | DFO (Ramgarh) | 22/10/2025 | In part of 2 point no-3 information regarding “district wise area to be diverted “ has not been provided |   | 
				| 156 | DFO (Ramgarh) | REPLY | CF (Bokaro) | 22/10/2025 | Change has been done. |   | 
				| 157 | CF (Bokaro) | REPLY | Nodal Officer | 22/10/2025 | The report is being sent to this office letter no-723 Dt.-21/10/2025 |   |